554-23-101 - Construct New SCI -ASI 01.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--Actionable-554-23-101 Construct New SCI Residential Rehab Apartment, Building H (VA-26-00005761)
- Solicitation number
- 36C25926R0032
About this file
These are electrical demolition and power plan construction documents for a new Spinal Cord Injury (SCI) Residential facility for the VA in Aurora, Colorado, scheduled for construction in July 2025. The documents detail electrical demolition requirements, including removing receptacles, lighting fixtures, wiring, conduits, switches, and occupancy sensors, with specific instructions to relocate at least 4 existing conduits. Key electrical specifications include providing a 40A breaker and wiring for a kitchen range, an emergency shunt trip breaker in the electrical room, a lift charging station receptacle at 72" height, and toggle switches for power-operated doors. The plans emphasize strict safety protocols, requiring all electrical work to be completed with circuits de-energized or in compliance with NFPA 70E standards for working on energized electrical systems, with the VA determining service shutdown procedures based on area criticality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Q and A 56 to 64 SCI Apt 02-04-2026 VA.docx | DOCX document | |
| table submittal 2014.pdf | ||
| 01 35 26 safety 2026-02-04.pdf | ||
| 36C25926R0032 0002.docx | DOCX document | |
| Pre bid Site Visit Attendance 15-01-2026.pdf | ||
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0032 0001.docx | DOCX document | |
| Answers to RFI Questions 41 to 55 SCI Apt 2026-01-23 VA.pdf | ||
| Drawings 554-23-101 Construct New SCI set 1 of 2.pdf | ||
| S02-Specifications 554-23-101 Construct New SCI.pdf | ||
| 36C25926R0032_1.docx | DOCX document | |
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| RFI Q and A 1 to 40.pdf | ||
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Drawings 554-23-101 New SCI Apartment set 2 of 2.pdf | ||
| Self-Performed and Subcontracted Worksheet.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
OS
P
OS
OS
OS
OS
HE-P01
ELEV
04-01-PE3
+42"
+60"
DIGITAL
SIGNAGE
04-NL11-48,50
04-EQL12-7
(PART)
TYP.
PUBLIC
TLT
H1-203
04-NL11-54
(PART)
,52
# KEY NOTES:
1.
2.
3.
4.
5.
DEMOLISH RECEPTACLES, WIRING, AND CONDUIT BACK TO
PANEL.
DEMOLISH LIGHTING FIXTURES, WIRING, AND CONDUIT BACK TO
PANEL.
DEMOLISH LIGHT SWITCHES.
DEMOLISH OCCUPANCY SENSORS.
DEMOLISH EXIT LIGHT FIXTURE.
6. RELOCATE AT LEAST 4 EXISTING CONDUITS IN PREPARATION
FOR CIRCADIAN LIGHT.
SHEET NOTES:
1.
2.
VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES
TO THE COR IMMEDIATELY.
ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL
PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (I.E. A NEW
BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS
THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE
CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON
ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE
ELECTRICAL SERVICE CAN BE SHUTDOWN OR IT WILL HAVE TO
BE WORKED HOT DEPENDING ON THE CRITICALITY OF THE
AREA BEING AFFECTED. IF THE WORK MUST BE DONE WITH
THE SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT,
AND CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK
PLAN PREPARED BY THE VA. WORK THAT REQUIRES SHUTTING
DOWN ELECTRICAL SERVICE MAY HAVE TO BE ACCOMPLISHED
DURING OTHER THAN NORMAL DUTY HOURS.
3. LIGHT LINES INDICATE EXISTING TO REMAIN.
4. DARK LINES INDICATE NEW WORK.
5. SEE PANEL CHEDULE ON SHEET EP601.
HE-P01
ELEV
04-01-PE3 +42"
TYP.
04NH12-3
(PART)
04NH12-1
(PART)
TYP
TYP
PUBLIC
TLT
H1-203
04-CH11-7
(PART)
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:5
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/E S-
IB
S.
rv t
04-ED-101
ELECTRICAL POWER AND LIGHTING
DEMO PLAN
DC WBR
NORTH
3/8" = 1'-0"1 ELEC DEMO POWER PLAN
04-NL11-47,49,51
3/8" = 1'-0"2 ELEC DEMO LIGHTING PLAN
2' 4'0 1'
SCALE:3/8"=1'-0"
7/1/2025 wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Text Box REMOVE AND REROUTE EXISTING ELECTRICAL CONDUIT, WIRING, AND JUNCTION BOXES SHOWN IN RED TO INTERSTITAL SPACE ABOVE. ENSURE ALL EXISTING JUNCTION BOXES ARE CONVENIENTLY ACCESSIBLE PER VA REQUIREMENTS. ACCESS PANELS HAVE BEEN STRATEGICALLY LOCATED IN PROJECT SPACE TO MINIMIZE THE AMOUNT OF RELOCATION. HOWEVER ALL EXISTING AND NEW WORK MUST MEET THE ACCESSABILITY REQUIREMENTS OF THE VA.
wrisner Text Box 7.
wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Arrow wrisner Line wrisner Text Box wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Line wrisner Arrow wrisner Arrow wrisner Arrow wrisner Line wrisner Text Box RELOCATE EXISTING CRITICAL POWER CONDUIT CURRENTLY LOCATED ABOVE DROPPED CEILING TO ALLOW FOR NEW LIGHTING INSTALLATION. NEW ROUTING MUST MEET VA ACCESSABILITY REQUIREMENTS wrisner Text Box 8.
wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Text Box wrisner Arrow wrisner Text Box 10.20.2025 wrisner Text Box
1 BIDDING PHASE ASI
wrisner Line wrisner Line wrisner Line wrisner Architect wrisner Architect wrisner Line wrisner Line wrisner Line wrisner Text Box wrisner Line wrisner Line wrisner Line wrisner Text Box
DN
T7
T1
T4
R
EF
MCWV DSHW AC
G
FC
I
GD
VW
H D
J
H O
O D
FAN
DOOR
R
EF
MCWV DSHW
AC
G
FC
I
ES
GD
VW
H D
J
ES
H O
O D
FAN
DOOR
H1-210B
PAT TLT
04-01-B1-02
H1-210A
PAT TLT
04-01-B2-01
H1-232A
PAT TLT, ISO
04-01-E1-02
H1-220A
PAT TLT
04-01-D2-01
H1-226A
PAT TLT
04-01-D1-02
H1-230A
PAT TLT
04-01-E2-01
H1-216
PATIENT RM
04-01-C1-01
H1-240A
PAT TLT
04-01-F1-02
H1-109A
PAT TLT
04-01-RBR1-02
H1-109B
PAT TLT
04-01-RBR1-03
H1-235
EXAM/TREATMENT
04-01-E3-02
H1-216B
PAT TLT
04-01-C1-02
H1-206B
PAT TLT
04-01-A1-02
H1-206A
PAT TLT
04-01-A2-03
H1-206
PATIENT RM
04-01-B1-01
H1-210B
PAT TLT
04-01-B1-02
H1-210
PATIENT RM
04-01-B1-03
H1-226
PATIENT RM, ISO
04-01-D1-03
H1-228
ANTEROOM
04-01-E2-02
H1-232A
PAT TLT, ISO
04-01-E1-02
H1-220
PATIENT RM
04-01-D1-01
H1-220A
PAT TLT
04-01-D2-01
H1-232
PATIENT RM
04-01-E1-01
H1-226A
PAT TLT
04-01-D1-02
H1-230
PATIENT RM
04-01-D1-03B
H1-230A
PAT TLT
04-01-E2-01
H1-240
PATIENT RM
04-01-F1-01
H1-240A
PAT TLT
04-01-F1-02
H1-244
PATIENT RM
04-01-F1-03 H1-236
PATIENT RM
04-01-E1-03
H1-236A
PAT TLT, ISO
04-01-F2-01
H1-109
PATIENT RM
04-01-RBR1-01
H1-111A
PAT TLT
04-01-RCR1-01
H1-117
PATIENT RM
04-01-RCR1-05
H1-114
W.C. ALCOVE
04-01-C3-03
H1-133
HAC
04-01-RFR1-03
H1-205
OFFICE
04-01-B3-01
H1-106
EQUIP STOR
04-01-A3-02
H1-209
NURSE
SPECIALIST
04-01-B3-03
H1-223
SOILED UTIL
04-01-D3-01
H1-130
NOURISH
04-01-D3-03
H1-203
STORAGE
-H1-A103 H1-207
OFFICE
04-01-B3-02 H1-100
ELEV VEST
04-01-A3-01
H1-110
OFFICE
04-01-B3-06
H1-234
OBSERV
04-01-D2-02
H1-105
LITTER STOR
04-01-RAR1-01
H1-108
EQUIP STOR
04-01-B3-05
H1-113
PATIENT RM
04-01-RCR1-02
H1-111
PATIENT RM
04-01-RBR1-04
H1-128
MED
04-01-D3-04
H1-216A
PAT TLT
04-01-C2-01
H1-237
CLEAN UTIL
04-01-E3-03
H1-213
CLEAN LINEN
04-01-C3-01H1-211
OFFICE
04-01-B3-04
H1-242
STAFF TLT
04-01-F1-04
H1-135
PATIENT RM
04-01-RFR1-05
H1-131A
PAT TLT
04-01-RFR1-04
H1-131
PATIENT RM
04-01-RFR1-02
H1-129A
PAT TLT
04-01-RFR1-01
H1-129
PATIENT RM
04-01-RER1-05
H1-125A
PAT TLT
04-01-RER1-04
H1-127
OBSERV
04-01-RER1-03
H1-123A
PAT TLT
04-01-RER1-01
H1-125
PATIENT RM
04-01-RER1-02
H1-123
PATIENT RM
04-01-RDR1-05
H1-121
ANTEROOM
04-01-RDR1-03
H1-119A
PAT TLT
04-01-RDR1-04
H1-119
PATIENT RM, ISO
04-01-RDR1-02
H1-117
PATIENT RM
04-01-RCR1-05
H1-117A
PAT TLT
04-01-RDR1-01
H1-113A
PAT TLT
04-01-RCR1-04
H1-104
HAC
04-01-A3-03
H1-CO8
CORRIDOR
04-01-C2-02
04-01-C3-05
EKG ALCOVE
H1-229
QUIET
04-01-E3-04
H1-124
NURSE STATION
04-01-E3-01
H1-202
STAFF
04-01-RGR1-08
H1-219
LITTER STOR
04-01-C3-04
H1-115
STAFF TLT
04-01-RCR1-03
H1-C09
CORRIDOR
04-01-E2-03
H1-221
X-RAY EQUIP
ALCOVE
04-01-D3-02
04-01-E3-06
CRASH CART
ALCOVE
04-01-E3-05
CRASH CART
ALCOVE
H1-C05
ELEV VEST
04-01-D3-05
H1-C01
CORRIDOR
04-01-RAR1-05
H1-C07
CORRIDOR
04-01-C3-02
CORRIDOR
04-01-E3-08
CORRIDOR
H1-C06
CORRIDOR
04-01-E3-07
H1-215
ELEC
04-01-C3-E1 H1-217
DATA /
TELECOMM
04-01-C3-T1
H1-239
DATA /
TELECOMM
04-01-F2-T2
H1-132
ELEC
04-01-F3-E2
04-01-D3-H1
CHUTE
HE-P02
ELEV
04-01-PE4
HE-P01
ELEV
04-01-PE3
04-01-SE17
ELEV
H1-ST1
STAIR
04-01-ST1
HE-S02
ELEV
04-01-SE4
HE-S01
ELEV
04-01-SE3
Panel
04-NL11
Panel
04-LSL11
04-CH11
04-NH12
04-LCP12
Panel
04-CL12
Panel
04-NL12
TLSL11
TCL11
04-CL11
LIVING/DINING
-H1-A104
KITCHEN
-H1-A105
BEDROOM
-H1-A102
BATHROOM
-H1-A101 +40"
+50"
04-ES-401
# KEY NOTES:
1.
2.
3.
4.
PROVIDE 3#8, 1#10, 3/4"C AND 40A BREAKER FOR KITCHEN
RANGE. COORDINATE RANGE SELECTION WITH VA
PERSONNEL.
PROVIDE EMERGENCY SHUNT TRIP BREAKER IN ELECTRICAL
ROOM H1-215.
PROVIDE RECEPTACLE FOR LIFT CHARGING STATION AT 72''
AFF.
PROVIDE, FOR THE TWO POWER OPERATED DOORS, A
TOGGLE SWITCH ABOVE THE CEILING IN THE HALLWAY TO
ALLOW MAINTENANCE AND REPAIR WORK.
SHEET NOTES:
1.
2.
3.
4.
5.
6.
7.
VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. IF
ANY DISCREPANCIES ARE FOUND FROM THE DRAWINGS AND
NOTES, NOTIFY THE COR IMMEDIATELY.
ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL
PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (I.E. A NEW
BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS
THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE
CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON
ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE
ELECTRICAL SERVICE CAN BE SHUTDOWN OR IT WILL HAVE TO BE
WORKED HOT DEPENDING ON THE CRITICALITY OF THE AREA
BEING AFFECTED. IF THE WORK MUST BE DONE WITH THE
SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND
CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK PLAN
PREPARED BY THE VA. WORK THAT REQUIRES SHUTTING DOWN
ELECTRICAL SERVICE MAY HAVE TO BE ACCOMPLISHED DURING
OTHER THAN NORMAL DUTY HOURS.
LIGHT LINES INDICATE EXISTING TO REMAIN
DARK LINES INDICATE WORK TO BE PERFORMED.
SEE TN101 FOR FIRE ALARM COMPONENTS.
ALL CONDUIT RUNS SHALL BE IN THE INTERSTITIAL SPACE ABOVE.
USE EXISTING CORED OPENINGS AND UNISTRUT HANGERS IF
FEASIBLE. CORE DRILL NEW OPENING, 2 ” MINIMUM, AS REQUIRED.
PROVIDE NEW TRAPEZE HANGERS AS REQUIRED.
ALL KITCHEN APPLIANCES ARE CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED.
H1-203
STORAGE
-H1-A103
H1-100
ELEV VEST
04-01-A3-01
H1-C07
CORRIDOR
HE-P01
ELEV
04-01-PE3
04-NL11-81
04-NL11-84
04-NL11-83
04-NL11-76
04-NL11-77,79
04-NL11-75
+40"
+50"
BATHROOM
-H1-A101
BEDROOM
-H1-A102
LIVING/DINING
-H1-A104
KITCHEN
-H1-A105
04-CL11-41
+42"
04-NL11-51
04-ES-401
04-ES-401
LINEN CLOSET
-H1-A108
CLOSET
-H1-A107
+72''
04-NL11-49
04-NL11-78
04-NL11-80
04-NL11-82
04-NL11-47
STV
04-CL11-43
LEVEL 1
0"
A
LEVEL 1 INT
11' - 6"
LEVEL 1
-7' - 4 1/2"
LEVEL 1 INT
4' - 1 1/2"
A
04-ES-401
3'
- 6
1'
- 0
LEVEL 1
0"
LEVEL 1 INT
11' - 6"
LEVEL 1
-7' - 4 1/2"
LEVEL 1 INT
4' - 1 1/2"
04-ES-401
3'
- 8
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:1
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/E S-
IB
S.
rv t
04-ES-401
ELECTRICAL POWER PLAN
JOL DKC
NORTH
1/8" = 1'-0"1 ELEC POWER PLAN
8'0 4' 16'
SCALE:1/8"=1'-0"
3/8" = 1'-0"2 ENLARGED ELECTRICAL POWER PLAN
2' 4'0 1'
SCALE:3/8"=1'-0"
3/8" = 1'-0"3 KITCHEN SECTION VIEW
3/8" = 1'-0"4 KITCHEN SECTION VIEW
APPLIANCES
DISHWASHER - "DSHW"
MICROWAVE - "MCWV"
HOOD ABOVE RANGE - "HD"
REFRIGERATOR/FREEZER - "REF"
STOVE - "STV"
GARBAGE DISPOSAL - "GD"
7/1/2025 wrisner Text Box REROUTED AND NEW JUNCTION BOXES SHALL BE LOCATED IN THE INTERSTITAL SPACE PER VA REQUIREMENTS. THIS INCLUDES EXISTING JUNCTION BOXES, CONDUIT, AND WIRING NOTED FOR RELOCATION ON 04-ED-101.
wrisner Text Box 5.
wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Rectangle wrisner Text Box J wrisner Line wrisner Line wrisner Line wrisner Line wrisner Line wrisner Text Box wrisner Arrow wrisner Arrow wrisner Arrow wrisner Arrow wrisner Line wrisner Line wrisner Text Box 10.20.2025 wrisner Text Box
1 BIDDING PHASE ASI
wrisner Line wrisner Line wrisner Line wrisner Architect wrisner Architect wrisner Line wrisner Line wrisner Line wrisner Text Box wrisner Line wrisner Line wrisner Line wrisner Text Box
| 04-ed-101 |
| 04-ES-401 |
File details come from the government source that posted it. Updated .