Drawings 554-23-101 Construct New SCI set 1 of 2.pdf
PDF 15 MB Posted
- Attached to
- Z2DA--Actionable-554-23-101 Construct New SCI Residential Rehab Apartment, Building H (VA-26-00005761)
- Solicitation number
- 36C25926R0032
About this file
This is a set of construction documents for a new Spinal Cord Injury (SCI) Residential Apartment Building H at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, dated July 2025. The project involves constructing a residential facility with multiple apartments, each featuring a bedroom, bathroom, kitchen, living/dining area, and accessibility features for veterans with spinal cord injuries.
The comprehensive set of drawings includes architectural, structural, mechanical, plumbing, electrical, telecommunications, fire alarm, and physical access control plans. Key design elements include circadian lighting panels, patient lift systems, accessible bathroom fixtures, smart home technologies, and specialized medical infrastructure. The project involves substantial demolition and reconstruction, with careful attention to maintaining existing medical facility operations and meeting VA-specific design requirements. The construction documents are prepared by AES Group, Inc. and indicate a detailed, multi-disciplinary approach to creating a specialized residential environment for veterans with spinal cord injuries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Q and A 56 to 64 SCI Apt 02-04-2026 VA.docx | DOCX document | |
| table submittal 2014.pdf | ||
| 01 35 26 safety 2026-02-04.pdf | ||
| 36C25926R0032 0002.docx | DOCX document | |
| Pre bid Site Visit Attendance 15-01-2026.pdf | ||
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0032 0001.docx | DOCX document | |
| Answers to RFI Questions 41 to 55 SCI Apt 2026-01-23 VA.pdf | ||
| S02-Specifications 554-23-101 Construct New SCI.pdf | ||
| 36C25926R0032_1.docx | DOCX document | |
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| 554-23-101 - Construct New SCI -ASI 01.pdf | ||
| RFI Q and A 1 to 40.pdf | ||
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Drawings 554-23-101 New SCI Apartment set 2 of 2.pdf | ||
| Self-Performed and Subcontracted Worksheet.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NUMBER SHEET NAME
04-GI-001 COVER SHEET AND DRAWINGS INDEX
04-GI-002 INFECTION CONTROL RISK ASSESSMENT PLAN
04-SS-000 COVER SHEET AND GENERAL NOTES
04-SS-101 FRAMING PLAN & DETAILS
04-AI-001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
04-AD-101 1ST FLOOR PARTIAL ARCHITECTURAL DEMOLITION PLAN AND RCP
04-AI-101 OVERALL FLOOR PLAN
04-AI-401 1ST FLOOR PARTIAL PLAN AND REFLECTED CEILING PLANS
04-AI-451 FINISH PLAN AND ENLARGED BATHROOM
04-AI-501 INTERIOR ELEVATIONS AND DETAILS
04-AI-502 INTERIOR FINISH SELECTIONS
04-AI-601 PARTITION TYPES, SCHEDULES AND DETAILS
04-MI-001 MECHANICAL GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
04-MD-101 INTERSTITIAL HVAC DEMO PLAN
04-MH-101 INTERSTITIAL HVAC PLAN
04-MI-501 MECHANICAL DETAILS
04-PI-001 PLUMBING GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
04-PD-101 PLUMBING PIPING DEMO PLAN
04-PD-102 SERVICE LEVEL WASTE AND VENT DEMO PLAN
04-PD-103 LEVEL 1 WASTE AND VENT DEMO PLAN
04-PP-101 PLUMBING PIPING PLAN
04-PL-101 SERVICE LEVEL WASTE AND VENT PIPING PLAN
04-PL-102 LEVEL 1 INTERSTITIAL WASTE AND VENT PIPING PLAN
04-PI-400 PLUMBING DETAILS
04-EI-001 ELECTRICAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
04-ED-101 ELECTRICAL POWER AND LIGHTING DEMO PLAN
04-ES-301 ELECTRICAL LIGHTING PLAN
04-ES-401 ELECTRICAL POWER PLAN
04-ES-502 ELECTRICAL DETAILS
04-ES-801 PANEL SCHEDULES
04-ES-802 PANEL SCHEDULES 2
04-TI-001 TELECOM GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
04-TD-101 TELECOM DEMO PLAN
04-AC-101 PHYSICAL ACCESS CONTROLS
04-ES-501 FIRE ALARM PLANS
04-TA-301 TECHNOLOGY PLANS
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:4
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/A I-I
BS
.rv t
04-GI-001
COVER SHEET AND DRAWINGS INDEX
JME LMF
Project 554-23-103 Construct New SCI Residential Apartment Building H Rocky Mountain Regional VA Medical Center 1700 N Wheeling St, Aurora, CO 80045
VICINITY MAP CAMPUS MAP
BUILDING H1
PROJECT
LOCATION
CAMPUS VIEW
07.01.2025
DN
# KEY NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
FLEXIBLE EXHAUST DUCTWORK TO BE INSTALLED AND
PRESENT PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES. PROVIDE HEPA FILTER FOR
EXHAUST AIR.
CUT OPENING NEAR THE TOP OF THE ICRA BARRIER TO
ALLOW FLEXIBLE DUCT TO PASS THROUGH. SEAL
AROUND DUCT OPENING TO PREVENT OUTDOOR AIR
INFILTRATION INTO ANY AREAS SURROUNDING THE
PROJECT AREA.
DEMOLISH EXISTING CRACKED WINDOW. INSTALL
TEMPORARY PLYWOOD TO COVER EXISTING WINDOW
AREA, AND RUN DUCTWORK THROUGH THE PLYWOOD
TO THE OUTSIDE. SEAL ALL PENETRATIONS. PROVIDE
BIRD SCREEN AT THE END OF THE FLEXIBLE DUCT. BACK
PLYWOOD WITH RIGID INSULATION AND
WEATHERSTRIPPING TO PREVENT AIR INFILTRATION AND
REDUCE HEAT TRANSFER.
AFTER PROJECT IS COMPLETE AND ICRA BARRIERS ARE
REMOVED, REMOVE TEMPORARY DUCTWORK,
PLYWOOD, AND PROVIDE REPLACEMENT WINDOW.
MATCH EXISTING CONSTRUCTION, COORDINATE WITH
COR TO ENSURE REPLACEMENT WINDOW HAS THE SAME
CHARACTERISTICS AND PERFORMANCE DATA AS THE
EXISTING CONSTRUCTION.
PROVIDE ICRA BARRIER TO CONTAIN ALL DUST AND
CONTAMINANTS DURING CONSTRUCTION ACTIVITIES.
PROVIDE ANTEROOM IN THIS LOCATION, 6'-0" WIDE X 3'-0"
DEEP.
PROVIDE ANTEROOM AT SOUTH SITE ENTRANCE 5'-0"
WIDE X 6'-0" DEEP.
WINDOW TO BE INSTALLED AFTER APARTMENT
CONSTRUCTION IS COMPLETE. INSTALL VIRACON GL-51
(OR APPROVED EQUAL) WINDOW APPROXIMATE SIZE
45"W X 63"H. FIELD MEASURE PRIOR TO ORDERING.
MODIFY ICRA HARD BARRIER FOR HALLWAY FLOORING
REPAIRS/REPLACEMENT.
1.
2.
3.
4.
5.
6.
7.
EXHAUST DUCTWORK TO BE PRESENT AT ALL TIMES
DURING CONSTRUCTION AND MUST TIE INTO ICRA
CONSTRUCTION BARRIER.
EXACT PLACEMENT OF DUCTWORK TO BE FIELD
VERIFIED DURING CONSTRUCTION, AND THE
CONTRACTOR MAY PROPOSE AN ALTERNATE SOLUTION
PRIOR TO CONSTRUCTION ACTIVITIES. RUN ICRA
EXHAUST AIR ABOVE THE EXISTING CEILING, TO
REMAIN, AT ALL POINTS UNTIL FINAL DISCHARGE
LOCATION. PROVIDE NEW WALL PENETRATIONS IF
REQUIRED.
DUCTWORK TO BE SIZED APPROPRIATELY AND
SUPPORTED AT ALL TIMES AND MAY BE A COMBINATION
OF RIGID AND FLEXIBLE DUCT.
REPAIR ALL BUILDING MODIFICATIONS BACK TO THEIR
ORIGINAL CONDITIONS AFTER COMPLETION OF
CONSTRUCTION ACTIVITIES.
PROVIDE HARD ICRA BARRIER TO CONTAIN ALL DUST
AND CONTAMINANTS AND TO CONTROL PRESSURE.
EXISTING WALLS TO REMAIN MAY SERVE AS ICRA HARD
BARRIER IF SUITABLE FOR DUST AND PRESSURE
CONTROL. COORDINATE WALL LOCATION WITH COR TO
ALLOW FOR BOTH CONSTRUCTION TO BE PERFORMED
AND CORRIDORS TO BE USABLE. ICRA DISCHARGE
DUCTWORK AND ASSOCIATED ITEMS ARE TO REMAIN
PROPERTY OF THE VA.
CONTINUOUS AND RECORDED PRESSURE MONITORING
IS REQUIRED.
POSITION HARD ICRA BARRIERS TO MAINTAIN 60" OF
HALLWAY TRAVEL SPACE FOR BOTH ADJACENT
CORRIDORS.
ICRA PLAN NOTES:
HE-P02
ELEV
04-01-PE4
HE-P01
ELEV
04-01-PE3
H1-ST1
STAIR
04-01-ST1
A
A
R1
R1
R2
R2
RB
RB
RA
RA
84 5
CORRIDOR
H1-C07
3 9
PHASING PLAN NOTES:
1.
2.
3.
CONTRACTOR SHALL DISCUSS AND COORDINATE A FINAL
PHASING PLAN WITH THE COR WITHIN 2 WEEKS OF CONTRACT
AWARD. PHASING PLAN SHALL BE SUBMITTED TO THE COR FOR
CONCURANCE, AND AGREED UPON PRIOR TO STARTING WORK.
MILESTONE DURATIONS, ORDER OF OPERATIONS, AND SPECIFIC
INFORMATION TO BE AGREED UPON. FINAL DETERMINATION OF
PHASING PLAN SHALL BE APPROVED BY THE COR.
SUBMIT DETAILED PHASING PLAN, INCLUDING ALL WORK
DESCRIBED AND SHOWN IN THE DRAWINGS / SPECIFICATIONS.
NOT ALL ITEMS IN THE PROJECT ARE LISTED BELOW. ENSURE
THE COR IS AWARE OF ALL ITEMS AND ACTIVITIES THAT OCCUR
DURING DEMOLITION AND INSTALLATION, AND NOTIFY THE COR
IMMEDIATELY OF ANY DEVIATION TO THE AGREED UPON
PHASING PLAN.
PHASING PLAN:
1.
2.
3.
4.
DEMOLITION
INSTALL ICRA WALLS AND TEMPORARY HVAC.
DEMOLISH AND CAP DUCTWORK. ENSURE CONTAMINANTS DO NOT ENTER
ANY RETURN OR EXHAUST DUCTWORK THROUGHOUT PROJECT
DURATION.
DEMOLISH WIRING, CONDUIT, ELECTRICAL / TELECOM EQUIPMENT,
LIGHTING FIXTURES, PLUMBING FIXTURES, AND PLUMBING LINES.
REMOVE WALL PARTITIONS, CEILINGS, AND FLOORING.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
NEW WORK
CORE DRILL SANITARY WASTE LINES FOR KITCHEN AND RESTROOM.
ENSURE THAT ADA APPROACH IS MAINTAINED FOR BATHROOM AND KITCHEN AND BATHROOM
SANITARY LINES ARE PLACED IN THE CORRECT LOCATION, AND APPROPRIATE SLOPE / TIE IN LOCATIONS ARE CONFIRMED. DO NOT PROCEED WITH FRAMING OR CABINETS UNTIL CONFIRMATION.
FRAME WALLS
DESIGN AND INSTALL CABINETRY, ENSURE SANITARY WASTE LINE IS CONCEALED.
INSTALL STRUCTURAL SUPPORT FOR OVERHEAD PATIENT LIFT.
INSTALL NEW ELECTRICAL / TELECOM EQUIPMENT, WIRING, CONDUIT.
INSTALL NEW PLUMBING FIXTURES AND PIPING.
INSTALL DRYWALL
INSTALL NEW CEILINGS, NEW DUCTWORK / DIFFUSERS, AND LIGHTING FIXTURES.
INSTALL NEW PATIENT LIFT
ENSURE ALL ITEMS NOTED IN THE DRAWINGS AND SPECIFICATIONS ARE INSTALLED.
INSTALL NEW FLOORING, DOORS, AND SIGNAGE.
REMOVE TEMPORARY DUCTWORK, AND PERFORM TAB ON THE NEW HVAC SYSTEM.
ONCE ALL ACTIVITIES ARE COMPLETED AND ACCEPTED, REMOVE ICRA BARRIERS.
PHASING PLAN:
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
4:
:4
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/M H
-IB
S.
rv t
04-GI-002
INFECTION CONTROL RISK
ASSESSMENT PLAN
WBR WBR
3/8" = 1'-0"1 TEMPORARY ICRA PLAN
2' 4'0 1'
SCALE:3/8"=1'-0"
C1
XX"xXX"
MARK DESCRIPTION
DRAWING LEGEND
0 REVISION TRIANGLE
STEEL/CONCRETE COLUMN
SYMBOL (REFER TO STEEL
COLUMN SCHEDULE)
X
SX.X
S0.0
DETAILS OR SECTION CUT
(DETAIL NUMBER/SHEET NUMBER)
DETAILS OR SECTION CUT IN PLAN
VIEW (DETAIL NUMBER/SHEET NUMBER)
STRUCTURAL EXTENT SYMBOL
SINGLE ARROW - END OF EXTENT
DOUBLE ARROW - CONTINUOUS
EXTENT ALONG THE ELEMENT LINE
UNTIL THE ELEMENT IS INTERRUPTED
INDICATES WIDE FLANGE COLUMN
INDICATES HOLLOW STRUCTURAL
SECTION (HSS) COLUMN OR
TUBE STEEL (TS) COLUMN
INDICATES HOLLOW STRUCTURAL
SECTION (HSS) COLUMN OR
STEEL PIPE COLUMN
INDICATES WOOD POST
INDICATES BUNDLED STUDS
INDICATES WOOD OR STEEL STUD WALL
INDICATES MASONRY/CMU WALL
INDICATES WOOD OR STEEL STUD SHEAR WALL
INDICATES BEARING WALL BELOW
INDICATES EXISTING WALL
ABBREVIATIONS
SHEET INDEX
WOOD FRAMING
1.
2.
3.
4.
5.
6.
7.
REFERENCED STANDARDS: CONFORM TO:
IBC 2024 CHAPTER 23 “WOOD”
NDS - “2024 NATIONAL DESIGN SPECIFICATIONS (NDS) FOR WOOD CONSTRUCTION ”
APA PDS - 97 PLYWOOD DESIGN SPECIFICATION (REVISED 2010)
ANSI/TPI 1 “NATIONAL DESIGN STANDARD FOR METAL-PLATE-CONNECTED WOOD TRUSS
CONSTRUCTION”
TPI HIB “COMMENTARY AND RECOMMENDATIONS FOR HANDLING, INSTALLING & BRACING METAL
PLATE CONNECTED WOOD TRUSSES ”
TPI DSB “RECOMMENDED DESIGN SPECIFICATION FOR TEMPORARY BRACING METAL PLATED
CONNECTED WOOD TRUSSES ”
APA REPORT T98-22 “NAIL PENETRATION AND FRAMING SPECIFIC GRAVITY FACTORS FOR SHEAR
WALLS AND DIAPHRAGM”
IDENTIFICATION: ALL SAWN LUMBER AND PRE-MANUFACTURED WOOD PRODUCTS SHALL BE IDENTIFIED BY
THE GRADE MARK OR A CERTIFICATE OF INSPECTION ISSUED BY THE CERTIFYING AGENCY.
MATERIALS:
SAWN LUMBER: CONFORM TO GRADING RULES OF WWPA, WCLIB, OR NLGA. FINER JOINTED STUDS
ACCEPTABLE AT INTERIOR WALL ONLY.
Member Use Size Species Grade
POSTS 4X4, 4X6, 6X6 DF NO. 2
BEAMS 2x 4x 6x DF NO. 2
1-3/4" X LVL 2.0E (WEYERHAEUSER (OR APPROVED ALTERNATIVE) TYP.)
TIMBER CONNECTORS: SHALL BE "STRONG TIE" BY SIMPSON COMPANY AS SPECIFIED IN THEIR LATEST CATALOG. ALTERNATE CONNECTORS BY OTHER MANUFACTURERS MAY BE SUBSTITUTED PROVIDED THEY HAVE CURRENT ICBO APPROVAL FOR EQUIVALENT OR GREATER LOAD CAPACITIES AND ARE REVIEWED AND APPROVED BY THE SER PRIOR TO ORDERING. ALL MANUFACTURE RECOMMENDATION SHALL BE FOLLOWED.
WHERE CONNECTORS STRAPS CONNECT TWO MEMBERS PLACE ONE HALF OF NAILS OR BOLTS IN EACH MEMBERS. WHERE STRAPS ARE USED AS HOLD-DOWNS, NAIL STRAPS TO WOOD FRAMING JUST PRIOR TO DRYWALL APPLICATION, AS LATE AS POSSIBLE TO ALLOW WOOD TO SHRINK AND BUILDING TO SETTLE.
PREMATURE NAILING OF STRAP MAY LEAD TO STRAP BUCKLING AND POTENTIAL FAILURE, WHICH
STRUCTURAL ENGINEER SHALL NOT BE LIABLE FOR FAILURE.
WHERE CONNECTORS ARE EXPOSED IN EXTERIOR APPLICATIONS IN CONTACT WITH PRESERVATIVE TREATED WOOD (PT) OTHER THAN CCA, CONNECTOR SHALL BE EITHER BATCH HOT-DIPPED GALVANIZED (HDG), OR MECHANICALLY GALVANIZED (ASTMB695 CLASS 40 OR GREATER) OR ZINC GALVANIZED WITH 1.85
OZ/SF.
DESIGN LOADS: BUILDING DESIGN LOADS HAVE BEEN DETERMINED IN ACCORDANCE WITH THE
BUILDING CODE AND ASCE 7 AS FOLLOWS:
DESIGN LOAD ON BEAM : 1000 LBS LIVE LOAD & 500 LBS DEAD LOAD AT CENTRE OF THE BEAM
DESIGN CRITERIA AND LOADS
ADHESIVEBASE
MATERIAL
CONCRETE
CMU (GROUTED)
CMU (HOLLOW)
CLAY BRICK (URM)
STEEL
CONCRETE
CMU (GROUTED)
CMU (HOLLOW)
CLAY BRICK (URM)
STEEL
CONCRETE
CMU (GROUTED)
CMU (HOLLOW)
CLAY BRICK (URM)
STEEL
EXPANSION
ANCHOR
SCREW
ANCHOR ADHESIVE
HILTI
HY 200
HY 70
HY 70
HY 70
KWIK BOLT TZ
KWIK BOLT TZ
HLC SLEEVE
HLC SLEEVE
KWIK HUS-EZ
KWIK HUS-EZ
KWIK CON II+
KWIK CON II+
SELF DRILL
HWH2 10-16
X-C*
X-C
X-C
X-U
* USE X-CP FOR WOOD SILL PLATE TO CONCRETE
SIMPSON STRONG-TIE
SET-3G
SET-XP
SET
SET
STRONG BOLT 2
STRONG BOLT 2
SLEEVE-ALL
TITEN HD
TITEN HD
TITEN HD
TITEN HD
X METAL
SCREW #10
PDPA**
PDP
PDP
PDPA
** USE PHN FOR WOOD SILL PLATE TO CONCRETE
DEWALT/POWERS FASTENERS
PURE 110+
AC100+GOLD
AC100+GOLD
AC100+GOLD
AC100+GOLD
STUD+ SD-1
LOK-BOLT AS
STUD+ SD-1
WEDGE BOLT+
WEDGE BOLT+
WEDGE BOLT+
0.300" DIA HEAD
DRIVE PIN***
0.300" DIA HEAD
DRIVE PIN***
0.300" DIA HEAD
DRIVE PIN***
0.300" DIA HEAD
DRIVE PIN***
*** 0.145" DIA SHANK
NOTE:
1. CLAY BRICK (URM) REFERS TO SOLID UNREINFORCED MASONRY WALLS
CONSTRUCTED WITH CLAY BRICK.
2. ALTERNATE FASTENERS MAY BE PROPOSED FOR REVIEW BY SER.
MECHANICAL AND CHEMICAL ANCHORS
ANCHOR CAPACITY: ANCHOR CAPACITY USED IN DESIGN SHALL BE BASED ON THE TECHNICAL DATA PUBLISHED BY MANUFACTURER OR SUCH OTHER METHOD AS APPROVED BY THE STRUCTURAL ENGINEER OF RECORD.
INSTALLATION: INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS AND IN ACCORDANCE WITH
SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS.
POST-INSTALLED DRILLING: HOLES FOR INSTALLING REINFORCING BARS, BOLTS, THREADED RODS AND INSERTS SHALL BE DRILLED USING THE ICC APPROVED DRILLING METHOD FOR THE ANCHOR TO BE INSTALLED. NON- DESTRUCTIVELY LOCATE EXISTING REINFORCING PRIOR TO DRILLING. DO NOT CUT EXISTING REINFORCING.
THREADED RODS: ADHESIVE ANCHORS SHALL USE ASTM A36 THREAD RODS, UNO
OVERHEAD INSTALLATION: ADHESIVE ANCHORS INSTALLED IN HORIZONTAL OR VERTICALLY OVERHEAD ORIENTATIONS THAT SUPPORT SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ADHESIVE ANCHOR INSTALLER (AAI) AS CERTIFIED THROUGH ACI/CRSI (ACI 318-11 D.9.2.2). PROOF OF CURRENT CERTIFICATION SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO COMMENCEMENT OF INSTALLATION.
MINIMUM CONCRETE AGE: ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21
DAYS (ACI 318-11 D.2.2).
ALLOWABLE ANCHORS: THE FOLLOWING TABLE OF ANCHORS REPRESENT THE DEFAULT PRODUCTS USED IN DESIGN. WHERE SPECIFIC PRODUCTS ARE NOT OTHERWISE CALLED OUT IN THE STRUCTURAL DRAWINGS, THIS
TABLE SHALL CONTROL.
FASTENERS: (NAILS, BOLTS, SCREWS, ETC.) ATTACHING TIMBER CONNECTORS (JOIST HANGERS, POST CAPS AND BASES, ETC) TO PT WOOD SHALL HAVE SIMILAR CORROSION RESISTANCE. VERIFY SUITABILITY OF THE FASTENER PROTECTION/COATING WITH THE WOOD TREATMENT CHEMICAL MANUFACTURER/SUPPLIER.
PROVIDE WASHER UNDER THE HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD ALL NAILS 12d AND SMALLER SHALL BE FULL LENGTH COMMON UNLESS NOTED OTHERWISE. 16d NAILS MAY BE 16d SINKERS UNLESS NOTED OTHERWISE. NAIL STRAPS TO WOOD FRAMING AS LATE AS POSSIBLE IN THE FRAMING PROCESS
TO ALLOW THE WOOD TO SHRINK AND THE BUILDING TO SETTLE.
FASTENERS SHALL CONFORM TO IBC SEC 2304.10 "CONNECTIONS AND FASTENERS". UNLESS NOTED ON PLANS, NAIL PER TABLE 2304.10.1. UNLESS NOTED OTHERWISE ALL NAILS SHALL BE COMMON. ALTERNATE NAILS MAY BE USED BUT ARE SUBJECT TO REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER. SUBSTITUTION OF STAPLES FOR NAILING OF RATED SHEATHING IS SUBJECT TO REVIEW BY THE STRUCTURAL ENGINEER PRIOR TO
CONSTRUCTION.
LAG BOLTS/BOLTS: CONFORM TO ASTM A325 AND IBC SEC 2304.10.
ENGINEERED WOOD PRODUCTS (WEYERHAEUSER, OR APPROVED ALTERNATIVE) : THE FOLLOWING MATERIALS ARE BASED ON LUMBER MANUFACTURED BY WEYERHAEUSER AND WERE USED FOR THE DESIGN AS SHOWN ON
THE PLANS.
LAMINATED VENEER LUMBER (LVL): CONFORM TO ICC ES REPORT NO. ESR-1387
NAILING REQUIREMENTS: PROVIDE MINIMUM NAILING IN ACCORDANCE WITH IBC TABLE 2304.10.1 "FASTENING SCHEDULE" EXCEPT AS NOTED ON DRAWINGS. NAILING FOR ROOF/FLOOR DIAPHRAGMS/SHEAR WALLS SHALL BE PER DRAWINGS. NAILS SHALL BE DRIVEN FLUSH AND SHALL NOT FRACTURE THE SURFACE OF SHEATHING.
STANDARD LIGHT FRAMING CONSTRUCTION: UNLESS NOTED OTHERWISE ON PLANS, CONSTRUCTION SHALL
CONFORM TO IBC SEC 2308 "CONVENTIONAL LIGHT-FRAMED CONSTRUCTION"
NAILERS ON STEEL COLUMNS AND BEAMS: WOOD 3X NAILERS ARE REQUIRED ON ALL HSS COLUMNS AND STEEL BEAMS ABUTTING OR EMBEDDED WITHIN WOOD FRAMING. UNLESS NOTED OTHERWISE, ATTACH WITH 5/8" DIAMETER BOLTS OR WELDED STUDS AT 16" ON CENTER. WOOD NAILERS ON BEAMS SUPPORTING JOISTS SHALL
NOT OVERHANG THE BEAM FLANGE BY MORE THAN 1/4".
MOISTURE CONTENT: WOOD MATERIAL USED FOR THIS PROJECT SHALL HAVE A MAXIMUM MOISTURE CONTENT OF 19% EXCEPT FOR PRESSURE-TREATED WOOD SILL PLATES. REFER TO TESTING AND
INSPECTION FOR VERIFICATION OF THESE LIMITS.
CLADDING COMPATIBILITY: THE ARCHITECT/OWNER SHALL REVIEW THE CLADDING AND INSULATION SYSTEMS PROPOSED FOR THE PROJECT WITH RESPECT TO THEIR PERFORMANCE OVER WOOD STUDS WITH MOISTURE CONTENTS GREATER THAN 19%. EIFS SYSTEMS SHOULD BE AVOIDED ON WOOD-FRAMED PROJECTS DUE TO
PROBLEMS WITH MOISTURE PROOFING.
PRESERVATIVE TREATMENT (PT): WOOD MATERIALS ARE REQUIRED TO BE "TREATED WOOD" IN ACCORDANCE WITH IBC SEC 2304.11. "DECAY AND TERMITE PROTECTION" SHALL CONFORM TO APPROPRIATE STANDARD OF THE AMERICAN WOOD-PRESERVERS ASSOCIATION (AWPA) FOR SAWN LUMBER, GLUE LAMINATED TIMBER, ROUND POLES, WOOD PILES AND MARINE PILES. FOLLOW AMERICAN LUMBER STANDARDS COMMITTEE (ALSC) QUALITY ASSURANCE PROCEDURES. PRODUCTS SHALL BEAR THE APPROPRIATE MARK. FASTENERS OR ANCHORS IN TREATED WOOD SHALL BE OF STAINLESS STEEL OR HOT DIPPED GALVANIZED OR AS PER IBC
2304.9.5. HUD UM48A PRESSURE-TREATED LUMBER AND PLYWOOD CERTIFICATION IS REQUIRED.
ALWAYS VERIFY THE SUITABILITY OF THE FASTENER PROTECTION/COATING WITH THE WOOD TREATMENT
CHEMICAL MANUFACTURER/SUPPLIER.
1.
IBC TABLE 1705.3: REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
VERIFICATION AND INSPECTION
INSPECTION OF ANCHORS POST INSTALLED IN HARDENED CONCRETE
MEMBERS (NOTE a).
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 1a.
a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS. X
X
ACI 318: D.9.2.4
ACI 318: D.9.2
TABLE NOTES:
a. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR ISSUED
BY AN APPROVED SOURCE IN ACCORDANCE WITH ACI 355.2 OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO THE COMMENCEMENT OF THE WORK.
1909.1
1909.1
CONTINUOUS PERIODIC REFERENCE
STANDARD
IBC
REFERENCE
b. DEFINITIONS:
i. PERIODIC - OBSERVE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING INSPECTIONS.
ii. CONTINUOUS - OBSERVE ITEMS FOR EACH BOLTED JOINT OR MEMBER
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
-0
7-
0:
:5
AM
C
:\U se rs \je ffp \A pp D at a\
Lo ca l\P ac ka ge s\
5A .W ha ts
Ap pD es kt op _c v1 g1 gv an yj gm
\T em pS ta te \7
2B
A1 F7
BA
1C
B3
5E 0C
B6 C
D E7
F\ Au ro ra
-S C
I-- -S tru ct ur al
_R
VT
_2
1.
rv t
04-SS-000
COVER SHEET & GENERAL NOTES
JULY 2025 MA JP
A.F.F. ABOVE FLOOR FINISH
ADD'L ADDITIONAL
AGGR. AGGREGATE
ALT. ALTERNATE
ACI AMERICAN CONCRETE INSTITUTE
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON AND STEEL
INSTITUTE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
AWS AMERICAN WELDING SOCIETY
A.B. ANCHOR BOLTS
ANCH. ANCHORAGE
APPROX. APPROXIMATE
ARCH. ARCHITECT OR ARCHITECTURAL
ASPH. ASPHALT
ASSY. ASSEMBLY
AVG. AVERAGE
B.P. BASE PLATE
BM. BEAM
BRG. BEARING
BLK. BLOCK
BLK'G BLOCKING
BRD. BOARD
BOTT. BOTTOM
B/ or B.O. BOTTOM OF
B.O.D. BOTTOM OF DECK
B.O.S. BOTTOM OF STEEL
B.N. BOUNDARY NAILING
BLDG. BUILDING
BOCA BUILDING OFFICIALS AND CODE
ADMINISTRATORS
INTERNATIONAL, INC.
C.C. CARRIED COLUMN
CLG. CEILING
C/G CENTER OF GRAVITY
C/C CENTER TO CENTER
CL CENTERLINE
C CHANNEL
CLR. CLEAR
COL. COLUMN
CJP COMPLETE JOINT PENETRATION
CONC. CONCRETE
CMU CONCRETE MASONRY UNITS
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
C.J. CONTROL, OR CONSTRUCTION
JOINT
CF CUBIC FOOT
CY CUBIC YARD
DTL. DETAIL
DIAG. DIAGONAL
Ø or DIA. DIAMETER Do DITTO
DBL. DOUBLE
2L DOUBLE ANGLE
D.F. DOUGLAS FIR
DWG. DRAWING
EA. EACH
E.F. EACH FACE
E.W. EACH WAY
E. EAST
E.N. EDGE NAILING
ELECT. ELECTRIC OR ELECTRICAL
ELEV. ELEVATION
ENG. OR ENGR. ENGINEER
EQ. EQUAL
EQUIP. EQUIPMENT
EST. ESTIMATE
EXCAV. EXCAVATE
(E) EXISTING
E.J. EXPANSION JOINT
EXT. EXTERIOR
FAB. FABRICATOR OR FABRICATION
F.S. FAR SIDE
' or FT. FEET OR FOOT
F.N. FIELD NAILING
FIN. FINISH
FLR. FLOOR
F.J. FLOOR JOIST
FTG. FOOTING
FDN. FOUNDATION
FRMG. FRAMING
GA. GAGE OR GAUGE
GALV. GALVANIZED
GEN. GENERAL
GLB. GLU-LAM BEAM
GR. GRADE
HNG'R. HANGER
H HEIGHT
HEX. HEXAGON
HORIZ. HORIZONTAL
" or IN. INCHES
INFO. INFORMATION
I.D. INSIDE DIAMETER
JT. JOINT
Kg KILOGRAM
K KIP (1,000 LBS)
KSI KIPS PER SQUARE INCH
L ANGLE
LVL LAMINATED VENEER LUMBER
Le LENGTH
LLBH LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LSH LONG SLOTTED HORIZONTAL
LSV LONG SLOTTED VERTICAL
LONG. LONGITUDINAL
LABDS LOS ANGELES BUILDING
DEPARTMENT AND SAFETY
LARR LOS ANGELES CITY RESEARCH
REPORT
LB or LBS POUND OR POUNDS
M.B. MACHINE BOLT
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MED. MEDIUM
MTL. METAL
MEZZ. MEZZANINE
MIN. MINIMUM
MISC. MISCELLANEOUS
MIX. MIXTURE
MULT. MULTIPLE
N.F. NEAR FACE
N.S. NEAR SIDE
NEC. NECESSARY
(N) NEW
NOM. NOMINAL
N. NORTH
N.T.S. NOT TO SCALE
# or No. NUMBER
O.C. ON CENTER
OPNG. OPENING
OPP. OPPOSITE
O.H. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
PTN. PARTITION
PERP. PERPENDICULAR
PL. PLATE
PLY. PLYWOOD
P.T. POST-TENSION
PCF POUNDS PER CUBIC FOOT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PROJ. PROJECT
P.L. PROPERTY LINE
Q.A. QUALITY ASSURANCE
QTY. QUANTITY
R RADIUS
REF. REFERENCE
RCP REFLECTED CEILING PLAN
REINF. REINFORCE, REINFORCED,
REINFORCEMENT, OR
REINFORCING
REQ'D. REQUIRED
REQ. REQUIREMENT
REV. REVISION
R.J. ROOF JOIST
R.R. ROOF RAFTER
RM. ROOM
SCHED. SCHEDULE
SECT. SECTION
S.W. SHEAR WALL
SHT'G. SHEATHING
SHT. SHEET
SMS SHEET METAL SCREW
SSH SHORT SLOTTED HOLE
SIM. SIMILAR
SIMP. SIMPSON STRONG-TIE
SK. SKETCH
S. SOUTH
S.I. SPECIAL INSPECTION
SPECS. SPECIFICATIONS
SQ. SQUARE
SF SQUARE FEET
STAGG. STAGGER, OR STAGGERED
STD. STANDARD
S STANDARD I BEAM
STL. STEEL
STIR. STIRRUP
STRUCT. STRUCTURAL
THK. THICK, OR THICKNESS
THRD. THREADED
THRU THROUGH
THRU-OUT THROUGH-OUT
T.N. TOE NAIL
TOL. TOLERANCE
T&G TONGUE AND GROOVE
T&B TOP AND BOTTOM
T/ or T.O. TOP OF
T.O.C. TOP OF CONCRETE
T.O.F. TOP OF FOOTING
T.O.M. TOP OF MASONRY
T.O.S. TOP OF STEEL
TRANS. TRANSVERSE
TJI TRUSS JOIST MACMILLAN I-JOIST
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
V.I.F. VERIFY IN FIELD
VERT. VERTICAL
VOL. VOLUME
V.W.A. VERIFY WITH ARCH.
WT. WEIGHT
WWF WELDED WIRE FABRIC
W. WEST
WF WIDE FLANGE
w/ WITH w/o WITHOUT
W.S. WOOD SCREW
W.P. WORK POINT
YD. YARD
STRUCTURAL GENERAL NOTES:
GOVERNING CODE: THE DESIGN AND CONSTRUCTION OF THIS PROJECT IS GOVERNED BY THE
"INTERNATIONAL BUILDING CODE", 2024 EDITION, HEREAFTER REFERRED TO AS IBC, AS ADOPTED AND
AMENDED BY CITY OF AURORA, CO.
IBC 2024
REFERENCE STANDARDS: 2024 IBC. WHERE OTHER STANDARDS ARE NOTED IN THE DRAWINGS, USE THE LATEST EDITION OF THE STANDARD UNLESS A SPECIFIC DATE IS INDICATED. REFERENCE TO A SPECIFIC SECTION IN THE SPECIFIED CODE DOES NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE
WITH THE ENTIRE STANDARD.
DEFINITIONS: THE FOLLOWING DEFINITIONS COVER THE MEANINGS OF CERTAIN TERMS USED IN THESE
NOTES:
"ARCHITECT/ENGINEER"-THE ARCHITECT OF RECORD AND THE STRUCTURAL ENGINEER OF
RECORD.
"STRUCTURAL ENGINEER OF RECORD" (SER) - THE STRUCTURAL ENGINEER WHO IS LICENSED
TO STAMP & SIGN THE STRUCTURAL DOCUMENT FOR THE STATED PROJECT. THE SER IS
RESPONSIBLE FOR THE DESIGN OF THE PRIMARY STRUCTURAL SYSTEM.
"SUBMIT FOR REVIEW" - SUBMIT TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO
FABRICATION OR CONSTRUCTION.
"PER PLAN" - INDICATES TO THE STRUCTURAL PLANS, ELEVATIONS AND STRUCTURAL GENERAL
NOTES.
SPECIFICATIONS: REFER TO THE PROJECT SPECIFICATIONS IF ISSUED AS PART OF THE CONTRACT
DOCUMENTS FOR SUPPLEMENTAL INFORMATION TO THESE DRAWINGS.
OTHER DRAWINGS: REFER TO THE ARCHITECTURAL, MECHANICAL ELECTRICAL, CIVIL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION INCLUDING BUT NOT LIMITED TO: DIMENSIONS,
ELEVATIONS, SLOPES, DOOR AND WINDOW OPENINGS, NON-BEARING WALLS, STAIRS, FINISHES, DRAINS, WATERPROOFING, RAILINGS, CURTAIN WALLS, ELEVATORS, CURBS, MECHANICAL UNIT
LOCATIONS, AND OTHER NON-STRUCTURAL ITEMS.
STRUCTURAL DETAILS: THE STRUCTURAL DRAWINGS ARE INTENDED TO SHOW THE GENERAL
CHARACTER AND EXTENT OF THE PROJECT AND ARE NOT INTENDED TO SHOW ALL DETAILS OF THE
WORK. ALL DIMENSIONS SHOWN OF DRAWINGS ARE APPROXIMATE.
STRUCTURAL RESPONSIBILITIES: THE SER IS RESPONSIBLE FOR THE STRENGTH AND STABILITY OF THE PRIMARY STRUCTURE IN ITS COMPLETED FORM. IF STRUCTURE IS NOT BUILT IN ACCORDANCE WITH STRUCTURAL PLANS, STRUCTURAL ENGINEER IS NOT LIABLE FOR ANY FAILURES WHICH MAY OCCUR
AFTER STRUCTURE IS BUILT.
COORDINATION: THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND ACCURACY OF THE WORK; FOR CONFORMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS; FOR SELECTING FABRICATION PROCESSES; FOR TECHNIQUES OF THE ASSEMBLY; AND FOR PERFORMING WORK IN A
SAFE AND SECURE MANNER; AND ALL INSPECTION NECESSARY.
MEANS, METHODS AND SAFETY REQUIREMENTS: THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION AND ALL JOB RELATED SAFETY STANDARDS SUCH AS OSHA AND DOSH (DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH). CONTRACTOR IS RESPONSIBLE TO ADHERE TO OSHA REGULATIONS REGARDING STEEL ERECTION ITEMS SPECIFICALLY ADDRESSED IN THE LATEST OSHA REGULATIONS. BOLTING AND FIELD WELDING AT ALL MEMBER CONNECTIONS IS TO
BE COMPLETED PRIOR TO RELEASE OF THE MEMBER FROM THE HOISTING MECHANISM UNLESS
REVIEWED AND APPROVED BY THE GENERAL CONTRACTOR'S TEMPORARY BRACING AND SHORING
DESIGN ENGINEER.
BRACING/SHORING DESIGN ENGINEER: THE CONTRACTOR SHALL AT HIS DISCRETION EMPLOY AN SSE, A REGISTERED PROFESSIONAL CIVIL, STRUCTURAL ENGINEER (PE, SE) FOR THE DESIGN OF ANY
TEMPORARY BRACING AND SHORING.
TEMPORARY SHORING, BRACING: THE CONTRACTOR IS RESPONSIBLE FOR THE STRENGTH AND
STABILITY OF THE STRUCTURE DURING CONSTRUCTION AND SHALL PROVIDE TEMPORARY SHORING, BRACING, AND OTHER ELEMENTS REQUIRED TO MAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE WORK REQUIRED IN THE CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS FOR PERFORMING THE WORK PROPERLY.
CONSTRUCTION LOADS: LOADS ON THE STRUCTURE DURING CONSTRUCTION SHALL NOT EXCEED THE DESIGN LOADS AS NOTED IN "DESIGN CRITERIA & LOADS” BELOW OR THE CAPACITY OF PARTIALLY COMPLETED CONSTRUCTION AS DETERMINED BY THE CONTRACTOR ’S SSE FOR BRACING/SHORING.
CHANGES IN LOADING: THE CONTRACTOR HAS THE RESPONSIBILITY TO NOTIFY THE SER OF ANY ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR PLUMBING IMPOSED ONTO THE STRUCTURE THAT
DIFFERS FROM, OR THAT IS NOT DOCUMENTED ON THE ORIGINAL CONTRACT DOCUMENTS
(ARCHITECTURAL / STRUCTURAL / MECHANICAL / ELECTRICAL OR PLUMBING DRAWINGS). PROVIDE
DOCUMENTATION OF LOCATION, LOAD, SIZE AND ANCHORAGE OF ALL UNDOCUMENTED LOADS IN
EXCESS OF 200 POUNDS. PROVIDE MARKED-UP STRUCTURAL PLAN INDICATING LOCATION OF ANY NEW
EQUIPMENT OR LOADS. SUBMIT PLANS TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO
INSTALLATION.
NOTE PRIORITIES: PLAN AND DETAIL NOTES AND SPECIFIC LOADING DATA PROVIDED ON INDIVIDUAL PLANS AND DETAIL DRAWINGS SUPPLEMENTS INFORMATION IN THE STRUCTURAL GENERAL NOTES.
DISCREPANCIES: IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, SPECIFICATIONS PLANS/DETAILS OR REFERENCED STANDARDS, THE ARCHITECT/ENGINEER SHALL DETERMINE WHICH SHALL GOVERN. DISCREPANCIES FOUND IN THE CONTRACT DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN THE PRICE THE MOST EXPENSIVE WAY OF COMPLETING THE WORK, UNLESS PRIOR SUBMISSION OF THE PRIME CONTRACTOR ASKS FOR A DECISION FROM THE
ARCHITECT AS TO WHICH HALL GOVERN. ACCORDINGLY, ANY CONFLICT IN OR BETWEEN THE
CONTRACT DOCUMENTS SHALL NOT BE A BASIS FOR ADJUSTMENT IN THE CONTRACT PRICE.
SITE VERIFICATION: THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE.
CONFLICTS BETWEEN THE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.
ALTERNATES: ALTERNATE PRODUCTS OF SIMILAR STRENGTH, NATURE AND FORM FOR SPECIFIED
ITEMS MAY BE SUBMITTED WITH ADEQUATE TECHNICAL DOCUMENTATION TO THE
ARCHITECT/ENGINEER FOR REVIEW. ALTERNATE MATERIALS THAT ARE SUBMITTED WITHOUT
ADEQUATE TECHNICAL DOCUMENTATION OR THAT SIGNIFICANTLY DEVIATE FROM THE DESIGN INTENT
OF MATERIALS SPECIFIED MAY BE RETURNED WITHOUT REVIEW. ALTERNATES THAT REQUIRE
SUBSTANTIAL EFFORT TO REVIEW WILL NOT BE REVIEWED UNLESS AUTHORIZED BY THE OWNER.
Sheet No. Sheet Title
R ev is io n
R ev is io n
R ev is io n
R ev is io n
R ev is io n
R ev is io n
04-SS-000 COVER SHEET & GENERAL NOTES
04-SS-101 FRAMING PLAN & DETAILS
1.
2.
3.
4.
5.
6.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
CONTRACTOR SHALL NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER OF ANY
DISCREPANCIES PRIOR TO CONSTRUCTION.
ALL SHOWN DIMENSIONS AND FRAMING SIZES SHALL BE FIELD VERIFIED.
(N) INDICATES "NEW". (E) INDICATES "EXISTING".
ALL EXISTING FRAMING AFFECTED BY THE REMODEL SHALL BE FIELD VERIFIED.
ALTERNATE MATERIALS MAY BE SUBMITTED FOR APPROVAL.
FOLLOW DETAILS 4 & 5 FOR NOTCHING BEAMS WHERE REQUIRED.
FRAMING PLAN NOTES:
(E) STRUCTURE
TO REMAIN
(E) STRUCTURE
TO REMAIN
(N) RAILING BELOW
BY OTHERS
(N) 3.5x11.25" LVL
(N ) 3
.5 x1
1.
" L
VL
(N) 3.5x11.25" LVL
(N) WIRE BRACING @
48" O.C., TYP.
REFER DETAIL 6&7/S100
(N) 4x4
POSTS, TYP.
04-SS-101
A
(N) 9"x6" x1/2" BENT PLATE
04-SS-101
(E) COMPOSITE
DECK TO REMAIN
(N) 12 GA. HANGER
WIRE MIN. 3 TURNS
(N) 5/16" (MIN.) DRILL-IN
EXPANSION ANCHOR. STEEL
STRAP 12 GA. X 1" WIDE MIN.
(N) 1/4" DIAMETER CLOSED EYE SCREW WITH
FULL THREAD EMBEDMENT (1-1/4" MIN.)
(N) 12 GA. HANGER
WIRE MIN. 3 TURNS
(N) POST
PER PLAN
(N) BEAM
PER PLAN
(N) SIMPSON HUC412
CONCEAL HANGER
(N) DTC CLIP @
POSTS ON ALL
FOUR SIDES
(E) COMPOSITE
DECK TO REMAIN
1/ 2"
G
AP
RAILING BY
OTHERS
(N) BRACING PER
DETAIL 6&7 ON S100
CEILING BY
OTHERS
(N) PL 1/8" x 2" TO
PROVIDE SUPPORT
FOR DTC CLIP
(N) HILTI X-U 22 0.157"
DIA. PAF SCREW
(E) COMPOSITE
DECK TO REMAIN
(N) POST
PER PLAN
(N) SIMPSON ABU POST
BASE W/ TITEN HD BOLT
2 1/2" EMBED
PE
R
SC
H
ED
PE
R
SC
H
ED
1/
2"
# OF
STUDS
STUD
SIZE
2x
2x
2x
FACE NAILING FOR BUNDLED
STUDS
10d @ 6" OC STAGGERED ALT FACE
20d @ 8" OC STAGGERED ALT FACE
20d @ 8" OC STAGGERED ALT FACE
NOTES:
1. AS ALTERNATE TO BUNDLED STUD NAILING FOR BUNDLES OF
3 OR MORE, STUDS MAY BE BUNDLED PER 2 STUDS WITH 10d
@ 6" OC STAGGERED FOR EACH ADDITIONAL STUD.
2. ALL BUNDLED STUDS SHALL BE CONSIDERED AS ONE STUD
IN ALL DETAILS THAT CALL FOR A "NUMBER OF STUDS".
1" TYP
BUNDLED STUD SCHEDULE
NAIL DRIVEN
FROM OTHER
SIDE OF BUNDLE
NAIL DRIVEN THIS
SIDE OF BUNDLE
2" T
YP
2"
T
YP
3" T
YP
1/ 8"
T
YP
3" T
YP
PROVIDE (3) ROWS OF 10d NAILS
@ 24" ON CENTER AS SHOWN.
OFFSET NAILS ON LEFT SIDE BY
12" FROM RAILS ON RIGHT SIDE
2-PLY
SAWN LUMBER
PROVIDE (3) ROWS OF 10d NAILS
@ 24" ON CENTER AS SHOWN.
OFFSET NAILS ON LEFT SIDE BY
12" FROM RAILS ON RIGHT SIDE
3-PLY
SAWN LUMBER
PROVIDE (3) ROWS 1/4" X 6" SIMPSON
SDS SCREWS @ 16" OC ON EACH SIDE
OF LVL. OFFSET SCREWS ON LEFT SIDE
BY 12" FROM SCREWS ON RIGHT SIDE
4-PLY LVL
3-PLY LVL
PROVIDE (2) ROWS 1/4" X 5" SIMPSON
SDS SCREWS @ 16" OC ON EACH SIDE
OF LVL. OFFSET SCREWS ON LEFT SIDE
BY 12" FROM SCREWS ON RIGHT SIDE
2-PLY LVL
PROVIDE (2) ROWS 1/4" X 3 1/2" SIMPSON
SDS SCREWS @ 24" OC ON EACH SIDE
OF LVL. OFFSET SCREWS ON LEFT SIDE
BY 12" FROM SCREWS ON RIGHT SIDE
D/3 MAX
D/
M
AX D/
M
AX
D
M
IN2"
M
AXD/
M
AXD/
OUTER 1/3 OF SPAN
NOTCHING NOT PERMITTED
MIDDLE 1/3 OF SPAN OUTER 1/3 OF SPAN
MAX
D/4
MAX
D/2.5
D D
EXTERIOR
AND BEARING
WALLS
NON- BEARING
WALLS
5/8" MIN
40%
5/8" MIN
5/8" MIN 60% 5/8" MIN
ANY WALL
NON- BEARING WALLS
OR NOT MORE THAN 2
SUCCESSIVE STUDS
BORED AND DOUBLED
ELECTRICAL OR PLUMBING PROTECTION
USE APPROVED STUD SHOE
FOR LARGER OPENINGS.
INSTALL PER MANUFACTURER
INSTRUCTIONS
DRILL D/6⌀ HOLE
BEFORE CUTTING
NOTCH IN WOOD
APPROVED NAIL
STOPPER PLATE
WOOD STUD(S)
AS REQUIRED
NOTE:
THIS DETAIL SHALL APPLY
FOR ELECTRICAL CONDUITS,
PLUMBING AND FOR ANY
OTHER USES WHICH
REQUIRED NOTCHING.
D/6 MAX
(N) 1/2" dia TITEN-HD ANCHOR
EMBEDDED 4" INTO EXISTING
CONCRETE WALL@ 16" O.C.
STAGGERED
(N) 1/2" THICK BENT PLATE W/ 2"
VERTICAL SLOTTED HOLES AT
TITEN-HD ANCHORS
(N) (2) 1/2" x 4" LAG SCREWS
STAGGER @ 16" O.C.
(N) BEAM PER
PLAN
(E) WALL TO
REMAIN
12" = 1'-0"2 BUNDLED STUD SCHEDULE
12" = 1'-0"3 TYP BUILT-UP WOOD BEAM CONNECTIONS
1" = 1'-0"4 TYP NOTCH LIMITATIONS FOR SAWN LUMBER
1" = 1'-0"5 TYP WOOD FRAMING PENETRATION DETAILS
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
-0
7-
0:
:5
AM
C
:\U se rs \je ffp \A pp D at a\
Lo ca l\P ac ka ge s\
5A .W ha ts
Ap pD es kt op _c v1 g1 gv an yj gm
\T em pS ta te \7
2B
A1 F7
BA
1C
B3
5E 0C
B6 C
D E7
F\ Au ro ra
-S C
I-- -S tru ct ur al
_R
VT
_2
1.
rv t
04-SS-101
FRAMING PLAN & DETAILS
JULY, 2025 MA JP
3/8" = 1'-0"1 FRAMING PLAN
1 1/2" = 1'-0"7 WIRE BRACING TO CONC. DECK CONNECTION
1 1/2" = 1'-0"6 WIRE BRACING TO BEAM CONNECTION
1 1/2" = 1'-0"9 POST CONNECTION WITH FRAMING ABOVE & BEAMS
1 1/2" = 1'-0"8 POST BASE CONNECTION
1 1/2" = 1'-0"10 BEAM TO WALL BRACING CONNECTION DETAIL
GENERAL ABBREVIATIONS:
ABA ARCHITECTURAL BARRIERS ACT
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
A/E ARCHITECT / ENGINEER
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
AI ACQUISITION / INSTALLATION
BD BOARD
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
CFCI CONTRACTOR FURNISHED AND
CONTRACTOR INSTALLED
CF CUBIC FOOT
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CONTINUOUS INSULATION
CMU CONCRETE MASONRY UNIT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CR CHAIR RAIL
CONC CONCRETE
CONST CONSTRUCTION
CU IN CUBIC INCH
CU YD CUBIC YARD
DEMO DEMOLITION
DET DETAIL
DIA, Ø DIAMETER
DR DOOR
DWG(S) DRAWING(S)
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISHING SYSTEM
ELEC ELECTRIC(AL)
ELEV ELEVATION
EQ EQUAL
EXIST EXISTING
EXP EXPOSED
EXP. JT EXPANSION JOINT
EXT EXTERIOR
FRP FIBERGLASS REINFORCED PLASTIC
FRR FIRE RESISTANCE RATING
FIN FINISH
FIN FL FINISHED FLOOR
FIN FL ELEV FINISHED FLOOR ELEVATION
FRPT FIRE-RETARDANT PRESSURE TREATED
FL FLOOR
FO FACE OF
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FLOOR TRANSITION
GFGI GOVERNMENT FURNISHED, GOVERNMENT
INSTALLED
GL GLASS
GSF GROSS SQUARE FEET
GYP GYPSUM
GRT GROUT
GWB GYPSUM WALL BOARD
HAC HOUSEKEEPING AIDS CLOSET
HM HOLLOW METAL
HORZ HORIZONTAL
HT HEIGHT
HR HAND RAIL
INC INCORPORATED
INFO INFORMATION
INT INTERIOR
LG LENGTH / LONG
LVT LUXURY VINYL TILE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MTL METAL
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER
MR MOISTURE RESISTANT
N/A NOT APPLICABLE
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NSF NET SQUARE FEET
NTS NOT TO SCALE
OC ON CENTER
OFF OFFICE
OPOI OWNER PROVIDED, OWNER INSTALLED
OPCI OWNER PROVIDED, CONTRACTOR INSTALLED
OPP OPPOSING HAND
P PAINT
PC PRIVACY CURTAIN
PCF POUNDS PER CUBIC FOOT
PEMB PRE-ENGINEERED METAL BUILDING
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PLAM PLASTIC LAMINATE
PLUM PLUMBING
PT PAINT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
RAD RADIUS
RB RUBBER WALL BASE
RCP REFLECTED CEILING PLAN
RE REFER TO, REFERENCE
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAFB SOUND ATTENUATING FIRE BLANKET
SCH SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
SSF SOLID SURFACE
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
STRUC STRUCTURE / STRUCTURAL
T TILE
TELECOM TELECOMMUNICATIONS
TEF TEXTURED EPOXY FLOORING
T.O. TOP OF
TYP TYPICAL
UL UNDERWRITER'S LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
VA VETERANS ADMINISTRATION
VERT VERTICAL
VIF VERIFY IN FIELD
VOC VOLITILE ORGANIC COMPOUND
VC VA FURNISHED AND CONTRACTOR INSTALLED
V/V VA FURNISHED AND VA INSTALLED
W WEST / WIDTH / WIDE
WB WALL BASE
WD WOOD DOOR
W/ WITH
W/O WITHOUT
WM WALK OF MAT
WS WINDOW SHADE
WP WALL PROTECTION
WT WEIGHT
YD YARD
YR YEAR
DETAIL NUMBER
SHEET REFERENCE
TYPICAL CALLOUT BUBBLE
EXTERIOR ELEVATION TAG
____________________________________________________________________________________SECTION CUT
INTERIOR ELEVATION TAG
DETAIL NUMBER
SHEET REFERENCE
ROOM TAG
ASSIGNED ROOM DESIGNATOR
ASSIGNED ROOM NUMBER
ROOM SQUARE FOOTAGE
?ENLARGED PLAN / DETAIL CALLOUT
? ELEVATIONS / LEVELS
ELEVATION LOCATION
ELEVATION LOCATION
ELEVATION TAG
FINISH ELEVATION
ROUGH ELEVATION
CENTER LINE
NORTH ARROW
SCALE: ?
VIEW TITLE
DRAWING TITLE
DRAWING SCALE
?REVISION TAG
REVISION CLOUD
?STRUCTURAL GRID
?GRID DESIGNATOR
GRID LINE
KEY NOTE TAG
SYMBOLS LEGEND:
DOOR TAG
WINDOW TAG
XXX
XX
ABA CLEARANCE AREAS
NTN
NAME
ELEVATION
PARTITION TAG XX
?TOILET ACCESSORY TAG
GENERAL NOTES:
1. BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS
AND NOTIFY VETERANS AFFAIRS COR OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH ANY WORK.
2. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO ORDERING OR INSTALLING ANY MATERIALS OR
EQUIPMENT.
3. DAMAGED AREAS CAUSED DURING CONSTRUCTION MUST
BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE. REPAIRS MUST MATCH EXISTING CONDITIONS AND
FINISHES.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL
AND DISPOSAL OF DEMOLITION AND/OR CONSTRUCTION
DEBRIS ASSOCIATED WITH THE WORK. DISPOSAL MUST BE IN
COMPLIANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS. THE PROJECT SITE MUST BE KEPT CLEAN
AND FREE FROM WASTE MATERIALS.
5. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY
REMOVED MATERIALS.
6. COORDINATE AND INSTALL FIRE-TREATED WOOD
BLOCKING OR SHEET METAL BACKING FOR ANCHORAGE OF
WALL-MOUNTED ITEMS.
7. INSTALL CONTROL JOINTS IN GYPSUM BOARD SURFACES
AS SHOWN AS DESCRIBED IN THE SPECIFICATIONS. ISOLATE
GYPSUM BOARD SURFACES WITH CONTROL JOINTS FOR
RUNS THAT EXCEED 30 FEET IN LENGTH.
8. GYPSUM BOARD PARTITIONS MUST EXTEND A MINIMUM OF
6 INCHES ABOVE FINISHED CEILING PLANE UNLESS NOTED
OTHERWISE.
9. NO WORK SHALL BE COVERED OR CONCEALED UNTIL IT
HAS BEEN INSPECTED, TESTED, AND/OR APPROVED BY THE
AUTHORITIES HAVING JURISDICTION.
10. COORDINATE DUMPSTER LOCATION WITH COR.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:4
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/A I-I
BS
.rv t
04-AI-001
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
JME LMERevision 1 Date 1
A
04-01-A2-03
PAT TLT
CORRIDOR
H1-C07
VIEWING
H1-102B
ENTRANCE / WAIT
H1-201
OFFICE
H1-102A
VEST
H1-102
CORRIDOR
H1-C04
VISITOR LOUNGE
H1-202
PUBLIC TLT
H1-203
D1
D1
D2 D2
D2
D2
D2
D3
D4
D6
D6
D7
D7
D8
D6
D9 D15
D11
D7
D6
D6
D6
D1
D1
D6
D6 D6
ELEVATOR VESTIBULE
D3
D7
D10
A
CORRIDOR
H1-C07
VIEWING
H1-102B
ENTRANCE / WAIT
H1-201
OFFICE
H1-102A
VEST
H1-102
CORRIDOR
H1-C04
VISITOR LOUNGE
H1-202
PUBLIC TLT
H1-203
D12
D13 D13 D13
D12
D12
D12D14
SHEET NOTES:
1. EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BOTH
ON PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF CONSTRUCTION.
VERIFY WHETHER FIELD DIMENSIONS WILL TAKE PRECEDENCE OVER
DRAWING DIMENSIONS. DO NOT SCALE FROM DRAWINGS.
2. PROTECT EXISTING NON-PROJECT SPACES FROM CONSTRUCTION
ACTIVITIES,
3. ALL DIMENSIONS ARE TO FINISH FACE - TYPICAL UNLESS NOTED
OTHERWISE.
4. ALL WORK WILL BE COMPLETED IN COMPLIANCE WITH APPLICABLE
CODES AND TO THE SATISFACTION OF THE COR.
5. COORDINATE THE REMOVAL AND/OR RELOCATION OF FIXTURES,
EQUIPMENT AND OTHER APPURTENANCES WITH THE COR.
6. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF EXISTING
CONSTRUCTION AFFECTED BY DEMOLITION TO NEW CONDITION. MATCH
EXISTING ADJACENT CONSTRUCTION AND MATERIAL TO GREATEST EXTENT
POSSIBLE, INCLUDING, BUT NOT LIMITED TO FLOORS, WALLS AND CEILINGS.
7. ALL PARTITIONS SHALL EXTEND 6" ABOVE CEILING UNLESS NOTED
OTHERWISE.
8. REMOVE EXISTING PLUMBING FIXTURES COMPLETELY, TYP. - SEE
PLUMBING DRAWINGS.
9. FINAL COUNTERTOP LENGTH TO BE DETERMINED ONCE SANITARY
SEWER CORE DRILLING LOCATIONS HAVE BEEN CONFIRMED, AND
SANITARY SEWER STUB UPS ARE INSTALLED. DO NOT MANUFACTURE
CABINETRY UNTIL SANITARY SEWER WORK AND STUB UPS ARE COMPLETE.
CABINETRY TO CONCEAL SANITARY WASTE LINES.
KEY NOTES:
D1. REMOVE EXISTING DOOR, FRAMES AND HARDWARE (LOCK
BUTTON), DOOR OPERATOR " BATHROOM IN USE" INDICATOR,
AND HANDICAP BUTTON.
D2. REMOVE EXISTING PARTITION WALL.
D3. REMOVE EXISTING HANDRAIL AND CRASHRAIL.
D4. VA WILL REMOVE TELEVISION.
D5. NOT USED.
D6. REMOVE EXISTING FURNITURE IN OFFICE AREAS, STORAGE
AND COORDINATE WITH COR FOR RELOCATION.
D7. REMOVE EXISTING FINISH MATERIALS INCLUDING: SHEET
FLOORING, WALL BASE, AND WAINSCOT. PREP FOR NEW
WORK, TYP.
D8. REMOVE EXISTING FINISH MATERIALS INCLUDING: CARPET
TILE, WALL BASE, AND WAINSCOT. PREP FOR NEW WORK, TYP.
D9. REMOVE EXISTING TOILET ACCESSORIES AND PLUMBING
FIXTURES COMPLETELY, CAP UTILITIES TYP. - SEE PLUMBING
DRAWINGS.
D10. REMOVE EXISTING FLOOR AND WALL TILE. PREP FOR
NEW WORK, TYP.
D11. REMOVE EXISTING COUNTERTOP IN THE WAITING AREA.
D12. REMOVE EXISTING HARD GYPSUM CEILING.
D13. REMOVE EXISTING ACOUSTICAL CEILING TILES AND
GRIDS.
D14. LEAVE IN PLACE DUCT AND RA GRILL IN ROOM H1-203 -
COORDINATE/SEE MECHANICAL DRAWINGS.
D15. REMOVE DOOR OPERATOR, BATHROM IN USE INDICATOR
LIGHT FIXTURE, TWO HANDICAP ACCESS BUTTONS, AND DOOR
LOCKING BUTTON
DX
LEGEND:
NO WORK / CHANGES IN THESE AREAS (NIC)
EXISTING ACOUSTICAL CEILING TILES TO REMAIN
EXISTING ACOUSTICAL CEILING TILES TO BE REMOVED
EXISTING GWB HARD CEILING TO BE REMOVED
EXISTING SPRINKLERS HEADS
HATCHED WALLS, DOORS AND FURNITURE TO BE
REMOVED FOR PROJECT
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:4
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/A I-I
BS
.rv t
04-AD-101
1ST FLOOR PARTIAL ARCHITECTURAL
DEMOLITION PLAN AND RCP
JME LMF
SCALE: 3/8" = 1'-0"
1ST FLOOR PARTIAL ARCHITECTURAL DEMOLITION
PLAN1 SCALE: 3/8" = 1'-0"
1ST FLOOR PARTIAL ARCHITECTURAL REFLECTED
CEILING PLAN DEMOLITION2
2' 4'0 1'
SCALE:3/8"=1'-0"
NORTH
B
B
D
D
E
E
F
F
G
G
H
H
J
J
R1
R1
R2
R2
RJ
RJ
RH
RH
RG
RG
RF
RF
RE
RE
RC
RC
RB
RB
RA
RA
K
K
RD
RD
Cabinet Bedside
Door Drawer8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
5'-0"
TD
TD
RFI 5015
WALL TYPE CHANGE TP B6A
FOR 4" ROUND DRYER VENT
VA RFI 5111
04-AI-401
AREA OF WORK
NOT IN CONTRACT
(NIC)
A
H1-C07
CORRIDOR
-H1-A105
KITCHEN
-H1-A104
LIVING/DINING
-H1-A103
STORAGE
ELEVATOR VESTIBULE
1 HR FRR FIRE BARRIER
2 HR FRR FIRE BARRIER
2 HR FRR SMOKE BARRIER AND
SMOKE BARRIER
LEGEND
(EXISTING FIRE RATED WALLS TO REMAIN)
SHEET NOTES:
1. ALL CORRIDOR WALLS TO BOTTOM OF STRUCTURE
ABOVE.
2. USE 5/8" TYPE "X" GYPSUM BOARD FOR ALL
PARTITIONS UNLESS NOTED OTHERWISE.
3. PROVIDE 20 GA. STRAPPING / BACKING FOR ALL
WALL MOUNTED CABINETS, GRAB BARS, HARDWARE,
FIXTURES ETC.
4. PROVIDE 5/8" CEMENTITIOUS BACKER BOARD
BEHIND CERAMIC OR PORCELAIN TILE WALL
SURFACING.
5. PROVIDE FIRE RATED SEALANT AT ALL
ELECTRICAL OUTLETS, PLUMBING FIXTURES OR
OTHER EQUIPMENT ABUTTING OR PENETRATING A
PARTITION.
6. REFER TO MECHANICAL DRAWINGS FOR ALL HVAC
DESIGN COMPONENTS.
7. REFER TO PLUMBING DRAWINGS FOR ALL
DEMOLISHED AND NEW PLUMBING FIXTURES.
8. REFER TO ELECTRICAL DRAWINGS FOR POWER
AND LIGHTING REQUIREMENTS.
9. SEE REFLECTED CEILING PLAN FOR SPRINKLER
HEAD LOCATIONS.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
6/
/2
2:
:5
PM
Au to de sk
D oc s:
//A ur or a
VA
S C
I/A I-I
BS
.rv t
04-AI-101
OVERALL FLOOR PLAN
JME LME
SCALE: 1/8" = 1'-0"
1ST FLOOR ARCHITECTURAL OVERALL1
SCALE: 1/4" = 1'-0"
PARTIAL 1ST FLOOR - FIRE AND SMOKE RATED
PARTITIONS2
8'0 4' 16'
SCALE:1/8"=1'-0"
4' 8'0 2'
SCALE:1/4"=1'-0"
H1-C07
CORRIDOR
-H1-A105
KITCHEN
04-AI-501
GURNEY
-H1-A104
LIVING/DINING
-H1-A103
STORAGE
6'-2 1/2"
85 SF
180 SF
178 SF
163 SF
48 SF
04-AI-501
A
A
-H1-A102
BEDROOM
CAREGIVER
RECLINER
-H1-A101
BATHROOM
A
A
A101
A
04-AI-501
04-AI-451
C
4 1/2"
1'-6"
2'-0"2'-0" 1'-0"
2'-8" 4'-0"
/2
-H1-A107
CLOSET
-H1-A108
LINEN CLOSET
B
A
A105A
11'-4"
2'-4"
/4
3'-8"
A103
AC
AA
6/AE501
19 CORRIDOR
H1-C04
ELEVATOR VESTIBULE
04-AI-601
4'-0"
14'-0"
A
04-AI-501
04-AI-501
-H1-A105
KITCHEN
-H1-A104
LIVING/DINING
-H1-A103
STORAGE
CORRIDOR
9'-0"
9'-0"
9'-4"
9'-0"
9'-0"
04-AI-501
04-AI-501
-H1-A101
BATHROOM
-H1-A102
BEDROOM
3'-0" 3
12'-0"
04-AI-501
04-AI-501
3'-0"
5'-0" 1'-0"
6"
04-AI-601
TYP.
ELEVATOR VESTIBULE
SHEET NOTES:
1. EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO
COMMENCEMENT OF CONSTRUCTION. VERIFY WHETHER FIELD
DIMENSIONS WILL TAKE PRECEDENCE OVER DRAWING
DIMENSIONS. DO NOT SCALE FROM DRAWINGS.
2. PROTECT EXISTING NON-PROJECT SPACES FROM
CONSTRUCTION ACTIVITIES,
3. ALL DIMENSIONS ARE TO FINISH FACE - TYPICAL UNLESS
NOTED OTHERWISE.
4. ALL WORK WILL BE COMPLETED IN COMPLIANCE WITH
APPLICABLE CODES AND TO THE SATISFACTION OF THE COR.
5. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES WITH THE
COR.
6. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO NEW
CONDITION. MATCH EXISTING ADJACENT CONSTRUCTION AND
MATERIAL TO GREATEST EXTENT POSSIBLE, INCLUDING, BUT
NOT LIMITED TO FLOORS, WALLS AND CEILINGS.
7. ALL PARTITIONS SHALL EXTEND 6" ABOVE CEILING UNLESS
NOTED OTHERWISE.
8. REMOVE EXISTING PLUMBING FIXTURES COMPLETELY, TYP. -
SEE PLUMBING DRAWINGS.
9. FINAL COUNTERTOP LENGTH TO BE DETERMINED ONCE SANITARY
SEWER CORE DRILLING LOCATIONS HAVE BEEN CONFIRMED, AND
SANITARY SEWER STUB UPS ARE INSTALLED. DO NOT MANUFACTURE
CABINETRY UNTIL SANITARY SEWER WORK AND STUB UPS ARE COMPLETE.
CABINETRY TO CONCEAL SANITARY WASTE LINES.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
ARCHITECT/ENGINEERS:
Professional Seal
D
C
B
A
E
CONSTRUCTION DOCUMENTS
JULY, 2025
/1
/2
:3 :0
A
M A u to d e s k D o c s /A u ro ra V
A S
C I/ A
I-
IB
S .r v t
04-AI-401
1ST FLOOR PARTIAL PLAN AND
REFLECTED CEILING PLANS
JME LMF
3/8" = 1'-0"1
PARTIAL 1ST FLOOR
ARCHITECTURAL FLOOR PLAN
3/8" = 1'-0"2
PARTIAL 1ST FLOOR REFLECTED
CEILING PLAN
2' 4'0 1'
SCALE:3/8"=1'-0"
NORTH
KEY NOTES:
1. 2' X 2' CIRCADIAN WALL PANEL WITH WOOD TRIM CASING-STAINED.
CENTER OVER SINK. REFER TO 13/04-AI-601 AND 04-ES-301.
2. TABLE, OPOI.
3. TV BRACKET, WALL MOUNTED/WALL BACKING. PROVIDE 42"
TELEVISION.
4. 1"W X 1'D X 8'L COVE LIGHT IN THE LIVING AREA
5. WALL MOUNTED MONITOR ON LIVING WALL. PROVIDE 50" TELEVISION.
6. DISHWASHER
7. MICROWAVE ON THE COUNTER
8. HOOD ABOVE RANGE WITH OVEN
9. REFRIGERATOR / FREEZER 20 CUBIC FEET
10. OVERHEAD PATIENT LIFT SYSTEM. REFER TO STRUCTURAL
DRAWINGS AND SPECIFICATION 11 73 00 FOR PATIENT LIFT
REQUIREMENTS.
11. RELOCATE FIRE SPRINKLER HEADS AS REQUIRED TO PROVIDE
COVERAGE, COORDINATE WITH MECHANICAL.
12. GWB SOFFIT ABOVE KITCHEN CABINETS
13. CLOSET
14. 2' X 4' CIRCADIAN PANEL MULLED IN 8" DEEP COVE WRAPPED IN
GYPSUM BOARD CENTER OVER BED. REFER TO 13/AE501 AND EL101
15. STAINLESS STEEL KITCHEN SINK
16. SLEEPER SOFA, OPOI
17. LAMP TABLE WITH SHADE, TYP. OPOI.
18. EXISTING WALL TO REMAIN
19. BIFOLD CLOSET DOOR
20. RESIDENTIAL BED, OPOI
21. CEILING ACCESS PANELS, TYP.
22. GLOVE RACK, OPOI
23. SHARP DISPOSAL CONTAINER
24. ADD HANDRAIL AND CRASHRAIL TO MATCH EXISTING, OPCI
25. CLOSET POCKET DOOR
26. LINEN CLOSET
27. RECESSED SHELF FOR SHAMPOO/SOAP/CONDITIONER
28. GARBAGE DISPOSAL PROVIDED AT THE BACK CORNER OF THE SINK
TO IMPROVE FRONT APPROACH ACCESSIBILITY AT THE SINK.
29. STOVE TO HAVE FRONT CONTROL FOR ACCESSIBILITY AND TO
INCLUDE INTERNET CONNECTIVITY IN ORDER TO PROVIDE CONTROL
OPTIONS WITH TECHNOLOGY. IN ADDITION THE STOVE IS TO HAVE ANTI-
TIP BRACKETS SECURED TO FLOOR AND WALL.
30. WALL MOUNTED CONTROL SWITCH FOR EXHAUST HOOD ABOVE
RANGE WITH OVEN. REFER TO MECHANICAL SHEET MH101, KEY NOTE 4
31. INFILL OPENING AFTER REMOVING THE EXISTING DOOR.
32. LENGH OF BASE CABINET TO CONCEAL THE SANITARY LINE TO BE
DETERMINED IN THE FIELD. DO NOT PRE-MANUFACTURE, ALSO REFER TO
KEYNOTE 33 FOR ABA ENCROAHMENT AT THIS LOCATION.
33. PROVIDE 18" OF CLEAR FRONT APPROACH ON DOOR PULL SIDE
REQUIREMENT FOR ACCESIBILITY CLEARANCE.
34. WOOD POSTS TO ALIGN WITH LIFT RAILS, REFER TO STRUCTURAL,
TYP.
35. REINSTALL EXHAUST AIR (EA) GRILLE.
36. PROVIDE EVACUATION SIGN ON BACK OF DOOR.
X
NO WORK / CHANGES IN THESE AREAS (NIC)
EXISTING ACOUSTICAL CEILING TILES
GWB HARD CEILING
24" X 24" SUPPLY DIFFUSER
12" X 24" RETURN GRILL
DOWNLIGHT
EXISTING SPRINKLER HEADS TO BE
RELOCATED AS REQUIRED
EXISTING EXHAUST AIR GRILLE TO BE
REINSTALLED
LEGEND:
37. PROVIDE WALL MOUNTED SHARPS CONTAINER. COORDINATE WITH
COR FOR EXACT LOCATION.
R1
04-01-RGR1-08
STAFF
H1-C07
CORRIDOR
-H1-A105
KITCHEN
-H1-A104
LIVING/DINING
-H1-A103
STORAGE
04-AI-501
B
A
ELEVATOR
VESTIBULE
B
-H1-A101
BATHROOM
-H1-A102
BEDROOM
NEW FLOORINGEXISTING FLOORING
N E
W F
L O
O R
IN
G
E X
IS
T
IN
G
F L O
O R
IN
G
NEW FLOORING
EXISTING FLOORING
VINYL WELDED SHEET FLOORING
NIC AREA
LUXURY VINYL TILE
CARPET TILE
SEALED CONCRETE
LEGEND:
N E
W F
L O
O R
IN
G
SHEET NOTES:
1. EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO
COMMENCEMENT OF CONSTRUCTION. VERIFY WHETHER FIELD
DIMENSIONS WILL TAKE PRECEDENCE OVER DRAWING
DIMENSIONS. DO NOT SCALE FROM DRAWINGS.
2. PROTECT EXISTING NON-PROJECT SPACES FROM
CONSTRUCTION ACTIVITIES,
3. PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT ALL
INTERIOR LAVATORY AND TOILET LOCATIONS.
4. ALL WALLS RECEIVING PORCELAIN TILE MUST CONFORM TO
THE TILE COUNCIL OF AMERICA'S (TCA) HANDBOOK.
5. ALL DIMENSIONS ARE TO FINISH FACE - TYPICAL UNLESS
NOTED OTHERWISE.
6. ALL WORK WILL BE COMPLETED IN COMPLIANCE WITH
APPLICABLE CODES AND TO THE SATISFACTION OF THE COR.
7. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES WITH THE
COR.
8. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO NEW
CONDITION. MATCH EXISTING ADJACENT CONSTRUCTION AND
MATERIAL TO GREATEST EXTENT POSSIBLE, INCLUDING, BUT
NOT LIMITED TO FLOORS, WALLS AND CEILINGS.
9. REFER TO AE601 FOR INTERIOR FINISH COMPONENTS.
10. ALL PARTITIONS SHALL EXTEND 6" ABOVE CEILING UNLESS
NOTED OTHERWISE.
11. MANUFACTURERS AND MODEL NUMBERS ARE BASIS OF
DESIGN. SUBMIT ALTERNATIVES FOR APPROVAL.
1. LUXURY VINYL TILE (LVT)
2. PORCELAIN TILE (PT)
3. CARPET TILE (CT)
4. FLOOR TRANSITION (FT)
A. BETWEEN LUXURY VINYL TILE AND
PORCELAIN TILE
B. BETWEEN LUXURY VINYL TILE AND
CARPET
5. EXISTING FLOOR TO REMAIN
6. SEALED CONCRETE (SC)
7. TV BRACKET, WALL MOUNTED/WALL BACKING
8. VIDEO WALL MONITOR
9. CORNER GUARD SEE DETAIL 9/AE501
10. WELDED VINYL SHEET FLOORING TO MATCH
EXISTING.
KEY NOTES: X
04-AI-501
-H1-A101
BATHROOM
3'-11" 5'-0"
4 4
6 6
TOILET ACCESSORIES SCHEDULE
TYPE MARK PRODUCT DESCRIPTION MANUFACTURER MODEL BACKING PROVIDED/
INSTALLED
GEORGIA
PACIFIC
ANTIBACTERIAL SHOWER
CURTAIN
BRADLEY 9537 NO
ENMOTION® IMPULSE® 10� 1-
ROLL AUTOMATED
TOUCHLESS PAPER TOWEL
DISPENSER
SIZE: 14.6" X 9.25" X 14"
(BLACK)
59488A YES OPCI
ELVARI - COAT/ROBE HOOK BRADLEY YES2B1-1100
CHANNEL FRAMED MIRROR BRADLEY 781-2436 NO CFCI
8334-E1PURELLSOAP DISPENSER (GRAPHITE) NO
This is the start of the file's text. The full file is on GovTribe.