This document is a comprehensive set of construction drawings for the Glacier National Park Rehabilitate Polebridge Water System project, prepared by the National Park Service Intermountain Region. The drawings include site plans, utility infrastructure improvements, demolition and reclamation plans, and detailed specifications for water distribution, storage, electrical, and communications systems.
The project encompasses rehabilitation of the water system serving Polebridge Ranger Station within Glacier National Park. Key construction components include: installation of a 14,000-gallon fiberglass water storage tank with associated overflow and drain systems; water supply lines and distribution lines with multiple valve locations and fire hydrants; a chlorination building with specialized equipment and piping; infiltration gallery with well infrastructure for water intake; electrical distribution with underground conduit banks, handholes, and dedicated panels for pump control and PLC operations; fiber optic and electrical communications conduits throughout the facility; erosion control measures including rolled erosion control blankets and straw wattles on slopes; staging areas for material and equipment storage; and comprehensive site restoration including vegetated area reclamation and gravel surface replacement. Design parameters specify water supply at 1.7 gallons per minute average instantaneous flow, 10 gallons per day average daily flow, and storage capacity of 14,000 gallons. All work must comply with applicable codes including 2023 NFPA standards, 2024 International Building Code, Montana Department of Transportation specifications, and relevant American Society standards. The drawings indicate specialized construction requirements for work within a World Heritage Site with strict environmental and archaeological monitoring protocols.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Docusign Envelope ID: 7E73CA1F-A891-8C95-8356-E0E49D41F272
4/23/2026
AutoCAD SHX Text
ST. MARY
AutoCAD SHX Text
BABB
AutoCAD SHX Text
WEST
AutoCAD SHX Text
GLACIER
AutoCAD SHX Text
ALBERTA
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
DUCK
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
BLACKFEET
AutoCAD SHX Text
HWY.
AutoCAD SHX Text
CARDSTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KIOWA
AutoCAD SHX Text
EAST
AutoCAD SHX Text
GLACIER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ESSEX
AutoCAD SHX Text
AutoCAD SHX Text
OLE CREEK
AutoCAD SHX Text
PARK
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
CUT BANK
AutoCAD SHX Text
WALTON
AutoCAD SHX Text
NYACK CREEK
AutoCAD SHX Text
HARRISON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text McDONALD
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LOGGING
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
QUARTZ
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
BOWMAN
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
CAMAS
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
ANACONDA
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
KINTLA
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
UPPER
AutoCAD SHX Text
WATERTON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
BRITISH COLUMBIA
AutoCAD SHX Text
MIDDLE
AutoCAD SHX Text
WATERTON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GLENNS
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
COSLEY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
BELLY
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GOAT
AutoCAD SHX Text
HAUNT
AutoCAD SHX Text
BELLY
AutoCAD SHX Text
RIVER
AutoCAD SHX Text V.C.
AutoCAD SHX Text
ST. MARY
AutoCAD SHX Text
ST. MARY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
TWO MEDICINE
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
TWO
AutoCAD SHX Text
MEDICINE
AutoCAD SHX Text
MANY
AutoCAD SHX Text
GLACIER
AutoCAD SHX Text
RISING SUN
AutoCAD SHX Text
LOGAN
AutoCAD SHX Text
PASS
AutoCAD SHX Text V.C.
AutoCAD SHX Text
SHERBURNE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
WEST
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
SPRAGUE
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
FISH CREEK
AutoCAD SHX Text
AVALANCHE
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
POLEBRIDGE
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
POLEBRIDGE
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
FALLS
AutoCAD SHX Text
BURLINGTON
AutoCAD SHX Text
NORTHERN
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
GLACIER COUNTY
AutoCAD SHX Text
PONDERA COUNTY
AutoCAD SHX Text
MIDDLE
AutoCAD SHX Text
FORK
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
WATERTON
AutoCAD SHX Text
LAKES
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
GOING-
AutoCAD SHX Text
TO-
AutoCAD SHX Text
THE-
AutoCAD SHX Text
SUN
AutoCAD SHX Text
FLATHEAD CO.
AutoCAD SHX Text
GLACIER CO.
AutoCAD SHX Text
CONTINENTAL
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
CONTINENTAL
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
NORTH FORK
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
ST. MARY RIVER
AutoCAD SHX Text
CHIEF MOUNTAIN
AutoCAD SHX Text
INTERNATIONAL
AutoCAD SHX Text
HWY.
AutoCAD SHX Text
HUNGRY
AutoCAD SHX Text
HORSE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
HUDSON
AutoCAD SHX Text
BAY
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
TO
AutoCAD SHX Text
KALISPELL,
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
TO
AutoCAD SHX Text
BROWNING,
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
LEWIS & CLARK
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text V.C.
AutoCAD SHX Text
APGAR
AutoCAD SHX Text
CAMAS CREEK
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
LOGGING
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
NORTH FORK RD.
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
PROVINCIAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
BLACKFEET
AutoCAD SHX Text
INDIAN
AutoCAD SHX Text
RESERVATION
AutoCAD SHX Text
HUDSON BAY
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
CUSTOMS
AutoCAD SHX Text
STATION
AutoCAD SHX Text
CUSTOMS
AutoCAD SHX Text
STATION
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
MANY
AutoCAD SHX Text
GLACIER
AutoCAD SHX Text
SWIFTCURRENT
AutoCAD SHX Text
TO
AutoCAD SHX Text
WHITEFISH,
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
CUSTOMS
AutoCAD SHX Text
STATION
AutoCAD SHX Text
LAKE
AutoCAD SHX Text McDONALD
AutoCAD SHX Text
LODGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
IDAHO
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
BRITISH COLUMBIA
AutoCAD SHX Text
ALBERTA
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
CARDSTON
AutoCAD SHX Text
GREAT
AutoCAD SHX Text
FALLS
AutoCAD SHX Text
KALISPELL
AutoCAD SHX Text
MISSOULA
AutoCAD SHX Text
HELENA
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
CONTINENTAL
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
GLACIER
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
ELKO
AutoCAD SHX Text
WATERTON
AutoCAD SHX Text
LAKES N.P.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF PROJECT
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
INTERMOUNTAIN REGION
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text
POLEBRIDGE RANGER STATION
AutoCAD SHX Text
FLATHEAD
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
CONSTRUCTION DRAWINGS
AutoCAD SHX Text
GLAC PMIS: 329234B
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
INTERMOUNTAIN
AutoCAD SHX Text
NORTHWEST
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 329234B
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
SCALE OF KILOMETERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLEASE CHECK WITH PARK OFFICIALS.
