Attachment J-0200000-14.xls
XLS spreadsheet 846 KB Posted
- Solicitation number
- N4008523R2849
About this file
This document appears to be an exhibit containing pricing details for a federal contract opportunity to provide facilities investment services, including preventive maintenance, repair, and alteration of heating, ventilation, and air conditioning (HVAC) equipment at the Philadelphia Navy Yard Annex and Naval Support Activity (NSA) in Philadelphia, PA.
The contract has a base period and four one-year option periods, for a total potential duration of 60 months. The required services include performing HVAC system maintenance, water testing and treatment, boiler inspections, and cooling tower cleaning for various buildings and regions associated with different government agencies like the Department of Defense, Defense Logistics Agency, and Bureau of Medicine and Surgery. The pricing exhibit includes firm-fixed-price line items for both recurring and non-recurring work, as well as unit prices for indefinite quantity work such as emergency and routine service calls, mechanical cleaning of cooling towers, and labor/material costs. The non-recurring work pricing escalates over the option periods.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Summary | |||||
| Recurring | Total Recurring Region Base Option Only | ||||
| Base Option | $ - 0 | HVAC Contract | Client UIC | ||
| Option 1 | $ - 0 | Region - NFPC - | N61003P0 | $ - 0 | |
| Option 2 | $ - 0 | Region - NSAP - | N32445P0 | $ - 0 | |
| Option 3 | $ - 0 | Region - PNYA - | N61003P0 | $ - 0 | |
| Option 4 | $ - 0 | Total Recurring Region Base Option Only | $ - 0 | ||
| Total Recurring | $ - 0 | ||||
| Total Recurring other Clients Base Option Only | |||||
| Non-Recurring | HVAC Contract | Client UIC | |||
| Base Option | $ 310,000.00 | DLA - | S04890P0 | $ - 0 | |
| Option 1 | $ 310,000.00 | BUMED - | N32626P0 | $ - 0 | |
| Option 2 | $ 320,000.00 | Total Recurring other Clients Base Option Only | $ - 0 | ||
| Option 3 | $ 330,000.00 | ||||
| Option 4 | $ 340,000.00 | ||||
| Total Non-Recurring | $ 1,610,000.00 | ||||
| Total Contract | $ 1,610,000.00 |
ELIN-Base Period-Recurring
| ATTACHMENT J-0200000-14 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N4008523R2849 | ||||||
| EXHIBIT A | ||||||
| Line Item 0001 Firm Fixed Price - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A009 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price | CAC |
| A001 - REGION - PNYA Spec Item 3 | ||||||
| A001AA | Perform Emergency Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.1 | 12 | MO | $0.00 | $0.00 | |
| A001AB | Perform Routine Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| A001AC | Develop and Implement Preventive Maintenance Program for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 and 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| A001AD | Develop and Implement Preventive Maintenance Program for Region PNYA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A001AE | Inspection, Light-off, Testing, and Certification by NAVFAC Boiler Inspection for Region PNYA Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| REGION - PNYA | UIC- N61003P0 | Subtotal | $0.00 | |||
| A002 - REGION - NSA-P Spec Item 3 | ||||||
| A002AA | Develop and Implement a Water Testing and Treatment Program for Region NSA-P HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A002AB | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 4 Section B and Building 9 twice a year. | 12 | MO | $0.00 | $0.00 | |
| A002AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 2 Section C four (4) times a year after hours/ weekend. | 12 | MO | $0.00 | $0.00 | |
| A002AD | Develop and Implement Preventive Maintenance Program for Region NSA-P HVAC Steam Meters provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| REGION - NSA-P Subtotal | REGION -NSA-P | UIC- N32445P0 | Subtotal | $0.00 | ||
| A004 - DLA PTC Spec Item 3 | ||||||
| A004AA | Develop and Implement a Water Testing and Treatment Program for DLA Water Softener Equipment provided in J-1502000 per Section C, Spec Item 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| A005 - DLA TS Item 3 | ||||||
| A005AA | Develop and Implement a Water Testing and Treatment Program for DLA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A005AB | Develop and Implement Preventative Mainenance Program for DLA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.4, 3.4.1, 3.5, 3.5.4 and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A005AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 3 Section C, Building 6 Section C, Building 26 and Building 45 twice a year. | 12 | MO | $0.00 | $0.00 | |
| A005AD | Develop and Implement Preventive Maintenance Program for DLA HVAC DDC (DLA Building 3, 5, 6, 26, and 45) provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| A006 - NFPC - PNYA Spec Item 3 | ||||||
| A006AA | Develop and Implement Preventive Maintenance Program for Foundry HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| A006AB | Develop and Implement Preventive Maintenance Program for NFPC Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A006AC | Develop and Implement a Water Testing and Treatment Program for NFPC HVAC Systems provided in J-1502000 per Section C; Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| A006AD | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for NFPC Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| A006AE | Perform Routine Service Call Work for NFPC provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| Region NFPC | UIC - N61003P0 | Subtotal | $0.00 | |||
| A007 - BUMED Spec Item 3 | ||||||
| A007AA | Develop and Implement Preventive Maintenance Program for BUMED (Bldg. 615) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| A007AB | Perform Routine Service Call Work for BUMED HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| A007AC | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for BUMED Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| A007AD | Develop and Implement Preventive Maintenance Program for BUMED Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| BUMED | UIC - N32626P0 | Subtotal | $0.00 | |||
| A009 - Building 9 - NSA-P Spec Item 3 | ||||||
| A009AD | Develop and Implement a Water Testing and Treatment Program for REGION OCHR (Bldg. 9) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| Building 9 - NSA-P | UIC - N32445P0 | Subtotal | $0.00 | |||
| TOTAL RECURRING WORK PRICE - BASE PERIOD | $0.00 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Base Period-Non Recurring
| ATTACHMENT J-0200000-14 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N4008523R2849 | |||||||
| EXHIBIT A | |||||||
| Line Item 0002 Firm Fixed Price - Base Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A711 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 600 | HR | $0.00 | $0.00 | |
| A701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 1 | LS | $310,000.00 | $310,000.00 | |
| A702 | Unit Priced Labor Work for Direct Digital Control (DDC) Systems- MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 1 | HR | $0.00 | $0.00 | |
| A703 | Unit Priced Labor Work - Subject to the Applicable CBA | Provide labor to perform all Unit Priced Labor work subject to any applicable Collective Bargaining Agreement (CBA) per the scope and delivery schedule specified in the order. | 1 | HR | $0.00 | $0.00 | |
| A704 | Routine Service Calls for Control Systems | The Contractor shall perform routine Direct Digital Control (DDC) System service call work during regular working hours. Each service call is limited to combined labor and material cost not to exceed $2,500.00. The total labor rate is based on the labor rate for ELIN A702 time the hours worked. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Service calls shall be completed within one working day. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: call number, date call received, date call completed, description of problem, description of work performed, labor hours expended and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| A705 | Emergency Service Calls for Control Systems | The Contractor shall perform Direct Digital Control (DDC) System emergency service call work 24 a day, seven days a week . Each service call is limited to combined labor and material cost not to exceed $2,500.00. The total labor rate is based on the labor rate for ELIN A702 time the hours worked. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. The Contractor shall respond to emergency service call requests within four hours of receipt of call during and outside of regular working hours. The Contractor shall remain at the work site until the emergency has been arrested. If follow up work is required to complete the repair, the call will be reclassified as routine and the corresponding completion time will then apply. Such follow up work will be considered part of the original service call. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: call number, date call received, date call completed, description of problem, description of work performed, labor hours expended and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| A706 | Routine Service Calls for HVAC Services | The Contractor shall perform routine HVAC service call work during regular working hours. Each service call is limited to a combined labor and material cost not to exceed $2,500.00. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Contractor shall respond to service call requests within four hours of receipt of call during regular working hours. Service calls shall be completed within five working days. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: Call number, date call received, date call completed, description of problem, description of work performed, labor hours expanded and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| A707 | Emergency Service Calls for Control Systems | The Contractor shall perform HVAC emergency service call work 24 hours a day, seven days a week. Each service call is limited to a combined labor and material cost not to exceed $2,500.00. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Contractor shall respond to service call requests within two hours of receipt of call during and outside of regular working hours. The Contractor shall remain at the work site until the emergency has been arrested. If follow up work is required to complete the repair, the call will be reclassified as routine and the corresponding completion time will then apply. Such follow up work will be considered part of the original service call. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: Call number, date call received, date call completed, description of problem, description of work performed, labor hours expanded and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| A708 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 1000 Tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 1000 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| A709 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 400 to 550 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 400-550 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| A710 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 200 to 400 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 200-400 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| A711 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 30 to 200 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for30-200 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system. | 1 | EA | $0.00 | $0.00 | |
| TOTAL NON-RECURRING WORK PRICE - BASE PERIOD | $310,000.00 |
ELIN-1st Opt Period-Recurring
| ATTACHMENT J-0200000-14 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N4008523R2849 | ||||||
| EXHIBIT B | ||||||
| Line Item 0003 Firm Fixed Price - First Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 through B009 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price | CAC |
| B001 - REGION - PNYA Spec Item 3 | ||||||
| B001AA | Perform Emergency Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.1 | 12 | MO | $0.00 | $0.00 | |
| B001AB | Perform Routine Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| B001AC | Develop and Implement Preventive Maintenance Program for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 and 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| B001AD | Develop and Implement Preventive Maintenance Program for Region PNYA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B001AE | Inspection, Light-off, Testing, and Certification by NAVFAC Boiler Inspection for Region PNYA Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| REGION - PNYA | UIC- N61003P0 | Subtotal | $0.00 | |||
| B002 - REGION - NSA-P Spec Item 3 | ||||||
| B002AA | Develop and Implement a Water Testing and Treatment Program for Region NSA-P HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B002AB | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 4 Section B and Building 9 twice a year. | 12 | MO | $0.00 | $0.00 | |
| B002AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 2 Section C four (4) times a year after hours/ weekend. | 12 | MO | $0.00 | $0.00 | |
| B002AD | Develop and Implement Preventive Maintenance Program for Region NSA-P HVAC Steam Meters provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| REGION - NSA-P Subtotal | REGION -NSA-P | UIC- N32445P0 | Subtotal | $0.00 | ||
| B004 - DLA PTC Spec Item 3 | ||||||
| B004AA | Develop and Implement a Water Testing and Treatment Program for DLA Water Softener Equipment provided in J-1502000 per Section C, Spec Item 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| B005 - DLA TS Item 3 | ||||||
| B005AA | Develop and Implement a Water Testing and Treatment Program for DLA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B005AB | Develop and Implement Preventative Mainenance Program for DLA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.4, 3.4.1, 3.5, 3.5.4 and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B005AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 3 Section C, Building 6 Section C, Building 26 and Building 45 twice a year. | 12 | MO | $0.00 | $0.00 | |
| B005AD | Develop and Implement Preventive Maintenance Program for DLA HVAC DDC (DLA Building 3, 5, 6, 26, and 45) provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| B006 - NFPC Spec Item 3 | ||||||
| B006AA | Develop and Implement Preventive Maintenance Program for Foundry HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| B006AB | Develop and Implement Preventive Maintenance Program for NFPC Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B006AC | Develop and Implement a Water Testing and Treatment Program for NFPC HVAC Systems provided in J-1502000 per Section C; Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| B006AD | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for NFPC Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| B006AE | Perform Routine Service Call Work for NFPC provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| Region NFPC | UIC - N61003P0 | Subtotal | $0.00 | |||
| B007 - BUMED Spec Item 3 | ||||||
| B007AA | Develop and Implement Preventive Maintenance Program for BUMED (Bldg. 615) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| B007AB | Perform Routine Service Call Work for BUMED HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| B007AC | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for BUMED Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| B007AD | Develop and Implement Preventive Maintenance Program for BUMED Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| BUMED | UIC - N32626P0 | Subtotal | $0.00 | |||
| B009 - Building 9 - NSA-P Spec Item 3 | ||||||
| B009AD | Develop and Implement a Water Testing and Treatment Program for REGION OCHR (Bldg. 9) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| Building 9 - NSA-P | UIC - N32445P0 | Subtotal | $0.00 | |||
| TOTAL RECURRING WORK PRICE - BASE PERIOD | $0.00 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-1st Opt Period Non Rec.
