This document contains the deliverables section from a facilities investment services contract for preventive maintenance, repair, and alteration of HVAC equipment at sites in Pennsylvania.
The contractor will be required to submit various recurring reports on a monthly basis related to service order summaries, preventive maintenance work schedules and status, inspection and certification program summaries and schedules. Additional recurring deliverables include water testing and treatment program summaries for HVAC, boiler and related systems. Ad hoc deliverables include certifications and licenses, warranty records, maintenance data and documentation to be provided upon request. The contractor must also submit non-recurring work proposals and quantities ordered through FedMall on an as-needed basis.
The contract will have a base period of performance with four one-year option periods not to exceed 60 months total. The solicitation number is N4008523R2849 and was issued by the Naval Facilities Engineering Command for facilities investment services at the Philadelphia Navy Yard Annex and Naval Support Activity in Philadelphia, Pennsylvania.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F 0200000 Deliveries or Performance
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.2.1.2
N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
1 As Required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes Final Revision
Within two working days
KO, COR
and all attendees
1 As Required
0200000 /2.3.4
N/A Permits and Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
0200000/ 2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
0200000/ 2.6.1
N/A Plans of Action and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
1 As required
0200000/ 2.6.1
N/A Cybersecurity Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
1 As required
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.6.4
N/A Scheduling and Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
0200000/ 2.6.4
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
0200000/ 2.6.5
N/A Notification of any Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
0200000/ 2.6.6
N/A Status of Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
0200000/ 2.6.7
N/A Service Interruptions
At least five working days in advance
KO and
COR
1 As required
0200000/ 2.6.8.2
N/A Pipe Delimited Flat-File
By the end of each workday
KO or a representat ive designated by the KO
1 Daily
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.6.8.2
N/A Sample Pipe Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
1 As required to demonstrat e the ability to properly format the flat-file 0200000/
2.6.8.2 N/A Asset and
Specification Data When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
0200000/ 2.6.8.3
N/A List of personnel requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
0200000/ 2.6.9.1
N/A Quality Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
0200000/ 2.6.9.1
N/A Revised Quality Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.6.9.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
0200000/ 2.6.9.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
0200000/ 2.6.10
N/A Property Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
0200000/ 2.7.1
N/A Organizational Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO and
COR
specified
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.7.2.6
N/A Proof of United States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
0200000/ 2.7.3
N/A Service Contract Reporting (SCR)
No later than 31 October
KO and
COR
1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
0200000/
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
0200000/ 2.8.8
N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
0200000/ 2.8.9
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
1 As required
0200000/ 2.9.2
N/A Accident Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.9.3
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
0200000/ 2.9.4.7
N/A Control of Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
0200000/ 2.9.6
J-0200000-05 NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
0200000/ 2.9.6
J-0200000-05 Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
0200000/ 2.9.6
J-0200000-05 Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
0200000/ 2.9.8
N/A Monthly On-Site Labor Report
First work day of each month.
KO and
COR
1 Monthly
0200000/ 2.9.9
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
0200000/ 2.9.10
N/A Safety Inspection and Monitoring Report
Upon request. KO and
COR
1 As required
0200000/ 2.9.11
N/A Safety Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
0200000/ 2.10
N/A EMS Goals and Policy Measurement Information
Upon request. KO and
COR
1 As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.10.2
N/A Environmental Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
0200000/ 2.10.2.1
N/A Laboratory Analysis
Upon Request KO and
COR
1 As specified
0200000/ 2.10.2.2
N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
0200000/ 2.10.2.3
J-0200000-05 Solid Waste Management and Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
0200000/ 2.10.2.3
J-0200000-05 Summary Solid Waste Management and Recycling Report
By October 10th KO and
COR
1 Annually
0200000/ 2.10.2.5
N/A Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
1 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
COR
required
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.10.2.8
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
0200000/ 2.10.2.8
J-0200000-05 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
0200000/ 2.10.2.12
N/A Asbestos Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
0200000/ 2.10.2.13
N/A Hazardous Air Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environme ntal Division, City, State, and EPA
1 Semi-annually
0200000/ 2.10.2.13
N/A Hazardous Air Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environme ntal Division
1 Monthly
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.10.3.2
N/A Recovered Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/ 2.11
N/A Mission Essential Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
0200000/ 2.11
N/A Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.12
N/A Technical Library Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
0200000/ 2.14.1
Recurring Work Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
20200000/ .14.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
0200000/ 2.15.1.1
N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
0200000/ 2.15.2.1
N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO 1 As required
1502000 – Facility Investment
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original / Copies
Number of Copies
(including original)
1502000/ 2.2.1
N/A
Certification and Licenses
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
1502000/
N/A Maintenance Data Report
Maintain current and provide to
KO upon request
KO As requested Maintain current and provide to KO upon request
1502000/
N/A Warranty Records Maintain current and provide to
KO upon request
KO As requested Maintain current and provide to KO upon request
1502000/ 3.1
J-1502000-03 Service Order Summary Report
First work day of each month
KO 12 Monthly
1502000/ 3.2
Preventive Maintenance Program Plan
30 calendar days after contract award
KO 12 25th day of proceeding month/ Monthly
1502000/ 3.2
N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/ 3.2
N/A Unaccomplished PM Report
Monthly KO 12 Monthly
1502000/ 3.4
Inspection, Testing, and Certification Program Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.4
Inspection, Testing and Certification Schedule and Equipment Certifications
First work day of each month
KO 2 Monthly
1502000/ 3.5.4
J-1502000-01 HVAC Water Testing and Treatment Program
Within 15 days after award or as requested by the
KO
KO 1 Monthly
1502000/ 3.5.6
J-1502000-01 Boiler Water Testing and Treatment Program
Within 15 days after award or as requested by the
KO
KO 1 Monthly