AutoCAD SHX Text
SOME ROADS ARE CLOSED IN WINTER;
AutoCAD SHX Text
ON GOING-TO-THE-SUN ROAD, AND
AutoCAD SHX Text
VEHICLE SIZE RESTRICTIONS EXIST
AutoCAD SHX Text
CAMPGROUND
AutoCAD SHX Text
PICNIC AREA
AutoCAD SHX Text
RANGER STATION
AutoCAD SHX Text
PARK HEADQUARTERS
AutoCAD SHX Text
VISITOR CENTER
AutoCAD SHX Text
HQ.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
STATE LINE
AutoCAD SHX Text
UNPAVED ROAD
AutoCAD SHX Text
COUNTY LINE
AutoCAD SHX Text
PAVED ROAD
AutoCAD SHX Text
PARK BOUNDARY
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WORLD HERITAGE SITE
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
UNESCO
AutoCAD SHX Text
QUALITY DESIGN CERTIFICATION
AutoCAD SHX Text
OR
AutoCAD SHX Text
OR
AutoCAD SHX Text Development (Title I)
AutoCAD SHX Text Prepared in Accordance with Design
AutoCAD SHX Text by Design Development (Title I)
AutoCAD SHX Text Construction Drawing Not Preceded
AutoCAD SHX Text Approved by Superintendent on
AutoCAD SHX Text Variance from Design Development (Title I)
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Sheet
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
A/E FIRM
AutoCAD SHX Text PRIME/CIVIL: NELSON ENGINEERING 430 S. CACHE STREET JACKSON, WY 83001 (307) 733-2087
AutoCAD SHX Text
THIS PROJECT
AutoCAD SHX Text
NOTE
AutoCAD SHX Text DRAWING INDEX SHEET SUB-SHEET TITLE OF SHEET SUB-SHEET TITLE OF SHEET TITLE OF SHEET GENERAL 1 COVER SHEET COVER SHEET 2 G1 GENERAL NOTES G1 GENERAL NOTES GENERAL NOTES 3 G2 LEGEND, SYMBOLS, & ABBREVIATIONS G2 LEGEND, SYMBOLS, & ABBREVIATIONS LEGEND, SYMBOLS, & ABBREVIATIONS 4 G3 EXISTING SITE & SURVEY CONTROL G3 EXISTING SITE & SURVEY CONTROL EXISTING SITE & SURVEY CONTROL 5 G4 DEMOLITION & RECLAMATION PLAN G4 DEMOLITION & RECLAMATION PLAN DEMOLITION & RECLAMATION PLAN 6 G5 STAGING AREAS G5 STAGING AREAS STAGING AREAS 7 G6 EROSION CONTROL PLAN G6 EROSION CONTROL PLAN EROSION CONTROL PLAN 8 G7 EXISTING CHLORINATION ROOM G7 EXISTING CHLORINATION ROOM EXISTING CHLORINATION ROOM CIVIL - WATER SYSTEM - WATER SYSTEM WATER SYSTEM 9 C1 WATER IMPROVEMENTS OVERVIEW C1 WATER IMPROVEMENTS OVERVIEW WATER IMPROVEMENTS OVERVIEW 10 C2 FIBER, BURIED ELECTRIC & COMMS PLAN C2 FIBER, BURIED ELECTRIC & COMMS PLAN FIBER, BURIED ELECTRIC & COMMS PLAN 11 C3 WATER SUPPLY TO CHLORINATION P&P 0+00 - 4+20 C3 WATER SUPPLY TO CHLORINATION P&P 0+00 - 4+20 WATER SUPPLY TO CHLORINATION P&P 0+00 - 4+20 12 C4 WATER SUPPLY TO TANK P&P 0+00 - 4+60 C4 WATER SUPPLY TO TANK P&P 0+00 - 4+60 WATER SUPPLY TO TANK P&P 0+00 - 4+60 13 C5 WATER SUPPLY TO TANK P&P 4+60 - 8+00 C5 WATER SUPPLY TO TANK P&P 4+60 - 8+00 WATER SUPPLY TO TANK P&P 4+60 - 8+00 14 C6 WATER SUPPLY TO TANK P&P 8+00 - 13+40 C6 WATER SUPPLY TO TANK P&P 8+00 - 13+40 WATER SUPPLY TO TANK P&P 8+00 - 13+40 15 C7 WATER DISTRIBUTION A P&P 0+00 - 5+20 C7 WATER DISTRIBUTION A P&P 0+00 - 5+20 WATER DISTRIBUTION A P&P 0+00 - 5+20 16 C8 WATER DISTRIBUTION A P&P 5+20 - 9+00 C8 WATER DISTRIBUTION A P&P 5+20 - 9+00 WATER DISTRIBUTION A P&P 5+20 - 9+00 17 C9 WATER DISTRIBUTION B P&P 0+00 - 4+60 C9 WATER DISTRIBUTION B P&P 0+00 - 4+60 WATER DISTRIBUTION B P&P 0+00 - 4+60 18 C10 WATER DISTRIBUTION B & C C10 WATER DISTRIBUTION B & C WATER DISTRIBUTION B & C 19 C11 WATER TANK SITE PLAN C11 WATER TANK SITE PLAN WATER TANK SITE PLAN 20 C12 DETAILS C12 DETAILS DETAILS 21 C13 DETAILS C13 DETAILS DETAILS 22 C14 DETAILS C14 DETAILS DETAILS 23 C15 DETAILS C15 DETAILS DETAILS 24 C16 DETAILS C16 DETAILS DETAILS CIVIL - INFILTRATION GALLERY - INFILTRATION GALLERY INFILTRATION GALLERY 25 C17 INFILTRATION GALLERY SITE PLAN C17 INFILTRATION GALLERY SITE PLAN INFILTRATION GALLERY SITE PLAN 26 C18 INFILTRATION GALLERY DETAILS C18 INFILTRATION GALLERY DETAILS INFILTRATION GALLERY DETAILS ELECTRICAL 27 E1 ELECTRICAL LEGEND, ABBREVIATIONS, & SYMBOLS E1 ELECTRICAL LEGEND, ABBREVIATIONS, & SYMBOLS ELECTRICAL LEGEND, ABBREVIATIONS, & SYMBOLS 28 E2 ELECTRICAL SITE PLAN E2 ELECTRICAL SITE PLAN ELECTRICAL SITE PLAN 29 E3 ENLARGED ELECTRICAL SITE PLAN E3 ENLARGED ELECTRICAL SITE PLAN ENLARGED ELECTRICAL SITE PLAN 30 E4 ENLARGED ELECTRICAL SITE PLAN E4 ENLARGED ELECTRICAL SITE PLAN ENLARGED ELECTRICAL SITE PLAN 31 E5 ENLARGED ELECTRICAL SITE PLAN E5 ENLARGED ELECTRICAL SITE PLAN ENLARGED ELECTRICAL SITE PLAN 32 E6 CHLORINATION BUILDING ELECTRICAL POWER PLANS E6 CHLORINATION BUILDING ELECTRICAL POWER PLANS CHLORINATION BUILDING ELECTRICAL POWER PLANS 33 E7 ELECTRICAL DETAILS E7 ELECTRICAL DETAILS ELECTRICAL DETAILS 34 E8 ELECTRICAL ONE-LINE DIAGRAM AND SCHEDULES E8 ELECTRICAL ONE-LINE DIAGRAM AND SCHEDULES ELECTRICAL ONE-LINE DIAGRAM AND SCHEDULES 35 E9 WELL PUMP MOTOR CONTROL SCHEMATICE9 WELL PUMP MOTOR CONTROL SCHEMATICWELL PUMP MOTOR CONTROL SCHEMATIC
DESIGN PARAMETERS
BUILDING INFORMATION
AutoCAD SHX Text
1.0 WILDLIFE 1. ALL CONTRACTORS AND SUBCONTRACTORS SHALL RECEIVE A TRAINING ON WORKING ALL CONTRACTORS AND SUBCONTRACTORS SHALL RECEIVE A TRAINING ON WORKING AROUND WILDLIFE, INCLUDING BEARS, PRIOR TO THE START OF WORK. COORDINATE WITH THE COR. ALL CONSTRUCTION PERSONNEL ARE REQUIRED TO FULLY UNDERSTAND AND ABIDE BY ALL PARK REQUIREMENTS, WHICH WILL BE STRICTLY ENFORCED AT ALL TIMES. FAILURE TO COMPLY MAY RESULT IN A CITATION AND FINE. A COPY OF BEAR, WILDLIFE, BEAR, WILDLIFE, AND SANITATION REQUIREMENTS WHILE WORKING IN GLACIER NATIONAL PARK WILL BE WILL BE PROVIDED TO THE CONTRACTOR. KEY POINTS OF THIS DOCUMENT INCLUDE: 1.1. FOOD HANDLING AND STORAGE FOOD HANDLING AND STORAGE 1.2. MATERIAL HANDLING AND STORAGE MATERIAL HANDLING AND STORAGE 1.3. PETROLEUM PRODUCT, ANTIFREEZE, AND CHEMICAL HANDLING AND STORAGE PETROLEUM PRODUCT, ANTIFREEZE, AND CHEMICAL HANDLING AND STORAGE 1.4. EQUIPMENT USE, MAINTENANCE, AND REFUELING EQUIPMENT USE, MAINTENANCE, AND REFUELING 1.5. SANITATION REQUIREMENTS, INCLUDING SITE CLEANLINESS, TRASH HANDLING AND SANITATION REQUIREMENTS, INCLUDING SITE CLEANLINESS, TRASH HANDLING AND DISPOSAL, AND PORTABLE TOILET REQUIREMENTS 1.6. WILDLIFE SAFETY AND POTENTIAL WILDLIFE INTERACTIONS WILDLIFE SAFETY AND POTENTIAL WILDLIFE INTERACTIONS 2.0 ARCHEOLOGICAL MONITORING 1. THE NPS ARCHEOLOGY & CULTURAL RESOURCES TEAM WILL MONITOR ALL GROUND THE NPS ARCHEOLOGY & CULTURAL RESOURCES TEAM WILL MONITOR ALL GROUND DISTURBING SITE WORK AND EXAMINE EXCAVATED MATERIALS IN ARCHEOLOGICALLY SENSITIVE AREAS. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF ALL GROUND DISTURBING ACTIVITIES AT LEAST TWO WEEKS PRIOR TO ANY GROUND DISTURBANCE. 2. WORK SHALL BE STOPPED IMMEDIATELY AND THE CONTRACTOR SHALL NOTIFY THE CO AND WORK SHALL BE STOPPED IMMEDIATELY AND THE CONTRACTOR SHALL NOTIFY THE CO AND COR IF SUSPECTED ARCHEOLOGICAL RESOURCES ARE DISCOVERED DURING CONSTRUCTION. THE ARCHEOLOGY AND CULTURAL RESOURCES TEAM WILL DETERMINE IF THE SUSPECTED ARCHEOLOGICAL RESOURCES ARE SIGNIFICANT, DOCUMENT THE LOCATION OF THE FINDINGS, AND IF NECESSARY, DEVELOP AN APPROPRIATE MITIGATION PLAN. THE CONTRACTOR MAY BE REQUIRED TO STOP WORK AT THE LOCATION OF THE FINDINGS AND MOVE ELSEWHERE UNTIL GIVEN CLEARANCE FROM NPS. 3.0 INVASIVE SPECIES 1. TO PREVENT THE INTRODUCTION OF NOXIOUS WEEDS TO THE PARK, THE CONTRACTOR TO PREVENT THE INTRODUCTION OF NOXIOUS WEEDS TO THE PARK, THE CONTRACTOR SHALL THOROUGHLY PRESSURE WASH ALL EARTH-MOVING AND OFF-ROAD VEHICLES AND EQUIPMENT WITH MINIMUM 122°F WATER AT 2,900 PSI PRIOR TO ENTERING THE PARK. ALL EQUIPMENT MUST BE FREE OF SOILS, PLANT MATTER, AND OTHER DEBRIS AS DETERMINED BY THE COR. COORDINATE INSPECTIONS WITH NPS AT LEAST TWO BUSINESS DAYS PRIOR TO BRINGING EQUIPMENT TO THE PARK. FAILED INSPECTIONS MUST BE CORRECTED AT THE CONTRACTOR'S EXPENSE. VEHICLES AND EQUIPMENT THAT ARE RE-ENTERING THE PARK DO NOT HAVE TO BE CLEANED AGAIN, PROVIDED THAT THEY HAVE NOT OPERATED ON A DIFFERENT JOBSITE. COORDINATE WITH NPS. 2. TO PREVENT INTRODUCTION OF AQUATIC INVASIVE SPECIES INTO THE PARK, ALL WATER TO PREVENT INTRODUCTION OF AQUATIC INVASIVE SPECIES INTO THE PARK, ALL WATER PUMPS, HOSES, AND TANKS FOR USE IN OR NEAR WATER BODIES MUST BE CHLORINATED WITH A 200 PPM CHLORINE SOLUTION AND INSPECTED BY NPS. USE A POWDER CALCIUM HYPOCHLORITE OR LIQUID BLEACH SODIUM HYPOCHLORITE. ALLOW THE SOLUTION TO STAND FOR AT LEAST 12 HRS AND TEST TO VERIFY THAT A MINIMUM 150 PPM IS PRESENT. CHLORINATED WATER SHALL BE DISPOSED OF OUTSIDE OF THE PARK. VEHICLES AND EQUIPMENT THAT ARE RE-ENTERING THE PARK DO NOT HAVE TO BE CHLORINATED AGAIN, PROVIDED THAT IT HAS NOT OPERATED ON A DIFFERENT JOBSITE. COORDINATE WITH NPS. 3. ALL IMPORTED ROCKS, GRAVEL, FILL, OR TOPSOIL SHALL BE SOURCED FROM A NPS ALL IMPORTED ROCKS, GRAVEL, FILL, OR TOPSOIL SHALL BE SOURCED FROM A NPS APPROVED WEED-FREE SOURCE. THIS LIST IS MAINTAINED BY NPS. COORDINATE WITH NPS.
AutoCAD SHX Text
1 SPECIAL PARK REQUIREMENTS
AutoCAD SHX Text ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES. SHOULD CODES CONFLICT, THE MORE STRINGENT REQUIREMENT SHALL APPLY. 1. HEALTH AND SAFETY CODES HEALTH AND SAFETY CODES 1.1. 29 CFR 1910 OCCUPATIONAL SAFETY AND HEALTH STANDARDS 29 CFR 1910 OCCUPATIONAL SAFETY AND HEALTH STANDARDS 1.2. 29 CFR 1926 SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION 29 CFR 1926 SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION 1.3. NFPA 241 STANDARDS FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION NFPA 241 STANDARDS FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS 2. MONTANA STATE CODES MONTANA STATE CODES 2.1. MONTANA DEQ CIRCULARS, CURRENT EDITIONS MONTANA DEQ CIRCULARS, CURRENT EDITIONS 2.2. MONTANA DEPT. OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE MONTANA DEPT. OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION 2020, V5.0 3. BUILDING CODES BUILDING CODES 3.1. 2023 NFPA 70 NATIONAL ELECTRIC CODE 2023 NFPA 70 NATIONAL ELECTRIC CODE 3.2. 2024 ICC I-CODES 2024 ICC I-CODES 4. ACCESSIBILITY CODES ACCESSIBILITY CODES 4.1. ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD 5. TRAFFIC CONTROL TRAFFIC CONTROL 5.1. MUTCD US DEPT. OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD US DEPT. OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES 6. THE FOLLOWING STANDARDS SHALL APPLY FOR ALL MATERIALS, INSTALLATIONS, AND TESTS: THE FOLLOWING STANDARDS SHALL APPLY FOR ALL MATERIALS, INSTALLATIONS, AND TESTS: 6.1. ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL 6.2. AWWA AMERICAN WATER WORKS ASSOCIATION AWWA AMERICAN WATER WORKS ASSOCIATION 6.3. AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS 6.4. ANSI AMERICAN NATIONAL STANDARDS INSTITUTE ANSI AMERICAN NATIONAL STANDARDS INSTITUTE 6.5. AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION 6.6. AISI AMERICAN IRON AND STEEL INSTITUTE AISI AMERICAN IRON AND STEEL INSTITUTE 6.7. AWS AMERICAN WELDING SOCIETY AWS AMERICAN WELDING SOCIETY 6.8. ACI AMERICAN CONCRETE INSTITUTE ACI AMERICAN CONCRETE INSTITUTE 6.9. ASHREA AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS ASHREA AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS 6.10. ISSA INTERNATIONAL SLURRY SURFACING ASSOCIATION ISSA INTERNATIONAL SLURRY SURFACING ASSOCIATION 6.11. UL UNDERWRITERS LABORATORIESUL UNDERWRITERS LABORATORIES
AutoCAD SHX Text
2 CODES AND STANDARDS
AutoCAD SHX Text
1. ALL UTILITIES NEAR THE PROJECT AREA SHALL BE MARKED PRIOR TO ANY CLEARING AND ALL UTILITIES NEAR THE PROJECT AREA SHALL BE MARKED PRIOR TO ANY CLEARING AND GRUBBING ACTIVITIES. 2. ONLY AREAS WITHIN THE LIMITS OF DISTURBANCE AS DEFINED ON THE PLANS SHEETS SHALL ONLY AREAS WITHIN THE LIMITS OF DISTURBANCE AS DEFINED ON THE PLANS SHEETS SHALL BE DISTURBED BY CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE WITH THE PARK IF IT IS ABSOLUTELY NECESSARY TO DISTURB AREAS OUTSIDE OF THE DEFINED LIMITS OF DISTURBANCE. 3. THE CONTRACTOR SHALL CLEARLY DELINEATE ALL VEGETATION AND TREES TO BE CLEARED THE CONTRACTOR SHALL CLEARLY DELINEATE ALL VEGETATION AND TREES TO BE CLEARED PRIOR TO STARTING WORK. ALL VEGETATION AND TREES OUTSIDE OF THE AREAS TO BE CLEARED SHALL BE PROTECTED BY THE CONTRACTOR. 4. SHOULD EXCAVATIONS DAMAGE OR BREAK ROOTS OF TREES TO REMAIN LARGER THAN 1" SHOULD EXCAVATIONS DAMAGE OR BREAK ROOTS OF TREES TO REMAIN LARGER THAN 1" DIAMETER, THE CONTRACTOR SHALL MAKE A CLEAN, PERPENDICULAR CUT TO THE UNDAMAGED PORTION OF THE ROOT. NOTIFY THE PARK IF EXCAVATION DAMAGES A ROOT THAT IS GREATER THAN 2" IN DIAMETER OF A TREE TO REMAIN. 5. REMOVED TREES AND VEGETATION SHOULD BE USED TO COVER DISTURBED SOILS WHEN REMOVED TREES AND VEGETATION SHOULD BE USED TO COVER DISTURBED SOILS WHEN TRENCHING IS COMPLETE TO PROVIDE A NATURAL GROUND COVER TO LIMIT EROSION. EXCESS MATERIAL SHALL BE DISPOSED OF OUTSIDE OF THE PARK BOUNDARY BY THE CONTRACTOR. 6. THE CONTRACTOR SHALL STRIP AND STOCKPILE ALL DUFF AND TOPSOIL PRIOR TO ANY THE CONTRACTOR SHALL STRIP AND STOCKPILE ALL DUFF AND TOPSOIL PRIOR TO ANY EXCAVATION, EARTH MOVING, OR HAULING OPERATIONS. ALL STOCKPILES SHALL BE PROPERLY PROTECTED FROM EROSION AND SEDIMENTATION. 7. THE CONTRACTOR SHALL SCARIFY THE TOP 4" OF ALL PLACED TOPSOIL IN PREPARATION OF THE CONTRACTOR SHALL SCARIFY THE TOP 4" OF ALL PLACED TOPSOIL IN PREPARATION OF SEEDING AND RESTORATION. TOPSOIL SHALL BE SMOOTHLY GRADED AND AT THE FINISH GRADE ELEVATION. TOPSOIL SHALL BE FREE OF CLODS, STONES, AND OTHER DEBRIS LARGER THAN 2". 8. SEEDING AND VEGETATION RESTORATION WORK WILL BE COMPLETED BY NPS. SEEDING AND VEGETATION RESTORATION WORK WILL BE COMPLETED BY NPS. 9. ALL IMPORTED ROCKS, GRAVEL, FILL, OR TOPSOIL SHALL BE SOURCED FROM A NPS APPROVED ALL IMPORTED ROCKS, GRAVEL, FILL, OR TOPSOIL SHALL BE SOURCED FROM A NPS APPROVED WEED-FREE SOURCE. THIS LIST IS MAINTAINED BY NPS. COORDINATE WITH THE COR. 10. UPON PROJECT COMPLETION, THE CONTRACTOR SHALL REMOVE ALL EXCESS SPOILS, ROCKS, UPON PROJECT COMPLETION, THE CONTRACTOR SHALL REMOVE ALL EXCESS SPOILS, ROCKS, BOULDERS, BRUSH, TREES, AND OTHER CONSTRUCTION DEBRIS FROM THE SITE AND DISPOSE OF THESE MATERIALS PROPERLY.
AutoCAD SHX Text
4 CLEARING, GRUBBING, TOPSOIL STRIPPING, & TREE PROTECTION
AutoCAD SHX Text
1. STAGING AREAS SHALL NOT OBSTRUCT EMERGENCY TRAFFIC, VISITOR TRAFFIC, STAGING AREAS SHALL NOT OBSTRUCT EMERGENCY TRAFFIC, VISITOR TRAFFIC, OR NPS USE AND OCCUPATION OF THE SITE. COORDINATE WITH THE COR. 2. OVERNIGHT MATERIAL AND EQUIPMENT STAGING AREAS SHOULD BE LIMITED TO OVERNIGHT MATERIAL AND EQUIPMENT STAGING AREAS SHOULD BE LIMITED TO HARDSCAPED AREAS SUCH AS GRAVEL OR PAVEMENT. AVOID STAGING MATERIALS ON NATURAL GROUND SURFACES.
AutoCAD SHX Text
3 MATERIAL AND EQUIPMENT STAGING AREAS
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
DRAWING INDEX &
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text G1
AutoCAD SHX Text
AVERAGE INSTANTANEOUS FLOW
AutoCAD SHX Text
1.7 GALLONS PER MINUTE
AutoCAD SHX Text
AVERAGE DAY FLOW
AutoCAD SHX Text
2,496 GALLONS PER DAY
AutoCAD SHX Text
PEAKING FACTOR
AutoCAD SHX Text
AutoCAD SHX Text
PEAK HOUR FLOW
AutoCAD SHX Text
17.3 GALLONS PER MINUTE
AutoCAD SHX Text
DESIGN PUMP FLOW RATE
AutoCAD SHX Text
18.0 GALLONS PER MINUTE
AutoCAD SHX Text
DESIGN PUMP HEAD
AutoCAD SHX Text
217 FEET
AutoCAD SHX Text
DOMESTIC STORAGE (MIN.)
AutoCAD SHX Text
2,496 GALLONS
AutoCAD SHX Text
FIRE STORAGE (MIN.)
AutoCAD SHX Text
10,587 GALLONS
AutoCAD SHX Text
REQUIRED STORAGE (MIN.)
AutoCAD SHX Text
13,083 GALLONS
AutoCAD SHX Text
DESIGN STORAGE
AutoCAD SHX Text
14,000 GALLONS
AutoCAD SHX Text
HYDRANT FIRE FLOW (MIN.)
