S02 Price Breakdown by Division sheet 36C26125R0047 Backflow.pdf

PDF 282 KB Posted

Attached to
Z1DA--36C26125R0047 | 36C261-25-AP-2824 | NRM 612A4-25-050 | Install Backflow Prevention Device MCC Bldg. 911
Solicitation number
36C26125R0047
Issued by

About this file

This document is a Price Breakdown by Division sheet for the VA Northern California Health Care System (VANCHCS) project to install a backflow prevention device in Building 911 at McClellan. The form provides a template for contractors to itemize project costs across different divisions, including general requirements, with line items for subtotal, bonds and insurance, overhead, and profit. The form is part of Solicitation Number 36C26125R0047, which requires detailed pricing documentation for a fire protection backflow prevention device installation project that must meet local, state, and federal regulatory standards.

The project scope involves installing a fire protection backflow prevention device at the VA Northern California Health Care System's McClellan Warehouse, located at 5443 Dudley Boulevard, McClellan, CA 95652. Contractors must provide all necessary personnel, equipment, materials, and administrative support to complete the installation in compliance with Sacramento Suburban Water District regulations. The solicitation requires submission of proposal information to Contracting Officer Nicole Renfrew by 10:00 AM PST on June 12, 2025, with all contractor personnel needing appropriate certifications and licenses to perform the work.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Breakdown by Division

CLIN 0001

Z1DA -- VANCHCS Install Backflow Prevention Device MCC Bldg. 911

Provide complete Price Breakdown by Division for complete project.

If necessary, add additional lines for each Division applicable to this project.

REF DESCRIPTION TOTAL

010000 DIVISION 1 - GENERAL REQUIREMENTS $

000000 DIVISION XX $

OTHER OTHER $

OTHER OTHER $

SUB TOTAL: $

BONDS &

INSURANCE

OVERHEAD $

PROFIT $

TOTAL PROJECT BID AMOUNT: $

DIVISIONAL COST BREAK-OUT

File details come from the government source that posted it. Updated .