This document is a set of electrical, telecommunications, and fire detection system modification drawings for the Construct New SCI Residential Rehab Apartment project at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project involves demolishing and modifying existing systems in Building H, including public address (PA), telecom/data, physical access controls (PACS), and fire detection/alarm systems across multiple rooms and areas.
Key specifications include: matching existing conduit sizes, using minimum 4 11/16-inch square junction boxes, factory-painting conduits in specific colors (black, yellow, red, white, purple, silver), protecting active systems during renovation, and coordinating with VA staff to maintain operational devices. The contractor must field verify existing conditions, demolish or modify systems as needed, install new conduits and junction boxes, and ensure all systems remain functional. The drawings provide detailed floor plans showing existing conditions, demolition areas, and new work locations, with specific notes on device relocation, cabling, and system modifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Q and A 56 to 64 SCI Apt 02-04-2026 VA.docx | DOCX document | |
| table submittal 2014.pdf | ||
| 01 35 26 safety 2026-02-04.pdf | ||
| 36C25926R0032 0002.docx | DOCX document | |
| Answers to RFI Questions 41 to 55 SCI Apt 2026-01-23 VA.pdf | ||
| Pre bid Site Visit Attendance 15-01-2026.pdf | ||
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0032 0001.docx | DOCX document | |
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| 554-23-101 - Construct New SCI -ASI 01.pdf | ||
| RFI Q and A 1 to 40.pdf | ||
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Self-Performed and Subcontracted Worksheet.docx | DOCX document | |
| Drawings 554-23-101 Construct New SCI set 1 of 2.pdf | ||
| S02-Specifications 554-23-101 Construct New SCI.pdf | ||
| 36C25926R0032_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number Sheet Name
1 04-GI-001-1 Cover Sheet and Drawing Index
2 04-ES-401-1 Electrical Power & Lighting Plan Demo, Modifications, New Work
3 04-TD-101-1 Public Address Demo, Modifications, New Work 4 04-TD-101-2 Telecom Plan - Demo, Modifications, New Work 5 04-AC-101-1 Physical Access Controls Demo, Modifications, New Work
6 04-ES-501-1 Fire Alarm Plans Demo, Modifications, New Work
GENERAL NOTES:
1. These general notes apply to the entire project.
2. The Contractor shall provide all engineering, equipment, labor, materials, supervision, and tools required to:
a. demolish or modify all architectural, mechanical, electrical, plumbing, and data systems within the work area and adjacent areas as needed.
b. construct new architectural, mechanical, electrical, plumbing, and data systems within the work area and adjacent areas as needed.
c. provide and coordinate ICRA (Infection Control Rick Assessment) measures and ILSM (Interim Life Safety Measures) as required.
3. All Contractor provided and installed components and systems shall be complete, functional, field tested, and conform to equipment manufacturer's recommendations, VA specifications, and federal, state, and local codes.
4. Fire caulk to maintain fire rating of all penetrations related to this project.
5. Prior to bid preparation, the Contractor shall field verify all required items and systems to be demolished including all existing piping and conduit run lengths. Existing piping and conduit lengths shown in this drawing set are approximate and incomplete. Prior to bid preparation, the Contractor shall field verify all required demolition. Prior to bid preparation, the Contractor shall field verify routes for new piping and conduit runs, their lengths and all required offsets. New piping lengths shown in this drawing set are approximate. Offsets and obstacles are not shown. Many spaces are congested with piping, conduit, duct, and equipment. The contractor shall field verified existing conditions and shall incorporate these conditions into original bid.
6. All horizontal piping and conduit runs shall align with building grid. Diagonal runs are not allowed. Vertical piping and conduit shall be plumb.
7. The Contractor may utilize existing supports to hang new piping and conduit where available. The Contractor shall provide new supports where needed.
8. The Contractor may utilize existing concrete slab penetrations, if needed and available. The Contractor shall concrete core drill new openings if and where needed. Minimum hole diameter is 2 inches. Coordinate with
COR.
9. Where not specified as new work, restore any disturbed ceilings, walls, floors, or surfaces to original condition.
10. Some construction operation, such as those which produce noise and vibration or construction operations or that require the shut down of utilities for tie-in, may be required to be performed outside of normal working hours, specifically early mornings, late afternoons, or weekends. This requirement is shall not cause an additional charge to the government but shall be incorporated into the contractor's original bid. Coordinate with COR.
11. For items and systems outside of the workspace, protect or modify to maintain operational, all existing furnishings, fixtures, and equipment: HVAC, PA system, lighting, fire protection, electrical conduit and circuits, etc.
12. The Fire Suppression system shall remain active at all times. Protect in place. Existing flexible piping connected to sprinkler heads allows for slight adjustment of final location compared to current location.
13. All new power, lighting, and data conduit shall be factory painted: black-normal, yellow-life safety, red-fire alarm/detection, white-PACS, purple-critical, and silver (unpainted)-data.
Buildings Legend
· Building A (10) South Clinic
· Building B (2) Research
· Building C (1) Concourse
· Building D (3) Diagnostic & Treatment S
· Building E (9) Central Clinic
· Building F (3) Diagnostic & Treatment N
· Building G (8) North Clinic
· Building H (4) Inpatient South
· Building K (5) Inpatient North
· Building L (6) Energy Center
Parking Lots
· PVS (13) Parking Visitors South
· PVN (12) Parking Visitors North
· PSN (11) Parking Staff North
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101Construct New SCI Residential Rehab Apartment, Building H
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C
O N
B
R
E S
D
T
D
A T
H
I
B S
K
I
B N
L
E
N C
G
C
B N
E
C
B C
A
C
B S
P
E
P S
N
P N
P
V N
P
S
P V
S
Q
A S
D
R
F S
H
6/24/2025 1:03:20 PM
Cover Sheet and Drawing Index for Drawing Set 2 of 2
11/13/25 SPM SPM
OS
OS
OS
OS
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
N
N
N
N
PA
A
A
04-01-A2-02
VISITOR LOUNGE
H1-201
ENTRANCE/WAIT
04-01-A2-01
H1-203
PUBLIC TLT
04-01-A3-04 H1-100
ELEV VEST
04-01-A3-01
H1-102B
VIEWING
04-01-A2-04
H1-102A
OFFICE
04-01-A3-05
CRITICAL CH11-7CRITICAL CH11-7
(DEMO BACK TO (DEMO BACK TO
NEAREST FIXTURE)NEAREST FIXTURE)
NL 11-54,56NL 11-54,56
CRITICAL CH11-7CRITICAL CH11-7
(DEMO BACK TO (DEMO BACK TO
NEAREST FIXTURE)NEAREST FIXTURE)
CRITICAL CH11-7CRITICAL CH11-7
(DEMO BACK TO (DEMO BACK TO
NEAREST FIXTURE)NEAREST FIXTURE)
flex NL11-77flex NL11-77
Bridge 3 LV LightingBridge 3 LV Lighting
(DEMO BACK TO CONTROL (DEMO BACK TO CONTROL
BOX IN HALLWAY)BOX IN HALLWAY)
NH12-3NH12-3
CRITICALCRITICAL
NH11-48,50,52NH11-48,50,52
NH11-47,49,51NH11-47,49,51
LIFE SAFETYLIFE SAFETY
NH12-3NH12-3NH12-1NH12-1CRITICALCRITICALLSL11-15,18LSL11-15,18
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
GROUND flex NL11-77GROUND flex NL11-77
(DEMO BACK TO (DEMO BACK TO
INTERSTITIAL)INTERSTITIAL)
3131343435353939
EXISTING JB TO BE EXISTING JB TO BE
RELOCATED OUTSIDE ROOM RELOCATED OUTSIDE ROOM
INTO HALL. MODIFY INTO HALL. MODIFY
INTERSTITIAL RACEWAYS AS INTERSTITIAL RACEWAYS AS
REQ'D. FED FROM ABOVE.REQ'D. FED FROM ABOVE.
TYP. 3 CORE DRILL 2" TYP. 3 CORE DRILL 2" ⌀⌀ MIN MIN
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
JBJB
NEW J-BOXNEW J-BOX
JBJB
NEW J-BOXNEW J-BOX
NEW J-BOXNEW J-BOX
JBJBJBJBJBJBJBJBJBJB
NEW J-BOXNEW J-BOXNEW J-BOXNEW J-BOX
VV
EE
DD
AA
XX
GG
II
HH
JJ
LL
MM
HH
JJ
LL
JBJB
WW
JBJB
SS
LSH11-1LSH11-1 3232
LEGENDLEGEND
DEMO NORMAL CONDUITDEMO NORMAL CONDUIT
PROTECT IN PLACEPROTECT IN PLACE
NEW NORMAL CONDUITNEW NORMAL CONDUIT
NOTESNOTES
7. TURN ALL LIGHTING CONTROL DEVICES OVER TO THE VA.7. TURN ALL LIGHTING CONTROL DEVICES OVER TO THE VA.
8. ALL EXISTING ELECTRICAL POWER & LIGHTING CONDUCTORS, CONDUIT, 8. ALL EXISTING ELECTRICAL POWER & LIGHTING CONDUCTORS, CONDUIT, J-BOXES, SUPPORTS, DEVICES, AND FIXTURES WITHIN THE WORK SPACE, J-BOXES, SUPPORTS, DEVICES, AND FIXTURES WITHIN THE WORK SPACE, WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE CONTRACTOR SHALL FIELD INSPECT THE EXTENT OF WORK PRIOR TO BID CONTRACTOR SHALL FIELD INSPECT THE EXTENT OF WORK PRIOR TO BID PREPARATION AND INCORPORATE ALL EXISTING CONDITIONS INTO PREPARATION AND INCORPORATE ALL EXISTING CONDITIONS INTO
ORIGINAL BID.ORIGINAL BID.
9. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT 9. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT
DIAMETER IF REQUIRED.DIAMETER IF REQUIRED.
10. MINIMUM HOME RUN JUNCTION BOX SIZE SHALL BE 4-11/16" SQUARE 10. MINIMUM HOME RUN JUNCTION BOX SIZE SHALL BE 4-11/16" SQUARE WITH DEPTH AS REQUIRED. FOLLOW NEC CODE FOR ALL OTHERS.WITH DEPTH AS REQUIRED. FOLLOW NEC CODE FOR ALL OTHERS.
11. NEW CONDUIT SHALL BE FACTORY PAIRED; RED- FOR FIRE DETECTION 11. NEW CONDUIT SHALL BE FACTORY PAIRED; RED- FOR FIRE DETECTION SYSTEMS, BLACK- NORMAL, PURPLE- CRITICAL AND YELLOW- LIFE SYSTEMS, BLACK- NORMAL, PURPLE- CRITICAL AND YELLOW- LIFE
SAFETY.SAFETY.
12. COORDINATE WORK WITH DRAWINGS SET 1 OF 2 PAGE 04.ES.401.12. COORDINATE WORK WITH DRAWINGS SET 1 OF 2 PAGE 04.ES.401.
13. REUSE EXISTING CONDUCTORS IF PERMITTED BY THE VA. PULL NEW 13. REUSE EXISTING CONDUCTORS IF PERMITTED BY THE VA. PULL NEW
CONDUCTORS AS REQUIRED. CONDUCTORS AS REQUIRED.
DEMO LIFE SAFETY CONDUITDEMO LIFE SAFETY CONDUIT
NEW LIFE SAFETY CONDUITNEW LIFE SAFETY CONDUIT
DEMO CRITICAL CONDUITDEMO CRITICAL CONDUIT
NEW CRITICAL CONDUITNEW CRITICAL CONDUIT
NAMENAME SYSTEMSYSTEM CKTSCKTS
A A NORMAL POWER NORMAL POWER 04-NH12-1 04-NH12-1
D D NORMAL POWER NORMAL POWER 04-NH12-3 04-NH12-3
E E NORMAL POWER NORMAL POWER 04-NH12-1 04-NH12-1
G G NORMAL POWER NORMAL POWER 04-NH12-1 04-NH12-1
H H NORMAL POWER NORMAL POWER 04-NH11-48,50,52 04-NH11-48,50,52
I I LIFE SAFETY LIFE SAFETY 04-LSH11-1 04-LSH11-1
J J NORMAL POWER NORMAL POWER 04-NL11-47,49,51 04-NL11-47,49,51
L L NORMAL POWER NORMAL POWER SPARE SPARE
M M NORMAL POWER NORMAL POWER 04-NH12-1 04-NH12-1
Q Q NORMAL POWER NORMAL POWER 04-NH12-3 04-NH12-3
S S NORMAL POWER NORMAL POWER ““OLDOLD”” CONSTRUCTION LIGHTING CONSTRUCTION LIGHTING
V V NORMAL POWER NORMAL POWER 04-NH12-3 04-NH12-3
W W NORMAL POWER NORMAL POWER 04-NH12-3 04-NH12-3
X X NORMAL POWER NORMAL POWER 04-NL11-54 04-NL11-54
NOTESNOTES
1. FOR ALL POWER AND LIGHTING CIRCUITS PULL CONDUCTORS BACK TO 1. FOR ALL POWER AND LIGHTING CIRCUITS PULL CONDUCTORS BACK TO NEAREST JBOX OUTSIDE OF THE NEW SCI APARTMENT AREA.NEAREST JBOX OUTSIDE OF THE NEW SCI APARTMENT AREA.
2. INSTALL NEW JBOXES OUTSIDE THE NEW SCI APARTMENT AS 2. INSTALL NEW JBOXES OUTSIDE THE NEW SCI APARTMENT AS
REQUIRED.REQUIRED.
3. INSTALL NEW JBOXES WITHIN THE NEW SCI APARTMENT WITHIN 3. INSTALL NEW JBOXES WITHIN THE NEW SCI APARTMENT WITHIN REACH OF THE RESIDENT ARCHITECTREACH OF THE RESIDENT ARCHITECT ’’S ACCESS PANELS ON THE NEW S ACCESS PANELS ON THE NEW
WORK PAGES OF THE DRAWING SET.WORK PAGES OF THE DRAWING SET.
4. MINIMIZE NEW POWER AND LIGHTING JBOXES WITHIN THE NEW SCI 4. MINIMIZE NEW POWER AND LIGHTING JBOXES WITHIN THE NEW SCI
APARTMENT.APARTMENT.
5. PULL UNUSED POWER CONDUCTORS BACK TO A JBOX IF THE CIRCUIT 5. PULL UNUSED POWER CONDUCTORS BACK TO A JBOX IF THE CIRCUIT IS TO BE REUSED OR IN USE ELSEWHERE. PULL BACK TO A POWER IS TO BE REUSED OR IN USE ELSEWHERE. PULL BACK TO A POWER PANEL IF A CIRCUIT IS NO LONGER TO BE USED.PANEL IF A CIRCUIT IS NO LONGER TO BE USED.
6. JUNCTION BOX "X" AND NORMAL POWER CIRCUIT 04-NL11-54 SHALL BE 6. JUNCTION BOX "X" AND NORMAL POWER CIRCUIT 04-NL11-54 SHALL BE DEMOLISHED BACK TO A NEW JUNCTION BOX IN THE INTERSTITIAL SPACE DEMOLISHED BACK TO A NEW JUNCTION BOX IN THE INTERSTITIAL SPACE
OR HALLWAY.OR HALLWAY.
JUNCTION BOXESJUNCTION BOXES
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key PlanCONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101CONSTRUCT NEW SCI
RESIDENTIAL APARTMENT
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C C O N
B
- R
ES
D T D
AT
H
IB
S
K
- I
BN
L
- E N C
G C
BN
E
- C
BC
A
- C
BS
PE
PS
N
PN
PV
N
PS
PV
S
Q
AS
D
R
FS
H
/1 3/ :3 8:
A M
C :\U se rs \V H
AE
C H W illi Se a\ O ne D riv e
- D ep ar tm en t o f V et er an s Af fa irs \D oc um en ts \A I-C
EN
TR
AL
_V H
AE
C H W illi Se a.
rv t
11/13/2025 7:38:31 AM
04.ES.401-1
ELECTRICAL EXISTING CONDITIONS,
DEMO, MOD AND NEW WORK
11/13/2025 SM SW
1/2" = 1'-0"1 LEVEL 1 SCI APARTMENT ELEXTRICAL MODIFICATIONS PLAN
HE-P02
ELEV
HE-P01
ELEV
PA
PA
PA
A
B
'-0
2'-0"
2'-0"
PA
PA
C
N
O
PA D
EM
O B
ACK
DEMOLISH CONDUIT, J BOXES, AND SUPPORTS
PROTECT IN PLACE
NEW WORK, CONDUIT AND JBOXES
1. TURN ALL DEVICES OVER TO THE VA.
2. COORDINATE WITH THE VA TO MAINTAIN ALL DEVICES IN THE SURROUNDING AREA ACTIVE.
3. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT DIAMETER IF REQUIRED.
4. MINIMUM JUNCTION BOX SIZE SHALL BE 4 11/16TH INCH SQUARE WITH DEPTH AS REQUIRED.
5. NEW CONDUIT AND BOXES SHALL BE FACTORY UNPAINTED SILVER FOR PA SYSTEMS.
H1-201
ENTRANCE/WAIT
H1-203
PUBLIC TLT
H1-100
ELEV VEST
H1-102B
VIEWING
H1-104
HAC
H1-102A
OFFICEH1-102
VEST
H1-C07
CORRIDOR
X CONDUIT IDENTIFICATION NUMBER
X JBOX IDENTIFICATION LETTER
6. COORDINATE WORK WITH DRAWINGS SET 1 OF 2 PAGE 04.TD.101.
7. REUSE EXISTING CABLING IF PERMITTED BY VA. PULL NEW CABLING AS REQUIRED.
TO
N
EAREST JB
OX
PA D
EM
O B
ACK
TO
N
EAREST JB
OX
Scale 3/8" = 1'-0" PAPER SIZE E
PA
PA DEMO BACK
TO NEAREST JBOX
KEYNOTES
CONTRACTOR INSTALLED NEW JBOX.
8. ALL EXISTING CABLING, CONDUIT, JBOXES, SUPPORTS, AND DEVICES WITHIN THE WORKSPACE, WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE CONTRACTOR SHALL
FIELD INSPECT THE EXTENT OF WORK PRIOR TO BID PREPARATION AND INCORPORATE ALL
EXISTING CONDITIONS INTO ORIGINAL BID.
NOTES
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101Construct New SCI Residential Rehab Apartment, Building H
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C
O N
B
R
E S
D
T
D
A T
H
I
B S
K
I
B N
L
E
N C
G
C
B N
E
C
B C
A
C
B S
P
E
P S
N
P N
P
V N
P
S
P V
S
Q
A S
D
R
F S
H
6/24/2025 1:03:20 PM
Public Address (PA) system existing conditions and modifications
HE-P01
ELEV
A
B
'-0
2'-0"
2'-0"
LOW VOLTAGE AUTO FLUSH XFMR
NURSE CALL
HVAC diff press sensor PIP
DATA
DOOR CONTROL
NURSE C
ALL
Ora ng e Plen um w ire
DATA
46 48
P
R
T
DOOR CONTROL
DOOR CONTROL
DOOR CONTROL
Ora ng e Plen um w ire
DEMOLISH CONDUIT, J BOXES, AND SUPPORTS
PROTECT IN PLACE
NEW WORK, CONDUIT AND JBOXES
1. COORDINATE WITH THE VA TO MAINTAIN ALL DEVICES IN THE SURROUNDING AREA ACTIVE.
NOTES
2. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT DIAMETER IF REQUIRED.
3. MINIMUM JUNCTION BOX SIZE SHALL BE 4 11/16TH INCH SQUARE WITH DEPTH AS REQUIRED.
H1-201
ENTRANCE/WAIT
H1-203
PUBLIC TLT
H1-100
ELEV VEST
H1-102B
VIEWING
H1-104
HAC
H1-102A
OFFICEH1-102
VEST
H1-C07
CORRIDOR
X CONDUIT IDENTIFICATION NUMBER
X JBOX IDENTIFICATION LETTER
4. COORDINATE WORK WITH DRAWINGS SET 1 OF 2, PAGE 04.TD.101.
5. REUSE EXISTING CABLING IF PERMITTED BY VA. PULL NEW CABLING AS REQUIRED.
KEYNOTES
INSTALL NEW JBOX. PULL BACK CABLING TO NEW JBOX.
