This document is a Request for Information (RFI) form for a VA construction project to install a backflow prevention device. The RFI (Contractor RFI #010) addresses a specific question about material testing laboratory responsibilities for the VANCHCS Install Backflow Prevention Device project at MCC Building 911 in McClellan, CA. The VA Project Manager clarified that while the VA will retain testing laboratories to verify compliance, the Contractor must provide documentation including lab and manufacturer reports demonstrating specification requirements have been met. The VA will participate in final commissioning using VA-retained assets to ensure fire code requirements are satisfied. The RFI is part of Solicitation Number 36C26125R0047, dated 05/16/2025, with an amendment number of 0002, and is to be sent to Contract Specialist Nicole Renfrew at nicole.renfrew@va.gov.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125R0047 | 36C261-25-AP-2824 | NRM 612A4-25-050 | Install Backflow Prevention Device MCC Bldg. 911

RFI FORM

Contractor Name:

Address:

Phone:

Email:

Please note: If submitting multiple RFIs, please utilize one form for each RFI.

Send to Contract Specialist: nicole.renfrew@va.gov

RFI

(REQUEST FOR INFORMATION)

RFQ #: 36C26125R0047 CONTRACTOR RFI #: 010

PROJECT NAME: VANCHCS Install Backflow Prevention

Device MCC Bldg. 911

DATE REQUESTED: 05/16/25

ACQUISITION NO.:

N/A

REFERENCE: N/A

DRAWING: N/A SPECIFICATION SECTION: N/A

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Specification Section 01 00 00, Part 1.1-C states that the Material Testing Laboratory will be retained by the VA and not by the Contractor. Will the VA clarify whether the Contractor or the VA will be hiring the Testing Laboratory?

VA PROJECT MANAGER’S RESPONSE

The referenced statement is a provision to allow the Government to use testing laboratories retained by the VA to verify compliance. For excavation of the backflow assembly, installation of the device, component connections, placement and compaction of backfill, and verification that adequate system pressure is maintained following installation, the Contractor shall present documentation under the

Contractor’s purview, including lab and manufacturer reports to demonstrate that the specification requirements have been met. The Government will participate in final commissioning to ensure the fire code requirements are met, for which VA-retained assets will be used.

VA TRACKING # FOR ALL RFIs: 36C26125R0047 AMENDMENT #: 0002

VA PROJECT ENGINEER/MANAGER: DATE: 5/21/2025

mailto:nicole.renfrew@va.gov mailto:w@va.gov

2025-05-21T11:49:41-0700
ISRAEL MODESTO