This is a Questions and Answers document for RFI (Request for Information) addressing clarifications on a federal construction solicitation for the Department of Veterans Affairs. The document contains government responses to questions 56 through 64 submitted by prospective contractors regarding Solicitation 36C25926R0032, which involves constructing a new SCI (Spinal Cord Injury) Residential Rehabilitation Apartment in Building H at Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The proposal deadline is February 9, 2026, at 10:00 AM Mountain Time, with submissions directed to Elia-Laritza.Ruiz-Manzo@va.gov.

The Q&A document clarifies several technical and operational requirements across multiple specification sections. Key clarifications include: confirmation that the onsite superintendent can serve as Quality Control Manager (referencing prior Amendment 0001); inclusion of specification 01 35 26 for site-specific safety (detailed in Amendment 0002); confirmation that main work occurs during normal business hours with after-hours work limited to shutdowns and tie-in; preservation of existing conduit and wiring for devices noted in drawing sheets; confirmation that no new switches are required; clarification that fire extinguishers are not required for the data closet; shunt trip breaker specifications for electrical work (2-pole, 3-space GE or ABB THQB breaker with fire detection system integration); and additional details regarding the motorized, ceiling-mounted kitchen table requiring 120V dedicated power with wall-mounted controls (cross-referenced to questions 46 and 54). All prior amendments and documentation remain in effect with no changes to the proposal due date.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI’S

SCI REHAB APARTMENT SOLICITATION 36C25926R0032

Question No.
Reference (Sect/Para/Page)
QUESTION
GOVERNMENT RESPONSE
56
01 45 00 3.4B & 01 45 00 3.1.
Confirm if the Onsite Superintendent can cover the role of Quality Control Manager.
The answer is found in question 41 from amendment 0001 posted on 2/03/26
57
01 45 00 3.A
References 01 35 26 which is not included in the specifications. Confirm if this spec is intended to be included in this project. If this is included can the site specific safety be covered by the superintendent as long as all requirements are met?
01 35 26 please see attachments amendment 0002
58
Spec 01 00 00
Confirm that main work can be completed during normal business hours. After hours work is limited to shutdowns and tie in work.
The answer is found in question 42 from amendment 0001 posted on 2/03/26
59
04.ES.501-1 & 04-TD-101
04.ES.501 calls out for a Wall Mounted Speaker Strobe in the Entrance waiting room to be demoed and a conduit to be demoed. ON 04-TD-101, it calls out with note key note 2 to preserve the device, the conduit, and the wire. Confirm whether the conduit and wire can remain for the devices called out in Sheet note 2.
The answer is found in question 17 from solicitation document " Prebid Requests For Information - questions 1 to 40. December 9, 2025."
60
04-TI-001 General Note 17
Confirm that no new switches will be required for this project. If they are required confirm that these are a VA provided item.
No changes to general note 17 on page 04-TI-001.
61
04-TI-001 General Note 34
Confirm no fire extinguisher is required for the DATA Closet.
Note 34 on page 04-TI-001 is not applicable to this project.
62
04-ES-401 Key Note 2
Provide additional information on Shunt Trip requirements and what equipment it is meant to serve.
Place new 2 pole (3 spaces) breaker in 04-NL11-47,49,51. GE or ABB THQB shunt trip breaker for the range. Loads assigned to ckts #47, 49, and 51 shall be moved to other spare/space locations. Ensure selected new two pole breaker is compatible with existing GE panel. Tie in control of new range breaker into existing fire detection system.
63
04-AI-401
Is there a separate equipment list showing OPOI and OPCI items?
The only information on OPOI and OPCI items are what has been already provided in drawings, specs, and the SOW.
64
Solicitation SOW
Notes that the table should be motorized, ceiling-mounted. Please provide additional information or BOD for this table. Will this table need a dedicated power source?
Please review question 46 and question 54 , also see attachment in amendment 0002