J-1502000-01 SYS AND EQUIP INVENTORY.xls
XLS spreadsheet 100 KB Posted
- Solicitation number
- N4008523R2849
About this file
This federal contract solicitation seeks facilities investment services for preventive maintenance, repair, and alteration of heating, ventilation, and air conditioning (HVAC) equipment at sites in Pennsylvania. The anticipated contract will be for a base period of one year with four one-year option periods not exceeding 60 months total. Services include all labor, management, supervision, tools, material, equipment, and other items necessary to perform HVAC services. Prospective contractors must register in the System for Award Management database. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REGION EQ LIST
| BLDG. | I.D.# | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | BELTS | AIR FILTERS | COOLING | REFRIGERANT | NOTES |
| 1 | 1-1 | 100 TON CHILLER | CARRIER | ATTIC CENTER | REGION | DX/ CW | R134A | |||
| 1 | 1-1-5 | COOLING TOWER | BAC - VC1-65-KMPU | ATTIC | REGION | (2) B66 | ||||
| 1 | *1-1-1 | WEST AHU 5 h.p. | CARRIER - 39THCDXMF-R-AEL-AB | ATTIC WEST SIDE | REGION | B41 | (3) 20X25X2 | CW | ||
| 1 | *1-1-2 | CENTER AHU 7.5 h.p. | CARRIER - 39THDDXMF-R-AFJ-AB | ATTIC CENTER SECT | REGION | B56 | (4) 16X25X2 (2) 16X20X2 | CW | ||
| 1 | *1-1-3 | EAST AHU 5 h.p. | CARRIER - 39THDDXMF-R-AFJ-AB | ATTIC EAST SIDE | REGION | B36 | (2) 25X25X2 | CW | ||
| 1 | *1-1-4 | MEZZ. AHU 2 h.p. | CARRIER 39LF06AA-CLFBJJB59 | MEZZ. LEVEL EAST | REGION | B30 | (2) 20X20X2 | CW | ||
| 1 | *H3 | IN LINE HUMIDIFIER (Attached to Carrier AHU 1-1-3) | NORTEC - NHTC+0202 | ATTIC WEST SIDE | REGION | Canister Type | ||||
| 1 | *H2 | IN LINE HUMIDIFIER (Attached to Carrier AHU 1-1-2) | NORTEC - NHTC+0203 | ATTIC CENTER SECT | REGION | Canister Type | ||||
| 1 | *H1 | IN LINE HUMIDIFIER (Attached to Carrier AHU 1-1-1) | NORTEC - NHTC+0204 | ATTIC EAST SIDE | REGION | Canister Type | ||||
| 1 | *H4 | IN LINE HUMIDIFIER (Attached to Carrier AHU 1-1-4) | DRISTEEM VAPORMIST - VM99-4 | MEZZ LEVEL EAST | REGION | Canister Type | ||||
| 1 | 1-1-1P | C.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | |||||
| 1 | 1-1-2P | C.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | |||||
| 1 | 1-1-3P | H.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | |||||
| 1 | 1-1-4P | H.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | |||||
| 1 | Pump # 5 | H.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | MARKED AS P5 ON MOTOR | ||||
| 1 | Pump # 6 | H.W. CIRC PUMP | BELL & GOSSETT | ATTIC CENTER | REGION | MARKED AS P6 ON MOTOR | ||||
| 1 | 1-1-5P | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSET - LQD56A17D60F | ATTIC | REGION | MARKED AS P1 | ||||
| 1 | 1-1-6P | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSET - LQD56A17D60F | ATTIC | REGION | MARKED AS P2 | ||||
| 1 | 1-1-7P | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSET - LQD56A17D60F | ATTIC | REGION | MARKED AS P3 | ||||
| 1 | 1-NGB-1 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - KBN601 | ATTIC | REGION | MARKED AS B1 BTU=600,000 | ||||
| 1 | 1-NGB-2 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - KBN601 | ATTIC | REGION | MARKED AS B2 BTU =600,000 | ||||
| 1 | 1-NGB-3 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - KBN701 | ATTIC | REGION | MARKED AS B3 BTU+700,000 | ||||
| 1 | P0002569 | FAN COIL UNIT HEATER (HW) | TRANE - UHSA126S8EAA1T00B0000 | ATTIC EAST SIDE, ABOVE AHU 1-1-3 | REGION | D/D | ASSET P0002569 | |||
| 1 | P0002516 | FAN COIL UNIT HEATER (HW) | TRANE - UHSA126S8EAA1T00B0001 | ATTIC CENTER, NEXT TO CHILLER | REGION | D/D | ASSET P0002516 | |||
| 56 | *56-1 | 7.5 TON PKG UNIT | CARRIER M/N 48FCEM08A2A5A0A0A0 - S/N 0923P35479 | ROOF WEST SIDE | REGION | D/D | (4) 16X20X2 | DX | R-410A | ASSET P0002633 |
| 56 | *56-2 | 10 TON PKG UNIT | CARRIER - M/N 48FCEM12A2A5A0A0A0 - S/N1223P3K7128 | ROOF WEST SIDE | REGION | D/D | (4) 20X20X2 | DX | R-410A | ASSET P0002632 |
| 56 | *56-3 | 8.5 TON PKG UNIT | YORK - M/N ZF102N12R2A1AAA1A2- S/N N2N1833909 | ROOF EAST SIDE (SERVES PD ADMIN) | REGION | A54 | (4) 20X24X2 | DX | R-410A | ASSET P0002625 |
| 56 | 56-4 | 3-TON AHU UNIT | CARRIER - M/N FAACNF036000AAAA - S/N 0807A82805 | ATTIC | REGION | D/D | 20X20X1 | DX | R-22 | ASSET P0002638 |
| 56 | 56-4A | 3-TON CONDENSING UNIT | CARRIER M/N PH13NR036-K - S/N 1914X71568 | ROOF WEST SIDE | REGION | D/D | DX | R-22 | ASSET P0002635 | |
| 56 | P0002635 | IN-LINE HUMIDIFIER (Attached to 56-2 PKG UNIT) | APRILAIRE - M/N 600A - S/N N/A | 2ND FL SLEEP QTR | REGION | ASSET P0002639, Canister Type | ||||
| 56 | 56-AHU-5 | AHU (COOLING & HEATING) | REZNOR M/N PDH150-S - S/N EBLJ836EN05337 | GYM/ ABOVE CEILING GRID | REGION | A36 | (2) 20X25X2 | DX | ASSET P0002644 | |
| 56 | 56-IRH-3 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N EP201 - S/N 1205-0011-0061 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002669 | ||||
| 56 | 56-IRH-4 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-115 -S/N 1206-034-115-0026 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002668 | ||||
| 56 | 56-IRH-5 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-115- S/N 1207-034-115-0036 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002667 | ||||
| 56 | 56-IRH-6 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-115 - S/N 1206-034115-0027 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002666 | ||||
| 56 | 56-IRH-7 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-80- S/N 1108-034-080-0036 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002665 | ||||
| 56 | 56-IRH-9 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-115 -S/N 1207-034-115-0034 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002664 | ||||
| 56 | 56-IRH-10 | GAS-FIRED INFRARED HEATER | ROBERTS GORDON - M/N CTH3-115 -S/N 1207-034-115-0035 | 1ST FLOOR FIREHOUSE | REGION | ASSET P0002663 | ||||
| 56 | UH1 | GAS-FIRED UNIT HEATER | MODINE - M/N N/A - S/N N/A | 1ST FL SOUTHEAST GARAGE BAY | REGION | D/D | ASSET P000 | |||
| 56 | P0002631 | 12T OUTDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PUHY-P144TNU-A - S/N 9ZP00058 | NORTH WEST ROOF (SERVES FD) | REGION | D/D | DX | R410A | ASSET P0002631 | |
| 56 | P0002627 | 1T OUTDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PUZ-A12NKA7 - S/N 83U07158B | SOUTH EAST ROOF (SERVES PD) | REGION | D/D | DX | R410A | ASSET P0002627 | |
| 56 | P0002648 | INDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PLFY-P12NFMU-E - S/N 94M00782 | CAPT. OFFICE FD, CEILING MOUNT | REGION | D/D | WASHABLE | DX | R410A | ASSET P0002648 |
| 56 | P0002649 | INDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PLFY-P12NFMU-E - S/N 8YM03724 | MARSHALL OFFICE FD, CEILING MOUNT | REGION | D/D | WASHABLE | DX | R410A | ASSET P0002649 |
| 56 | P0002650 | INDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PLFY-EP24NEMU-E - S/N 98A07193D | CONFERENCE RM FD, CEILING MOUNT | REGION | D/D | WASHABLE | DX | R410A | ASSET P0002650 |
| 56 | P0002651 | INDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PLFY-P12NFMU-E - S/N 8YM03727 | UNION OFFICE FD, CEILING MOUNT | REGION | D/D | WASHABLE | DX | R410A | ASSET P0002651 |
| 56 | P0002671 | INDOOR S/S HEAT PUMP UNIT | MITSUBISHI M/N PKA-A12HA7 - S/N 9XA20827A | LOCKER RM PD, WALL MOUNT | REGION | D/D | WASHABLE | DX | R410A | ASSET P0002671 |
| 545 | *545-1 | 30T PACKAGE UNIT | TRANE M/N SXHFC3040Z48C6CD7001A0D00G00000000Y8000 - S/N C01H57787 | S.E. EXTERIOR GROUND | REGION | SF - RF | (16) 20X20X2 | DX | R-22 | ASSET P0002587 |
| 545 | 545-1-1 | HW REHEAT COIL | TRANE - M/N N/A- S/N N/A | S.E. OFFICES /ABOVE CEILING GRID | REGION | N/A | N/A | N/A | ||
| 545 | 545-VAV-1 | VAV | TRANE - M/N VSWE17301V01100DD033000000000 - S/N R01H28721C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 16X16X1 | ASSET P0002615 | ||
| 545 | *545-VAV-2 | VAV | TRANE - M/N VSWE11111V01100DD033000000000 - S/N R01H28722C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 12X16X1 | ASSET P0002614 | ||
| 545 | *545-VAV-3 | VAV | TRANE - M/N VSWE17151V01100DD033000000000 - S/N R01H28725C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 15X20X1 | ASSET P0002616 | ||
| 545 | *545-VAV-4 | VAV | TRANE - M/N VSWE11111V011100DD033000000000 - S/N R01H28723C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 12X16X1 | ASSET P0002617 | ||
| 545 | *545-VAV-5 | VAV | TRANE - M/N VSWE17151V01100DD033000000000 - S/N R01H28728C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 15X20X1 | ASSET P0002619 | ||
| 545 | *545-VAV-6 | VAV | TRANE - M/N VSWE17151V01100DD033000000000 - S/N R01H28726C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 15X20X1 | ASSET P0002620 | ||
| 545 | *545-VAV-7 | VAV | TRANE - M/N VSWE11111V01100DD033000000000 - S/N R01H28724C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 12X16X1 | ASSET P0002621 | ||
| 545 | *545-VAV-8 | VAV | TRANE - M/N VSWE17201V01100DD033000000000 - S/N R01H28729C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 15X20X1 | ASSET P0002622 | ||
| 545 | *545-VAV-9 | VAV | TRANE - M/N VSWE17151V01100DD033000000000 - S/N R01H28727C | OFFICES/ ABOVE CEILING GRID | REGION | D/D | 15X20X1 | ASSET P0002623 | ||
| 545 | ATC | ATC | UTILITY CLOSET/ WEST | REGION | ||||||
| 545 | 545-NGB-1 | HOT WATER BOILER (NATURAL GAS) BTU =400,000 | LOCHINVAR - M/N CHN0402 - S/N G12H00242020 | WAREHOUSE/ MECH ROOM EAST | REGION | (1) 12X12X1 -Combustion Air Filter | ASSET P0002592 | |||
| 545 | 545-NGB-2 | HOT WATER BOILER (NATURAL GAS) BTU =400,000 | LOCHINVAR - M/N CHN0402 - S/N G12H00242021 | WAREHOUSE/ MECH ROOM EAST | REGION | (1) 12X12X1 -Combustion Air Filter | ASSET P0002593 | |||
| 545 | 545-HWCP-1 | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSETT | WAREHOUSE/ MECH ROOM EAST | REGION | ASSET P0002594 | ||||
| 545 | 545-HWCP-2 | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSETT | WAREHOUSE/ MECH ROOM EAST | REGION | ASSET P0002595 | ||||
| 545 | 545-HWCP-3 | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSETT | WAREHOUSE/ MECH ROOM EAST | REGION | ASSET P0002596 | ||||
| 545 | 545-HWCP-4 | IN-LINE CENTRIFUGAL HOT WATER CIRC PUMP | BELL & GOSSETT | WAREHOUSE/ MECH ROOM EAST | REGION | ASSET P0002597 | ||||
| 545 | 545-ARU-1 | AIR ROTATION UNIT | POWRMATIC - M/N TE-11 - S/N 0912-22707-03 | WAREHOUSE AREA | REGION | BX49 | (3) 16X16X2 (6) 16X20X2 (3) 20X20X2 (1) 16X35X2 | ASSET P0002602 | ||
| 545 | 545-ARU-2 | AIR ROTATION UNIT | POWRMATIC - M/N TE-11 - S/N 0912-22707-01 | WAREHOUSE AREA | REGION | BX49 | (3) 16X16X2 (6) 16X20X2 (3) 20X20X2 (1) 16X35X2 | ASSET P0002601 | ||
| 545 | 545-ARU-3 | AIR ROTATION UNIT | POWRMATIC - M/N TE-11 - S/N 0912-22707-02 | WAREHOUSE AREA | REGION | BX49 | (3) 16X16X2 (6) 16X20X2 (3) 20X20X2 (1) 16X35X2 | ASSET P0002600 | ||
| 545 | P0002889 | UNIT HEATER | DAYTON - M/N 2HDA1 - S/N N/A | MECH ROOM/ CLOSET SOUTH | REGION | D/D | ASSET P0002589 | |||
| 1082 | P0002315 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - M/N KBN601 - S/N N/A | MECHANICAL ROOM | REGION | ASSET P0002315 | ||||
| 1082 | P0002316 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - M/N KBN601 - S/N N/A | MECHANICAL ROOM | REGION | ASSET P0002316 | ||||
| LEGEND | ||||||||||
| * = YEAR ROUND OPERATION | ||||||||||
| DX= DIRECT EXPANSION COOLING | ||||||||||
| CW= CHILLED WATER | ||||||||||
| HW= HEATING WATER | ||||||||||
| ATC= AUTOMATED TEMPURATURE CONTROLS | ||||||||||
| AHU= AIR HANDLING UNIT | ||||||||||
| MUA= MAKE UP AIR UNIT | ||||||||||
| ARU= AIR ROTATION UNIT | ||||||||||
| RTU= ROOFTOP PACKAGE UNIT | ||||||||||
| VAV= VARIABLE AIR VOLUME UNIT | ||||||||||
| PTAC= PACKAGE TERMINAL AC UNIT | ||||||||||
| S/S= AC SPLIT SYSTEM | ||||||||||
| EF= EXHAUST FAN | ||||||||||
| WU= WINDOW AC UNIT | ||||||||||
| D/D= DIRECT DRIVE | ||||||||||
| M/N= MODEL NUMBER | ||||||||||
| S/N= SERIAL NUMBER |
&LPNBC HVAC
&CREGION EQUIPMENT LIST
&RJ-1502000-01
&L* Indicates Year Round Operation
NFPC EQ LIST
| BLDG.# | I.D.# | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | BELTS | AIR FILTERS | COOLING | REFRIGERANT | NOTES |
| 20 | 20-ARU-1 | AIR ROTATION UNIT | POWRMATIC - TE-41 | INDOOR | NFPC | YES | YES | |||
| 20 | 20-ARU-2 | AIR ROTATION UNIT | POWRMATIC - TE-42 | INDOOR | NFPC | YES | YES | |||
| 20 | 20-ARU-3 | AIR ROTATION UNIT | POWRMATIC -TE-43 | INDOOR | NFPC | YES | YES | |||
| 20 | 20-ARU-4 | AIR ROTATION UNIT | POWRMATIC - TE-44 | INDOOR | NFPC | YES | YES | |||
| 20 | 20-ARU-5 | AIR ROTATION UNIT | POWRMATIC - TE-45 | INDOOR | NFPC | YES | YES | |||
| 20 | 20-MAU-1 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-2 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-3 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-4 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-5 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-6 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-7 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-MAU-8 | MAKE-UP AIR UNIT | POWRMATIC - GA MODELS | ROOFTOP UNIT | NFPC | |||||
| 20 | 20-AHU-1 | AIR HANDLING UNIT | YORK - JZOZJN32P4AAA1 | ROOFTOP UNIT | NFPC | YES | R-410A | |||
| 20 | 20-AHU-2 | AIR HANDLING UNIT | REZNOR -PCDH-150 | ROOFTOP UNIT | NFPC | YES | R-410A | |||
| 20 | 20-SS-1 | SPLIT SYSTEM - CONDENSER | SANYO | Mezzanine at the Northwest Corner | NFPC | |||||
| 20 | 20-SS-1-1 | SPLIT SYSTEM EVAPORATOR | SANYO | Radiographic Storage Area | NFPC | D/D | WASHABLE | |||
| *49 | 49-SS-1 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | DAIKIN-2MXS18GVJU | ON GROUND SOUTH EAST CORNER | NFPC | DX | R-410A | |||
| *49 | 49-SS-1-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | DAIKIN | METROLOGY ROOM 1ST FLOOR | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 40-SS-1-2 | MINI SPLIT SYSTEM EVAPORATOR HEAD | DAIKIN | METROLOGY ROOM 1ST FLOOR | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-2 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | DAIKIN-RXS09LVJU | ON GROUND EAST SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-2-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | DAIKIN | METROLOGY OFFICE 1ST FLOOR | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-3 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL EAST SIDE 2ND FLOOR | NFPC | DX | R-410A | |||
| *49 | 49-SS-3-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | BREAKROOM 2ND FLOOR | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-4 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL UNDER STAIRWELL ON SOUTHSIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-4-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | COMPUTER ROOM | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-5 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI- PUH24EK | ON GROUND SOUTH SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-5-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 1ST FLOOR SUPPLY ROOM | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-6 | MINI SPLIT CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON SOUTHSIDE 1ST FLOOR | NFPC | DX | R-410A | |||
| *49 | 49-SS-6-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 1ST FLOOR FEEDS OFFICE NEXT TO MAINTENANCE SUPERVISOR OFFICE | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-7 | MINI SPLIT CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON THE WEST SIDE 2ND FLOOR | NFPC | DX | R-410A | |||
| *49 | 49-SS-7-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 2ND FLOOR FEEDS OFFICE ON OTHER SIDE OF WALL | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-8 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON WEST SIDE 2ND FLOOR | NFPC | DX | R-410A | |||
| *49 | 49-SS-8-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 2ND FLOOR FEEDS OFFICE ON OTHER SIDE OF WALL | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-9 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON NORTH SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-9-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 1ST FLOOR OFFICE ON NORTHSIDE OF BUILDING | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-10 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON NORTH SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-10-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | MITSUBISHI | 1ST FLOOR OFFICE ON NORTHSIDE OF BUILDING | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-11 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | MITSUBISHI | MOUNTED ON WALL ON NORTH SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-11-1 | MINI SPLIT SYTEM EVAPORATOR HEAD | MITSUBISHI | 2ND FLOOR FEEDS OFFICE ON OTHER SIDE OF WALL | NFPC | D/D | WASHABLE | DX | R-410A | |
| *49 | 49-SS-12 | MINI SPLIT SYSTEM CONDENSER UNIT HEAT PUMP | DAIKIN | MOUNTED ON WALL ON NORTH SIDE | NFPC | DX | R-410A | |||
| *49 | 49-SS-12-1 | MINI SPLIT SYSTEM EVAPORATOR HEAD | DAIKIN | FEEDS LOCKER ROOM ON 2ND FLOOR | NFPC | D/D | WASHABLE | DX | R-410A | |
| 546 | 546-2 | 230 TON CHILLER | TRANE CHILLER UNIT | OUTSIDE OF BLDG. 546 - EAST SIDE | NFPC | |||||
| 546 | 546-1 | 230 TON SCREW CHILLER | YORK #YCAS0230EC46X | OUTSIDE OF BLDG. 546 - EAST SIDE | NFPC | FREQUENCY DRIVE A | ||||
| 546 | AHU-1 | 40-TON AIR HANDLER UNIT | YORK #CP680DWDIAF40 | OUTSIDE OF BLDG. 546 - EAST SIDE | NFPC | YES | ALL | CW | ||
| 546 | AHU-2 | 40-TON AIR HANDLER UNIT | YORK #CP680DWDIAF40 | OUTSIDE OF BLDG. 546 - EAST SIDE | NFPC | YES | ALL | CW | ||
| 546 | P-1 | C.W. CIRC PUMP | INSIDE BLDG. 546 - EAST SIDE | NFPC | 25 HP | |||||
| 546 | P-2 | C.W. CIRC PUMP | INSIDE BLDG. 546 - EAST SIDE | NFPC | 40 HP | |||||
| 546 | 546-ARU-1 | AIR ROTATION UNIT | POWRMATIC | INSIDE BLDG. 546 | NFPC | YES | YES | GAS FIRED TYPE | ||
| 546 | 546-ARU-2 | AIR ROTATION UNIT | POWRMATIC | INSIDE BLDG. 546 | NFPC | YES | YES | GAS FIRED TYPE | ||
| 546 | 546-ARU-3 | AIR ROTATION UNIT | POWRMATIC | INSIDE BLDG. 546 | NFPC | YES | YES | GAS FIRED TYPE | ||
| 546 | DDC-1 | DDC - PROGRAMMABLE LOOP CONTROLLER | KMC | DDC CABINET LOCATED INSIDE BLDG. 546 WEST SIDE WALL OF MACHINE SHOP | NFPC | NOTE: The DDC system is a specialized design control system. It is recommended that Core subcontract and coordinate their efforts concerning this system through Vortechs Automation, Inc. POC @ Vortechs is Walter Horigan at (215)322-6788. | ||||
| 592 | 592-ARU-1 | AIR ROTATION UNIT | POWRMATIC -TE-41 | 2N FLOOR (TOP FLOOR OF BLDG.) | NFPC | YES | YES | GAS FIRED TYPE | ||
| 592 | 592-ARU-2 | AIR ROTATION UNIT | POWERMATIC | 1ST FLOOR NW LOW BAY | NFPC | YES | YES | GAS FIRED TYPE | ||
| 592 | 592-ARU-3 | AIR ROTATION UNIT | POWERMATIC | 1ST FLOOR SW LOW BAY | NFPC | YES | YES | GAS FIRED TYPE | ||
| 592 | 592-GUH-1 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-2 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-3 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-4 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-5 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-6 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-7 | GAS UNIT HEATER | 1ST FLOOR WEST BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-8 | GAS UNIT HEATER | 2ND FLOOR MEZZANINE | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-9 | GAS UNIT HEATER | 2ND FLOOR MEZZANINE | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-10 | GAS UNIT HEATER | 2ND FLOOR MEZZANINE | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-11 | GAS UNIT HEATER | 2ND FLOOR MEZZANINE | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-GUH-12 | GAS UNIT HEATER | 2ND FLOOR MEZZANINE | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-1 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-2 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-3 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-4 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-5 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-6 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-7 | INFRARED HEATER | 1ST FLOOR EAST HIGH BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-8 | INFRARED HEATER | 1ST FLOOR WEST LOW BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-IRH-9 | INFRARED HEATER | 1ST FLOOR WEST LOW BAY | NFPC | YES | YES | GAS FIRED TYPE | |||
| 592 | 592-MAU-1 | SPLIT UNIT | LOW ROOF WEST SIDE | NFPC | YES | YES | ||||
| 592 | 592-MAU-2 | SPLIT UNIT | LOW ROOF WEST SIDE | NFPC | YES | YES | ||||
| 712 | 712-NGB-1 | STEAM BOILER | WEIL-MCLAIN - M/N LGB-5 - S/N ,CP7633234 | BASEMENT MECHANICAL ROOM | NFPC | BTU =421,000 | ASSET P000484 | |||
| 712 | 712-NGB-2 | STEAM BOILER | WEIL-MCLAIN - M/N LGB-5 S/N 5433004 | BASEMENT MECHANICAL ROOM | NFPC | BTU= 421,000 | ASSET P000485 | |||
| 712 | 712-CPR-1 | CONDENSATE PUMPS & RECEIVER | BELL & GOSSET - M/N 62CSM - S/N Q98J46-SA0771993-015 1 | BASEMENT MECHANICAL ROOM | NFPC | TWO PUMPS | ||||
| 712 | Water Treatment System (Water softener and Chem. feed pump) | CLACK - M/N TT56MSXF2T - S/N 4796640-20, PULSATRON - M/N LB564SA-PTC1 - S/N 05/16.709015 | BASEMENT MECHANICAL ROOM | NFPC | for 2 boilers | ASSET P0001667 & P0001665 | ||||
| *1029 | 1029-ARU-1 | AIR ROTATION UNIT | POWRMATIC TE-51 | NORTHWEST (INSIDE Building) | NFPC | YES | YES | GAS FIRED TYPE | ||
| *1029 | 1029-ARU-1-CC-1 | COOLING COIL FOR ARU-1 | POWRMATIC | NORTHWEST (INSIDE Building) | NFPC | YES | ||||
| *1029 | 1029-ARU-2 | AIR ROTATION UNIT | POWRMATIC -TE-51 | NORTHEAST (INSIDE Building)) | NFPC | YES | YES | GAS FIRED TYPE | ||
| *1029 | 1029-ARU-3 | AIR ROTATION UNIT | POWRMATIC - TE-41HC | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-ARU-4 | AIR ROTATION UNIT | POWRMATIC-TE-31HC | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-ARU-5 | AIR ROTATION UNIT | POWRMATIC-TE-31HC | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-ARU-6 | AIR ROTATION UNIT | POWRMATIC-TE-31HC | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-1 | CONDENSER UNIT | YORK | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-2 | CONDENSER UNIT | YORK | NORTHSIDE EASTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-3 | CONDENSER UNIT | YORK | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-4 | CONDENSER UNIT | YORK | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-5 | CONDENSER UNIT | YORK | NORTHSIDE CENTER (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-CU-6 | CONDENSER UNIT | YORK | NORTHSIDE CENTER (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-AHU-1 | PACKAGE UNIT | YORK | NORTHSIDE EASTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-MAU-1 | MAKE-UP AIR UNIT | YORK | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| *1029 | 1029-MAU-2 | MAKE-UP AIR UNIT | YORK | NORTHSIDE WESTEND (OUTSIDE) | NFPC | YES | ||||
| 20/1029 | Pkg-02 | PACKAGE UNIT | TRANE Model# WSC048H3REA00JT | LOWER ROOF (Between Bldg. 20 and 1029) | NFPC | Unit feeds building 20 Office Area East War Room/Production Manager's Office (AA-0052) | ||||
| 20/1029 | Pkg-03 | PACKAGE UNIT | TRANE Model# WCD048C400BC | LOWER ROOF (Between Bldg. 20 and 1029) | NFPC | Unit feeds the Project Room | ||||
| 20/1029 | Pkg.04 | PACKAGE UNIT | CARRIER Model# 50TCQA07A2A6A-0A0A0 | LOWER ROOF (Between Bldg. 20 and 1029) | NFPC | Unit feeds Bathrooms/Tool Room 77 | ||||
| 20/1029 | Pkg-05 | PACKAGE UNIT | TRANE Model# TSC092H4RNA02D0 | LOWER ROOF (Between Bldg. 20 and 1029) | NFPC | Unit feeds the Break/Training Room 78. Unit is 7.5 tons | ||||
| 1081 | *1081-1-1 | AHU | YORK - M/N RDS708BY - S/N 35B0084903 | ROOF | NFPC | A62 | (6) 16X25X2 | ASSET P0002672 | ||
| 1081 | *1081-1-2 | AHU | YORK - M/N RDS708BY - S/N 35B0084703 | ROOF | NFPC | A62 | (6) 16X25X2 | ASSET P0002673 | ||
| 1081 | *1081-1-3 | AHU | YORK - M/N RDS708BY - S/N 35B0084803 | ROOF | NFPC | A62 | (6) 16X25X2 | ASSET P0002674 | ||
| 1081 | 1081-NGB-1 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - M/N CHN0992 - S/N G12H00241961 | MECHANICAL ROOM | NFPC | 16X16X1 - Comb. Air Filter | ASSET P0001899 | |||
| 1081 | 1081-NGB-2 | HOT WATER BOILER (NATURAL GAS) | LOCHINVAR - M/N CHN0992 - S/N G12H00241962 | MECHANICAL ROOM | NFPC | 16X16X1 - Comb. Air Filter | ASSET P0001898 | |||
| 1081 | 1081-HWCP-1 | IN-LINE CENTRIFUGAL HOT WATER CEN PUMP | BELL & GOSSET | MECHANICAL ROOM | NFPC | ASSET P0001894 | ||||
| 1081 | 1081-HWCP-2 | IN-LINE CENTRIFUGAL HOT WATER CEN PUMP | BELL & GOSSET | MECHANICAL ROOM | NFPC | ASSET P0001895 | ||||
| 1081 | 1081-HWCP-3 | IN-LINE CENTRIFUGAL HOT WATER CEN PUMP | BELL & GOSSET | MECHANICAL ROOM | NFPC | ASSET P0001896 | ||||
| 1081 | 1081-HWCP-4 | IN-LINE CENTRIFUGAL HOT WATER CEN PUMP | BELL & GOSSET | MECHANICAL ROOM | NFPC | ASSET P0001897 | ||||
| 1081 | HOT WATER LOOP | HOT WATER LOOP | MECHANICAL ROOM | NFPC | GLYCOL | |||||
| * = YEAR ROUND OPERATION |
BUMED EQ LIST
| BLDG.# | I.D.# | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | BELTS | FILTERS | COOLING | REFRIGERANT | NOTES |
| 615 | RTU-1 | 30-TON DX UNIT COOLING W/HOT WATER COIL HEAT | TRANE - M/N SSHLF30ECA59A5CD6L00A0W000000000T008000 - S/N C10E02148 | ROOF, NORTH SIDE | REGION | SF (2) B68 - RF - B66 | (16) 20x20x2 | DX | R-410-A | ASSET P0002690 |
| 615 | RTU-2 | 30-TON DX UNIT COOLING W/HOT WATER COIL HEAT | TRANE - M/N SLHLF304AN36#49D7001ACWE0000000RT0M8000# - S/N C15F03691 | ROOF, SOUTH SIDE | REGION | SF (1) AX63 - RF BX77 | (6) 24X24X4 (2)12X24X4 | DX | R-410-A | ASSET P0002691 |
| 615 | HP-1 | 2-TON CEILING CASSETTE TYPE INDOOR UNIT - EVAPATOR HEAD | PANASONIC - M/N S-26PU2U6 - S/N 3968201025 | ENTRANCE VESTIBULE | REGION | D/D | WASHABLE | DX | R-410-A | ASSET P0002722 |
| 615 | HP-2 | 1.5- TON WALL MOUNTED CASSETTE TYPE INDOOR UNIT- EVAPATOR HEAD | PANASONIC - M/N E18NKUA - S/N N/A | ELEVATOR MACHINERY ROOM | REGION | D/D | WASHABLE | DX | R-410-A | ASSET P0002725 |
| 615 | HP-3 | 2-TON WALL MOUNTED CASSETTE TYPE INDOOR UNIT - EVAPATOR HEAD | PANASONIC - M/N CS-E24NKUA - S/N 2994904232 | COMMUNICATION ROOM | REGION | D/D | WASHABLE | DX | R-410-A | ASSET P0002723 |
| 615 | CU-1 | 2-TON OUTDOOR CONDENSER UNIT | PANASONIC - M/N CU-E24NKUA - S/N N/A | ROOF, SERVES ENTRANCE VESTIBULE | REGION | D/D | DX | R410-A | ASSET P0002688 | |
| 615 | CU-2 | 1.5 TON OUTDOOR CONDENSER UNIT | PANASONIC - M/N CU-E18NKUA - S/N 6657405923 | ROOF, SERVES ELEVATOR MECH. ROOM | REGION | D/D | DX | R410-A | ASSET P0002687 | |
| 615 | CU-3 | 2- TON OUTDOOR CONDENSER UNIT | PANASONIC - M/N CU-E24NKUA - S/N 6657504052 | ROOF, SERVES COMM. ROOM | REGION | D/D | DX | R410-A | ASSET P0002689 | |
| 615 | B-1 | BOILER - #1 (Gas Fired) | WEIL-MCLAIN - M/N 399-CTNG - S/N N/A | MECHANICAL ROOM | REGION | ASSET P0002697 | ||||
| 615 | B-2 | BOILER - #2 (Gas Fired) | WEIL-MCLAIN - M/N 399-CTNG - S/N N/A | MECHANICAL ROOM | REGION | ASSET P0002698 | ||||
| 615 | BP-1 | CIRCULATING PUMP - #1 | WEIL-MCLAIN | MECHANICAL ROOM | REGION | IN LINE BOILER PUMP | ||||
| 615 | BP-2 | CIRCULATING PUMP - #2 | WEIL-MCLAIN | MECHANICAL ROOM | REGION | IN LINE BOILER PUMP | ||||
| 615 | EF-1 | EXHAUST FAN | COOK - M/N 80SQN80SQN-B - S/N 076SF79415-01/0000701 | MECH. ROOM, CEILING | REGION | A32 | ASSET P0002710 | |||
| 615 | EF-2 | EXHAUST FAN | COOK - M/N 150 ACE150C6B - S/N 076SF79415-01/0001901 | ROOF | REGION | A20 | ASSET P0002692 | |||
| 615 | EF-3 | EXHAUST FAN | COOK - M/N 100 CPF 100CPFB - S/N 076SF79415-00/0000701 | ROOF | REGION | YES | ASSET P0002694 | |||
| 615 | EF-4 | EXHAUST FAN | COOK - M/N N/A - S/N N/A | MECH. ROOM, CEILING | REGION | A37 | ASSET P0002711 | |||
| 615 | P-1 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES SOUTH ZONE RADIANT HEAT | REGION | ASSET P0002703 | ||||
| 615 | P-2 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES WEST ZONE RADIANT HEAT | REGION | ASSET P0002704 | ||||
| 615 | P-3 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES NORTH ZONE RADIANT HEAT | REGION | ASSET P0002705 | ||||
| 615 | P-4 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES EAST ZONE RADIANT HEAT | REGION | ASSET P0002706 | ||||
| 615 | P-5 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES UNIT HEATERS | REGION | ASSET P0002707 | ||||
| 615 | P-6 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES RTU-I | REGION | ASSET P0002708 | ||||
| 615 | P-7 | HOT WATER CIRC. PUMP | TACO - M/N 1915E1E1 - S/N N/A | MECH. RM, SERVES RTU-2 | REGION | ASSET P0002709 | ||||
| 615 | HWP-1 | HOT WATER CIRC. PUMP | TACO - M/N KV3007 - S/N N/A | MECH. RM, SERVES PRIMARY LOOP | REGION | ASSET P0002701 | ||||
| 615 | HWP-2 | HOT WATER CIRC. PUMP | TACO - M/N KV3007 - S/N N/A | MECH. RM, SERVES PRIMARY LOOP | REGION | ASSET P0002702 | ||||
| 615 | UH-1 | CABINET UNIT HEATER | VULCAN - M/N RW1120-02 - S/N 01403397 | NORTHEAST SIDE, NEAR EXAM ROOM 106 | REGION | D/D | WASHABLE | ASSET P0002724 | ||
| 615 | UH-2 | CABINET UNIT HEATER | VULCAN - M/N RW1120-02 - S/N 01403397 | VESTIBULE ENTRANCE | REGION | D/D | WASHABLE | ASSET P0002695 | ||
| 615 | UH-3 | UNIT HEATER | QMARK - M/N MUH0381 - S/N N/A | MECHANICAL ROOM | REGION | D/D | WASHABLE | ASSET P0002713 | ||
| 615 | UH-4 | CABINET UNIT HEATER | VULCAN - M/N RW1120-02 - S/N 01403397 | SOUTHWEST CORNER, KITCHEN | REGION | D/D | WASHABLE | ASSET P0002718 | ||
| 615 | UH-5 | CABINET UNIT HEATER | VULCAN - M/N RW1120-02 - S/N 01403397 | 2ND FLOOR ELEVATOR LOBBY | REGION | D/D | WASHABLE | ASSET P0002719 |
WTR TRTMNT GLYC LIST
| COOLING TOWER TREATMENT LIST | RECOMMENDED WATER TREATMENT | |||
| SITE | CLIENT | BUILDING | LOCATION | FREQUENCY |
| NOTES: 1) If the contractor adds biocide to control bacteria, the contractor must select a biocide approved by the Philadelphia Water Department. 2) Water treatment services to include PM on associated injection pumps and water softener systems. | ||||
| PNYA | REGION | 1 | ATTIC / UNIT 1-1-5 | |
| NSA PHILA | REGION-N | 2 | SECTION B-ROOF / UNIT 2B-200 / 200 TON | all year round (52 weeks) |
| NSA PHILA | REGION-N | 2 | SECTION B-ROOF / UNIT 2B-400 / 400 TON | all year round (52 weeks) |
| NSA PHILA | REGION-N | 2 | SECTION C-ROOF / UNIT 2C / 550 TON | all year round (52 weeks) |
| NSA PHILA | DLA | 3 | SECTION C-ROOF / UNIT 3C / 500 TON | seasonal (32 weeks) |
| NSA PHILA | REGION-N | 4 | SECTION B-ROOF / UNIT 4B / 500 TON | seasonal (32 weeks) |
| NSA PHILA | REGION-N | 4 | SECTION D-ROOF / UNIT 4D / 30 TON | seasonal (32 weeks) |
| NSA PHILA | DLA | 6 | SECTION C-ROOF / UNIT 6C / 1000 TON | seasonal (32 weeks) |
| NSA PHILA | REGION-N | 9 | SECTION 'B' ROOF | seasonal (32 weeks) |
| NSA PHILA | REGION-N | 26 | ROOF / UNIT 26 / 200 TON | seasonal (32 weeks) |
| NSA PHILA | DLA | 45 | ROOF/UNIT 45/ CT501-A Asset #P001038 | all year round (52 weeks) |
| CHILLED WATER SYSTEMS TREATMENT LIST | RECOMMENDED WATER TREATMENT | |||
| SITE | CLIENT | BUILDING | LOCATION | FREQUENCY |
| PNYA | REGION | 1 | ATTIC | |
| PNYA | NFPC | 546 | OUTSIDE OF BLDG. 546, EAST SIDE/230-TON UNIT | SEASONAL (7 MONTHS) |
| NSA PHILA | NWSS | 1 | WING 4-MECHANICAL RM / UNIT AC-1400 / 30 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | NWSS | 1 | WING 2-MECHANICAL RM / UNIT AC-1204 / 30 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION B-MECHANICAL RM / UNIT AC-2-1 / 200 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION B-MECHANICAL RM / UNIT AC-2-2 / 400 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION C-MECHANICAL RM / UNIT AC-2-3 / 550 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | DLA | 3 | SECTION C-MECHANICAL RM / UNIT AC-3 / 500 TON | monthly (12 months) |
| NSA PHILA | REGION-N | 4 | SECTION B-MECHANICAL RM / UNIT AC-4-1 / 500 TON | seasonal (7 months) |
| NSA PHILA | REGION-N | 4 | SECTION D-MECHANICAL RM / UNIT AC-4-2 / 30 TON | seasonal (7 months) |
| NSA PHILA | REGION-N | 4 | SECTION D-LOADING DOCK / UNIT AC-4-3 / 80 TON | seasonal (7 months) |
| NSA PHILA | DLA | 5 | SECTION C-MECHANICAL ROOM | monthly (12 months) |
| NSA PHILA | DLA | 6 | SECTION C-MECHANICAL RM / UNIT AC-6-1 / 500 TON | monthly (12 months) |
| NSA PHILA | DLA | 6 | SECTION C-MECHANICAL RM / UNIT AC-6-2 / 500 TON | monthly (12 months) |
| NSA PHILA | REGION-N | 9 | SECTION 'B' MECHANICAL ROOM | seasonal (7 months) |
| NSA PHILA | DLA | 26 | MECHANICAL RM / UNIT AC-26 / 200 TON | seasonal (7 months) - DUAL TEMP (2 PIPE SYS) |
| HOT WATER SYSTEMS TREATMENT LIST | RECOMMENDED WATER TREATMENT | |||
| SITE | CLIENT | BUILDING | LOCATION | FREQUENCY |
| PNYA | REGION | 1 | ATTIC | seasonal (7 months) |
| PNYA | REGION | 545 | Mechanical Room | seasonal (7 months) |
| PNYA | REGION | 712 | Mechanical Room | monthly (12 months) |
| PNYA | REGION | 1082 | Mechanical Room | seasonal (7 months) |
| NSA PHILA | NWSS | 1 | WING 4-MECHANICAL RM / UNIT AC-1400 / 30 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | NWSS | 1 | WING 2-MECHANICAL RM / UNIT AC-1204 / 30 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION B-MECHANICAL RM / UNIT AC-2-1 / 200 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION B-MECHANICAL RM / UNIT AC-2-2 / 400 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | REGION-N | 2 | SECTION C-MECHANICAL RM / UNIT AC-2-3 / 550 TON | monthly (12 months) - DUAL TEMP (2 PIPE SYS) |
| NSA PHILA | DLA | 3 | SECTION C-MECHANICAL RM / UNIT AC-3 / 500 TON | monthly (12 months) |
| NSA PHILA | REGION-N | 4 | SECTION B-MECHANICAL RM / UNIT AC-4-1 / 500 TON | seasonal (7 months) |
| NSA PHILA | REGION-N | 4 | SECTION D-MECHANICAL RM / UNIT AC-4-2 / 30 TON | seasonal (7 months) |
| NSA PHILA | REGION-N | 4 | SECTION D-LOADING DOCK / UNIT AC-4-3 / 80 TON | seasonal (7 months) |
| NSA PHILA | DLA | 5 | SECTION C-MECHANICAL ROOM | monthly (12 months) |
| NSA PHILA | DLA | 6 | SECTION C-MECHANICAL RM / UNIT AC-6-1 / 500 TON | monthly (12 months) |
| NSA PHILA | DLA | 6 | SECTION C-MECHANICAL RM / UNIT AC-6-2 / 500 TON | monthly (12 months) |
| NSA PHILA | REGION-N | 9 | SECTION 'B' MECHANICAL ROOM | monthly (12 months) |
| NSA PHILA | DLA | 26 | MECHANICAL RM / UNIT AC-26 / 200 TON | seasonal (7 months) - DUAL TEMP (2 PIPE SYS) |
| BOILER WATER TREATMENT LIST | RECOMMENDED WATER TREATMENT | |||
| CLIENT | BUILDING | LOCATION | FREQUENCY | |
| PNYA | REGION | 1082 | Mechanical Room | |
| PNYA | REGION | 712 | HOT WATER LOOP/ MECHANICAL ROOM | all year round (52 weeks) |
| NSA PHILA | DLA | 5 | SECTION C-MECHANICAL ROOM / UNIT B-1 / 1200 MBH @ 125 PSI | all year round (52 weeks) |
| NSA PHILA | DLA | 5 | SECTION C-MECHANICAL ROOM / UNIT B-2 / 1200 MBH @ 125 PSI | all year round (52 weeks) |
| GLYCOL SYSTEMS LIST | ||||
| SITE | CLIENT | BUILDING | LOCATION | |
| PNYA | REGION | 712 | HOT WATER LOOP/ MECHANICAL ROOM | |
| PNYA | REGION | 1081 | HOT WATER LOOP/ MECHANICAL ROOM | |
| PNYA | REGION | 1082 | HOT WATER LOOP/ MECHANICAL ROOM | |
| PNYA | NFPC | 546 | CHILLED WATER LOOP SYSTEM INSIDE BLDG. 546, EAST SIDE | |
| PNYA | REGION | 545 | HOT WATER LOOP/ MECHANICAL ROOM | |
| WATER SOFTENER | ||||
| SITE | CLIENT | BUILDING | LOCATION | RECOMMENDED WATER TREATMENT |
| FREQUENCY | ||||
| NSA PHILA | DLA | 5 | SECTION C-MECHANICAL ROOM | All year round (52 weeks) |
| LABORATORY (2 TANKS) BOILERS (1 TANK) | ||||
| NOTE: REPLENISH BRINE SOLUTION AND SODIUM AS NEEDED |
NSAP Cooling Towers
| BLDG. # | I.D. # | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | NOTES |
| 2 | Unit 2C | 550 Ton Cooling Tower plus condenser tubes | Baltimore Air Coil - M/N 3333A-LM-2- S/N U037954201 | Roof Section C | Region | ASSET B2-CT-001 |
| 3 | Unit 3C | 500 Ton Cooling Tower plus condenser tubes | Marley - M/N NC SERIES - S/N 10021687A1NC8402PAMMF | Roof Section C | DLA | ASSET P0002280 |
| 4 | Unit 4B | 500 Ton Cooling Tower plus condenser tubes | Marley - M/N SERIES 220 - S/N 222-521 1-447-87 0 | Roof Section B | Region | ASSET P0002281 |
| 6 | Unit 6C | 1000 Ton Cooling Tower plus condenser tubes | EVAPCO - M/N SST12136B - S/N 970770 | Roof Section C | DLA | ASSET B6-CT-001 |
| 9 | Unit 9 | 240 Ton Cooling Tower plus condenser tubes | Baltimore Air Coil - M/N 3240C - S/N U107699901 | Roof Section B | Region | ASSET B9-CT-1 |
| 26 | Unit 26 | 200 Ton Cooling Tower plus condenser tubes | Baltimore Air Coil - M/N T01760R - S/N U012878301 | Lower Roof South East | DLA | ASSET P0002282 |
| 45 | Unit 45 CT501-A | 90 Ton Cooling Tower plus condenser tubes | Reymsa - M/N RTU606105A - S/N M45M2J1144E18434204 | Roof | DLA | ASSET P001038 |
NSAP Steam Meters
| BLDG.# | I.D.# | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | NOTES |
| 1 | MA_NI_ST_BL_1_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1410 | REGION N | |
| 1 | MA_NI_ST_BL_1_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1410 | REGION N | |
| 1 | MA_NI_ST_BL_1_3 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1410 | REGION N | |
| 1 | MA_NI_ST_BL_1_4 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1210 | REGION N | |
| 1 | MA_NI_ST_BL_1_5 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1210 | REGION N | |
| 2 | MA_NI_ST_BL_2_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 2, Section B | REGION N | |
| 2 | MA_NI_ST_BL_2_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 2, Section B | REGION N | |
| 2 | MA_NI_ST_BL_2_3 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 2, Section C | REGION N | |
| 3 | MA_NI_ST_BL_3_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 3, Section A | REGION N | |
| 3 | MA_NI_ST_BL_3_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 3, Section C | REGION N | |
| 4 | MA_NI_ST_BL_4_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 4, Section A | REGION N | |
| 4 | MA_NI_ST_BL_4_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 4, Section B | REGION N | |
| 5 | MA_NI_ST_BL_5_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 5, Section B | REGION N | |
| 5 | MA_NI_ST_BL_5_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 5, Section B | REGION N | |
| 5 | MA_NI_ST_BL_5_3 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 5, Section B | REGION N | |
| 5 | MA_NI_ST_BL_5_4 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 5, Section B | REGION N | |
| 6 | MA_NI_ST_BL_6_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 6, Section C | REGION N | |
| 6 | MA_NI_ST_BL_6_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 6, Section C | REGION N | |
| 7 | MA_NI_ST_BL_7_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 7, Section B | REGION N | |
| 7 | MA_NI_ST_BL_7_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 7, Section C | REGION N | |
| 8 | MA_NI_ST_BL_8_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 8, Gym Steam Pit | REGION N | |
| 8 | MA_NI_ST_BL_8_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 8, Warehouse | REGION N | |
| 9 | MA_NI_ST_BL_9_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 9, Mech. Rm. North | REGION N | |
| 10 | MA_NI_ST_BL_10_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 10, Mech. Rm. East | REGION N | |
| 12 | MA_NI_ST_BL_12_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 12, Steam Plant West | REGION N | |
| 15 | MA_NI_ST_BL_15_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 1, Mech. Rm. 1210 | REGION N | |
| 24 | MA_NI_ST_BL_24_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg 24, Steam Pit North | REGION N | |
| 25 | MA_NI_ST_BL_25_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 12, Steam Plant West | REGION N | |
| 27 | MA_NI_ST_BL_27_1 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 27 Section B | REGION N | |
| 27 | MA_NI_ST_BL_27_2 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 27 Section B | REGION N | |
| 27 | MA_NI_ST_BL_27_3 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 27 Section B | REGION N | |
| 27 | MA_NI_ST_BL_27_4 | STEAM FLOW METER | Spirax Sarco - VLM10 or RIM10 | Bldg. 27 Section B | REGION N |
NSAP DLA DDC
| BLDG.# | I.D.# | DESCRIPTION | MFG - M/N - S/N | LOCATION | CUSTOMER | NOTES |
| 24 | n/a | Desktop PC | n/a | North Office | DLA | |
| 24 | n/a | Labtop PC | n/a | HVAC Supervisor Office | DLA | |
| 45 | n/a | Desktop PC | n/a | Mechanical Room Ground Level | DLA | |
| 3 | n/a | Control Panel/ Network Controllers | n/a | 3C Mechanical Room | DLA | |
| 5 | n/a | Control Panel/ Network Controllers | n/a | 5D Mechanical Room | DLA | |
| 6 | n/a | Control Panel/ Network Controllers | n/a | 6C Mechanical Room | DLA | |
| 26 | n/a | Control Panel/ Network Controllers | n/a | 2nd Fl. Electric Closet West | DLA | |
| 45 | n/a | Control Panel/ Network Controllers | n/a | Penthouse Mechanical Room | DLA |
File details come from the government source that posted it. Updated .