Advancing Expeditionary Space Domain Awareness
Closed Solicitation Posted
- Solicitation number
- SF243-D017
- Agency
-
Air Force Materiel Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
About this opportunity
The Department of the Air Force Materiel Command seeks Phase II proposals under DoD SBIR 24.3 topic SF243-D017, Advancing Expeditionary Space Domain Awareness, with proposals due October 23, 2024, a deadline that has passed. The topic is Phase II only: Phase I awards will not be made, and offerors must submit documentation of a completed Phase I-type feasibility study performed outside SBIR/STTR funding. The Set Aside line is Total Small Business.
The topic seeks a space domain awareness system for continuous monitoring of Low Earth Orbit and beyond, integrating ground-based, ocean-based, and high-altitude platforms, optical, RF, and infrared sensors, AI-enabled command and control, and real-time anomaly detection. Phase II focuses on platform refinement, sensor integration, testing, and validation, and Phase III anticipates transition at Technology Readiness Level 8 or higher. Feasibility documentation must identify potential Air Force and Space Force stakeholders and an integration pathway. The awardee must perform at least two-thirds of the research and analytical effort, and the Principal Investigator must maintain primary employment (over 50% time) with the small business throughout performance. The topic is subject to ITAR (22 CFR Parts 120-130) and EAR, and proposed foreign national participation must be disclosed. Proposers must be registered in SAM with an active Unique Entity ID and submit through the Defense SBIR/STTR Innovation Portal (DSIP). The proposal comprises Volumes 1-6, with the technical volume limited to 35 pages.
Across the D2P2 solicitation, award values range from $1.8 million to $3.0 million with performance periods of 15 to 24 months. The listed codes are NAICS 541715 and PSC AC12. No Technical Point of Contact is listed, and no CMMC level requirement applies.
Notice text
DoD SBIR topic SF243-D017
Component: USAF
Command: AFMC
Phase: SBIR Program Phase II Action
Technology Areas: Space Platforms
Focus Areas: Space Technology
Keywords: Space domain awareness; Continuous monitoring; Sensor integration; Command and control; Data processing; Interoperability; Resilience; Cost-effectiveness; International collaboration; Training; Sustainability; Anomaly detection; Pattern analysis; Decision support; Space security
ITAR: Yes
Objective:
The end goal of the Expeditionary Space Domain Awareness (ExSDA) project is to establish a comprehensive system for monitoring and safeguarding activities in space. This system will continuously monitor Low Earth Orbit (LEO) and beyond, detecting potential threats and analyzing patterns of activity. It will enable rapid response to emerging threats, integrating seamlessly with existing assets and international partners. The system will prioritize resilience and sustainability, aiming for cost-effectiveness while adhering to international norms for responsible behavior in space. Ultimately, the ExSDA project aims to enhance space security and stability, supporting continued exploration and utilization of space for future generations.
Description:
To achieve the objective of establishing a comprehensive system for monitoring and safeguarding activities in space, several key tasks need to be accomplished. These tasks encompass platform development, sensor integration, AI-enabled command and control, data processing and analytics, interoperability, resilience, cost-effectiveness, international collaboration, testing, and training. By addressing these components, we can create a robust space domain awareness system that enhances security, stability, and sustainability in the space domain.
· Platform Development: Develop ground-based, ocean-based, and high-altitude platforms equipped with advanced sensor technologies for continuous monitoring of the space domain.
· Sensor Integration: Integrate a variety of sensors, including optical, RF, infrared, and other relevant technologies, to provide comprehensive coverage and multi-domain awareness.
· AI-Enabled Command and Control: Implement an AI-enabled command and control system to automate sensor deployment, data collection, and analysis, optimizing resource allocation and response times.
· Data Processing and Analytics: Develop sophisticated algorithms and analytics tools for real-time data processing, change detection, pattern analysis, and anomaly detection, enhancing situational awareness and decision-making capabilities.
· Interoperability and Integration: Ensure interoperability and seamless integration with existing terrestrial and space-based assets, as well as international partners, to facilitate information sharing and collaborative response efforts.
· Resilience and Sustainability: Design the system with built-in redundancy, fail-safe mechanisms, and sustainable practices to ensure continuous operation and minimize disruptions, while also addressing environmental concerns such as space debris.
· Cost-Effectiveness and Scalability: Optimize the system for cost-effectiveness and scalability, leveraging commercial off-the-shelf technologies, maximizing operational efficiency, and accommodating future growth and expansion.
· International Collaboration and Norms: Foster international collaboration and adherence to established norms and guidelines for responsible behavior in space, promoting transparency, cooperation, and mutual trust among space-faring nations.
· Testing and Validation: Conduct rigorous testing and validation exercises to ensure the reliability, effectiveness, and safety of the system under various operational scenarios and conditions.
· Training and Capacity Building: Provide training and capacity-building programs for personnel involved in operating, maintaining, and utilizing the SDA system, empowering them with the necessary skills and knowledge for effective performance.
Phase I:
This topic is intended for technology proven ready to move directly into Phase II. Therefore, Phase I awards will not be made for this topic. The applicant is required to provide detail and documentation in the D2P2 proposal which demonstrates accomplishment of a “Phase I-type” effort, including a feasibility study. This includes determining, insofar as possible, the scientific and technical merit and feasibility of ideas appearing to have commercial potential. It must have validated the product-mission fit between the proposed solution and a potential Air Force and/or Space Force stakeholder. The applicant should have defined a clear, immediately actionable plan with the proposed solution and the DAF customer and end-user.
The feasibility study should have:
1. Clearly identified the potential stakeholders of the adapted solution for solving the Air Force and/or Space Force need(s).
2. Described the pathway to integrating with DAF operations, to include how the applicant plans to accomplish core technology development, navigate applicable regulatory processes, and integrate with other relevant systems and/or processes.
3. Describe if and how the solution can be used by other DoD or Governmental customers.
Phase II:
During the Phase II period of performance, the primary objective is to further develop the concepts and prototypes established in Phase I into a well-defined deliverable prototype. The following outlines the Phase II objectives, expectations, and prototyping requirements:
1. Platform Development: Refine and optimize the design of ground-based, ocean-based, and high-altitude platforms to ensure robustness, reliability, and scalability. Develop detailed specifications for each platform, including operating parameters such as altitude, endurance, and sensor capabilities.
2. Sensor Integration: Finalize the integration of various sensors, including optical, RF, infrared, and other relevant technologies, ensuring seamless interoperability and compatibility. Conduct thorough testing to validate sensor performance and accuracy under different environmental conditions.
3. Command and Control Enhancement: Enhance the AI-enabled command and control system to improve automation, decision-making, and response capabilities. Implement advanced algorithms for data processing, anomaly detection, and pattern analysis to enhance situational awareness and reduce response times.
4. Data Processing and Analytics: Further develop analytics tools and algorithms for real-time data processing, change detection, and pattern recognition. Conduct extensive testing to validate the effectiveness and accuracy of the analytics tools in detecting and analyzing space domain activities.
5. Interoperability and Integration: Continue efforts to ensure seamless integration with existing terrestrial and space-based assets, as well as international partners. Conduct interoperability testing to verify compatibility and information sharing capabilities.
6. Resilience and Sustainability Optimization: Refine resilience and sustainability features, including redundancy, fail-safe mechanisms, and environmental considerations such as space debris mitigation. Conduct thorough testing to validate the system's resilience and sustainability under various scenarios.
7. Cost-Effectiveness and Scalability: Optimize the system for cost-effectiveness and scalability, leveraging commercial off-the-shelf technologies and maximizing operational efficiency. Develop a scalable architecture capable of accommodating future growth and expansion.
8. International Collaboration and Norms Adherence: Strengthen efforts to foster international collaboration and adherence to established norms and guidelines for responsible behavior in space. Expand partnerships and information-sharing mechanisms with allied and partner nations.
9. Testing and Validation: Conduct comprehensive testing and validation exercises to verify the reliability, effectiveness, and safety of the prototype under realistic operational conditions. Include performance testing, stress testing, and scenario-based simulations to assess system performance and resilience.
10. Training and Documentation: Develop training programs and documentation for personnel involved in operating, maintaining, and utilizing the SDA system. Ensure that users are proficient in system operation, troubleshooting, and response procedures.
Success criteria for Phase II will include the delivery of a well-defined, fully functional prototype that meets the specified operational parameters and performance requirements. Additionally, success will be measured by the system's ability to enhance space domain awareness, improve decision-making capabilities, and contribute to space security, stability, and sustainability.
Phase III:
Phase III represents the transition of SBIR/STTR-funded research and development efforts into Department of Defense (DoD) and/or commercial applications using non-SBIR/STTR funds. The
expected Phase III effort, TRL at Phase III entry, and transition planning considerations are outlined below:
1. Expected Phase III Effort:
· Phase III will focus on further maturing the technology developed during Phases I and II into deployable solutions for DoD and/or commercial applications.
· Efforts will include refining the prototype into a production-ready system, conducting additional testing and validation, and addressing any remaining technical challenges or performance improvements.
· Emphasis will be placed on scaling production, enhancing reliability, and meeting specific operational requirements for end-users.
2. Expected TRL at Phase III Entry:
· The expected Technology Readiness Level (TRL) at Phase III entry will vary depending on the specific technology and its intended applications.
· Ideally, the technology will enter Phase III at TRL 8 or higher, indicating that it has been demonstrated in an operational environment and is ready for transition to end-users.
3. Transition Planning:
· Transition planning will involve identifying potential government and commercial partners, customers, and stakeholders interested in adopting the technology.
· Efforts will include engaging with acquisition programs, military units, agencies, and industry partners to facilitate technology transition and adoption.
· Plans will be developed to navigate any necessary government approvals, certifications, or regulatory requirements to enable the deployment and use of the technology.
· Additional funding sources and investment opportunities will be explored to support the commercialization and widespread adoption of the technology beyond SBIR/STTR funding.
· Collaboration with Defense Acquisition Framework (DAF) customers and other DoD entities will be pursued to identify additional transition opportunities and potential funding mechanisms for continued development and sustainment.
Files
| File | Type | Posted |
|---|---|---|
| SF243-D017.pdf | ||
| AF_SBIR_243_DP2_v4.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Fusion of Cooperative Information Sharing for Uncrewed Air Systems (FOCISAUS) | Air Force Materiel Command | Total Small Business | |
| Battle Damage Indications / Battle Damage Assessment Collection, Aggregation, and Analytics Improvement | Air Force | Total Small Business | |
| Counter-Unmanned Aerial Systems Rapid Maturation | Office of the Secretary of Defense | Total Small Business | |
| Low SWaP, 2-micron Fiber Amplifiers | Air Force Materiel Command | Total Small Business | |
| Technical Data Package Modernization for Information Assurance and Secure Data Exchange | Air Force Materiel Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity