This document is a Request for Information (RFI) form for a VA contract to install a backflow prevention device at the VA Northern California Health Care System (VANCHCS) McClellan Warehouse, Building 911. The RFI, numbered 008, addresses a contractor's inquiry about the duration of fire line shutdown required for the installation work. The VA Project Manager responded that the fire line will be taken out of service for the entire duration of the work, including cutting into the existing line, installing the new section and backflow device, and completing final testing and inspection. The response indicates this is not expected to be a one-day event, and the contractor will need to demonstrate the full duration of activities in their schedule submission. The solicitation number is 36C26125R0047, with a request date of 05/16/25 and an amendment number of 0002.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26125R0047 | 36C261-25-AP-2824 | NRM 612A4-25-050 | Install Backflow Prevention Device MCC Bldg. 911
RFI FORM
Contractor Name:
Address:
Phone:
Email:
Please note: If submitting multiple RFIs, please utilize one form for each RFI.
Send to Contract Specialist: nicole.renfrew@va.gov
RFI
(REQUEST FOR INFORMATION)
RFQ #: 36C26125R0047 CONTRACTOR RFI #: 008
PROJECT NAME: VANCHCS Install Backflow Prevention
Device MCC Bldg. 911
DATE REQUESTED: 05/16/25
ACQUISITION NO.:
N/A
REFERENCE: N/A
DRAWING: N/A SPECIFICATION SECTION: N/A
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Will the VA clarify how long this line will be allowed to be shut down to accommodate the required work? If the time period allowed is too short to complete the work in one day, will subsequent shut downs be permitted?
VA PROJECT MANAGER’S RESPONSE
The fire line will be taken out of service for the duration of the work required make the connection and restore the line following inspection and acceptance. The line will be shut off prior to the Contractor cutting into the existing, completing the new section, including installation of the backflow device, and final testing, inspection and acceptance. This is not expected be a one day event; the Contractor will be responsible to show duration of these activities in the schedule submission.
VA TRACKING # FOR ALL RFIs: 36C26125R0047 AMENDMENT #: 0002
VA PROJECT ENGINEER/MANAGER: DATE: 5/21/2025