This document is a Standard Form 1442 Solicitation, Offer, and Award for a construction contract issued by the Department of Veterans Affairs Network Contracting Office. The project involves constructing a new Spinal Cord Injury (SCI) Residential Rehabilitation Apartment in Building H at the Rocky Mountain VA Medical Center in Aurora, Colorado. The project is a total set-aside for Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a project magnitude between $500,000 and $1,000,000, using NAICS code 236220.

Key details include a site visit scheduled for January 15, 2026, at 1 PM, and a proposal submission deadline of February 9, 2026, by 10 AM MT. The contract requires demolition and reconstruction of walls, floors, ceilings, and systems, including plumbing, electrical, and communication infrastructure. Specific requirements include installing a retractable kitchen table, using a Schluter transition system between tile surfaces, and implementing Infection Control Risk Assessment IV (ICRA IV) protections. The period of performance is 360 calendar days, with 14 days allocated for initial administrative tasks. Contractors must be registered in the System for Award Management (SAM) and verified in the SBA certification database.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25926R0032 X 03-09-2026 554-23-101 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Elia Laritza Ruiz Manzo Elia-Laritza.Ruiz-Manzo@va.gov

Elia L Ruiz Manzo 303-712-5727 The contractor shall furnish all labor, equipment, materials, and supervision for the 554-23-101 Construct New SCI Residential Rehab Apartment, Building H at the Rocky Mountain VAMC located at 1700 N Wheeling St, Aurora, CO 80045.

Important Notice: Apparent successful offerors must apply for and receive verification from the Small Business Administration (SBA) through the SBA certification data base via 13 CFR Part 128, VAAR 819.7011, and VAAR 819.7003 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the SBA certification database at the time of offer submission. Failure to be both VERIFIED by SBA and VISIBLE on the SBA certification database at the time of offer submission and contract award will result in the offeror’s proposal being deemed non-compliant. All offerors are urged to contact the SBA and submit the required documents to obtain verification of their SDVOSB status if they have not already done so.

In accordance with FAR 52.204-7, System for Award Management (SAM), Prospective contractors shall be registered in the SAM database prior to close of solicitation.

Project magnitude: between $500,000 and $1,000,000. The NAICS code is 236220 - Small Business size standard is $45 M.

A site visit shall be held on January 15, 2026, at 1 PM. MT, please meet at the front of the Patriot Brew Coffee Shop.

entrance.

All questions in relation to this solicitation should be submitted in writing before January 22, 2026, via e-mail to:

Elia-Laritza.Ruiz-Manzo@va.gov before 10:00AM MT.

All submitted proposals must be received in email by the closing date and time. This solicitation closes February 9, 2026, by 10 AM MT.

Proposals shall be submitted via e-mail in accordance with Part I/Section B, to be considered for this project.

