The file is a Prime and Sub Contractor Construction Breakdown Excel spreadsheet with an extensive template for cost estimation across 34 construction division categories. The spreadsheet includes detailed sections for labor and materials cost breakdowns, with columns for quantity, unit price, and total cost for each division, ranging from Special Sections (Division 0) to Transportation (Division 34). Despite the comprehensive template, all cost fields are currently populated with zero dollars, suggesting this is an empty cost estimation framework.

The document is associated with a Department of Veterans Affairs solicitation (36C25926R0032) for remodeling an existing space into a residential rehabilitation apartment for spinal cord injury patients at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project involves demolishing and reconstructing walls, floors, ceilings, and systems in Building H, including installing new plumbing, electrical, low voltage data systems, and kitchen cabinetry. Specific requirements include a ceiling-mounted, motorized, retractable kitchen table and adherence to Infection Control Risk Assessment IV (ICRA IV) protections during construction.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NEW PROJECTNO DESIGNPRELIMINARY
COMPLETEDDESIGN
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 0-SPECIAL SECTIONS$ - 0
DIVISION 1-GENERAL REQUIREMENTS$ - 0
DIVISION 2-EXISTING CONDITIONS$ - 0
DIVISION 3-CONCRETE$ - 0
DIVISION 4-MASONRY$ - 0
DIVISION 5-METALS$ - 0
DIVISION 6-WOOD AND PLASTIC$ - 0
DIVISION 7-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 8-DOORS AND WINDOWS$ - 0
DIVISION 9-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
SUB-TOTAL$ - 0
OVERHEAD@$ - 0
PROFIT@$ - 0
BONDS@$ - 0
PROJECT TOTAL:$ - 0

&A

&D

Div 0 Special Sections

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 0 Special Sections
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 1 General Requirements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Divison 1 General Requirements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

Div 2 Existing Conditions

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 2 Existing Conditions
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 3 Concrete

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 3 Concrete
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 4 Masonry

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 4 Masonry
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 5 Metals

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 5 Metals
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&A

&D

Div 6 Wood & Plastic

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 6 Wood & Plastic
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 7 Thermal & Moisture Protec

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 7 Thermal & Moisture Protection
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 8 Doors & Windows

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 8 Doors & Windows
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 9 Finishes

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 9 Finishes
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions10.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 10 Specialties

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 10 Specialties
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 11 Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 11 Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 12 Furnishings

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 12 Furnishings
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 13 Special Construction

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 13 Special Construction
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Division 14 Conveying Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 14 Conveying Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 21 Fire Suppression

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 21 Fire Suppression
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 22 Plumbing

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 22 Plumbing
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 23 HVAC

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 23 Heat, Ventilating, and Air Conditioning
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 26 Electrical

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 26 Electrical
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 27 Communications

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 27 Communications
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 28 Electronic Safety & Secu

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 28 Electronic Safety & Security
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 31 Earthwork

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 31 Earthwork
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 32 Exterior Improvements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 32 Exterior Improvements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 33 Utilities

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 33 Utilities
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 34 Transportation

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 34 Transportation
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

File details come from the government source that posted it. Updated .