Self-Performed and Subcontracted Worksheet.docx
DOCX document 20 KB Posted
- Attached to
- Z2DA--Actionable-554-23-101 Construct New SCI Residential Rehab Apartment, Building H (VA-26-00005761)
- Solicitation number
- 36C25926R0032
About this file
The file is a Self-Performed and Subcontracted Worksheet for a federal construction contract. The document requires offerors in general construction (NAICS code 236220) to self-perform at least 15% of personnel contract costs, with a higher 25% threshold for specialty trade contractors. Bidders must provide a detailed breakdown of personnel and material costs by specification division, including home office overhead, profit, fees, and bond costs. The worksheet mandates clear identification of personnel costs performed by the prime contractor and any eligible service-disabled veteran-owned small business (SDVOSB) subcontractors.
The worksheet is associated with a Department of Veterans Affairs project to remodel an existing space into a residential rehabilitation apartment for spinal cord injury patients at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project involves comprehensive renovation work including demolition of walls, floors, ceilings, and existing systems, followed by reconstruction and installation of new plumbing, electrical, low voltage data, communication systems, kitchen cabinetry, and appliances. Contractors must implement Infection Control Risk Assessment IV (ICRA IV) protections and may be required to perform disruptive work after normal working hours at no additional government cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Q and A 56 to 64 SCI Apt 02-04-2026 VA.docx | DOCX document | |
| table submittal 2014.pdf | ||
| 01 35 26 safety 2026-02-04.pdf | ||
| 36C25926R0032 0002.docx | DOCX document | |
| Pre bid Site Visit Attendance 15-01-2026.pdf | ||
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0032 0001.docx | DOCX document | |
| Answers to RFI Questions 41 to 55 SCI Apt 2026-01-23 VA.pdf | ||
| Drawings 554-23-101 Construct New SCI set 1 of 2.pdf | ||
| S02-Specifications 554-23-101 Construct New SCI.pdf | ||
| 36C25926R0032_1.docx | DOCX document | |
| 554-23-101 - Construct New SCI -ASI 01.pdf | ||
| RFI Q and A 1 to 40.pdf | ||
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Drawings 554-23-101 New SCI Apartment set 2 of 2.pdf | ||
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division and name |
| SDVOSB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
| Sub Total (Personnel Costs, Material/Equipment Costs) |
| $ |
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $_________________
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $__________________ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | ________________% |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
| ________________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)