Alternate protection upon award is required IAW FAR IAW FAR 52.228-14

X X 52.211-10 X 10 Calendar Days

10:00 AM

MST

02-09-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE5
ITEM INFORMATION5
A.4 DELIVERY SCHEDULE5
A.5 Statement of Work.6
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS14
2.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)21
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)22
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)22
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)22
2.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014)23
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)24
2.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)25
2.8 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)28
2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)29
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)29
REPRESENTATIONS AND CERTIFICATIONS29
3.1 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)29
3.2 52.228-1 BID GUARANTEE (SEP 1996)31
GENERAL CONDITIONS32
4.1 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)32
4.2 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018) (DEVIATION FEB 2025)35
4.3 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) (DEVIATION FEB 2025)37
4.4 52.222-12 CONTRACT TERMINATION—DEBARMENT (MAY 2014) (DEVIATION FEB 2025)39
4.5 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (AUG 2018)39
4.6 52.222-50 Combating Trafficking in Persons. (NOV 2021) (DEVIATION OCT 2025)39
4.7 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024) (DEVIATION FEB 2025)47
4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)48
4.9 52.233-1 ALT 1 Disputes. (DEVIATION NOV 2025)52
4.10 52.233-3 Protest after Award. (DEVIATION NOV 2025)53
4.11 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) (DEVIATION NOV 2025)54
4.12 52.236-2 Differing Site Conditions (DEVIATION AUG 2025)54
4.13 52.236-3 Site Investigation and Conditions Affecting the Work (DEVIATION AUG 2025)54
4.14 52.236-5 Material and Workmanship (DEVIATION AUG 2025)55
4.15 52.236-6 Superintendence by the Contractor (DEVIATION AUG 2025)56
4.16 52.236-7 Permits and Responsibilities (DEVIATION AUG 2025)56
4.17 52.236-8 Other Contracts (DEVIATION AUG 2025)56
4.18 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (DEVIATION AUG 2025)57
4.19 52.236-10 Operations and Storage Areas (DEVIATION AUG 2025)57
4.20 52.236-11 Use and Possession Prior to Completion (DEVIATION AUG 2025)58
4.21 52.236-12 Cleaning Up (DEVIATION AUG 2025)59
4.22 52.236-13 Accident Prevention (DEVIATION AUG 2025)59
4.23 52.236-14 Availability and Use of Utility Services (DEVIATION AUG 2025)59
4.24 52.236-15 Schedules for Construction Contracts (DEVIATION AUG 2025)60
4.25 52.236-17 Layout of Work (DEVIATION AUG 2025)60
4.26 52.236-21 Specifications and Drawings for Construction (DEVIATION AUG 2025)61
4.27 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)63
4.28 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025)72
4.29 52.243-4 Changes (DEVIATION JUL 2025)73
4.30 SUPPLEMENTAL INSURANCE REQUIREMENTS74
4.31 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)75
4.32 52.252-4 ALTERATIONS IN CONTRACT (APR 1984)75
4.33 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)75
4.34 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)77
4.35 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)80
4.36 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)81
4.37 Wage Determination.82
4.38 List of Attachments90

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

554-23-101 Construct New SCI Residential Rehab Apartment Blld H Contract Period: Base POP Begin:

POP End:

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
1.00
360 Calendar Days from NTP
FOB:
DESTINATION

A.5 Statement of Work.

1.0 - OBJECTIVE

The Department of Veteran’s Affairs has a requirement to remodel existing space into a residential rehabilitation apartment for spinal cord injury or disorder patients as described in the construction drawings and specifications. The location of the work is in the Inpatient Building South (building 4 also known as H) at RMR VAMC, 1700 N. Wheeling St., Aurora CO 80045.

All Contractor-provided materials, systems, and components shall optimize performance, require low-maintenance, and be energy efficient. All Contractor provided materials, systems, and components shall comply with applicable codes, be field tested, be fully functional, and be installed in accordance with manufacturer’s specifications.

2.0 – STATEMENT OF WORK

In accordance with the construction drawings and specifications provide the following items and services. The required work includes but is not limited to these items.

· Demolish walls, floors, and ceilings.

· Demolish plumbing, electrical, and low voltage data and communication systems.

· Construct walls, floors, and ceilings.

· Install plumbing, electrical, and low voltage data and communication systems.

· Provide and install kitchen cabinetry and appliances.

· Provide Infection Control Risk Assessment IV (ICRA IV) protections during construction.

· Work causing noise, vibration, dust, or possible disruption to normal operations may be required to be done after normal working hours, at no additional cost to the government.

· The items below are required. The items below are supplemental information or corrections or clarifications to the project drawings.

· #04-A1-601 Detail 8A The transition from the porcelain tile to the luxury vinyl tile shall be a Schluter system or equal to create a level transition.

· #04-A1-401 View 1 Key Note 2. The kitchen table shall be contractor purchased contractor installed. The table shall be retractable, ceiling mounted, motorized, 120 V, with wall mounted SPDT up/neutral/down controls. The table shall allow for a minimum of 6’-8” a.f.f. clearance when in the up position. The table shall be 60” diameter and constructed of hospital grade cleanable components. Limit switches shall control the upper and lower, 30” a.f.f., stopping positions. The controls shall allow for the table to be used at heights above the lower limit. Field coordinate location with COR. Provide power to the table.

· #04-A1-401 View 1 Key Note 19. The bedroom closet door is contractor purchased contractor installed. It is a bifold door.