| ATTACHMENT J-0200000-14 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N4008523R2849 | |||||||
| EXHIBIT B | |||||||
| Line Item 0004 Firm Fixed Price - First Option Period | |||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B711 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 600 | HR | $0.00 | $0.00 | |
| B701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 1 | LS | $310,000.00 | $310,000.00 | |
| B702 | Unit Priced Labor Work for Direct Digital Control (DDC) Systems- MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 1 | HR | $0.00 | $0.00 | |
| B703 | Unit Priced Labor Work - Subject to the Applicable CBA | Provide labor to perform all Unit Priced Labor work subject to any applicable Collective Bargaining Agreement (CBA) per the scope and delivery schedule specified in the order. | 1 | HR | $0.00 | $0.00 | |
| B704 | Routine Service Calls for Control Systems | The Contractor shall perform routine Direct Digital Control (DDC) System service call work during regular working hours. Each service call is limited to combined labor and material cost not to exceed $2,500.00. The total labor rate is based on the labor rate for ELIN B702 time the hours worked. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Service calls shall be completed within one working day. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: call number, date call received, date call completed, description of problem, description of work performed, labor hours expended and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| B705 | Emergency Service Calls for Control Systems | The Contractor shall perform Direct Digital Control (DDC) System emergency service call work 24 a day, seven days a week . Each service call is limited to combined labor and material cost not to exceed $2,500.00. The total labor rate is based on the labor rate for ELIN B702 time the hours worked. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. The Contractor shall respond to emergency service call requests within four hours of receipt of call during and outside of regular working hours. The Contractor shall remain at the work site until the emergency has been arrested. If follow up work is required to complete the repair, the call will be reclassified as routine and the corresponding completion time will then apply. Such follow up work will be considered part of the original service call. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: call number, date call received, date call completed, description of problem, description of work performed, labor hours expended and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| B706 | Routine Service Calls for HVAC Services | The Contractor shall perform routine HVAC service call work during regular working hours. Each service call is limited to a combined labor and material cost not to exceed $2,500.00. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Contractor shall respond to service call requests within four hours of receipt of call during regular working hours. Service calls shall be completed within five working days. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: Call number, date call received, date call completed, description of problem, description of work performed, labor hours expanded and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| B707 | Emergency Service Calls for Control Systems | The Contractor shall perform HVAC emergency service call work 24 hours a day, seven days a week. Each service call is limited to a combined labor and material cost not to exceed $2,500.00. The Contractor shall, per Annex 2, notify the KO upon identification that the service call will exceed the $2,500.00 threshold. Contractor shall respond to service call requests within two hours of receipt of call during and outside of regular working hours. The Contractor shall remain at the work site until the emergency has been arrested. If follow up work is required to complete the repair, the call will be reclassified as routine and the corresponding completion time will then apply. Such follow up work will be considered part of the original service call. Within three working days of completion, Contractor shall submit to the KO a report that includes the following information: Call number, date call received, date call completed, description of problem, description of work performed, labor hours expanded and material costs incurred. | 1 | EA | $0.00 | $0.00 | |
| B708 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 1000 Tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 1000 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| B709 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 400 to 550 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 400-550 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| B710 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 200 to 400 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for 200-400 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system | 1 | EA | $0.00 | $0.00 | |
| B711 | Mechanical Cleaning and double disinfection of Cooling Towers and condenser unit. 30 to 200 tons | The Contractor shall mechanically clean and disinfect cooling towers and condensers for30-200 tons unit. Contractor shall inspect equipment and provide Legionella specific testing during operation of system. | 1 | EA | $0.00 | $0.00 | |
| TOTAL NON-RECURRING WORK PRICE - FIRST OPTION PERIOD | $310,000.00 |
ELIN-2nd Opt Period-Recurring
| ATTACHMENT J-0200000-14 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N4008523R2849 | ||||||
| EXHIBIT C | ||||||
| Line Item 0005 Firm Fixed Price - Second Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs C001 through C009 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Extended Price | CAC |
| C001 - REGION - PNYA Spec Item 3 | ||||||
| C001AA | Perform Emergency Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.1 | 12 | MO | $0.00 | $0.00 | |
| C001AB | Perform Routine Service Call Work for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| C001AC | Develop and Implement Preventive Maintenance Program for Region PNYA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 and 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| C001AD | Develop and Implement Preventive Maintenance Program for Region PNYA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C001AE | Inspection, Light-off, Testing, and Certification by NAVFAC Boiler Inspection for Region PNYA Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| REGION - PNYA | UIC- N61003P0 | Subtotal | $0.00 | |||
| C002 - REGION - NSA-P Spec Item 3 | ||||||
| C002AA | Develop and Implement a Water Testing and Treatment Program for Region NSA-P HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C002AB | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 4 Section B and Building 9 twice a year. | 12 | MO | $0.00 | $0.00 | |
| C002AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 2 Section C four (4) times a year after hours/ weekend. | 12 | MO | $0.00 | $0.00 | |
| C002AD | Develop and Implement Preventive Maintenance Program for Region NSA-P HVAC Steam Meters provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| REGION - NSA-P Subtotal | REGION -NSA-P | UIC- N32445P0 | Subtotal | $0.00 | ||
| C004 - DLA PTC Spec Item 3 | ||||||
| C004AA | Develop and Implement a Water Testing and Treatment Program for DLA Water Softener Equipment provided in J-1502000 per Section C, Spec Item 3.5.4 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| C005 - DLA TS Item 3 | ||||||
| C005AA | Develop and Implement a Water Testing and Treatment Program for DLA HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C005AB | Develop and Implement Preventative Mainenance Program for DLA Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.4, 3.4.1, 3.5, 3.5.4 and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C005AC | Mechanical Clean and Double Disinfection Cooling Tower and clean condenser tubes in Building 3 Section C, Building 6 Section C, Building 26 and Building 45 twice a year. | 12 | MO | $0.00 | $0.00 | |
| C005AD | Develop and Implement Preventive Maintenance Program for DLA HVAC DDC (DLA Building 3, 5, 6, 26, and 45) provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| DLA - TS - NSA-P | UIC - S04890P0 | Subtotal | $0.00 | |||
| C006 - NFPC Spec Item 3 | ||||||
| C006AA | Develop and Implement Preventive Maintenance Program for Foundry HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| C006AB | Develop and Implement Preventive Maintenance Program for NFPC Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C006AC | Develop and Implement a Water Testing and Treatment Program for NFPC HVAC Systems provided in J-1502000 per Section C; Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| C006AD | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for NFPC Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| C006AE | Perform Routine Service Call Work for NFPC provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| Region NFPC | UIC - N61003P0 | Subtotal | $0.00 | |||
| C007 - BUMED Spec Item 3 | ||||||
| C007AA | Develop and Implement Preventive Maintenance Program for BUMED (Bldg. 615) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | |
| C007AB | Perform Routine Service Call Work for BUMED HVAC Systems provided in J-1502000 per Section C, Spec Item 3.1.3 | 12 | MO | $0.00 | $0.00 | |
| C007AC | Inspection, Light-Off, Testing, and Certification By NAVFAC Boiler Inspection for BUMED Boilers provided in J-1502000 per Section C, Spec Item 3.4 and 3.4.1 | 12 | MO | $0.00 | $0.00 | |
| C007AD | Develop and Implement Preventive Maintenance Program for BUMED Boilers and Water Testing and Treatment Program provided in J-1502000 per Section C; Spec Item 3.2, 3.2.1, 3.2.3, 3.5, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| BUMED | UIC - N32626P0 | Subtotal | $0.00 | |||
| C009 - Building 9 - NSA-P Spec Item 3 | ||||||
| C009AD | Develop and Implement a Water Testing and Treatment Program for REGION OCHR (Bldg. 9) HVAC Systems provided in J-1502000 per Section C, Spec Item 3.2.1, 3.5.4, and 3.5.6 | 12 | MO | $0.00 | $0.00 | |
| Building 9 - NSA-P | UIC - N32445P0 | Subtotal | $0.00 | |||
| TOTAL RECURRING WORK PRICE - BASE PERIOD | $0.00 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .