This is a Request for Proposals (RFP) for the rehabilitation of the Polebridge Water System at Glacier National Park in Montana.
The Government seeks a firm-fixed price construction contract to rehabilitate the water system serving the Polebridge Ranger Station Area. The scope includes construction of a new infiltration gallery, water storage tank, and water main or service lines to connect four housing units and two administrative buildings to the potable water service. Work also encompasses installation of a programmable logic controller, pump control panel, pump protection system, tank monitoring system, and fiber optic lines to five buildings. The project is set aside as a Total Small Business set-aside, with a NAICS code of 237110 and a size standard of $45 million. The contract magnitude is between $1 million and $5 million. Offerors must be registered in the System for Award Management (SAM) with an "active" status and must maintain small business certification throughout contract performance. Proposals are due by August 14, 2026 at 1:00 p.m. local time, with a 120-day Government acceptance period. The contractor must commence work within 10 calendar days of receiving notice to proceed and complete all work within 274 calendar days. Performance and payment bonds are required within 10 calendar days of award, each in an amount equal to 100 percent of the contract price. An organized site visit is scheduled for July 27, 2026 at the Polebridge Ranger Station. Proposals must be submitted in two volumes: Volume I (non-price, addressing past performance, project experience, key personnel, schedule, and safety) and Volume II (price proposal). Award will be made on a best-value basis considering technical merits, performance risk, and price, without numerical scoring or predetermined weighting.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P1426R0013
NPS, IMR - Northern Rockies MABO PO Box 168 Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
Stacy_Vallie@ios.doi.gov
0044034569
PIR
Stacy Vallie 4064044167
07/15/2026
08/14/2026
10 274 FAR Clause 52.211-10
Project Name: Rehabilitate Polebridge Water System, Glacier National Park, PMIS: GLAC 329234B
Type of Contract: Firm Fixed Price Construction Contract
Magnitude (FAR 36.204): Between $1,000,000 and $5,000,000
Set-Aside: Total Small Business
NAICS CODE: 237110
SIZE STANDARD: $45M
The Government contemplates award of a firm-fixed price contract resulting from this solicitation.
See Section L "Instructions, Conditions and Notices to Offerors" for proposal submission specifics.
Continued...
1 60
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, IMR - Northern Rockies MABO PO Box 168 Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
PIR
Stacy Vallie
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P1426R0013
Questions shall be submitted in writing to
Stacy_Vallie@ios.doi.gov no later than 5 business days prior to the solicitation close date. No phone calls please.
Delivery: 06/21/2027
Delivery Location Code: 0011286207
NPS. Glacier NP
61 Scoyen Circle
West Glacier MT 59936 US
Period of Performance: 09/21/2026 to
06/21/2027
00010 Water System Improvements
SUBCLIN# TITLE QTY UNIT
10.1 Distribution System 1 LS
10.2 Infiltration System 1 LS
10.3 Water Tank 1 LS
10.4 Control System 1 LS
Product/Service Code: Y1NE
Product/Service Description: CONSTRUCTION OF
WATER SUPPLY FACILITIES
00020 Fiber Optics
Product/Service Code: Y1NZ
Product/Service Description: CONSTRUCTION OF
OTHER UTILITIES
PART I – THE SCHEDULE
SECTION A – SOLICITATION/CONTRACT FORM
This is a Request for Proposals (RFP), in accordance with the Specifications and Drawings and is issued on Standard Form (SF) SF1442 in the preceding pages.
The Government will evaluate all Proposals in an impartial manner and consideration will be given to those with the highest perceived value to the government based on responses to the evaluation factors identified in Section M.
In accordance with FAR Part 15 and FAR Part 36, a price evaluation will be performed to determine the reasonableness of the proposed price. Reasonableness will be determined considering other competitive prices received and comparison to the Independent Government Cost Estimate.
(END OF SECTION A)
SECTION B – SERVICES AND PRICES
Proposal pricing shall be provided in accordance with Section L and is incorporated herein. The contractor must furnish an itemized breakdown. Offerors shall use the Price Schedule provided as an attachment.
Project Title: Rehabilitate the Polebridge Area Water System Location: Glacier National Park Solicitation No.: 140P1426R0013 Park – PMIS NO.: GLAC – 329234B
CONTRACT PRICE SCHEDULE
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
SCHEDULE OF BASE ITEMS
CLIN
SUB
CLIN# TITLE QTY UNIT Unit Price Total Price
10 Water System Improvements
10.1 Distribution System 1 LS
10.2 Infiltration Gallery 1 LS
10.3 Water Tank 1 LS
10.4 Control System 1 LS
20 Fiber Optics 1 LS
TOTAL PROPOSED PRICE (SUB CLINs 10.1 - 10.4 and 20):
(End of clause)
(END OF SECTION B)
SECTION C – SPECIFICATIONS/DRAWINGS
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov.
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (May 2024) -DEVIATION (Feb 2025)
52.223-23 Sustainable Products and Services (MAY 2024) - DEVIATION (May 2026)
Description of Work:
All field work is located in the Polebridge Ranger Station Area, located in Glacier National Park’s northwest corner, approximately 1.0 miles from Polebridge, Montana.
Work generally consists of construction of a new public water system that includes a new infiltration gallery, new water storage tank, and new water main or service lines to service area buildings. Four housing units and two administrative buildings will be connected to the new potable water service.
A new programmable logic controller, pump control panel, pump protection system, and tank monitoring system will be installed. The chlorination treatment system will remain unchanged. Work also includes the installation of fiber optic lines to five buildings. Refer to the attached Civil Plans.
1452.236-70 Prohibition Against Use of Lead-based Paint - Department of the Interior (Jul 1996)
Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.
(End of clause)
(END OF SECTION C)
http://www.acquisition.gov/
SECTION D - PACKAGING AND MARKING
Contractor initiated correspondence and submittals shall identify the task order number and the associated contract number. Task order requirements will be detailed at the task order level, but correspondence includes the Submittal Register and Construction Schedule/Reports. Submittals shall be submitted to the Contracting Officer's Representative (COR) and copied to the task order CO. If hard copies are required, specific task order documentation or meetings will detail submission addresses.
(END OF SECTION D)
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction (Aug 1996)
(a) Definition."Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this-section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.
The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may-
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(END OF SECTION E)
SECTION F – PERFORMANCE
Work shall be completed by skilled personnel per industry standards and manufacturer specifications.
52.211-10 Commencement, Prosecution, and Completion or Work (Apr 1984)
The Contractor shall be required to:
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 274 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.236-15 Schedules for Construction Contracts (Apr 1984) - DEVIATION (Jan 2026)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of clause)
52.242-14 Suspension of Work (Apr 1984)
The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1)by an act of the Contracting Officer in the administration of this contract, or (2)by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.
However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed-
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(END OF SECTION F)
SECTION G – CONTRACT ADMINISTRATION DATA
1. CONTRACT REPRESENTATIVES:
Contracting Officer (CO):
Stacy Vallie Stacy_Vallie@ios.doi.gov
Contracting Officer’s Representative (COR):
Kirby Granite Kirby_Granite@nps.gov
2. JOB SITE ADMINISTRATION
The Government’s designated COR will be available at the site to inspect the work as it progresses. The COR will prepare a Daily Log, beginning with the first day of the contract, detailing ground and weather conditions, work being performed, materials delivered, and notes of any problems or difficulties. Government inspections do not relieve the Contractor of responsibility for providing adequate quality control measures. At the end of every day of work on this contract, The Contractor’s Superintendent, as defined below, shall contact the COR to review the daily log, and sign as the Contractor’s representative. Unless the Contractor’s Superintendent makes a contrary notation on the daily log, the log shall be presumed to be accurate for recording daily inspections and conditions, work accomplished, and notations of any issues as described above. In accordance with FAR 22.406.7(4) regular compliance checks may include comparison to daily inspector’s reports and daily logs of construction to ensure consistency in meeting compliance requirements.
Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed at bringing all such contractual problems to the immediate attention of the CO.
The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor affects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. All field changes must be approved by the CO prior to execution.
All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
3. FINAL PAYMENT
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
mailto:Stacy_Vallie@ios.doi.gov
4. AVAILABILITY OF UTILITIES SERVICES
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonably required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
5. UTILITIES CONSERVATION
The contractor will be required to participate in government energy conservation programs. For this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
6. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS
The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.
7. INTERIM AND FINAL INSPECTIONS
i. Prior to covering, enclosing, or hiding any of type work, the Contractor must contact the Government representative to perform an interim inspection. Failure to contact the Government representative to perform an interim inspection prior to concealment may result in the Contractor being required to uncover performed work sufficiently to allow for proper inspection.
ii. When ready for final inspection, the Contractor shall notify the CO and COR, requesting a final inspection in writing to the CO. The final inspection shall normally be requested a minimum of three (3) calendar days before the desired date or as otherwise negotiated with the Contracting Officer.
iii. The final inspection will be onsite with the Contractor, the Contracting Officer’s Representative, and Contract Specialist/Contracting Officer (when possible).
8. CONSTRUCTION CONTRACT ADMINISTRATION
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
DOI AAAP-0050 Notice to Contractors - Contractor Performance Assessment Reporting System (Dec 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes. 7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of notice)
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
https://www.cpars.gov/ https://www.cpars.gov/
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
The contractor shall submit a draft Invoice Package, including copies of the following documents, to the National Park Service’s (NPS) Contracting Officer’s Representative (COR) and Contract Specialist (CS) a minimum of 5 working days prior to submittal of the formal Invoice through IPP. Within 5 working days of receipt, the COR shall provide an acceptability recommendation to both the NPS CS and the contractor. If the COR recommends acceptance, the contractor shall submit a copy of the final version of the checklist and the Invoice Package to the NPS through IPP.
1. Completed copy of the COR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP).
2. Completed copy of the Pay Estimate Form (including signed certification of subcontractor payments).
3. Completed copy of the Limitations on Subcontracting Report.
4. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts.
5. A copy of the current construction schedule (refer to project specification section 013216).
6. A copy of the current Schedule of Values. (refer to project specification section 013216).
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(END OF SECTION G)
https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
SECTION H - SPECIAL CONTRACT REQUIREMENTS
KEY PERSONNEL (Contractor shall complete section (a) listing Key Personnel per their technical proposal)
(a) The Contractor shall list the Key Personnel assigned to the resultant contract:
Project Manager:
Site Superintendent:
On-site Quality Control Supervisor:
On-site Safety Supervisor:
(b) During the first 60 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 60-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.
(End of clause)
GREEN PROCUREMENT
To the extent that the construction services provided by the Contractor require provision of any of the types of products listed at https://sftool.gov/greenprocurement, the Contractor is expected to provide the green type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards.
(END OF SECTION H)
https://sftool.gov/greenprocurement
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
52.252-2 – Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at http://www.acquisition.gov.
52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or
Proposed for Debarment (Jan 2025) – DEVIATION (May 2026) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) –
DEVIATION (May 2026) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) – DEVIATION (May
2026) 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) – DEVIATION* 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) – DEVIATION (Jan 2026) 52.219-8 Utilization of Small Business Concerns (Jan 2025) – DEVIATION (Jan 2026) 52.219-28 Post-Award Small Business Program Rerepresentation (Jan 2025) - DEVIATION (Jan 2026) 52.222-3 Convict Labor (Jun 2003) – DEVIATION (Jun 2003) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (Mar 2018) – DEVIATION (May
2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) – DEVIATION (May 2026) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (Jul 2005) - DEVIATION (Feb 2025) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) – DEVIATION (May 2026) 52.222-12 Contract Termination-Debarment (MAY 2014) – DEVIATION (Feb 2025) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-35 Equal Opportunity for Veterans (Jun 2020) – DEVIATION (May 2026) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) – DEVIATION (May 2026) 52.222-37 Employment Reports on Veterans (Jun 2020) – DEVIATION (May 2026) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (Oct 2025) – DEVIATION (May 2026) 52.222-54 Employment Eligibility Verification (Jan 2025) – DEVIATION (May 2026) 52.222-55 Minimum Wages Under Executive Order 13658 (Jan 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) – DEVIATION (Jan 2022) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) – DEVIATION (May 2026) 52.225-9 Buy American – Construction Materials (Oct 2022) – DEVIATION* 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance - Work on Government Installation (Jan 1997) 52.228-11 Individual Surety - Pledges of Assets (Feb 2021) – DEVIATION (May 2023) 52.228-12 Prospective Subcontractor Request for Bonds (May 2014) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-16 Progress Payments (Nov 2021) – DEVIATION* 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.232-90 Fast Payment Procedures (May 2026) – DEVIATION* 52.233-1 Disputes (May 2014) – DEVIATION* 52.233-3 Protest after Award (Aug 1996) – DEVIATION* 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) – DEVIATION* 52.236-2 Differing Site Conditions (Apr 1984) – DEVIATION (Jan 2026) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) – DEVIATION (Jan 2026) 52.236-5 Material and Workmanship (Apr 1984) – DEVIATION (Jan 2026) 52.236-6 Superintendence by the Contractor (Apr 1984) – DEVIATION (Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) – DEVIATION (Jan 2026) 52.236-8 Other Contracts (Apr 1984) – DEVIATION (Jan 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) –
DEVIATION (Jan 2026) 52.236-10 Operations and Storage Areas (Apr 1984) – DEVIATION (Jan 2026) 52.236-11 Use and Possession Prior to Completion (Apr 1984) – DEVIATION (Jan 2026) 52.236-12 Cleaning Up (Apr 1984) – DEVIATION (Jan 2026) 52.236-13 Accident Prevention (Nov 1991) – DEVIATION (Jan 2026) 52.236-14 Availability and Use of Utility Services (Apr 1984) – DEVIATION (Jan 2026) 52.236-16 Quantity Surveys (Apr 1984) – DEVIATION (Jan 2026) 52.236-17 Layout of Work (Apr 1984) – DEVIATION (Jan 2026) 52.236-21 Specifications and Drawings for Construction (Feb 1997) – DEVIATION (Jan 2026) 52.236-26 Preconstruction Conference (Feb 1995) 52.240-92 Security Requirements (Aug 2025) – DEVIATION (Mar 2026) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Aug 2025) – DEVIATION (Mar
2026) 52.242-13 Bankruptcy (July 1995) 52.243-4 Changes (Jun 2007) – DEVIATION (Oct 2025) 52.244-5 Competition in Subcontracting (Dec 1996) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan 2025) –
DEVIATION (Feb 2025) 52.245-1 Government Property (Sep 2021) 52.245-9 Use and Charges (Apr 2012) 52.246-21 Warranty of Construction (Mar 1994)
52.248-3 Value Engineering-Construction (Oct 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - (ALT I) (Sept 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) – DEVIATION (Mar 2026)
CLAUSES INCORPORATED BY FULL TEXT
52.219-14 Limitations on Subcontracting (Oct 2022) - DEVIATION (Jan 2026)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition.
Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F);
or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 https://www.acquisition.gov/far/19.000#FAR_19_000 https://www.acquisition.gov/far/19.000#FAR_19_000 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505 https://www.acquisition.gov/far/19.504#FAR_19_504 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/19.504#FAR_19_504 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause— ☒ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.
Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)
(a) Definitions. As used in this clause-
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b)The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to Stacy_Vallie@ios.doi.gov.
(End of clause)
52.228-15 Performance and Payment Bonds-Construction (JUN 2020) – DEVIATION (May 2023)
(a)Definitions. As used in this clause- Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b)Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1)Performance bonds ( Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2)Payment Bonds ( Standard Form 25A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3)Additional bond protection.
(i)The Government may require additional performance and payment bond protection if the contract price is increased.
mailto:Stacy_Vallie@ios.doi.gov https://www.acquisition.gov/far/28.102-1#FAR_28_102_1 https://www.gsa.gov/forms-library/performance-bond https://www.gsa.gov/forms-library/payment-bond
The increase in protection generally will equal 100 percent of the increase in contract price.
(ii)The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c)Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer,…