· #04-ES-401 In the Storage closet, H1-203, the electrical outlet shall be a quad.

· #04-AC-101 View 1 Key Note 3. The electrically operated wave sensor shall be mounted in a location that is accessible to patients in wheelchairs. Field coordinate with the COR. The east end of the kitchen cabinetry, south facing, is an appropriate location. Modify cabinet features to allow for the mounting of the wave sensor.

· #04-TA-301 One additional nurse call pull cord shall be provided in the main living area. Field coordinate location with the COR.

· #04-ES-301 All circadian light fixture shall have separate switches and controls, independent of the regular room lights.

3.0 – GENERAL

The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations (CFR) 29, Part 1910 and 1926. This includes the requirement that the Contractor have a “Competent Person” on the job at all times. The Competent Person must have a 30-hour Occupational Safety and Health Administration (OSHA) card, completed within the last five years. All Contractor employees, on site, shall have a ten (10) hours OSHA construction safety training certificate, at a minimum. Documentation of these requirements shall be submitted and approved prior to performing the work.

This entire project shall conform to 100% of all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes.

The Contractor shall be responsible for the health and safety of their own employees. The VA will inform the Contractor of any hazards such as designated permit confined spaces, electrical hazards, etc. which may affect Contractor employees. The Contractor must take precautions appropriate for the safety of their employees as well as provide equipment necessary for these actions. Contractor employees will notify the VA Representative before entering a designated permit required confined space, so precautions can be taken in advance of the work.

The Contractor shall hold harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any property occurring in connection with, in any way incident to, or arising out of the occupancy, use, service, operation or performance of work under the terms of the contract, resulting in whole or in part from the negligence acts or omissions of the Contractor, any Subcontractor, or any employee, agent, or representative of the Contractor or Subcontractor

The Contractor is responsible for protection of existing finishes, and VA property, furnishings, fixtures, and equipment (FF&E), located in the areas where demolition, construction, preventative maintenance, and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The Contractor is liable for any damage to VA property during the course of the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned FF&E and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor’s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition.

4.0 – PROJECT MANAGEMENT

Based on the above list of work items, the Contractor selected must complete, maintain, and submit the following documentation and managerial requirements:

· Construction schedule including sequencing, phasing, and durations.

· The schedule will be provided to the COR within ten (10) working days after Notice to Proceed (NTP).

· Coordinate and follow a phasing schedule. The phasing schedule must be approved by the Contracting Officer’s Representative (COR). Work by others in the construction site requires the Contractor to perform tasks during specific time periods as directed by the COR.

· Obtain VA identification Personal Identity Verification (PIV) badges for all employees. Contractor to consider lead-time for badge procurement.

· Manage job-site access and security.

· Implement and maintain required ICRA and ILSM measures.

· Follow all required safety protocols.

5.0 – SUPPORTING DOCUMENTS

Contractor shall be required to field verify current conditions and accuracy of most current documentation, construction drawings and specifications.

6.0 – CODE & REGULATION COMPLIANCE

The Contractor shall comply with the public laws and statutes including all changes and amendments of federal, state, and local environmental statutes and regulations in effect of date of issuance of this delivery order, including, the applicable portions of the documents cited in the basic contract and below, most recent editions.

· National Fire Protection Association (NFPA):

· NFPA 99 Health Care Facilities Code

· NFPA 101 Life Safety Code

· International Code Council (ICC): IBC: International Building

· Building Officials and Code Administrators International (BOCA)

· International Conference of Building Officials (ICBO): UBC: Uniform Building Code

· 29 CFR 1910 Occupational Safety and Health Standards

· 29 CFR 1926 Safety and Health Regulations for Construction

· Federal Occupational Safety and Health Act (OSHA)

· Underwriters Laboratories

· International Plumbing Code

· SBCCI Standard Plumbing Code

7.0 – SUBMITTALS

Contractor shall submit the following prior to beginning scope of work:

· Project schedule with sequencing, durations, phasing, and cost loading within 10 working days of NTP. Update as needed monthly with invoices.

· Site Specific Safety Plan (SSSP) with an emphasis on, but not limited to, demolition, installation, and safety.

· Submit to VA Safety staff for review within 10 working days after the issuance of NTP.

· Include a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals, etc.

· Detail fire, construction, and health-related safety measures.

· Listing safety training records for all employees expected on site.

· Include detailed Job-Safety-Analysis (JSA) or Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA) for all tasks associated with Statement of Work (SOW)

· Wait for approved by VA Safety staff prior to start of construction activities. Allow 10 working days for approval. Correct if necessary.

· Construction Demolition Removal / Handover Plan, if applicable.

· Inspection reports, manufacturer approval certificates, and warranties.

· Penetration, live work, or hot work permits as necessary.

· Manufacturer and construction warranties as noted in specifications or where applicable.

· SOV – Schedule of Value. The schedule will be provided to COR 10 working days prior to start of the work.

· Material Submittals – Submit for to COR for approval.

· Physical and electronic Redline (As-Built) drawings of the completed work.

Technical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer (CO) or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises.

Contractor shall submit hours worked, full report of completed structural, piping, and electrical which shall include location, hours worked, the full name of Contractor’s employees on site, and digital photographs before and after work is completed. Reports shall be submitted within one day upon completion of the work performed. Contractor will provide a complete redline drawing of the completed work. Reports shall be provided in hard copy as well as in an agreeable and compatible electronic format such as, but not limited to, pdf or Microsoft Word.

8.0 – RESOURCES

The Government will not furnish any resources for the fulfillment of the work required under this contract other than electricity for area(s) where work is being conducted. Under this contract, the Contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, supervision, and for testing and maintenance required for completion of this contract.

Contractor shall provide all necessary parts and equipment to complete the objective of this contract in accordance with manufacturer specifications. All new equipment, including parts, shall be preapproved by the COR.

The Contractor shall instruct his/her personnel in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities which shall include but not necessarily be limited to:

1.Lights shall be used only in areas where and at the time when work is actually being performed unless otherwise directed.
2.Contractor’s personnel will not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems.
3.Government telephones shall not be used for personal reasons or for any toll or long-distance calls.

9.0 – TECHNICIAN/INSPECTOR QUALIFICATIONS

The Government reserves the right to reject Contractor’s staff for safety violation, lack of required training, or other causes. Documented prior the work, Contractor shall provide staff throughout the contract qualified to perform work on required components and systems. The Contractor shall notify the Government within 3 business days if it intends to replace a staff member. At the time of notification, the Contractor shall submit all required certifications for all personnel working on the contract. In the event new, or replacement, personnel become involved in the contract, the Contractor must submit all required certification. Additions or changes in personnel require written approval of the Government. The Contractor shall have a back-up staff available in the event the primary staff is unable to perform his/her duties.

The Contractor will ensure their personnel and Subcontractor personnel meet the privacy standards as set forth by HIPPA (Health Insurance Portability and Accountability Act of 1996) with respect to personal and confidential information that they may come upon, while contract work is being performed.

10.0 – PERSONNEL ASSIGNMENTS

The Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW within the designated period of performance and required sequencing/ phasing. The Contractor shall maintain throughout the life of this contract, a current list of laborers, tradesmen, technicians, superintendents, etc. and their credentials available for inspection by the Government at any time.

The Contractor shall specify a Project Manager who will have responsibility for performance of contract services. The Project Manager shall be competent to supervise all aspects of contract and shall be available on-site during performance of contract work. The Contracting Officer shall be notified in writing of the name of the Project Manager and of changes in personnel appointed to fulfill this function.

11.0 – ACCEPTANCE STANDARDS

The VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, is not satisfactorily executed, or if the system is not properly tested and inspected to achieve certification. All work completed by the Contractor must be reviewed and approved by the VA.

12.0 – SAFETY AND FIRE PREVENTION

Comply with the following safety and fire prevention principles and regulations.

a. Precaution shall be exercised at all times for the protection of all persons on the site and government property. These precautions shall include, but not be limited to, the installation of adequate safety guards and protective devices for all equipment and machinery, whether used in the performance of work or permanently installed as part of the work. Contractor shall comply with all applicable laws relating to safety precautions.

b. The Contractor shall immediately correct any fire and safety deficiencies caused by his/her personnel. If the Contractor fails or refused to correct deficiencies promptly, the CO may issue an order stopping all or any part of the work and hold the Contractor in default of the contract.

c. The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract. The Contractor shall keep abreast of and comply with changes in these requirements and codes applicable to the contract. The requirements include but are not limited to those found in Federal and State OSHA statutes and regulations, such as applicable provisions of Title 29, CFR Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthy working conditions for its employees.

d. The Contractor’s personnel shall follow applicable facility policies concerning fire/disaster programs.

e. All materials and equipment will be removed from the facility or stored properly at the end of the workday and secured during the workday. Under no circumstances will the Contractor allow for any equipment to be left unattended for any length of time.

f. The Contractor shall comply with all applicable Federal, State, and local legal requirements regarding workers health and safety.

g. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.

h. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially regarding exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants.

i. No flammable liquids shall be stored or used in the Medical Center.

j. The necessary number and appropriate types of portable fire extinguishers are required per NFPA 10 and NFPA 241. Contractor shall keep certification on site at all times of extinguisher inspections.

k. The Contractor shall request from the COR a permit for all live work, cutting, welding, soldering, and permit required confined space entry. All permits shall be prominently displayed during all construction. Allow 10 working days for approval.

l. All necessary precautions shall be taken by the Contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.

m. The Contractor shall assume responsibility of environmental protection of all material storage.

12.1 - ENVIRONMENTAL PROTECTION

Comply with the following environmental protection principles and regulations.

a. In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements” as well as the specific requirements stated elsewhere in the Contract Documents.

b. The Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA Housekeeping shall not be dispatched for cleaning associated with Contractor work.

c. Contractor shall use freight elevators for transmission of materials and personnel. Contractor shall take every precaution in preserving the elevators, including the hoist way and lobby doors, interior finishes, and shall conduct all good practices in observing lifting and motor components tolerances. Any damage incurred to any elevator component due to negligence will be repaired at expense of the Contractor, within the workday of incurred damage.

13.0 – WORK STANDARDS AND ICRA/ILSM

Work site shall be free of debris and returned to original condition upon completion of demolition and construction, preventative maintenance, or repairs.

All work is to be performed in areas used daily by facility clients and staff. Contractor will take suitable measures to control all material and equipment to produce a minimum of interference in facility routine. All work shall be performed in a safe and prudent manner.

Contractor shall so perform all work as to offer the least possible obstruction and inconvenience to staff and the public and shall have under construction no greater amount of work than can be completed promptly and properly with due regard to the rights of staff and the public. Any person that the COR may deem incompetent or disorderly shall be promptly removed from the facility and not be allowed to return for the duration of the agreement.

The Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be developed with the COR and the Infection Control Practitioner. The Contractor shall comply with Interim Life Safety Measures (ISLM) which will be developed with the COR and the Safety Office. Multiple ICRA’s may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase.

14.0 - HAZARDOUS MATERIAL REPORTING

Comply with the following hazardous material reporting principles and regulations.

a. The Contractor shall maintain hazardous material inventories and safety data sheets (SDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR’s 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project’s completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).

b. Hazardous Materials Inventories, Safety Data Sheets and material quantities used shall be submitted to the CO for approval.

c. In the event of a hazardous spill, Contractor shall immediately notify the COR. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.

d. Asbestos Containing Material (ACM) should not be present in the workspace. If the Contractor locates suspected ACM, the Contractor shall contact the COR immediately for further direction. If any suspected ACM is disturbed or becomes friable, the construction site shall be shut down until abatement can be performed, after which the job site shall be reopened for continued work.

15.0 – HOURS OF WORK

With preapproved exceptions, as needed or as required, the hours of work shall take place during the normal business hours of 7:00 AM and 4:00 PM, Monday through Friday, Federal Holidays excluded. Weekend, after-hours, and Federal holiday work is permitted with a request in writing submitted beforehand. Allow 10 working days for approval. Off hours, as needed or as required, are not to be billed as overtime. Federal Holidays may include other days declared a federal holiday by the President of the United States. Federal Holidays are defined below.

New Year’s DayMartin Luther King Jr’s DayPresidents Day
Memorial DayJuneteenthIndependence Day
Labor DayColumbus DayVeterans Day
Thanksgiving DayChristmas Day

If a holiday falls on Sunday, the following Monday will be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as the National Holiday by the U.S. Government.

All work shall be scheduled and performed within the dates and times approved by the COR, in conjunction with the department(s) occupying the space served by this project and in conjunction with work performed by others within the construction site.

16.0 - BADGES AND PARKING

Contractor must acquire PIV badge for all staff onsite prior to work beginning. While on VA Facilities, official I.D. badges shall be worn continuously. Failure of the background check may result in specific personnel being disallowed to work on VA premises and the Contractor will need to provide replacement personnel.

It is the responsibility of the Contractor’s personnel to park in the appropriate designated parking areas. The designated parking area will be specified by COR upon award of contract. While performing under this contract, all vehicles used by the Contractor shall be locked and the keys removed when not in use. This is intended to protect the Contractor’s property and the safety of the patients at the Medical Center.

17.0 – QUALITY CONTROL

The Contractor shall have a quality control program to assure the requirements of this contract are provided as specified. The Contractor and COR will inspect the work. Deficiencies will be noted and corrected. Any damage done by the Contractor will also be noted and corrected by the Contractor within a time period specified by the COR. Damage causing an immediate impact on the environment of the hospital shall be corrected immediately.

18.0 – ACCEPTANCE STANDARDS

Completed work will be to the entire satisfaction of the VA. The COR shall be the sole judge as to its acceptability. Any work not acceptable to the COR, shall be immediately, at Contractor’s own expense, refashioned to an acceptable level.

19.0 – KEYS

a. Keys: The COR shall provide the Contractor access to all buildings and rooms if required in the provisions of this contract. The Contractor shall notify the COR when leaving these areas.

b. Clearances/Access Controls: Contractor and all personnel shall comply with the security clearances or access controls of areas within the Medical Center. If the Contractor must obtain access to areas that require special security precautions, obtain permission from the COR prior to access.

20.0 – MEETINGS

Pre-Bid meeting and site walk will be held at a date and time specified by the COR to review the scope of work, site conditions, and work requirements with prospective contractors, and to provide answers to any questions. Contractor and/or Sub-contractors are encouraged to attend the pre-bid meeting before submitting a bid. The date and time of this walkthrough will be determined by the CO and COR. Contractor and/or Subcontractors shall be responsible for directing any clarification requests that arise at the pre-bid walkthrough to the CO prior to the bidding of the work.

21.0 – PERIOD OF PERFORMANCE

Government intends to issue NTP immediately after kickoff meeting with Contractor. The period of performance for this contract is three hundred and sixty (360) calendar days. The period of performance includes fourteen (14) days anticipated to complete initial administrative tasks.

----------------------------------- END OF STATEMENT OF WORK.-----------------------------------------

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

PART I - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

PART I/SECTION A – REQUEST FOR PROPOSAL

I.1A JOINT VENTURES

If submitting an offer as a joint venture as defined by P.L. 109-461 AND Department of Veterans Affairs I.L. 049-06-4. Certified SDVOSB/VOSB listed in the SBA certification database at https://veterans.certify.sba.gov/ (see 13 CFR 128). A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations under VAAR 819.7003 paragraph (b). An offeror must provide a copy of the joint venture agreement specific to the project that is consistent with the percentage of required work and net proceed. Additionally, the offeror must provide a breakdown or labor of which is to be performed by the SDVOSB firm and that which is performed by the small business joint venture firm and that which is sub-contracted. All Joint Ventures will be required to be registered and verified as an entity in VETCERT.

I.2A SELECTION PROCEDURES

This acquisition will be a competitive acquisition utilizing FAR Part 15 source selection employing tradeoff source selection procedures. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations, and certifications. All such offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined non-compliant. It is the intent of the Government to award without discussions; however, the Government will reserve the right to have discussions if such are needed.

I.3A PRE-PROPOSAL SITE VISIT

See SF 1442, Block 10 Site Visit of this solicitation for date and location of the site visit.

I.4A SELECTION CRITERIA

This acquisition will utilize the tradeoff process in accordance with FAR 15.101-1. This process permits tradeoffs between non-cost factors and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest rated proposal to achieve a best value contract award based on established evaluation criteria. Inherent in this process is the necessity to make tradeoffs considering the non-cost strengths and weaknesses, risks, and the cost (or price) offered in each proposal.

The source selection process will be conducted utilizing FAR part 15.101-1 Trade-off Process Source Selection Procedures. Offers will be evaluated using the following evaluation factors:

Factor 1 – Past Performance Factor 2 – Compliance Requirements Factor 3 – Price

Past performance will be evaluated on a basis of significantly more important than, cost or price.

Past Performance Evaluation For Factor 1, based on the evaluation of all recent and relevant past performance for an offeror, an overall performance confidence rating shall be assigned. The performance confidence ratings are defined below:

ASSESSMENT
DESCRIPTION
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Note: In the case of an offeror without a record of past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall receive an unknown confidence (neutral) performance confidence rating.

(a) Aspects of Past Performance Evaluation. The past performance evaluation is an assessment based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. There are two aspects of the past performance evaluation.

(1) The first is to evaluate whether the offeror’s present/past performance is recent and relevant or not relevant to the effort to be acquired. The criteria to establish what is relevant is unique to each source selection.
(2) The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. In addition, the Government reserves the right to obtain information for use in the evaluation of past performance from all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
(b) Source Selection Evaluation Board (SSEB) members will review past performance information to determine the quality and usefulness as it applies to the performance confidence assessment.

Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.

For Factor 2, offerors will be rated as either meets or does not meet the requirements.

Factor 1-Past Performance

(a) Solicitation Submittal Requirements:

Offerors shall provide a maximum of five (5) recent and relevant projects (as defined below) to demonstrate their ability to perform the proposed work identified within the Specifications, drawings, and Statement of Work. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted. The Government will evaluate past performance based upon sources available to the contracting officer that may include Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS) and Electronic Subcontract Reporting System (eSRS). IF THERE IS NOT A PAST PERFORMANCE EVALUATION IN PPIRS or FAPPIIS, then the offeror shall submit Past Performance Questionnaires (PPQ) for each project. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Elia Laritza Ruiz Manzo, Elia-Laritza.Ruiz-Manzo@va.gov.

Recency – a recent project is defined as being completed within five years of the due date of this solicitation.

Relevant – includes performance of efforts in a project of renovation or remodeling that include general construction in an active medical facility that are similar or greater in scope, magnitude, and complexity than the effort described in this solicitation.

Offerors are cautioned to submit enough information in the format specified in the solicitation. Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.

(b) – Basis of Evaluation:

The contracting officer shall review recent and relevant performance information on each offeror based on past efforts provided by the offeror and may obtain data independently from other government and commercial sources. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror. Offerors with no past performance history or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.

Initially offers shall be ranked according to price, including any option prices if applicable. The lowest price offer’s past performance shall be evaluated to determine its performance confidence rating.

If the lowest priced evaluated offer is judged to have a Substantial Confidence performance assessment, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.

If the lowest price offer does not receive a Substantial Confidence performance confidence rating, the past performance evaluation continues until an offeror’s past performance is judged to have a Substantial Confidence performance rating. The Government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.

Factor 2 – Compliance Requirements:

The Government will evaluate compliance factors:

· OSHA or EPA Violation(s): Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.

· Experience Modification Rate (EMR): Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0. If an offeror’s EMR is above 1.0, the offeror must submit a written explanation of the EMR from its insurance carrier on the insurance carrier’s letterhead, describing the reasons for the EMR and the anticipated date the EMR may be reduced to 1.0 or below.

· Adherence to clause 852.219-75: Offerors must provide documentation demonstrating compliance with clause 852.219-75 Failure to provide the required documentation for these factors may deem the offeror ineligible for award.

Factor 3 – Price:

(a)…