AutoCAD SHX Text
250 GALLONS PER MINUTE
AutoCAD SHX Text
BUILDING #
AutoCAD SHX Text
BUILDING NAME
AutoCAD SHX Text
WATER SERVICE
AutoCAD SHX Text
BUILDING USAGE
AutoCAD SHX Text
AutoCAD SHX Text
RANGER RESIDENCE
AutoCAD SHX Text
YEAR ROUND WATER
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
CABIN
AutoCAD SHX Text
SEASONAL WATER
AutoCAD SHX Text
SEASONAL
AutoCAD SHX Text
AutoCAD SHX Text
RANGER OFFICE
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT CACHE
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
FIRE CACHE, STORAGE, CHLORINATOR
AutoCAD SHX Text
NO (SPIGOT)
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
GENERATOR BUILDING
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
HAZARDOUS MATERIAL STORAGE
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
STRISSEL CABIN
AutoCAD SHX Text
YEAR ROUND WATER
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
LAUNDRY AND SHOWER
AutoCAD SHX Text
SEASONAL WATER
AutoCAD SHX Text
SEASONAL
AutoCAD SHX Text
AutoCAD SHX Text
POLEBRIDGE RANGER STATION
AutoCAD SHX Text
SEASONAL WATER
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
RADIO SHED
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
DORM
AutoCAD SHX Text
SEASONAL WATER
AutoCAD SHX Text
SEASONAL
AutoCAD SHX Text
AutoCAD SHX Text
VAULT TOILET
AutoCAD SHX Text
NO
AutoCAD SHX Text
YEAR ROUND USE
AutoCAD SHX Text
AutoCAD SHX Text
SCHOOL TO PARK CABIN
AutoCAD SHX Text
SEASONAL WATER
AutoCAD SHX Text
SEASONAL
AutoCAD SHX Text
ARV-1
AutoCAD SHX Text
PLC
AutoCAD SHX Text
CV-1
AutoCAD SHX Text
FM-100
AutoCAD SHX Text
HV-1
AutoCAD SHX Text
HV-2
AutoCAD SHX Text
HV-3
AutoCAD SHX Text
HV-4
AutoCAD SHX Text
HV-5
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
PG
AutoCAD SHX Text
PG
AutoCAD SHX Text
PG
AutoCAD SHX Text
HV-6
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
ELECTROMAGNETIC FLOWMETER
AutoCAD SHX Text
PRESSURE GUAGE
AutoCAD SHX Text
PG
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
AIR VALVE
AutoCAD SHX Text
CHLORINE INJECTION
AutoCAD SHX Text
P&ID SYMBOLS
AutoCAD SHX Text ARV AIR RELEASE VALVE AIR RELEASE VALVE CI CHLORINE INJECTION CHLORINE INJECTION CV CHECK VALVE CHECK VALVE FE FLOW SENSOR FLOW SENSOR FIT FLOW INDICATOR & TRANSMITTER FLOW INDICATOR & TRANSMITTER FM FLOW METER FLOW METER FMAL FLOOR MOISTURE ALARM FLOOR MOISTURE ALARM FQIR FLOW QUANTITY INDICATE & RECORD FLOW QUANTITY INDICATE & RECORD GPD GALLONS PER DAY GALLONS PER DAY HOA HAND/OFF/AUTO HAND/OFF/AUTO HS HAND SWITCH HAND SWITCH HV HAND VALVE HAND VALVE LAH HIGH LEVEL ALARM HIGH LEVEL ALARM LAL LOW LEVEL ALARM LOW LEVEL ALARM LIRC LEVEL INDICATE & RECORD LEVEL INDICATE & RECORD LT LEVEL TRANSMITTER LEVEL TRANSMITTER PE PRESSURE SENSOR PRESSURE SENSOR PG PRESSURE GAUGE PRESSURE GAUGE PID PIPING & INSTRUMENTATION DIAGRAM PIPING & INSTRUMENTATION DIAGRAM PLC PROGRAM LOGIC CONTROL (CENTER) PROGRAM LOGIC CONTROL (CENTER) PRIC PRESSURE INDICATE & RECORD PRESSURE INDICATE & RECORD YC RUN CONTROLRUN CONTROL
AutoCAD SHX Text
%%UACRONYM
AutoCAD SHX Text
%%UDEFINITION
AutoCAD SHX Text
PROCESS & INSTRUMENTATION DIAGRAM (P&ID)
AutoCAD SHX Text
CHLORINATION ROOM
AutoCAD SHX Text
WELL PUMP
AutoCAD SHX Text
YC
AutoCAD SHX Text
AutoCAD SHX Text
LOC/REM
AutoCAD SHX Text
TANK
AutoCAD SHX Text
LICR
AutoCAD SHX Text
AutoCAD SHX Text
LICR
AutoCAD SHX Text
AutoCAD SHX Text
LT
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
RESERVOIR
AutoCAD SHX Text
LAL
AutoCAD SHX Text
AutoCAD SHX Text
LOW
AutoCAD SHX Text
ALARM
AutoCAD SHX Text
LAH
AutoCAD SHX Text
AutoCAD SHX Text
HIGH
ALARM
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
ST
AutoCAD SHX Text S
AutoCAD SHX Text
LS
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
EB
AutoCAD SHX Text
SURVEY LINETYPES
AutoCAD SHX Text
EDGE OF SITE GEOMETRY
AutoCAD SHX Text
EDGE OF WATERWAY
AutoCAD SHX Text
MAJOR CONTOUR
AutoCAD SHX Text
MINOR CONTOUR
AutoCAD SHX Text
COMMUNICATIONS LINE
AutoCAD SHX Text
ELECTRIC LINE
AutoCAD SHX Text
PROPANE LINE
AutoCAD SHX Text
STORM SEWER LINE
AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
TELEPHONE LINE
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
SEWER FORCEMAIN LINE
AutoCAD SHX Text
FIBER OPTIC LINE
AutoCAD SHX Text
GUARDRAIL
AutoCAD SHX Text
FEE BOX
AutoCAD SHX Text
FLAGPOLE
AutoCAD SHX Text
POST OR BOLLARD (ROUND OR SQUARE)
AutoCAD SHX Text
ROAD SIGN
AutoCAD SHX Text
INTERPRETIVE SIGN
AutoCAD SHX Text
BOULDER
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
ELECTRIC BREAKER OR SERVICE DISCONNECT BOX
AutoCAD SHX Text
ELECTRIC METER
AutoCAD SHX Text
PICNIC TABLE
AutoCAD SHX Text
FIRE PIT
AutoCAD SHX Text
WINDOW WELL
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text G.S.
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text C.I.
AutoCAD SHX Text
PIPE INVERT
AutoCAD SHX Text
INV.
AutoCAD SHX Text
GALLON
AutoCAD SHX Text
GAL.
AutoCAD SHX Text
TRASH OR RECYCLING
AutoCAD SHX Text
BUILDING & ROOF OVERHANG
AutoCAD SHX Text
ROAD GATE & GUY WIRE
AutoCAD SHX Text
ELECTRIC PEDESTAL
AutoCAD SHX Text
HANDHOLE (COMPOSITE MATERIAL)
AutoCAD SHX Text
SATELLITE DISH
AutoCAD SHX Text
MONITORING WELL
AutoCAD SHX Text
PROPANE MANHOLE
AutoCAD SHX Text
PROPANE METER
AutoCAD SHX Text
PROPANE VALVE
AutoCAD SHX Text
SEPTIC TANK COVER AND APPROXIMATE TANK LIMITS
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
SEWER LIFT STATION
AutoCAD SHX Text
SEWER CLEANOUT
AutoCAD SHX Text
PROPANE TANK (UNDERGROUND)
AutoCAD SHX Text
WATER CURB STOP
AutoCAD SHX Text
WATER VAULT STRUCTURE
AutoCAD SHX Text
WATER PUMP OUT
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WATER SPIGOT
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
TELEPHONE PEDESTAL
AutoCAD SHX Text
SHRUB OR BUSH
AutoCAD SHX Text
DECIDUOUS TREE
AutoCAD SHX Text
PINE TREE
AutoCAD SHX Text
ASPHALT AREA
AutoCAD SHX Text
CONCRETE AREA
AutoCAD SHX Text
LANDSCAPING STONE AREA
AutoCAD SHX Text
VEGETATION AREA
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
BUILDING SYMBOLS
AutoCAD SHX Text
SITE FEATURES & FURNITURE SYMBOLS
AutoCAD SHX Text
SURVEY CONTROL SYMBOLS
AutoCAD SHX Text
SITE UTILITY SYMBOLS
AutoCAD SHX Text
SITE VEGETATION SYMBOLS
AutoCAD SHX Text
SITE GROUND COVER HATCHES
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
PVC
AutoCAD SHX Text
WATER AREA (APPROXIMATE HIGH-WATER LINE)
AutoCAD SHX Text
TREE STUMP
AutoCAD SHX Text
HIGH DENSITY POLYETHYLENE
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
LINEAR FEET
AutoCAD SHX Text
LF
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
NPS
AutoCAD SHX Text
ST
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
LEGEND, SYMBOLS,
AutoCAD SHX Text
& ABBREVIATIONS
AutoCAD SHX Text
G2
EB
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
LS
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
1. SURVEY DATA WAS COLLECTED BY NPS IN APRIL TO MAY 2025 USING A TRIMBLE R-12i GNSS UNIT SURVEY DATA WAS COLLECTED BY NPS IN APRIL TO MAY 2025 USING A TRIMBLE R-12i GNSS UNIT OWNED BY NPS AND A TRIMBLE R-12 BASE STATION. 2. THE COORDINATE SYSTEM IS NAD83 MONTANA STATE PLANES (2500) AND NAD83. SURVEYING THE COORDINATE SYSTEM IS NAD83 MONTANA STATE PLANES (2500) AND NAD83. SURVEYING TOLERANCES ARE WITHIN 0.15' HORIZONTAL AND 0.25' VERTICAL ACCURACY. ALL UNITS ARE LISTED IN INTERNATIONAL FEET. 3. SITE CONDITIONS MAY HAVE CHANGED SINCE THE SURVEY WAS COMPLETED. THE CONTRACTOR SITE CONDITIONS MAY HAVE CHANGED SINCE THE SURVEY WAS COMPLETED. THE CONTRACTOR SHALL VISIT THE SITE AND UNDERSTAND ALL SITE CONDITIONS PRIOR TO THE START OF WORK. 4. UTILITY DATA MAY BE INCOMPLETE. THE LOCATION OF ALL KNOWN AND UNKNOWN UTILITIES IS NOT UTILITY DATA MAY BE INCOMPLETE. THE LOCATION OF ALL KNOWN AND UNKNOWN UTILITIES IS NOT GUARANTEED. THE CONTRACTOR SHALL FIELD VERIFY THE PIPE OR CONDUIT SIZE AND HORIZONTAL AND VERTICAL LOCATIONS OF ALL UTILITIES PRIOR TO THE START OF CONSTRUCTION. UTILITIES OWNED BY NPS OR PUBLIC UTILITY COMPANIES MAY BE PRESENT AT THE SITE. NOTIFY NPS OF ANY DISCREPANCIES. 5. THE CONTRACTOR SHALL CALL MONTANA 811 AT LEAST THREE BUSINESS DAYS PRIOR TO ANY THE CONTRACTOR SHALL CALL MONTANA 811 AT LEAST THREE BUSINESS DAYS PRIOR TO ANY AT LEAST THREE BUSINESS DAYS PRIOR TO ANY THREE BUSINESS DAYS PRIOR TO ANY GROUND DISTURBANCE. THE CONTRACTOR SHALL ENSURE THAT ALL UTILITIES ARE CLEARLY MARKED FOR THE DURATION OF CONSTRUCTION. 6. THE CONTRACTOR SHALL MAINTAIN SURVEY CONTROL POINTS THROUGHOUT CONSTRUCTION. IF THE CONTRACTOR SHALL MAINTAIN SURVEY CONTROL POINTS THROUGHOUT CONSTRUCTION. IF CONTROL POINTS ARE DISTURBED BY CONSTRUCTION, NEW CONTROL POINTS SHALL BE SET AND TIED INTO THE PROJECT'S EXISTING DATUM BY THE CONTRACTOR. FINAL CONTROL POINTS SHALL BE NOTED ON AS-BUILT DRAWINGS. 7. ONLY TREES IN THE POTENTIAL AREA OF EFFECT WERE SURVEYED. ONLY TREES IN THE POTENTIAL AREA OF EFFECT WERE SURVEYED.
AutoCAD SHX Text
SURVEY NOTES
AutoCAD SHX Text CONTROL POINT 1 (CP#1) (N, E, Z) = (1687908.768, 816726.576, 3561.14) REBAR WITH ORANGE CAP SET IN GRASSY AREA OFF THE SOUTHWEST CORNER OF THE INTERSECTION OF THE RANGER STATION LOOP ROAD AND THE HOUSING AREA ROAD, APPROXIMATELY 5.4' FROM THE "AUTHORIZED VEHICLES ONLY" SIGN. CONTROL POINT 2 (CP#2) (N, E, Z) = (1688024.765, 816941.301, 3595.52) REBAR SET IN VEGETATED AREA, APPROXIMATELY 11.2' FROM THE WEST EDGE OF THE INSIDE NORTH FORK ROAD AND 11.3' SOUTH OF A 14" LARCH TREE. CONTROL POINT 3 (CP#3) (N, E, Z) = (1687560.127, 816827.540, 3558.58) REBAR SET IN VEGETATED AREA, APPROXIMATELY 15.5' SOUTHEAST OF THE EXISTING FIRE HYDRANT AND 11.7' NORTHEAST OF AN EXISTING 4" DECIDUOUS TREE. CONTROL POINT 4 (CP#4) (N, E, Z) = (1687201.786, 817277.527, 3639.61) REBAR SET IN VEGETATED AREA, APPROXIMATELY 5.4' FROM THE EAST EDGE OF THE INSIDE NORTH FORK ROAD ACROSS FROM THE EXISTING WATER TANK LOCATION AND JUST NORTH OF A BIG BOULDER. CONTROL POINT 5 (CP#5) (N, E, Z) = (1687492.878, 816287.559, 3560.60) REBAR WITH ALUMINUM CAP SET BY THE FEDERAL HIGHWAY ADMINISTRATION, APPROXIMATELY 9.5' FROM THE EDGE OF THE ROADWAY AND 180' ALONG THE CENTERLINE FROM THE END OF THE BRIDGE.
AutoCAD SHX Text
SURVEY CONTROL POINTS
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 60'
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
EXISTING SITE &
AutoCAD SHX Text
SURVEY CONTROL
AutoCAD SHX Text
AutoCAD SHX Text G3
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
NORTH FORK FLATHEAD RIVER
AutoCAD SHX Text
BOWMAN CREEK
AutoCAD SHX Text
GLACIER DRIVE
AutoCAD SHX Text
EX-SSMH-02
AutoCAD SHX Text
EX-SSMH-04
AutoCAD SHX Text
EX-SAN-06
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
1000 GAL. SEPTIC TANK
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
EX-SAN-01
AutoCAD SHX Text
EX-SAN-05
AutoCAD SHX Text
EX-SSMH-03
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
ROAD GATE
AutoCAD SHX Text
SEPTIC DRAIN FIELD
AutoCAD SHX Text
REGULATIONS SIGN
AutoCAD SHX Text
SELF-PAY KIOSK
AutoCAD SHX Text
FEE BOX
AutoCAD SHX Text
COVEY MEADOW TRAILHEAD
AutoCAD SHX Text
DESTINATION DISTANCE SIGN
AutoCAD SHX Text
POSTS WITH CHAIN
AutoCAD SHX Text
VEHICLE LENGTH RESTRICTION SIGN
AutoCAD SHX Text
VEHICLE LENGTH RESTRICTION SIGN
AutoCAD SHX Text
KEEP RIGHT SIGN
AutoCAD SHX Text
INFO KIOSK
AutoCAD SHX Text
8" PVC CULVERT
AutoCAD SHX Text
DO NOT ENTER SIGN
AutoCAD SHX Text
AUTHORIZED VEHICLES ONLY SIGN
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
SPEED LIMIT SIGN
AutoCAD SHX Text
12" PVC CULVERT
AutoCAD SHX Text 10,000 GALLON PLASTIC WATER TANK RIM = 3648.48 4' BURY DEPTH 7.9' x 30.4'L22" ACCESS PORT
AutoCAD SHX Text
2" G.S. VENT PIPE
AutoCAD SHX Text
END OF 2" G.S. OVERFLOW PIPE, DRAIN TO GRADE
AutoCAD SHX Text
SPEED LIMIT SIGN
AutoCAD SHX Text
STOP AHEAD SIGN
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
TRASH & RECYCLING
AutoCAD SHX Text
SEPTIC DRAIN FIELD
AutoCAD SHX Text
ENTRANCE SIGN
AutoCAD SHX Text
PROPANE TANKS
AutoCAD SHX Text
VALVE BOX
AutoCAD SHX Text
12" PVC CULVERTS
AutoCAD SHX Text
ABANDONED WATER STRUCTURE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text CONTROLS CABLE FROM EXISTING CONTROL PANEL IN CHLORINATION ROOM TO WATER TANK (BLACK COLOR; ON GRADE)
AutoCAD SHX Text
ELECTRICAL MANHOLE
AutoCAD SHX Text
CP#3
AutoCAD SHX Text
STORM RUNOFF DRYWELL
AutoCAD SHX Text
RADIO COMMUNICATIONS WIRES TO B#97 AND B#1451 (WHITE COLOR; ON GRADE)
AutoCAD SHX Text INFILTRATION GALLERY 3' x 10' DEPTH
AutoCAD SHX Text
ABANDONED WATER SUPPLY STRUCTURE
AutoCAD SHX Text
ABOVE-GROUND GASOLINE TANK ENCLOSURE (7' WOOD FENCE)
AutoCAD SHX Text CONTROLS CABLE FROM EXISTING CONTROL PANEL IN CHLORINATION ROOM TO WATER TANK (BLACK COLOR; ON GRADE)
AutoCAD SHX Text
BURIED TELEPHONE LINE
AutoCAD SHX Text
TRASH
AutoCAD SHX Text
LIFT STATION ELECTRICAL CONTROLS
AutoCAD SHX Text CONTROLS CABLE FROM EXISTING CONTROL PANEL IN CHLORINATION ROOM TO WATER TANK (BLACK COLOR; ON GRADE)
AutoCAD SHX Text
RADIO COMMUNICATIONS WIRES TO B#97 AND B#1451 (WHITE COLOR; ON GRADE)
AutoCAD SHX Text
PROJECT LOCATION: POLEBRIDGE RANGER STATION AREA
AutoCAD SHX Text
NORTH FORK ROAD
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
NORTH FORK FLATHEAD RIVER
AutoCAD SHX Text
GLACIER DRIVE
AutoCAD SHX Text
FLATHEAD NATIONAL FOREST
AutoCAD SHX Text
POLEBRIDGE, MT
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text WATER LINE TRENCH (SUPPLY AND DISTRIBUTIONS LINES AT 5' COVER; COMMUNICATION LINES IN CONDUIT AT 2' COVER)
AutoCAD SHX Text
ABANDONED TELEPHONE LINE IN 2.5" G.S. CONDUIT
AutoCAD SHX Text
2" G.S. VENT PIPE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
ASSUMED LOCATION OF WATER MAIN
AutoCAD SHX Text B#1455
AutoCAD SHX Text B#1448
AutoCAD SHX Text B#1447
AutoCAD SHX Text B#1450
AutoCAD SHX Text B#353
AutoCAD SHX Text B#97
AutoCAD SHX Text B#1451
AutoCAD SHX Text B#1865
AutoCAD SHX Text B#1594
AutoCAD SHX Text B#1454
AutoCAD SHX Text B#1842
AutoCAD SHX Text B#98
AutoCAD SHX Text B#1449
AutoCAD SHX Text B#1576
DRAIN LINE
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
LS
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
EB
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
LS
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
& RECLAMATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text G4
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 60'
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
NORTH FORK FLATHEAD RIVER
AutoCAD SHX Text
BOWMAN CREEK
AutoCAD SHX Text
GLACIER DRIVE
AutoCAD SHX Text DEMOLITION NOTES: : 1. DO NOT DISTURB EXISTING STRUCTURES, CONNECT WATER SERVICES AND WATER MAINS DO NOT DISTURB EXISTING STRUCTURES, CONNECT WATER SERVICES AND WATER MAINS 5' OUTSIDE OF EXISTING STRUCTURES UNLESS CALLED OUT OTHERWISE. 2. EXISTING WATER AND SEWER INFRASTRUCTURE IS ESTIMATED FROM AS-BUILTS AND EXISTING WATER AND SEWER INFRASTRUCTURE IS ESTIMATED FROM AS-BUILTS AND MAY NOT REFLECT EXACT LOCATIONS IN THE FIELD. 3. ALL COMPONENTS DESIGNATED FOR REMOVAL AND DISPOSAL SHALL BECOME PROPERTY ALL COMPONENTS DESIGNATED FOR REMOVAL AND DISPOSAL SHALL BECOME PROPERTY OF THE CONTRACTOR AND BE REMOVED AND DISPOSED OF OUTSIDE THE PARK. 4. LIMITS OF DISTURBANCE BOUNDARIES SHALL COMPLY GENERALLY WITH THE LINES LIMITS OF DISTURBANCE BOUNDARIES SHALL COMPLY GENERALLY WITH THE LINES SHOWN ON THESE DRAWINGS. THE ACTUAL CONSTRUCTION BOUNDARIES SHALL BE FLAGGED BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING OFFICER (CO) PRIOR TO CONSTRUCTION. 5. ABANDONED PIPES THAT ARE ENCOUNTERED IN THE TRENCH MUST BE REMOVED AND ABANDONED PIPES THAT ARE ENCOUNTERED IN THE TRENCH MUST BE REMOVED AND PLUGGED AT THE ENDS. 6. INSTALL EROSION CONTROL PER SHEET G6 - EROSION CONTROL PLAN.INSTALL EROSION CONTROL PER SHEET G6 - EROSION CONTROL PLAN.G6 - EROSION CONTROL PLAN..
AutoCAD SHX Text B#1455
AutoCAD SHX Text B#1448
AutoCAD SHX Text B#1447
AutoCAD SHX Text B#1450
AutoCAD SHX Text B#353
AutoCAD SHX Text B#97
AutoCAD SHX Text B#1451
AutoCAD SHX Text B#1865
AutoCAD SHX Text B#1594
AutoCAD SHX Text B#1454
AutoCAD SHX Text B#1842
AutoCAD SHX Text B#98
AutoCAD SHX Text B#1449
AutoCAD SHX Text B#1576
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
NORTH FORK FLATHEAD RIVER
AutoCAD SHX Text
BOWMAN CREEK
AutoCAD SHX Text
GLACIER DRIVE
AutoCAD SHX Text B#1455
AutoCAD SHX Text B#1448
AutoCAD SHX Text B#1447
AutoCAD SHX Text B#1450
AutoCAD SHX Text B#353
AutoCAD SHX Text B#97
AutoCAD SHX Text B#1451
AutoCAD SHX Text B#1865
AutoCAD SHX Text B#1594
AutoCAD SHX Text B#1454
AutoCAD SHX Text B#1842
AutoCAD SHX Text B#98
AutoCAD SHX Text B#1449
AutoCAD SHX Text B#1576
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
GRAVEL ROAD REPLACEMENT VEGETATION RECLAIM AREA ROLLED EROSION CONTROL
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
REMOVE TANK AND DRAIN LINE, SEE NOTE 3 THIS SHEET
AutoCAD SHX Text
REMOVE FIRE HYDRANT
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#3
AutoCAD SHX Text
REMOVE 2" G.S. VENT PIPE
AutoCAD SHX Text
REMOVE FIRE HYDRANT, CUT 1' BELOW GRADE AND BACKFILL WITH CONCRETE
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
REMOVE CURB STOPS
AutoCAD SHX Text
REMOVE OLD ELECTRICAL BREAKER BOX AND POST
AutoCAD SHX Text
REMOVE OLD CURB STOP. CUT RISER PIPE FOR OLD VALVE. CUT BELOW GRADE AND BURY
AutoCAD SHX Text
REMOVE CURB STOPS, PUMP OUTS, AND HANDHOLE
AutoCAD SHX Text
REMOVE OLD CURB STOP
AutoCAD SHX Text
REMOVE CURB STOPS, PUMP OUT, AND HAND HOLE
AutoCAD SHX Text
REMOVE CURB STOPS AND PUMP OUT
AutoCAD SHX Text REMOVE OLD COMMUNICATIONS LINE THAT IS LAYING ON GRADE FROM CHLORINATION ROOM TO EXISTING TANK
AutoCAD SHX Text
REMOVE OLD VALVE RISER PIPES FROM OLD DRAIN LINE. CUT BELOW GRADE AND BURY.
AutoCAD SHX Text SEE SHEET G7 FOR DEMOLITION G7 FOR DEMOLITION FOR DEMOLITION RELATED TO THE CHLORINATION ROOM
AutoCAD SHX Text
LIMITS OF DISTURBANCE, SEE NOTE 4 THIS SHEET
AutoCAD SHX Text REMOVE EXISTING CAST IRON LID, CUT EXISTING CMP 1' BELOW GRADE. BACKFILL TO GRADE TO ABANDON
AutoCAD SHX Text
CP#5
AutoCAD SHX Text REMOVE ALL CONCRETE AROUND THE EXISTING CMP PIPE. CUT PIPE 1' BELOW GRADE. BACKFILL TO GRADE TO ABANDON IN PLACE
AutoCAD SHX Text
REMOVE 28" TREE SNAG
REMOVE THE FLAT CONCRETE LID ON EXISTING VAULT, BACKFILL THE BASE IN PLACE TO ABANDON
THE BOWMAN PIT STAGING AREA APPROXIMATELY 16,000 SF MATERIAL AND EQUIPMENT STAGING AREA SHARED BY THE CONTRACTOR AND NPS. THIS AREA IS LOCATED APPROXIMATELY 1.0 MILES UP THE STEEP, NARROW, AND WINDY BOWMAN LAKE ROAD. THIS AREA CAN BE ACCESSED BY LOADERS AND SMALL DUMP TRUCKS - PLEASE USE GREAT CAUTION WHILE TRAVELING THIS ROUTE. THIS AREA WILL NOT BE ACCESSIBLE IN THE WINTER MONTHS.
AutoCAD SHX Text
BOWMAN LAKE ROAD
AutoCAD SHX Text
BOWMAN CREEK
AutoCAD SHX Text BOWMAN CREEK BRIDGE SINGLE LANE BRIDGE INVENTORY RATING: 21.0 TONS OPERATING RATING: 36.0 TONS
AutoCAD SHX Text
B#1455 POLEBRIDGE RANGER STATION
AutoCAD SHX Text THE COVEY MEADOW TRAILHEAD PARKING AREA APPROXIMATELY 1,000 SF VEHICLE AND EQUIPMENT PARKING AREA ONLY. NO MATERIAL STAGING. CONFINE PARKING AREA LIMITS TO WITHIN THE GRAVEL PARKING AREA.
AutoCAD SHX Text THE SOLAR PANELS STAGING AREA APPROXIMATELY 3,400 SF MATERIAL AND EQUIPMENT STAGING AREA. A PORTION OF THIS STAGING AREA MAY BE WITHIN THE EXIT LANE, PROVIDED THAT THERE IS AT LEAST A 12' LANE TO ALLOW VEHICLES TO PASS THROUGH.
AutoCAD SHX Text THE BOWMAN CREEK PULLOFF STAGING AREA APPROXIMATELY 850 SF MATERIAL AND EQUIPMENT STAGING AREA
AutoCAD SHX Text THE NORTH FORK OVERLOOK PARKING AREA APPROXIMATELY 800 SF VEHICLE AND EQUIPMENT PARKING AREA ONLY. NO MATERIAL STAGING. CONFINE PARKING AREA LIMITS TO WITHIN THE GRAVEL PULLOFF AREA; DO NO OBSTRUCT THE ROAD.
AutoCAD SHX Text
WATER TANK AREA
AutoCAD SHX Text
1. STAGING AREAS SHALL NOT OBSTRUCT EMERGENCY TRAFFIC, VISITOR TRAFFIC, OR NPS USE AND STAGING AREAS SHALL NOT OBSTRUCT EMERGENCY TRAFFIC, VISITOR TRAFFIC, OR NPS USE AND OCCUPATION OF THE SITE. COORDINATE WITH NPS. 2. OVERNIGHT MATERIAL AND EQUIPMENT STAGING AREAS SHALL BE LIMITED TO HARDSCAPED AREAS OVERNIGHT MATERIAL AND EQUIPMENT STAGING AREAS SHALL BE LIMITED TO HARDSCAPED AREAS SUCH AS GRAVEL OR PAVEMENT. AVOID STAGING MATERIALS ON NATURAL GROUND SURFACES. 3. THESE IDENTIFIED MATERIAL AND STAGING AREAS SHALL BE AVAILABLE FOR CONTRACTOR USE THESE IDENTIFIED MATERIAL AND STAGING AREAS SHALL BE AVAILABLE FOR CONTRACTOR USE THROUGHOUT THE DURATION OF THE PROJECT, UNLESS OTHERWISE NOTED. DEPENDING ON NPS OPERATIONS DURING CERTAIN PROJECT PHASES, OTHER MATERIAL AND EQUIPMENT STAGING AREAS MAY BE AVAILABLE IN THE MAINTENANCE AREA, HOUSING AREA, OR WATER TANK AREA. COORDINATE WITH NPS. 4. MATERIAL AND EQUIPMENT STAGING AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION MATERIAL AND EQUIPMENT STAGING AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION PRIOR TO PROJECT CLOSEOUT.
AutoCAD SHX Text
MATERIAL AND EQUIPMENT STAGING AREAS
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
VISITOR PARKING AREAS
AutoCAD SHX Text NORTH FORK FLATHEAD RIVER BRIDGE TWO LANE BRIDGE INVENTORY RATING: 34.0 TONS OPERATING RATING: 57.0 TONS
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
STAGING AREAS
AutoCAD SHX Text
AutoCAD SHX Text G5
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 150'
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLOW-UP DETAIL
G6
AutoCAD SHX Text
EB
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
LS
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NELSON ENGINEERING
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 197288
AutoCAD SHX Text
AutoCAD SHX Text
NE
AutoCAD SHX Text 04/08/2026
AutoCAD SHX Text
GLACIER NATIONAL PARK
AutoCAD SHX Text
REHABILITATE POLEBRIDGE WATER SYSTEM
AutoCAD SHX Text 329234B
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Date
AutoCAD SHX Text Initial
AutoCAD SHX Text
EROSION CONTROL PLAN
AutoCAD SHX Text
AutoCAD SHX Text G6
AutoCAD SHX Text
INSIDE NORTH FORK ROAD
AutoCAD SHX Text
NORTH FORK FLATHEAD RIVER
AutoCAD SHX Text
BOWMAN CREEK
AutoCAD SHX Text
GLACIER DRIVE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
STRAW WATTLE LIMITS OF DISTURBANCE
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'
AutoCAD SHX Text INSTALL ±35 LF STRAW WATTLES (FIBERROLLS) ALONG EDGE OF CREEK ACCESS PER DETAIL 1/C16, SEE NOTE 2 THIS SHEETC16, SEE NOTE 2 THIS SHEET, SEE NOTE 2 THIS SHEET
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#3
AutoCAD SHX Text
CP#5
AutoCAD SHX Text NOTES: : 1. STRAW WATTLES (FIBER ROLLS) SHALL BE 100% BIODEGRADABLE, SEE DETAIL 1/C16. STRAW WATTLES (FIBER ROLLS) SHALL BE 100% BIODEGRADABLE, SEE DETAIL 1/C16. C16. . 2. REMOVED VEGETATION SHOULD BE LAID OVER EXPOSED SOILS TO PROVIDE A NATURAL REMOVED VEGETATION SHOULD BE LAID OVER EXPOSED SOILS TO PROVIDE A NATURAL COVER TO LIMIT EROSION. 3. CONTRACTOR IS RESPONSIBLE FOR PREPARING AND SUBMITTING A SWPPP FOR APPROVAL CONTRACTOR IS RESPONSIBLE FOR PREPARING AND SUBMITTING A SWPPP FOR APPROVAL BY THE CO. 4. MAXIMUM ALLOWABLE TREE REMOVALS ALLOWED IF NECESSARY FOR CONSTRUCTION MAXIMUM ALLOWABLE TREE REMOVALS ALLOWED IF NECESSARY FOR CONSTRUCTION OPERATIONS. OTHER TREES MAY REQUIRE BRANCH TRIMMING TO FACILITATE CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO LIMIT TREE REMOVALS AND VEGETATION DISTURBANCE AREA TO THE LEAST IMPACT POSSIBLE. THE CONTRACTOR SHALL COORDINATE EQUIPMENT ACCESS ROUTES, EXCAVATION AREA, STOCKPILE AREA, TREE REMOVAL, AND VEGETATION REMOVAL WITH NPS.
AutoCAD SHX Text
REMOVE TREES IN RED DASHED LINES, SEE NOTE 4 THIS SHEET
AutoCAD SHX Text
PROTECT TREE OUTSIDE OF LOD PER DETAIL 1/C12C12
AutoCAD SHX Text
PROTECT TREES PER DETAIL 1/C12C12
AutoCAD SHX Text
SEE BLOW-UP DETAIL THIS SHEET
AutoCAD SHX Text
REMOVE TREES IN RED DASHED LINES, SEE NOTE 4 THIS SHEET
AutoCAD SHX Text
INSTALL ±180 LF STRAW WATTLES (FIBERROLLS), SEE NOTE 1 THIS SHEET
AutoCAD SHX Text
INSTALL ±416 LF…