Scale 3/8" = 1'-0" PAPER SIZE E
Telemetry Protect in Place
RELOCATE WIRELESS ACCESS POINT DEVICE TO THE ADJACENT ELEVATOR VESTIBULE
H1-100. COORDINATE LOCATION WITH THE COR. RUN ADDITIONAL CONDUIT AS REQUIRED.
PULL NEW CABLING. ELIMINATE ASSOCIATED JBOXES WITHIN THE NEW SCI APARTMENT.
TELEMETRY UNIT PROTECT IN PLACE. SLIGHT RELOCATION IS ALLOWED TO AVOID NEW
WORK. COORDINATE WITH THE COR. PROVIDE NEW FLEXIBLE CONDUIT AND SUPPORTS
AS NEEDED. TRACE AND PROTECT IN PLACE ALL ASSOCIATED CONDUIT AND CABLING.
PROTECT IN PLACEPIP
DEMO BACK TO NEAREST JBOX IN HALLWAY.
6. ALL EXISTING CABLING, CONDUIT, JBOXES, SUPPORTS, AND DEVICES WITHIN THE WORKSPACE, WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE CONTRACTOR SHALL
FIELD INSPECT THE EXTENT OF WORK PRIOR TO BID PREPARATION AND INCORPORATE ALL
EXISTING CONDITIONS INTO ORIGINAL BID.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101Construct New SCI Residential Rehab Apartment, Building H
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C
O N
B
R
E S
D
T
D
A T
H
I
B S
K
I
B N
L
E
N C
G
C
B N
E
C
B C
A
C
B S
P
E
P S
N
P N
P
V N
P
S
P V
S
Q
A S
D
R
F S
H
6/24/2025 1:03:20 PM
Telecom / Data existing conditions and modifications
H
HE-P01
ELEV
A
B
'-0
2'-0"
2'-0"
PACS 0
4-
-C
2-
-A
PACS 0
4-
-C
2-
-A
DEMOLISH CONDUIT, J BOXES, AND SUPPORTS
PROTECT IN PLACE
NEW WORK, CONDUIT AND JBOXES
1. COORDINATE WITH THE VA TO MAINTAIN ALL DEVICES IN THE SURROUNDING AREA ACTIVE.
NOTES
2. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT DIAMETER IF REQUIRED.
3. MINIMUM JUNCTION BOX SIZE SHALL BE 4 11/16TH INCH SQUARE WITH DEPTH AS REQUIRED.
4. NEW CONDUIT AND BOXES SHALL BE FACTORY PAINTED WHITE FOR PACS SYSTEMS.
H1-201
ENTRANCE/WAIT
H1-203
PUBLIC TLT
H1-100
ELEV VEST
H1-102B
VIEWING
H1-104
HAC
H1-102A
OFFICEH1-102
VEST
H1-C07
CORRIDOR
X CONDUIT IDENTIFICATION NUMBER
5. COORDINATE WORK WITH DRAWINGS SET 1 OF 2, PAGE 04.AC.101.
6. REUSE EXISTING CABLING IF PERMITTED BY VA. PULL NEW CABLING AS REQUIRED.
KEYNOTES
CONTRACTOR INSTALLED NEW JBOX.
Scale 3/8" = 1'-0" PAPER SIZE E
7. ALL EXISTING CABLING, CONDUIT, JBOXES, SUPPORTS, AND DEVICES WITHIN THE WORKSPACE, WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE CONTRACTOR SHALL
FIELD INSPECT THE EXTENT OF WORK PRIOR TO BID PREPARATION AND INCORPORATE ALL
EXISTING CONDITIONS INTO ORIGINAL BID.
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101Construct New SCI Residential Rehab Apartment, Building H
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C
O N
B
R
E S
D
T
D
A T
H
I
B S
K
I
B N
L
E
N C
G
C
B N
E
C
B C
A
C
B S
P
E
P S
N
P N
P
V N
P
S
P V
S
Q
A S
D
R
F S
H
6/24/2025 1:03:20 PM
Physical Access Controls (PACS) existing conditions and modifications
HE-P01
ELEV
A
B
'-0
2'-0"
2'-0"
43 44
B
F
K
U
DEMOLISH CONDUIT, J BOXES, AND SUPPORTS
PROTECT IN PLACE
NEW WORK CONDUIT, JBOXES, CABLING, AND SUPPORTS
1. TURN ALL DEVICES OVER TO THE VA.
2. COORDINATE WITH THE VA TO MAINTAIN ALL DEVICES IN THE SURROUNDING AREA ACTIVE.
NOTES
3. AT A MINIMUM MATCH EXISTING CONDUIT SIZES. UPSIZE CONDUIT DIAMETER IF REQUIRED.
4. MINIMUM JUNCTION BOX SIZE SHALL BE 4 11/16TH INCH SQUARE WITH DEPTH AS REQUIRED.
5. NEW CONDUIT AND BOXES SHALL BE FACTORY PAINTED RED FOR FIRE DETECTION SYSTEMS.
H1-201
ENTRANCE/WAIT
H1-203
PUBLIC TLT
H1-100
ELEV VEST
H1-102B
VIEWING
H1-104
HAC
H1-102A
OFFICEH1-102
VEST
H1-C07
CORRIDOR
X CONDUIT IDENTIFICATION NUMBER
X JBOX IDENTIFICATION LETTER
6. COORDINATE WORK WITH DRAWINGS SET 1 OF 2 PAGE 04.ES.501.
7. REUSE EXISTING CABLING IF PERMITTED BY VA. PULL NEW CABLING AS REQUIRED.
SMOKE DETECTOR (DEMO QTY 1. PIP QTY 2)
WALL MOUNTED SPEAKER STROBE (DEMO QTY 2. PIP QTY 1)
WALL MOUNTED STROBE (DEMO QTY 3. PIP QTY 0)
DEVICE SYMBOLS AND DEMO / PIP QUANTITIES
WALL MOUNTED SPEAKER (DEMO QTY 0. PIP QTY 3)
ADDRESSABLE RELAY MODULE (DEMO QTY 0. PIP QTY 1)
VA STAFF TO RE-FEED.
KEYNOTES
INSTALL NEW JBOX. REUSE EXISTING JBOX, IF PRESENT AND IF ACCEPTABLE
EXISTING JBOX AND INSTALL NEW JBOX ACCORDING TO FILL REQUIREMENTS.
VA STAFF TO RE-FEED / TERMINATE CABLING.
CONTRACTOR TO COORDINATE TO ENSURE CONTINUED SERVICE.
CONTRACTOR TO COORDINATE TO ENSURE CONTINUED SERVICE.
PROTECT IN PLACEP I P
INSTALL NEW JBOX.
8. FIELD COORDINATE NEW JBOX LOCATIONS WITH VA.
Scale 3/8" = 1'-0" PAPER SIZE E
9. ALL EXISTING CABLING, CONDUIT, JBOXES, SUPPORTS, AND DEVICES WITHIN THE WORKSPACE, WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DEMOLISHED. THE CONTRACTOR SHALL FIELD
INSPECT THE EXTENT OF WORK PRIOR TO BID PREPARATION AND INCORPORATE ALL EXISTING
CONDITIONS INTO ORIGINAL BID.
SIZE. IF REQUIRED BY CODE, THE CONTRACTOR SHALL REMOVE AN
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-23-101Construct New SCI Residential Rehab Apartment, Building H
AURORA, COLORADO
N
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
C
C
O N
B
R
E S
D
T
D
A T
H
I
B S
K
I
B N
L
E
N C
G
C
B N
E
C
B C
A
C
B S
P
E
P S
N
P N
P
V N
P
S
P V
S
Q
A S
D
R
F S
H
6/24/2025 1:03:20 PM
Fire Detection/Alarm existing conditions and modifications
| 1 04.GI.001-1 cover sheet |
| 2 04.ES.401-1 power lighting |
| 3 04.TD.101-1 PA system |
| 4 04.TD.101-2 telecom |
| 5 04.AC.101-1 PACS |
| 6 04.ES.501-1 fire alarm detect |
File details come from the government source that posted it. Updated .