SF243-D017.pdf

Standard Form PDF 73 KB Posted

Attached to
Advancing Expeditionary Space Domain Awareness
Solicitation number
SF243-D017
Issued by

About this file

This is a Space Force Small Business Innovation Research (SBIR) topic solicitation for the Expeditionary Space Domain Awareness (ExSDA) project, designated SF243-D017.

The objective is to establish a comprehensive system for continuous monitoring and safeguarding activities in Low Earth Orbit (LEO) and beyond, with capabilities for threat detection, pattern analysis, rapid response, and international collaboration while maintaining cost-effectiveness and adherence to international space norms. Key development areas include ground-based, ocean-based, and high-altitude platforms; multi-sensor integration (optical, RF, infrared); AI-enabled command and control systems; real-time data processing and analytics with anomaly detection; interoperability with existing terrestrial and space-based assets and international partners; resilience and sustainability features addressing space debris; scalable commercial off-the-shelf technologies; and personnel training and capacity building. The solicitation is restricted under the International Traffic in Arms Regulation (ITAR, 22 CFR Parts 120-130) and Export Administration Regulation (EAR, 15 CFR Parts 730-774), requiring disclosure of any proposed foreign national participation.

This topic is designated for Phase II awards only; Phase I awards will not be made. Applicants must submit documentation in the D2P2 proposal demonstrating completion of a Phase I-type feasibility study, including identification of potential Air Force and Space Force stakeholders, integration pathway with Defense Acquisition Framework (DAF) operations, and applicability to other DoD or governmental customers. Phase II will focus on refining and optimizing platforms, finalizing sensor integration, enhancing AI command and control, developing analytics tools, ensuring interoperability, optimizing resilience and sustainability, and conducting comprehensive testing and validation. Phase III anticipates transition to DoD and commercial applications at Technology Readiness Level 8 or higher, with emphasis on production scalability and engagement with acquisition programs and industry partners. No Technical Point of Contact is listed, and no CMMC level requirement applies.

View the file

Other versions and copies of SF 243

File Revision Posted Attached to
SF243-D013.pdf Revision not stated CCDM (Camouflage, Concealment, Deception, and Maneuver) Interrogation
SF243-D012.pdf Revision not stated Foreign Space Launch Detection
SF243-0003.pdf Revision not stated Reentry Events and Impact Location Prediction
SF243-D002.pdf Revision not stated Low Earth Orbit Space Domain Awareness Optical Fence
SF243-D011.pdf Revision not stated Launch Cycle Initiation Detection
SF243-D008.pdf Revision not stated RETURN (Returning ExoaTmospheric Unique Research is Novel)
SF243-0004.pdf Revision not stated Responsible Space Behavior Event Classification
SF243-D003.pdf Revision not stated Characterization and Typing of Hard-to-Acquire Targets using Advanced Machine Learning Methods on WFOV Staring Data
SF243-D009.pdf Revision not stated ASAT Launch Detection and Threat Assessment
SF243-D016.pdf Revision not stated Tactical High Orbit Fast Transfer
SF243-0001.pdf Revision not stated Event Based Data Fusion for Temporal Super Resolution in Image Based Tracking
SF243-D018.pdf Revision not stated Space Sustainment & Maneuver: Advancing Strategic Superiority in Orbital Operations
SF243-D010.pdf Revision not stated Object Transiting Tracking
SF243-D006.pdf Revision not stated Future Space Architectures through Advanced Mission Design and In-Space Development Platforms
SF243-D014.pdf Revision not stated Responsive, Radiation-hardened GEO Rideshare Capability
SF243-D004.pdf Revision not stated Nitramine Cost Reduction Development
SF243-D015.pdf Revision not stated Advancing Space Capabilities for Joint Warfighting Opportunities
SF243-0002.pdf Revision not stated Spectral-Binning Focal Plane Array for Infrared Spectroscopy
SF243-D001.pdf Revision not stated Manufacturing of New Nosetip Materials for Reentry Vehicles
SF243-D005.pdf Revision not stated Event-Based Sensor Readout Integrated Circuit
Show all 20

Who attaches SF 243

Other files

File Type Posted
AF_SBIR_243_DP2_v4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF243-D017: Advancing Expeditionary Space Domain Awareness

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Space Platforms

MODERNIZATION PRIORITIES:

Space Technology

KEYWORDS:

Space domain awareness; Continuous monitoring; Sensor integration; Command and control; Data processing;

Interoperability; Resilience; Cost-effectiveness; International collaboration; Training; Sustainability; Anomaly detection; Pattern analysis; Decision support; Space security

ADDITIONAL INFORMATION

N/A

OBJECTIVE:

The end goal of the Expeditionary Space Domain Awareness (ExSDA) project is to establish a comprehensive system for monitoring and safeguarding activities in space. This system will continuously monitor Low Earth Orbit (LEO) and beyond, detecting potential threats and analyzing patterns of activity. It will enable rapid response to emerging threats, integrating seamlessly with existing assets and international partners. The system will prioritize resilience and sustainability, aiming for cost-effectiveness while adhering to international norms for responsible behavior in space. Ultimately, the ExSDA project aims to enhance space security and stability, supporting continued exploration and utilization of space for future generations.

ITAR:

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

DESCRIPTION:

To achieve the objective of establishing a comprehensive system for monitoring and safeguarding activities in space, several key tasks need to be accomplished. These tasks encompass platform development, sensor integration, AI-enabled command and control, data processing and analytics, interoperability, resilience, cost-effectiveness, international collaboration, testing, and training. By addressing these components, we can create a robust space domain awareness system that enhances security, stability, and sustainability in the space domain.

· Platform Development: Develop ground-based, ocean-based, and high-altitude platforms equipped with advanced sensor technologies for continuous monitoring of the space domain.

· Sensor Integration: Integrate a variety of sensors, including optical, RF, infrared, and other relevant technologies, to provide comprehensive coverage and multi-domain awareness.

· AI-Enabled Command and Control: Implement an AI-enabled command and control system to automate sensor deployment, data collection, and analysis, optimizing resource allocation and response times.

· Data Processing and Analytics: Develop sophisticated algorithms and analytics tools for real-time data processing, change detection, pattern analysis, and anomaly detection, enhancing situational awareness and decision-making capabilities.

· Interoperability and Integration: Ensure interoperability and seamless integration with existing terrestrial and space-based assets, as well as international partners, to facilitate information sharing and collaborative response efforts.

· Resilience and Sustainability: Design the system with built-in redundancy, fail-safe mechanisms, and sustainable practices to ensure continuous operation and minimize disruptions, while also addressing environmental concerns such as space debris.

· Cost-Effectiveness and Scalability: Optimize the system for cost-effectiveness and scalability, leveraging commercial off-the-shelf technologies, maximizing operational efficiency, and accommodating future growth and expansion.

· International Collaboration and Norms: Foster international collaboration and adherence to established norms and guidelines for responsible behavior in space, promoting transparency, cooperation, and mutual trust among space-faring nations.

· Testing and Validation: Conduct rigorous testing and validation exercises to ensure the reliability, effectiveness, and safety of the system under various operational scenarios and conditions.

· Training and Capacity Building: Provide training and capacity-building programs for personnel involved in operating, maintaining, and utilizing the SDA system, empowering them with the necessary skills and knowledge for effective performance.

PHASE I:

This topic is intended for technology proven ready to move directly into Phase II. Therefore, Phase I awards will not be made for this topic. The applicant is required to provide detail and documentation in the D2P2 proposal which demonstrates accomplishment of a “Phase I-type” effort, including a feasibility study. This includes determining, insofar as possible, the scientific and technical merit and feasibility of ideas appearing to have commercial potential. It must have validated the product-mission fit between the proposed solution and a potential Air Force and/or Space Force stakeholder. The applicant should have defined a clear, immediately actionable plan with the proposed solution and the DAF customer and end-user.

The feasibility study should have:

1. Clearly identified the potential stakeholders of the adapted solution for solving the Air Force and/or Space Force need(s).

2. Described the pathway to integrating with DAF operations, to include how the applicant plans to accomplish core technology development, navigate applicable regulatory processes, and integrate with other relevant systems and/or processes.

3. Describe if and how the solution can be used by other DoD or Governmental customers.

PHASE II:

During the Phase II period of performance, the primary objective is to further develop the concepts and prototypes established in Phase I into a well-defined deliverable prototype. The following outlines the Phase II objectives, expectations, and prototyping requirements:

1. Platform Development: Refine and optimize the design of ground-based, ocean-based, and high-altitude platforms to ensure robustness, reliability, and scalability. Develop detailed specifications for each platform, including operating parameters such as altitude, endurance, and sensor capabilities.

2. Sensor Integration: Finalize the integration of various sensors, including optical, RF, infrared, and other relevant technologies, ensuring seamless interoperability and compatibility. Conduct thorough testing to validate sensor performance and accuracy under different environmental conditions.

3. Command and Control Enhancement: Enhance the AI-enabled command and control system to improve automation, decision-making, and response capabilities. Implement advanced algorithms for data processing, anomaly detection, and pattern analysis to enhance situational awareness and reduce response times.

4. Data Processing and Analytics: Further develop analytics tools and algorithms for real-time data processing, change detection, and pattern recognition. Conduct extensive testing to validate the effectiveness and accuracy of the analytics tools in detecting and analyzing space domain activities.

5. Interoperability and Integration: Continue efforts to ensure seamless integration with existing terrestrial and space-based assets, as well as international partners. Conduct interoperability testing to verify compatibility and information sharing capabilities.

6. Resilience and Sustainability Optimization: Refine resilience and sustainability features, including redundancy, fail-safe mechanisms, and environmental considerations such as space debris mitigation. Conduct thorough testing to validate the system's resilience and sustainability under various scenarios.

7. Cost-Effectiveness and Scalability: Optimize the system for cost-effectiveness and scalability, leveraging commercial off-the-shelf technologies and maximizing operational efficiency. Develop a scalable architecture capable of accommodating future growth and expansion.

8. International Collaboration and Norms Adherence: Strengthen efforts to foster international collaboration and adherence to established norms and guidelines for responsible behavior in space. Expand partnerships and information-sharing mechanisms with allied and partner nations.

9. Testing and Validation: Conduct comprehensive testing and validation exercises to verify the reliability, effectiveness, and safety of the prototype under realistic operational conditions. Include performance testing, stress testing, and scenario-based simulations to assess system performance and resilience.

10. Training and Documentation: Develop training programs and documentation for personnel involved in operating, maintaining, and utilizing the SDA system. Ensure that users are proficient in system operation, troubleshooting, and response procedures.

Success criteria for Phase II will include the delivery of a well-defined, fully functional prototype that meets the specified operational parameters and performance requirements. Additionally, success will be measured by the system's ability to enhance space domain awareness, improve decision-making capabilities, and contribute to space security, stability, and sustainability.

PHASE III DUAL USE APPLICATIONS:

Phase III represents the transition of SBIR/STTR-funded research and development efforts into Department of Defense (DoD) and/or commercial applications using non-SBIR/STTR funds. The expected Phase III effort, TRL at Phase III entry, and transition planning considerations are outlined below:

1. Expected Phase III Effort:

· Phase III will focus on further maturing the technology developed during Phases I and II into deployable solutions for DoD and/or commercial applications.

· Efforts will include refining the prototype into a production-ready system, conducting additional testing and validation, and addressing any remaining technical challenges or performance improvements.

· Emphasis will be placed on scaling production, enhancing reliability, and meeting specific operational requirements for end-users.

2. Expected TRL at Phase III Entry:

· The expected Technology Readiness Level (TRL) at Phase III entry will vary depending on the specific technology and its intended applications.

· Ideally, the technology will enter Phase III at TRL 8 or higher, indicating that it has been demonstrated in an operational environment and is ready for transition to end-users.

3. Transition Planning:

· Transition planning will involve identifying potential government and commercial partners, customers, and stakeholders interested in adopting the technology.

· Efforts will include engaging with acquisition programs, military units, agencies, and industry partners to facilitate technology transition and adoption.

· Plans will be developed to navigate any necessary government approvals, certifications, or regulatory requirements to enable the deployment and use of the technology.

· Additional funding sources and investment opportunities will be explored to support the commercialization and widespread adoption of the technology beyond SBIR/STTR funding.

· Collaboration with Defense Acquisition Framework (DAF) customers and other DoD entities will be pursued to identify additional transition opportunities and potential funding mechanisms for continued development and sustainment.

REFERENCES:

https://www.ssc.spaceforce.mil/Program-Offices/Space-Domain-Awareness-Combat-Power.1.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .