SF243-D016.pdf

Standard Form PDF 60 KB Posted

Attached to
Tactical High Orbit Fast Transfer
Solicitation number
SF243-D016
Issued by

About this file

This is a Direct to Phase II (D2P2) solicitation topic from SpaceWERX in partnership with Space Systems Command/Advanced Analysis (SSC/AAA) and United States Space Command (USSPACECOM) for development of responsive Orbit Transfer Vehicle (OTV) technology. The topic, SF243-D016: Tactical High Orbit Fast Transfer (THOFT), seeks cutting-edge technologies to rapidly deploy small spacecraft to high-energy orbits (GEO, Cislunar, MEO) within hours rather than months or years, addressing critical capability gaps in U.S. Space Force response times to emerging threats beyond Low Earth Orbit. The primary focus areas include advanced space vehicle propulsion systems achieving a target delta vee above 3000 m/s with multiple restart capability and non-toxic propellants for reduced ground operations; platform enhancements addressing structural mass reduction and compact packaging suitable for small launch vehicle fairings or multi-manifest rideshare missions; and secondary subsystems including thermal controls, navigation, avionics, and guidance/navigation/control for autonomous trajectories.

This Direct to Phase II topic skips Phase I awards and requires applicants to submit Phase I-type feasibility documentation demonstrating scientific and technical merit with proof-of-concept activities. Phase II proposals must include prototype development of key enabling technologies, integrated component proof-of-concept, or ground-unit propulsion-bus integration with full demonstration and testing, specifically addressing propulsion challenges or mass-reduction components that affect attainable delta vee. Proposals must evaluate solutions against measurable objectives, describe how the solution enhances non-defense commercial offerings for scalability and production capability, identify clear transition pathways involving stakeholders including end users and launch vehicle providers, and specify integration with current and potential solutions in development. The technology falls under ITAR (International Traffic in Arms Regulation, 22 CFR Parts 120-130) and EAR (Export Administration Regulation, 15 CFR Parts 730-774) restrictions, requiring disclosure of any proposed foreign nationals, their country of origin, visa/work permit status, and assigned statement of work tasks. No technical point of contact is designated. CMMC level requirement is N/A.

View the file

Other versions and copies of SF 243

File Revision Posted Attached to
SF243-D013.pdf Revision not stated CCDM (Camouflage, Concealment, Deception, and Maneuver) Interrogation
SF243-D012.pdf Revision not stated Foreign Space Launch Detection
SF243-0003.pdf Revision not stated Reentry Events and Impact Location Prediction
SF243-D002.pdf Revision not stated Low Earth Orbit Space Domain Awareness Optical Fence
SF243-D011.pdf Revision not stated Launch Cycle Initiation Detection
SF243-D017.pdf Revision not stated Advancing Expeditionary Space Domain Awareness
SF243-D008.pdf Revision not stated RETURN (Returning ExoaTmospheric Unique Research is Novel)
SF243-0004.pdf Revision not stated Responsible Space Behavior Event Classification
SF243-D003.pdf Revision not stated Characterization and Typing of Hard-to-Acquire Targets using Advanced Machine Learning Methods on WFOV Staring Data
SF243-D009.pdf Revision not stated ASAT Launch Detection and Threat Assessment
SF243-0001.pdf Revision not stated Event Based Data Fusion for Temporal Super Resolution in Image Based Tracking
SF243-D018.pdf Revision not stated Space Sustainment & Maneuver: Advancing Strategic Superiority in Orbital Operations
SF243-D010.pdf Revision not stated Object Transiting Tracking
SF243-D006.pdf Revision not stated Future Space Architectures through Advanced Mission Design and In-Space Development Platforms
SF243-D014.pdf Revision not stated Responsive, Radiation-hardened GEO Rideshare Capability
SF243-D004.pdf Revision not stated Nitramine Cost Reduction Development
SF243-D015.pdf Revision not stated Advancing Space Capabilities for Joint Warfighting Opportunities
SF243-0002.pdf Revision not stated Spectral-Binning Focal Plane Array for Infrared Spectroscopy
SF243-D001.pdf Revision not stated Manufacturing of New Nosetip Materials for Reentry Vehicles
SF243-D005.pdf Revision not stated Event-Based Sensor Readout Integrated Circuit
Show all 20

Who attaches SF 243

Other files

File Type Posted
AF_SBIR_243_DP2_v4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF243-D016: Tactical High Orbit Fast Transfer

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Space Platforms

MODERNIZATION PRIORITIES:

Space Technology

KEYWORDS:

OTV, fast transfer, Dynamic Space Operations

ADDITIONAL INFORMATION

N/A

OBJECTIVE:

This Direct to Phase II (D2P2) Topic, offered by SpaceWERX in partnership with SSC/AAA and USSPACECOM, seeks cutting-edge ideas and state-of-the-art capabilities to rapidly respond to urgent on orbit needs. The primary objective is to demonstrate revolutionary technologies for resilient and responsive dynamic space operations using space transport vehicles via the development, integration, testing, and demonstration of technology to attain responsive, rapid, high delta vee craft. Thus, this effort seeks to accelerate technology developments that lead to a new class of high delta V, responsive, rapid transfer Orbit Transfer Vehicles (OTVs) that will meet military needs.

ITAR:

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

DESCRIPTION:

Tactical High Orbit Fast Transfer (THOFT) is the ability to rapidly respond to needs on High-Orbital Energy orbits on operationally relevant timelines. As evidenced by the investments and numerous deployments of capabilities placed on orbit by actors within the Global Power Competition, Space is a dynamic domain. Before, up to, and during a conflict, space capabilities rely heavily upon U.S. space assets.

The capability deficiency and current mission impact within the realm of space operations for the Department of Defense (DoD) stems from a lack of rapid response capability to respond to emerging threats. This is emphasized where response is needed to beyond LEO orbits where small launch vehicles cannot reach and rideshares often do not target. Current systems have extended response times, ranging from months to years, which renders them unable to effectively counter adversarial action or respond to threats. Inflexibility in current mission planning processes also hampers the DoD’s ability to adapt to dynamic situation in space.

Our mission is to reduce United States Space Force (USSF) response times to events and situations in beyond LEO regions from months or years to hours or days. Thus, having a significant impact on U.S. and ally resilience. To meet the Target Performance Goals, a new class of Orbit Transfer Vehicles (OTVs) will need to be developed to demonstrate the ability to reach all regions of the space domain, including high energy orbits (GEO, Cislunar, MEO, etc.) in effectual, operationally-relevant timelines. This involves emplacement of a small spacecraft into a beyond- LEO orbit within hours. Transported via advanced propulsion systems to get to the necessary orbits, and on-orbit operational procedures to include end- of-life disposal. This OTV will exploit proven spacecraft secondary systems that can be implemented with minimal non-recurring engineering, thus allowing greater focus on the technologies that enable the orbital transfer itself (e.g. lightweight structure, propulsion, etc.). The USSF encourages respondents to this topic to enhance future OTV capabilities to offer technological solutions for full prototype OTV development to meet this need, or demonstration of key enabling technology, as well as integration and full ground demonstration of developed technology solutions.

AREAS OF EMPHASIS

1) Space Vehicle propulsion:

• Propulsive systems to provide for High performance mission capability demands to attain a target Delta Vee above 3000 m/s (notional ESPA class vehicle). Similarly, retaining propulsive flexibility; i.e. the ability for orbital adjustment and mission flexibility will demand Multiple re-start capability

• Interest in propellants that are easier to handle/more efficient and quicker to fuel for reduced ground operations. In the case of bi-propellant systems a non-toxic configuration must suffice. All while retaining the ability for storage of short on-orbit mission lifetime (Hours & days with potential expansion to weeks or months with further technology development). This may incur on-orbit cryogenic propellant storage to a degree.

• Responsiveness and ground operations will further require non-toxic propellants for secondary propulsion or Attitude Control systems.

2) Platform enhancement (structure/subsystems):

• Structural, or secondary systems that will affect the dry mass of the system. These may include structure, propellant tanks, secondary components, power systems, etc. Overall impact must be demonstrated at an integrated or rolled up level to address secondary impacts on other subsystems.

• Architecture envisions an easily packaged and deployable solution that accommodate either a single stack (Fits within a small launch vehicle payload fairing with accommodation for an ESPA class spacecraft) or integration into a multi-manifested ride- share mission. Hence compact packaging technologies will further.

• Rapid transition to an operational system, with viable production rate and surge capability. This infers the leverage/use of active commercial space bus, Orbital Transfer Vehicle or other spacecraft production lines now in development but may need to be modified or enhanced to reduce structural mass, etc.

3) Subsystems: Subsystems may need to be addressed, since they do play a role in determining viability of an overall system, but are deemed to be secondary in nature to the focus of this topic. Items such as thermal controls to meet variety of orbital inclinations, internal navigation, on-orbit data processing, avionics and GN&C for complex orbital and suborbital autonomous trajectories and tools and training to quickly conduct optimal transfer trajectory, intercept, orbital alignment, and minimize reliance on ground network.

PHASE I:

This topic is intended for technology proven ready to move directly into Phase II. Therefore, Phase I awards will not be made for this topic. The applicant is required to provide detail and documentation in the D2P2 proposal which demonstrates accomplishment of a “Phase I-type” elements, including a feasibility study. This includes determining the scientific and technical merit, as well as potential risk mitigation activities, or initial proof of concept type activities.

PHASE II:

Proposals should include prototype development for the key enabling technologies, or an integrated component proof of concept, or ground unit propulsion-bus integration, with full component demonstration and/or test and evaluation of the proposed solution prototype system. Whatever aspect, technology or focus of a phase 2 effort should affect the attainable delta Vee to meet the mission capability, thus the activities should address the challenging propulsion aspects or the secondary components and structure to reduce the mass fraction. These activities should focus specifically on:

1. Evaluating the adapted solution against the proposed objectives and measurable key results.

2. Describing in detail how the installed solution differs from or enhances the non-defense commercial offering to solve the Air Force and/or Space Force need(s), as well as how it can be scaled for wide adoption, i.e., modified for scale, production rate, timeframe for Initial Operational Capability, etc..

3. Identifying the proposed solution's clear transition path, taking into account input from affected stakeholders, including but not limited to, end users, operators, Launch vehicle providers, integrators, etc.

4. Specifying the solution's integration with other current and potential solutions currently in development.

PHASE III DUAL USE APPLICATIONS:

Some solutions may go from Phase II to Phase III as soon as the product-market fit is verified. Potential Phase III awardees will transition to the adapted non-Defense commercial solution to provide expanded mission capability for a broad range of potential Governmental and civilian users and alternate mission applications.

REFERENCES:

FitzGerald, B., Sander, A., Parziale, J. (2016). Future Foundry: A New Strategic Approach to Military- Technical Advantage. https://www.cnas.org/publications/reports/future-foundry.

1.

Blank, S. (2016). The Mission Model Canvas - An Adapted Business Model Canvas for Mission-Driven Organizations. https://steveblank.com/2016/02/23/the-mission-model-canvas-an-adapted-business-model-canvas-for-mission-driven-organizations/.

2.

US Department of Defense. (2018). 2018 National Defense Strategy of the United States Summary.

https://dod.defense.gov/Portals/1/Documents/pubs/2018-National-Defense-Strategy-Summary.pdf.

3.

Chaplain, C. T. (2016). Space Acquisitions: Challenges Facing DOD as it Changes Approaches to Space Acquisitions. US Government Accountability Office Washington United States.

https://www.gao.gov/assets/680/675978.pdf.

4.

Space Capstone Publication, Spacepower (SCP). (2020).

https://www.spaceforce.mil/Portals/1/Space%20Capstone%20Publication_10%20Aug%202020.pdf.

5.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .