S02 Sol R0036 AttF SOW.Att19_Subcontractor Info Consent 578-25-003.pdf

PDF 123 KB Posted

Attached to
Z1DA--578-25-003 Renovate Elevators B200 (Construction) at the Hines VA Hospital in Hines, IL
Solicitation number
36C25225R0036_3
Issued by

About this file

This document is a Subcontractor or Teaming Partner Information and Consent Form for a Department of Veterans Affairs solicitation to renovate elevators in Building 200 at the Hines VA Hospital. The form is designed to obtain consent from major subcontractors (including Elevator Manufacturer, Elevator Installer, Electrical, Telecom, Security, and Fire Protection) to allow the prime contractor to discuss their past and present performance information during the source selection process.

The form provides a template for subcontractors to list up to four reference projects, including contract numbers, project titles and locations, the subcontractor's role and work performed, and contact information for reference points of contact. By signing the form, subcontractors acknowledge the government's emphasis on past performance and agree to allow performance information to be shared with the prime contractor for evaluation purposes. The solicitation number is 36C25225R0036 and the project number is 578-25-003, focused on elevator renovations at the Hines VA Hospital in Illinois.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
S06 36C25225R0036 006_Att06 26 43 13 Surge Protection Devices - Addendum 1.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf PDF
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att12_Cutting Welding and Other Hot Work.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION SENSITIVE

FAR 2.101 & 3.104-5

Solicitation 36C25225R0036

Project 578-25-003 Renovate Elevators in Bldg 200

Attachment F – Subcontractor Info Consent Page 1 of 4

Solicitation Attachment F

Subcontractor or Teaming Partner Information and Consent Form

Subcontractor or Teaming Partner Consent for the Release of Past Performance Information to the

Prime Contractor and Reference Information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that this consent form be completed by the major subcontractors/teaming partners identified in your proposal.

Major subcontractors include:

1.) Elevator Manufacturer

2.) Elevator Installer

3.) Electrical

4.) Telecom

5.) Security

6.) Fire Protection

Attachment F – Subcontractor Info Consent Page 2 of 4

SAMPLE FORM from SUBCONTRACTOR or TEAMING PARTNER:

__________________________(company name) is currently planning on participating as a

(Subcontractor or Teaming Partner) with ___________________________________________

(prime contractor or name of entity providing proposal) for the Department of Veterans Affairs

RFP 6C25225R0036 for Project 578-25-003 Renovate Elevators in Bldg 200.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process as well as our recommended references as listed on the attachment.

Name Title of individual with authority to sign for, and legally bind the company

Email Phone

Address of Record

** See listed attachments on following page(s) **

Attachment F – Subcontractor Info Consent Page 3 of 4

Reference List (company OTHER THAN with prime contractor associated with this solicitation):

1. Contract # __________________________________________________________

Project # and Title: __________________________________________________________

Project Location: __________________________________________________________

Describe your role (Prime/Sub) work performed and value: __________________________

Reference POC Name______________________________ Phone_____________________

Email address: ______________________________________________________________

2. Contract # __________________________________________________________

Project Location: __________________________________________________________

Describe your role (Prime/Sub) work performed and value: __________________________

Attachment F – Subcontractor Info Consent Page 4 of 4

3. Contract # __________________________________________________________

Project Location: __________________________________________________________

Describe your role (Prime/Sub) work performed and value: __________________________

4. Contract # __________________________________________________________

Project Location: __________________________________________________________

Describe your role (Prime/Sub) work performed and value: __________________________

File details come from the government source that posted it. Updated .