S02. 3rd Flr Amb Care - Final Specifications.pdf

PDF 8 MB Posted

Attached to
Y1DA - RENOVATE 3RD FLOOR AMB CARE FOR SPECIALTY CARE CLINIC - 541-23-101
Solicitation number
36C25025B0011
Issued by

About this file

This file contains detailed technical specifications and general requirements for a construction project to renovate approximately 11,600 square feet of Specialty Care Clinic space on the 3rd floor Ambulatory Care Wing at the Louis Stokes Cleveland VA Medical Center. The specifications outline requirements for demolition, construction, mechanical, electrical, plumbing, fire protection, and technology systems work.

The document includes comprehensive divisions covering general requirements, existing conditions, metals, wood/plastics/composites, thermal/moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, and electronic safety/security. Key operational requirements include maintaining hospital operations 24/7, coordinating all utility interruptions with 7-15 days advance notice, implementing infection control measures, and completing work in multiple phases. The contractor must provide warranties, as-built drawings, and training for VA staff. The project includes a deduct alternate related to conference room door systems. Supporting technical requirements are detailed through extensive specifications sections and drawing lists covering architectural, interiors, electrical, fire protection, mechanical, plumbing and technology aspects of the renovation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center

10701 East Blvd. Cleveland, Ohio 44106

TECHNICAL SPECIFICATIONS

RENOVATE 3RD FLOOR AMB CARE

FOR SPECIALTY CARE CLINIC

PROJECT # 541-23-101

Final Construction Document Submission October 1, 2024

ARCHITECT:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779

COST ESTIMATING:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

ENGINEER:

IMEG Corp.

101 North Seventh Street Louisville, KY 40202 Phone: 440-262-3063

Renovate 3rd Floor Amb Care for Specialty Care Clinic Final CD Submission

Task Order 36C25023C0022

Project: 541-23-101 1-9-2024

06-01-23

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 10 Table of Contents 06-23 00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 02-23 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22 01 91 51 Mechanical/Electrical Systems Manual

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 06 60 Schedules for Plastic Fabrications 06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Insulation 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 11 16 Interior Aluminum Doors, Frames, and Glazing Frame 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 34 00 Special Function Doors 08 41 26 All-Glass Entrances and Storefronts 08 71 00 Door Hardware 05-22

Project: 541-23-101 1-9-2024

06-01-23

TABLE OF CONTENTS

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

08 71 13.11 Low Energy Power Assist Door Operators 01-21 08 80 00 Glazing 01-21 08 87 00 Architectural Window Films

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 01-21 09 77 00 Special Wall Surfacing 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 26 00 Wall and Door Protection 01-21 10 26 23.11 Decorative Protection Panels 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 00 Metal Lockers

DIVISION 12 – FURNISHINGS

12 36 00 Countertops 12-18

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-21

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 12-22 22 61 13.74 Dental Compressed-Air Piping 05-23 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 05-23 22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-23

Project: 541-23-101 1-9-2024

06-01-23

TABLE OF CONTENTS

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 11-21 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning for HVAC Systems 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 03-23 23 25 00 HVAC Water Treatment 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 36 00 Air Terminal Units 03-23 23 37 00 Air Outlets and Inlets 03-23

DIVISION 25 – INTEGRATED AUTOMATION

25 09 00 Systems Integration

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-22 26 09 23 Lighting Controls 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Control, Communication and Signal Wiring 06-15 27 15 00 Communications Structured Cabling 01-16 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 05-20 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

Project: 541-23-101 1-9-2024

06-01-23

TABLE OF CONTENTS

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

28 05 13 Conductors and Cables for Electronic Safety and Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

Project: 541-23-101 10-1-2024

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET

GI001 DRAWING INDEX, ABBREVIATIONS, GENERAL NOTES AND SYMBOLS

GI100 LIFE SAFETY ANALYSIS

GI110 LIFE SAFETY PLAN - PROPOSED

GI111 LIFE SAFETY PLAN – DURING CONSTRUCTION

GI120 PHASING PLAN

GI121 PHASING PLAN – PLUMBING ACCESS

GI122 PHASING PLAN – TILE RECONSTRUCTION

GI123 PHASING PLAN – TILE RECONSTRUCTION

ARCHITECTURAL DEMOLITION

AD110 DEMOLITION THIRD FLOOR PLAN

AD210 DEMOLITION REFLECTED CEILING PLAN

ARCHITECTURAL

AE010 WALL & PARTITION ASSEMBLIES

AE011 TYPICAL PARTITION DETAILS

AE012 TYPICAL MOUNTING DETAILS

AE020 DOOR SCHEDULE, DOOR & FRAME TYPES & ELEVATIONS

AE021 DOOR & FRAME DETAILS

AE030 CASEWORK DETAILS

AE040 CEILING DETAILS

AE110 ARCHITECTURAL THIRD FLOOR PLAN

AE111 ARCHITECTURAL FOURTH FLOOR PLAN, RCP & ROOF PLAN

AE150 EQUIPMENT THIRD FLOOR PLAN

AE151 ENLARGED EQUIPMENT PLANS

AE210 ARCHITECTURAL REFLECTED CEILING PLAN

AE400 INTERIOR ELEVATIONS

AE401 INTERIOR ELEVATIONS

AE402 INTERIOR ELEVATIONS

AE403 INTERIOR ELEVATIONS

Project: 541-23-101 10-1-2024

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 2

AE404 INTERIOR ELEVATIONS

AE405 INTERIOR ELEVATIONS

AE600 INTERIOR DETAILS

INTERIORS

IG010 SIGNAGE TYPES

IG011 SIGNAGE TYPES

IG400 ENLARGED INTERIOR SIGNAGE PLAN AND SCHEDULE

IN010 FINISH LEGEND AND DETAILS

IN110 INTERIOR DESIGN THIRD FLOOR FINISH PLAN

ELECTRICAL

E000 ELECTRICAL COVERSHEET

E001 ELECTRICAL SYSTEMS COVERSHEET

E002 BASEMENT FLOOR ELECTRICAL KEY PLAN

E003 THIRD FLOOR ELECTRICAL KEY PLAN

E103 THIRD FLOOR DEMOLITION PLAN - LIGHTING

E104 THIRD FLOOR DEMOLITION PLAN – POWER & SYSTEMS

E203 THIRD FLOOR PLAN – LIGHTING

E213 THIRD FLOOR PLAN – POWER

E215 PENTHOUSE/ROOF PLAN - POWER

E223 THIRD FLOOR PLAN – SYSTEM

E300 ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DETAILS

E401 ELECTRICAL DETAILS

E500 ELECTRICAL ON-LINE DIAGRAM

E600 ELECTRICAL SCHEDULES

E700 ELECTRICAL PANEL SCHEDULES

E701 ELECTRICAL PANEL SCHEDULES

FIRE PROTECTION

F000 FIRE PROTECTION COVERSHEET

F103 THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN

F203 THIRD FLOOR FIRE PROTECTION PLAN

F501 FIRE PROTECTION DETAILS

MECHANICAL

M000 MECHANICAL COVERSHEET

M103 THIRD FLOOR HVAC DUCTWORK DEMOLITION PLAN

M105 FIFTH FLOOR/ROOF HVAC DUCTWORK DEMOLITION PLAN

Project: 541-23-101 10-1-2024

05-01-20

LIST OF DRAWING SHEETS

00 01 15 - 3

M113 THIRD FLOOR HVAC PIPING DEMOLITION PLAN

M203 THIRD FLOOR HVAC DUCTWORK PLAN

M204 FOURTH FLOOR HVAC DUCTWORK PLAN

M205 FIFTH FLOOR ROOF HVAC DUCTWORK PLAN

M213 THIRD FLOOR HVAC PIPING PLAN

M303 THIRD FLOOR AIR BALANCE PLAN

M501 HVAC DETAILS

M502 HVAC DETAILS

M601 HVAC SCHEDULES

M701 TEMPERATURE CONTROLS

M702 TEMPERATURE CONTROLS

PLUMBING

P000 PLUMBING AND MEDICAL GAS COVERSHEET

P102 SECOND FLOOR PLUMBING DEMOLITION PLAN

P103 THIRD FLOOR PLUMBING DEMOLITION PLAN

P202 SECOND FLOOR PLUMBING PLAN

P203 THIRD FLOOR PLUMBING PLAN

P213 THIRD FLOOR MEDICAL GAS PLAN

P501 PLUMBING AND MEDICAL GAS DETAILS

P502 PLUMBING DIAGRAMS

TECHNOLOGY

T000 TECHNOLOGY COVERSHEET

T001 SECOND FLOOR TECHNOLOGY KEY PLAN

T002 THIRD FLOOR TECHNOLOGY KEY PLAN

T103 THIRD FLOOR PLAN DEMOLITION PLAN - TECHNOLOGY

T203 THIRD FLOOR PLAN – TELECOMMUNICATIONS

T204 THIRD FLOOR PLAN – NURSECALL

T205 THIRD FLOOR PLAN – SECURITY

T300 TECHNOLOGY ENLARGEMENTS

T400 TECHNOLOGY DETAILS

T401 TECHNOLOGY DETAILS

T402 TECHNOLOGY DETAILS

T500 TECHNOLOGY DIAGRAMS

T501 TECHNOLOGY DIAGRAMS

T600 TECHNOLOGY SCHEDULES

- - - END - - -

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 RESTORATION

1.10 AS-BUILT DRAWINGS

1.11 WARRANTY MANAGEMENT

1.12 USE OF ROADWAYS

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.14 TEMPORARY USE OF EXISTING ELEVATORS

1.15 TEMPORARY TOILETS

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

1.17 NEW TELEPHONE EQUIPMENT

1.18 TESTS

1.19 INSTRUCTIONS……………………………………………………………………………………………………………………..29

1.20 GOVERNMENT-FURNISHED PROPERTY…………………………………………………………………………………………31

1.21 SAFETY SIGN………………….……………………………………………………………………………………………………………………32

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -2

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Renovate 3rd

Floor Ambulatory Care for Specialty Care Clinic as required by drawings and specifications.

B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the

Contracting Officer.

C. Offices of L2e-Oculus JV and IMEG Corp., as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

E. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to the VA in terms of personal and professional conduct and technical knowledge.

Should the assignment to this contract of any person by the contractor be deemed to conflict with the interest of VA, or in the event performance is deemed to be unsatisfactory at any time

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -3 during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement with three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.

F. Contractor shall designate a full time on site Superintendent dedicated to the project for its full duration of construction.

1.3 STATEMENT OF BID ITEM(S)

A. General Contractor shall refer to solicitation for bid item descriptions. Refer to AE sheets for base bid scope of work as well as alternates.

B. ITEM I, BASE BID CONSTRUCTION: Work includes general construction, alterations, and removal of existing conditions for the renovation of the 3rd Floor Ambulatory Care and construction of the Specialty Care Clinic.

C. DEDUCT ALTERNATE NO. 1: BASE BID except the replacement of the all-glass pivot hinge door and all-glass storefront system at both conference rooms (3AC362 and 3AC361), Section 08 41 26, with an aluminum framed system, door and hardware as indicated in the drawings, Sections 08 11 16 and 08 71 00. See Sheet AE021 for systems details and Sheet AE406 for elevations.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -4

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Guards: Not Required.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -5

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -6

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted

24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -7

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. All work in public corridors shall be performed “off hours” unless otherwise approved for the COR.

G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

H. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -8 and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

All such actions shall be coordinated with the COR or Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. The

Contractor shall provide a minimum notice of sixty (60) days to the COR to permit time to procure payments without construction delay.

J. Phasing:

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -9

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor. See

Phasing drawings for project phasing.

K. The Main Medical Center will be occupied during performance of work; but immediate areas of alterations will be vacated. All areas of the building outside the Construction Areas will be fully occupied and functional during construction.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -10 partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

L. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 60 degrees

F at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -11 equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Outages can be mandated at the discretion of the Contracting

Officer to take place after normal business hours, including

Saturdays and Sundays, with no additional cost to the

Government.

4. Contractor shall thoroughly investigate the impact of any outage on patient and staff prior to proceeding with the outage.

5. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

6. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

7. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

8. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -12 responsibility of the Government and not the Contractor. The

Contractor shall provide a minimum notice of sixty (60) days to the COR to permit time to procure payments without construction delay.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not require to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing entrances must be approved by the COR.

P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply

Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -13

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -14 extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -15 shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -16

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

1.10 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.11 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of

Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan.

Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -17 of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.

Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -18

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the

Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the

Government while performing the work, including, but not limited to administrative expenses.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -19

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the

Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.

Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the

Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the

Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service

Requirements:

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -20

Following oral or written notification by the Contracting

Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction

Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

1. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

Overhead doors not operational, causing a security, fire or safety problem.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -21

2) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors Overhead doors not operational.

Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical Power failure (entire area or any building operational after 1600 hours).

Security lights.

Smoke detectors.

f) Code 2-Electrical Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical Exterior lights not operational.

h) Code 1-Gas Leaks and pipeline breaks.

i) Code 1-Heat Power failure affecting heat.

j) Code 1-Plumbing Hot water heater failure.

2) Leaking water supply pipes

k) Code 2-Plumbing Flush valves not operating properly Fixture drain, supply line or any water pipe leaking.

Toilet leaking at base.

l) Code 3- Plumbing Leaky faucets.

m) Code 3-Interior Floors damaged.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -22

Paint chipping or peeling.

Casework damaged.

n) Code 1-Roof Leaks Damage to property is occurring.

o) Code 2-Water (Exterior) No water to facility.

p) Code 2-Water (Hot) No hot water in portion of building listed.

q) Code 3 All work not listed above.

E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the

Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -23

Warranty Tags

Warranty response time priority code

1.12 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on

Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense.

When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -24 overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. For all mechanical systems that are utilized during construction air filter media shall be used to cover all return air grilles during construction.

4. For all mechanical systems utilized during construction the inside of the air handling units and associated ductwork shall be cleaned after construction is complete.

5. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

6. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

7. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

8. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government. Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

Project: 541-23-101 1-9-2024

11-01-21

GENERAL REQUIREMENTS

01 00 00 -25

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.14 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevators for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor may use the Main Atrium Elevators in the

Main Medical Center for daily use during after-hours time frames only and for special nonrecurring time intervals when permission is granted. It is preferred that the service elevator serve as the main source of Contractor use. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a) Entrance jambs, heads soffits and threshold plates.

b) Entrance columns, canopy, return panels and inside…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .