S02. 3rd Flr Amb Care - Final Drawings.pdf
PDF 48 MB Posted
- Solicitation number
- 36C25025B0011
About this file
This is a set of final architectural/engineering drawings for the renovation project of the 3rd Floor Ambulatory Care area at the Louis Stokes Cleveland VA Medical Center. The drawings detail the planned renovation of approximately 11,600 square feet of existing Specialty Care Clinic Space within the Third Floor Ambulatory Care Wing.
The drawings support solicitation #36C25025B0011, which is a 100% SDVOSB set-aside construction project with an estimated value between $5-10 million. The renovation work will be performed at 10701 East Boulevard, Cleveland, OH 44106, and requires contractors to coordinate with the VA Contracting Officer and COR. The RFI submission deadline is January 15, 2025 at 3:30 PM EST, and bidders must be verified in VetCert and registered in SAM to be eligible for award.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPT. OF VETERANS AFFAIRS
VA CONTRACT NUMBER: 36C25023C0022
VA PROJECT NUMBER: 541-23-101
VETERANS HEALTH CARE SYSTEM
10701 East Blvd., Cleveland OH 44106
RENOVATE 3RD FLOOR AMB CARE
FOR SPECIALTY CARE CLINIC
o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
A
B
C
D
E
F
G
5 4 3 2 1678910
A
B
C
D
E
F
G
5 4 3 2 1678910
Project Number
Building Number
Drawing NumberLocation
Issue Date
Project Title
Checked Drawn
Drawing Title
Approved:
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
REVISIONS: DATE:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
101 North Seventh Street Louisville, KY 40202 Phone: 440-262-3063 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI000
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
COVER SHEET FINAL CONSTRUCTION DOCUMENT
SUBMISSION
A101
SIM
A101
SIM
BUILDING ELEVATION/SECTIONDetail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Room No.
Door/Room No.
Key Note No.
ALIGN
WALL SECTION
DETAIL SECTION/CALLOUT
ROOM TAG
DOOR TAG
PARTITION TAG
KEYNOTE
ALIGNED SURFACES
Room Name
Area
AREA TAG
Area NameArea Name
150 SF
SCOPE OF PROJECT
Project Limit Line
Grid No.
CENTERLINE
COLUMN GRID LINE
Level/Datum Elevation AFF
LEVEL MARKER
Level/Datum Name
Window Type WINDOW TYPE TAG1t
Highpoint @ Tail SLOPE INDICATOR
Starting Point @ Center DIMENSION CROSSHAIR
NORTH ARROW
Plan North Reference Label
0 1 Revision Reference Number
Revision Cloud Depicting Area Revised
REVISION
CEILING TAG
A101
SIM
Detail No.
Sheet No.
Reference Label
XX-1
1'-0"A.F.F. Clg Height
Clg Type
Xx.x
Xx.x
Sheet No.
Detail No.
Partition Traits
Partition Configuration
X#x
#X ##
ELEVATION
Room Name
OFA01 Room Code.
P-3 FINISH TAG
Name Elevation
1. WORK INCLUDES APPLYING AND PAYING FOR REQUIRED PERMITS AND INSPECTIONS.
2. NOTIFY ARCHITECT OF ANY CLARIFICATIONS NEEDED PRIOR TO COMMENCING WORK.
3. EMPLOY ONLY SKILLED WORKERS, EXPERIENCED IN THEIR RESPECTIVE TRADES.
4. COORDINATE WORK OF VARIOUS TRADES. ENSURE EACH HAS ADEQUATE SPACE AND RESOURCES FOR PROPER INSTALLATION OF THE WORK.
5. SCALING DRAWINGS IS DISCOURAGED AND PERFORMED AT CONTRACTOR’S SOLE RISK. NOTIFY ARCHITECT IF ADDITIONAL DIMENSION
INFORMATION OR CLARIFICATION IS REQUIRED.
6. COORDINATE SCHEDULE FOR WORK INDICATED TO BE PROVIDED BY OTHERS. ALLOW ACCESS, SPACE FOR PERFORMANCE OF WORK AND
STORAGE AND OTHER RESOURCES.
7. DRAWINGS OF EXISTING CONDITIONS ARE BASED UPON OWNER PROVIDED DRAWINGS AND OTHER DOCUMENTS AND UPON CURSORY ON-SITE OBSERVATION. THEY ARE INTENDED AS A REASONABLE PRESENTATION OF EXISTING CONDITIONS. THEY ARE NOT A COMPLETE OR
EXHAUSTIVE REPRESENTATION OF EXISTING CONDITIONS.
8. EXISTING FACILITY WILL REMAIN OPERATIONAL DURING CONSTRUCTION. SEE PHASING DRAWINGS FOR ICRA REQUIREMENTS AND PHASING.
SOME AREAS OF WORK WILL REQUIRE WORK DURING OFF HOURS OR WEEKENDS IN ORDER TO MEET ICRA REQUIREMENTS AND MAINTAIN A
FULLY OPERATIONAL FACILITY.
PLAN
NORTH
ACTUAL
NORTH
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI001
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
DRAWING INDEX, ABBREVIATIONS,
GENERAL NOTES AND SYMBOLS
FINAL CONSTRUCTION DOCUMENT
SUBMISSION
PROJECT LOCATION MAP (NTS)
PROJECT DIRECTORY
SHEET INDEX
PROJECT LOCATION
LEGEND
ABBREVIATIONS
PROJECT GENERAL NOTES
BUILDING KEY PLAN (NTS)
PROJECT LOCATION
ARCHITECT CONTACT:
ELAINE LEWIS
elaine.lewis@l2eoculus.com
314-730-2779
L2e-OCULUS JV
20 SOUTH SARAH STREET
ST. LOUIS, MO 63108
MEP, TECH ENGINEER CONTACT:
CHRIS CAMPBELL
Christopher.P.Campbell@imegcorp.com
440-546-9776
IMEG CORP.
672 E. ROYALTON RD.
BROADVIEW HEIGHTS, OH 44147
CLIENT CONTACT:
RICHARD CLARK
Richard.Clark8@va.gov
216-791-2300 #46133
DEPARTMENT OF VETERAN AFFAIRS
10701 EAST BLVD.
CLEVELAND, OH 44106
COST ESTIMATING CONTACT:
KYLE VEATER
kveater@ocmi.com
469-431-0571
OCMI, INC.
1722 ROUTH STREET, STE. 900
DALLAS, TX 75201
PLAN
NORTH
ACTUAL
NORTH
SHEET # SHEET NAME REV. # REV. DATE
00 - GENERAL
GI000 COVER SHEET
GI001 DRAWING INDEX, ABBREVIATIONS, GENERAL NOTES AND SYMBOLS
GI100 LIFE SAFETY ANALYSIS
GI110 LIFE SAFETY PLAN - PROPOSED
GI111 LIFE SAFETY PLAN - DURING CONSTRUCTION
GI120 PHASING PLAN
GI121 PHASING PLAN - PLUMBING ACCESS
GI122 PHASING PLAN - TILE RECONSTRUCTION
GI123 PHASING PLAN - TILE RECONSTRUCTION
02 - DEMOLITION
AD110 DEMOLITION THIRD FLOOR PLAN
AD210 DEMOLITION REFLECTED CEILING PLAN
03 - ARCHITECTURAL
AE010 WALL & PARTITION ASSEMBLIES
AE011 TYPICAL PARTITION DETAILS
AE012 TYPICAL MOUNTING DETAILS
AE020 DOOR SCHEDULE, DOOR & FRAME TYPES & ELEVATIONS
AE021 DOOR & FRAME DETAILS
AE030 CASEWORK DETAILS
AE040 CEILING DETAILS
AE110 ARCHITECTURAL THIRD FLOOR PLAN
AE111 ARCHITECTURAL FOURTH FLOOR PLAN, RCP & ROOF PLAN
AE150 EQUIPMENT THIRD FLOOR PLAN
AE151 ENLARGED EQUIPMENT PLANS
AE210 ARCHITECTURAL REFLECTED CEILING PLAN
AE400 INTERIOR ELEVATIONS
AE401 INTERIOR ELEVATIONS
AE402 INTERIOR ELEVATIONS
AE403 INTERIOR ELEVATIONS
AE404 INTERIOR ELEVATIONS
AE405 INTERIOR ELEVATIONS
AE600 INTERIOR DETAILS
06 - INTERIORS
IG010 SIGNAGE TYPES
IG011 SIGNAGE TYPES
IG400 ENLARGED INTERIOR SIGNAGE PLAN AND SCHEDULE
IN010 FINISH LEGEND AND DETAILS
IN110 INTERIOR DESIGN THIRD FLOOR FINISH PLAN
07 - ELECTRICAL
E000 ELECTRICAL COVERSHEET
E001 ELECTRICAL SYSTEMS COVERSHEET
E002 BASEMENT FLOOR ELECTRICAL KEY PLAN
E003 THIRD FLOOR ELECTRICAL KEY PLAN
E103 THIRD FLOOR DEMOLITION PLAN - LIGHTING
E104 THIRD FLOOR DEMOLITION PLAN - POWER & SYSTEMS
E203 THIRD FLOOR PLAN - LIGHTING
E213 THIRD FLOOR PLAN - POWER
E215 PENTHOUSE/ROOF PLAN - POWER
E223 THIRD FLOOR PLAN - SYSTEMS
E300 ENLARGED ELECTRICAL PLANS
E400 ELECTRICAL DETAILS
E401 ELECTRICAL DETAILS
E500 ELECTRICAL ONE-LINE DIAGRAM
E600 ELECTRICAL SCHEDULES
E700 ELECTRICAL PANEL SCHEDULES
E701 ELECTRICAL PANEL SCHEDULES
08 - FIRE PROTECTION
F000 FIRE PROTECTION COVERSHEET
F103 THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN
F203 THIRD FLOOR FIRE PROTECTION PLAN
F501 FIRE PROTECTION DETAILS
13 - MECHANICAL
M000 MECHANICAL COVERSHEET
M103 THIRD FLOOR HVAC DUCTWORK DEMOLITION PLAN
M105 FIFTH FLOOR/ROOF HVAC DUCTWORK DEMOLITION PLAN
M113 THIRD FLOOR HVAC PIPING DEMOLITION PLAN
M203 THIRD FLOOR HVAC DUCTWORK PLAN
M204 FOURTH FLOOR HVAC DUCTWORK PLAN
M205 FIFTH FLOOR ROOF HVAC DUCTWORK PLAN
M213 THIRD FLOOR HVAC PIPING PLAN
M303 THIRD FLOOR AIR BALANCE PLAN
M501 HVAC DETAILS
M502 HVAC DETAILS
M601 HVAC SCHEDULES
M701 TEMPERATURE CONTROLS
M702 TEMPERATURE CONTROLS
15 - PLUMBING
P000 PLUMBING AND MEDICAL GAS COVERSHEET
P102 SECOND FLOOR PLUMBING DEMOLITION PLAN
P103 THIRD FLOOR PLUMBING DEMOLITION PLAN
P202 SECOND FLOOR PLUMBING PLAN
P203 THIRD FLOOR PLUMBING PLAN
P213 THIRD FLOOR MEDICAL GAS PLAN
P501 PLUMBING AND MEDICAL GAS DETAILS
P502 PLUMBING DIAGRAMS
20 - TECHNOLOGY
T000 TECHNOLOGY COVERSHEET
T001 SECOND FLOOR TECHNOLOGY KEY PLAN
T002 THIRD FLOOR TECHNOLOGY KEY PLAN
T103 THIRD FLOOR PLAN DEMOLITION PLAN - TECHNOLOGY
T203 THIRD FLOOR PLAN - TELECOMMUNICATIONS
T204 THIRD FLOOR PLAN - NURSECALL
T205 THIRD FLOOR PLAN - SECURITY
T300 TECHNOLOGY ENLARGEMENTS
T400 TECHNOLOGY DETAILS
T401 TECHNOLOGY DETAILS
T402 TECHNOLOGY DETAILS
T500 TECHONOLOGY DIAGRAMS
T501 TECHNOLOGY DIAGRAMS
T600 TECHNOLOGY SCHEDULES
AB ANCHOR BOLT
ABV ABOVE
AC AIR CONDITIONING
ACC ACCESS
ACOUS ACOUSTICAL
ACP ACOUSTIC CEILING
PANEL
ACR ACRYLIC PANEL
ACT ACOUSTIC CEILING TILE
AD ACCESS DOOR
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE
ADJC Adjacent
AFF Above Finished Floor
AHU Air Handling Unit
AL/ALUM Aluminum
ALT Alternate
ANC Anchor/Anchorage
ANOD Anodized
AP Acoustical Panel
APPROX Approximate
ARCH Architect (ural)
ASB Asbestos
AUX Auxillary
B/D Bottom of Deck
BD Board
BEL Below
BET Between
BEV Beveled
BIT Bituminous
BLDG Building
BLK/G Blocking
BM Beam
BOT Bottom
BRG Bearing
BRG PL Bearing Plate
BRK Brick
BS Both Sides
BSMT Basement
BUR Built Up Roofing
BW Both Ways
C Conduit
CAB Cabinet
CC Center to Center
CCTV Closed Circuit Television
CEM Cement
CER Ceramic
CFL Counter Flashing
CG Corner Guard
CIRC Circumference
CJ Construction Joint
CK Caulk (ing)
CLG Ceiling
CLS Closure
CMU Concrete Masonry Unit
CO Clean Out
COL Column
COMP Compress (ed), (ion), (ible)
CONC Concrete
CONN Connection
CONST Construction
CONT Continuous or Continue
CORR Corridor
CPT Carpet (ing)
CR Card Reader
CTR Center/Counter
CTSK Countersink
DEMO Demolish, Demolition
DEPR Depressed
DET Detail
DF Drinking Fountain
DIA Diameter
DIAG Diagonal
DIM Dimension
DIV Division
DMT Demountable
DN Down
DP Damp Proofing
DR Door
DS Downspout
DWG Drawing
DWR DRAWER
EA EACH
EB Expansion Bolt
EG Exterior Grade
EJ Expansion Joint
EL Elevation
ELEC Electric (al)
ELEV Elevator
EMERG Emergency
ENAM Enamel
ENT Entrance
EQ Equal
EQUIP Equipment
EST Estimate
EWC Electric Water Cooler
EXF Exhaust Fan
EXH Exhaust
EXP Exposed/Expansion
EXT Exterior
EXTG Existing
F/CONC Face of Concrete
F/FIN Face of Finish
F/MAS Face of Masonry
FA Fire Alarm
FAB Fabric
FAS Fasten, Fastener
FBO Furnished By Others
FD Floor Drain
FDN Foundation
FE Fire Extinguisher
FEC Fire Extinguisher Cabinet
FF Finished Floor/Face
FGL Fiberglass
FHC Fire Hose Cabinet
FHS Fire Hose Station
FIN Finish (ed)
FLASH Flashing
FLX Flexible
FPRFG Fireproofing
FR Fire Resistant
FRP Fiber Reinforced Plastic
FS Face of Studs
FSZ Full Size
FT Feet/Foot
FTG Footing
FURR Furring
GA Gage, Guage
GALV Galvenized
GB Grab Bar
GC General Contract (or)
GFI Ground Fault Interrupt
GL Glass, Glazing
GVL Gravel
GWB Gypsum Wall Board
GYP/BD Gypsum (Board)
HB Hose Bib
HC Hollow Core
HM Hollow Metal
HORIZ Horizontal
HP High Point/Horsepower
HR Handrail
HT Height
HTG Heating
HVAC Heating/Ventilating/AC
ID Inside Diameter
IF Inside Face
INCL Include (d), (ing)
INFO Information
INSUL Insulate (d), (ion)
INT Interior
INV Invert
JBOX Junction Box
JC Janitor's Closet
JT Joint
KD Knock Down
KO Knockout
KP Kick Plate
L Long
LAB Laboratory
LAM Laminate (d)
LAV Lavatory
LB Pound
LP Low Point
LT Light
LVT Luxury Vinyl Tile
MAINT Maintenance
MAS Masonry
MAT Material (s)
MAX Maximum
MCB Metal Corner Bead
MDF Medium Density Fiberboard
MECH Mechanic (al)
MED Medium
MET Metal
MFR Manufacture (r)
MIN Minimum
MIR Mirror
MISC Miscellaneous
MO Masonry Opening
MTL Material
MULL Mullion
N/A Not Applicable
NIC Not in Contract
NOM Nominal
NRC Noise Reduction Coefficient
NTS Not To Scale
OA Overall
OC On Center
OD Outside Diameter
OH Opposite Hand
OHD Overhead
OPNG Opening
OPP Opposite
OTO Out To Out
PD Panic Device
PFB Prefabricate (d)
PFN Pre-Finished
PLYWD Plywood
PNT Paint
POL Polished
PROP Property
PRT Partial/Preservative Treated
PTD Painted
PTN Partition
PTR Paper Towel Dispenser
PVC Polyvinyl Chloride
QT Quarry Tile
QZ Quartz
RAD Radius
RD Roof Drain
RDC Roof Drain Conductor
REF Reference
REFL Reflect (ed), (ive), (or)
REINF Reinforce (d)
REQD Required
REV Revision (s), Revised
RFG Roofing
RM Room
RO Rough Opening
RS Resinous Floor
RSF Resilient Sheet Flooring
S Sink
SC Sealed Concrete
SCH Schedule
SECT Section
SFGL Safety Class
SIM Similar
SNT Sealant
SQ Square
SS Stainless Steel
SSM Solid Surface Material
STA Station
STD Standard
STG Seating
STL Steel
STRUCT Structural
SUSP Suspended
SYM Symmetry (ical)
SYS System
T Tile
T&G Tongue And Groove
T/S Top of Slab
T/W Top of Wall
TEL Telephone
TERR Terrazzo
TH Threshold
THK Thick (ness)
TKS Tack Strip
TLB Towel Bar
TO Top Of
TOL Tolerance
TOS Top of Steel
TP Toilet Partition
TPD Toilet Paper Dispenser
TRAN Transition
TYP Typical
UNF Unfinished
UNO Unless Noted Otherwise
UR Urinal
VCT Vinyl Composition Tile
VERT Vertical
VIF Verify In Field
VIN Vinyl
VPB Vapor Barrier
W/ With
W/O Without
WB Wall Base
WC Water Closet
WD Wood
WG Wired Glass
WH Water Heater
WIN Window
WP Waterproofed
WPF Weather Proofing
WPT Working Point
WSCT Wainscot
WT Window Treatment
WWF Welded Wire Fabric
XFMR Transformer
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI100
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
LIFE SAFETY ANALYSIS FINAL CONSTRUCTION DOCUMENT
SUBMISSION
LIFE SAFETY - BUILDING CODE ANALYSIS
PROJECT NAME: RENOVATE 3RD FLOOR AMB CARE FOR SPECIALTY CARE CLINIC
CITY: CLEVELAND
COUNTY: CUYAHOGA
STATE: OHIO
AUTHORITY HAVING JURISDICTION: DEPARTMENT OF VETERAN AFFAIRS
APPLICABLE CODES AND STANDARDS 2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2023 NFPA 70, NATIONAL ELECTRICAL CODE
2024 NFPA 101, LIFE SAFETY CODE (LSC)
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE
(PG-18-13)
BASIC BUILDING INFORMATION
CONSTRUCTION TYPE (NFPA TABLE 21.1.6.1) EXISTING TYPE I (332) PROPOSED TYPE I (332)
OCCUPANCY CLASSIFICATION (NFPA 6.1.1) EXISTING AMBULATORY HEALTH CARE OCCUPANCIES
MIXED OCCUPANCIES (NFPA6.1.14.3.2) THE BUILDING SHALL COMPLY WITH THE MOST RESTRICTIVE REQUIREMENTS OF THE OCCUPANCIES INVOLVED, UNLESS SPEARATE
SAFEGUARDS ARE APPROVED.
HEIGHT & AREA LIMITATIONS ANALYSIS (IBC TABLE 504.3)
ALLOWABLE HEIGHT: 5 STORIES & 180 FT
ACTUAL HEIGHT (EXISTING): 4 STORIES & 60 FT
ALLOWABLE AREA (IBC TABLE 506.2): UL
ACTUAL BUILDING AREA / FLOOR (EXISTING): 27,725 SQ FT
ALLOWABLE AREA PER OCCUPANT (NFPA TABLE 7.3.1.2): 150 SF
ACTUAL OCCUPANTS: 3RD FLOOR RENOVATION: 11,915 SF ÷ 150 SF PER OCCUPANT = 80 OCCUPANTS
FIRE-RESISTANT BUILDING ELEMENTS NFPA 5000 TABLE 7.2.1.1)
STRUCTURAL FRAME: 3 HOURS
EXTERIOR BEARING WALLS: 3 HOURS
INTERIOR BEARING WALLS: 3 HOURS
INTERIOR NONBEARING WALLS: 0 HOURS
FLOOR CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS: 2 HOURS
ROOF CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS: 1.5 HOURS
EXTERIOR OPENINGS: PROTECTED: NOT REQUIRED
UNPROTECTED: UNLIMITED
PASSIVE FIRE SAFETY FEATURES - TRAVEL DISTANCES
EXIT TRAVEL DISTANCE - WITH SPRINKLERS (NFPA 21.2.6): 200 FT MAXIMUM ALLOWED
ACTUAL EXIT TRAVEL DISTANCES: SEE LIFE SAFETY PLANS
COMMON PATH DISTANCE - WITH SPRINKLERS (NFPA 20.2.5.2.1): 100 FT MAXIMUM ALLOWED
ACTUAL COMMON PATH DISTANCES: SEE LIFE SAFETY PLANS
DEAD END DISTANCE (NFPA 20.2.5.2.1): 50 FT MAXIMUM ALLOWED
ACTUAL DEAD END DISTANCES: SEE LIFE SAFETY PLANS
EXIT CAPACITY:
MINIMUM NUMBER OF EXITS PER FLOOR (NFPA 21.2.4) 3RD FLOOR RENOVATION: 2 EXITS
3RD FLOOR RENOVATION - 80 OCCUPANTS EXITS REQUIRED - 2 EXITS PROVIDED - 2
STAIRWAYS (NFPA TABLE 7.2.2.2.1.1(b))
REQUIRED: 36"
PROVIDED: STAIR 1 = 44"
STAIR 2 = 44"
DOORS (NFPA 7.2.1.2.3.2)
REQUIRED: 32"
PROVIDED: ACTUAL DOOR WIDTHS: SEE LIFE SAFETY PLANS
STAIR ENCLOSURE CONSTRUCTION 2 HR CONSTRUCTION WITH 60 MINUTE OPENING PROTECTIVES
SHAFT ENCLOSURE CONSTRUCTION 2 HR CONSTRUCTION
OCCUPANCY SEPARATION ALL SEPARATION REQUIREMENTS PER NFPA TABLE 6.1.14.1(A & B).
ACTIVE FIRE SAFETY FEATURES
AUTOMATIC SPRINKLER SYSTEM: REQUIRED, PROVIDED THROUGHOUT THE BUILDING
FIRE ALARM SYSTEM: PROVIDED
DETECTION SYSTEM: REQUIRED (NFPA 90A, ASME 17.1)
SMOKE CONTROL SYSTEM: NOT REQUIRED, NOT PROVIDED.
PORTABLE FIRE EXTINGUISHERS: PROVIDED PER NFPA 10. 75' TRAVEL DISTANCE.
EXIT IDENTIFICATION: REQUIRED, PROVIDED
EXIT ILLUMINATION: REQUIRED, PROVIDED
NOTE:
REFER TO THE FIRE ALARM AND FIRE SUPPRESSION ENGINEERING DRAWINGS FOR SPECIFIC
REQUIREMENTS REGARDING SUPPRESSION, DETECTION AND NOTIFICATION SYSTEMS.
INFORMATION ABOVE SHOWN FOR REFERENCE ONLY.
F
F
F F
F
F
F
EXIT SIGN CONNECTED TO LIFE SAFETY POWER (SHADING INDICATES
ILLUMINATED SIDE OF SIGN) (COORDINATE W/ ELECTRICAL)
FIRE EXTINGUISHER CABINET - EXTINGUISHER BY VA
(COORDINATE W/ FIRE MARSHAL)
ONE HOUR SMOKE BARRIER CONSTRUCTION
PATH OF TRAVEL - (FEET)
ONE HOUR FIRE WALL CONSTRUCTION
TWO HOUR FIRE WALL CONSTRUCTION
ONE HOUR FIRE WALL SMOKE BARRIER CONSTRUCTION
FIRE ALARM STROBE - WALL MOUNTED
(COORDINATE W/ FIRE MARSHAL)
X
W
Y
EXIT ACCESS DOOR
W = DOOR CLEAR WIDTH
X = CALCULATED OCCUPANT LOAD
Y = CODE REQUIRED OCCUPANT LOAD
FIRE ALARM STROBE - CEILING MOUNTED
(COORDINATE W/ FIRE MARSHAL)S
50 51 52 53 5453A
M
N
O
K
L
PATH C
PATH A
PATH B
P A
T H
C P
A T
H D
PATH B
137' - 3"
50'-0" MAX DEAD END CORRIDOR
37'-4 7/8"
CHECK IN
3AC322
SC183
CHECK OUT
3AC336
SC183
EKG EXAM
3AC346
CCD01
EXAM 1
3AC345
CCD06
EXAM 2
3AC342
CCD06
PATIENT RR
3AC343
SB201
EXAM 3
3AC341
CCD06
EXAM 10
3AC355
CCD06
EXAM 5
3AC350
CCD06
EXAM 4
3AC340
CCD06
DIALYSIS RR
3AC370A
SB159
DIALYSIS
TRAINING
3AC370
SC273
EXAM 6
3AC354
CCD06
EXAM 7
3AC356
CCD06
LARGE EXAM 1
/ALT EKG EXAM
3AC348
CCD16
EXAM 8
3AC358
CCD06
PATIENT RR
3AC353
SB201
EXAM 9
3AC351
CCD06
EXAM 12
3AC359
CCD06
EXAM 11
3AC357
CCD06LARGE EXAM 2
3AC349
CCD16
SOILED UTILITY
3AC352
SB743
CLEAN SUPPLY
3AC368
SB737
STERILE SUPPLY
3AC374
CS116
MEDICATION
3AC372
SV583
OFFICE -
CARDIOLOGY
3AC369
SS204
BREAK ROOM
3AC367
SS262
LARGE
CONFERENCE
3AC361
SS101
SMALL
CONFERENCE
3AC362
SS101
TEAMING
3AC363
SS218
ELEC
3AC337
H/W ALCOVE
3AC321
STRETCHER
ALCOVE
3AC332
NURSE STATION
3AC347
NURSE STATION
3AC375
NURSE STATION
3AC344
PATIENT
CORRIDOR
3AC339
STAFF CORRIDOR
3AC364
STAFF RR
3AC365
SB191
STAFF RR
3AC366
SB191
LOBBY
3AC310
PATIENT
CORRIDOR
3AC333
CORRIDOR
3AC332
PATIENT
CORRIDOR
3AC320
PATIENT
CORRIDOR
3AC360
PATIENT
CORRIDOR
3AC376
PATIENT
CORRIDOR
3AC338
SCHEDULING
ALCOVE
3AC332A
OIT ROOM
3AC371
ELECTRICAL
ROOM
3AC373
STAIR A
3S1
OIT ROOM
3AC335
JANITORIAL -
HAZARDOUS
ROOM
3AC334
STAIR B
3S3
PROJECT LIMIT LINE
PROJECT LIMIT LINE
P R
O V
ID
E
S P
R
IN
K
LE
R S
A T
W
IN
D O
W S
T O
A
R
IU
M
, R E
F E
R T
O F
IR
E
P R
O T
E C
T
IO
N
D R
A W
IN
G
P R
O V
ID
E
S P
R
IN
K
LE
R S
A T
W
IN
D O
W S
O
A
R
IU
M
, R E
F E
R T
O F
IR
E
P R
O T
E C
T
IO
N
D R
A W
IN
G
PROVIDE SPRINKLERS AT WINDOWS TO
ATRIUM, REFER TO FIRE PROTECTION
DRAWING
44"
44"
S
S
S S
S
S S S
SSS
S S S
S
S
S
S
SS
S S
S S
SS S
S
S
S
S
S
S
S
S
S
S
S
P A
T H
E
P A
T H
E
PATH D
STORAGE
3AC323
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI110
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
LIFE SAFETY PLAN - PROPOSED FINAL CONSTRUCTION DOCUMENT
SUBMISSION
EXIT ACCESS TRAVEL DISTANCE
Path ID Common Path
Distance Allowable Common
Path Actual Travel
Distance Allowable Travel
Distance
A 62' - 1" 75' - 0" 198' - 6" 200' - 0"
B 21' - 9" 75' - 0" 115' - 4" 200' - 0"
C 63' - 4" 75' - 0" 149' - 1" 200' - 0"
D 19' - 5" 75' - 0" 93' - 11" 200' - 0"
E 29' - 8" 75' - 0" 119' - 5" 200' - 0"
GENERAL NOTES
LEGEND
0' 4' 8' 16' 32'
3/16" = 1'-0"G10 LIFE SAFETY THIRD FLOOR PLAN
PLAN
NORTH
ACTUAL
NORTH
A. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. THE HEIGHT OF DOORS SHALL NOT
BE LESS THAN 80 INCHES.
B. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR
ANY SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS TO HAVE PANIC HARDWARE. PANIC
HARDWARE SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. FORCE
REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS.
C. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE
LEVEL.
D. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE
IS PERMITTED IN ANY EGRESS PATHS.
E. SPRINKLERS TO MEET THE REQUIREMENTS OF NFPA 101 8.6.7.1 (C). REFER TO FIRE PROTECTION
DRAWINGS FOR SPRINKLER LOCATIONS.
F. ALL NEW PROPOSED FIRE EXTINGUISHER LOCATIONS ARE DETERMINED BY THE DIRECTION OF THE LOCAL
AUTHORITY.
G. THE INFORMATION CONTAINED IN THESE LIFE SAFETY PLANS ARE IN REFERENCE TO THE PROJECT SCOPE OF WORK (PROJECT LIMIT LINE) CONTAINED IN THE ARCHITECTURAL PLANS. A COMPLETE LIFE SAFETY REVIEW OF THE FACILITY WAS NOT COMPLETED AS PART OF THIS SCOPE OF WORK. AREAS OUTSIDE OF THE SCOPE OF WORK (PROJECT LIMIT LINE) OF THESE DOCUMENTS WERE PROVIDED BY VAMC FOR REFERENCE BY THE DESIGN TEAM AND ARE ASSUMED TO BE ACCURATE AND COMPLETE FOR USE IN THESE CONSTRUCTION DOCUMENTS. COORDINATE WITH VAMC FOR ANY ADDITIONAL LIFE SAFETY
INFORMATION OUTSIDE OF THIS SCOPE OF WORK.
H. REPLACE ANY CEILING TILES REMOVED FOR CONSTRUCTION ACTIVITIES AT THE END OF EACH SHIFT IN
AREAS OUTSIDE OF THE RATED CONSTRUCTION BARRIER.
EXIT SIGN CONNECTED TO LIFE SAFETY POWER (SHADING INDICATES
ILLUMINATED SIDE OF SIGN) (COORDINATE W/ ELECTRICAL)
FIRE EXTINGUISHER CABINET - EXTINGUISHER BY VA
(COORDINATE W/ FIRE MARSHAL)
ONE HOUR SMOKE BARRIER CONSTRUCTION
PATH OF TRAVEL - (FEET)
ONE HOUR FIRE WALL CONSTRUCTION
TWO HOUR FIRE WALL CONSTRUCTION
ONE HOUR FIRE WALL SMOKE BARRIER CONSTRUCTION
FIRE ALARM STROBE - WALL MOUNTED
(COORDINATE W/ FIRE MARSHAL)
X
W
Y
EXIT ACCESS DOOR
W = DOOR CLEAR WIDTH
X = CALCULATED OCCUPANT LOAD
Y = CODE REQUIRED OCCUPANT LOAD
FIRE ALARM STROBE - CEILING MOUNTED
(COORDINATE W/ FIRE MARSHAL)S
50 51 52 53 5453A
M
N
O
K
L
PATH F
PATH F
PROJECT LIMIT LINE
PROJECT LIMIT LINE
44"
S
S
S S
WAITING AREA
3AC313
CORRIDOR
3AC314
AISLE
3AC354
CONFERENCE
3AC344A
CORRIDOR
3AC345
OFFICE 17
3AC342
OFFICE 16
3AC340
OFFICE 19
3AC349
OFFICE 20
3AC350
OIT ROOM
3AC335
JANITORIAL
3AC334
OFFICE 18
3AC348
FILE ROOM
3AC347
WORK ROOM
3AC346
WOMEN
3AC341
MEN
3AC339
OFFICE 14
3AC337
OFFICE 11
3AC334
BREAK ROOM
3AC333
OFFICE 15
3AC338
OFFICE 13
3AC336
OFFICE 12
3AC335
OFFICE 9
3AC332
OFFICE 7
3AC330
RESIDENT
3AC328A
OFFICE 5
3AC327
OFFICE 4
3AC326
OFFICE 3
3AC325
OFFICE 2
3AC324
OFFICE 1
3AC323
OIT ROOM
3AC371
ELECTRICAL
ROOM
3AC373
STAIR A
3S1
OFFICE 8
3AC331
OFFICE 6
3AC329
CONSTRUCTION
ANTEROOM
3AC300T
STAIR B
3S3
LOBBY
3AC310
WAITING
3AC310B
EYE CLINIC
WAITING
3AC210
CORRIDOR
3AC281
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI111
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
LIFE SAFETY PLAN - DURING
CONSTRUCTION
FINAL CONSTRUCTION DOCUMENT
SUBMISSION
EXIT ACCESS TRAVEL DISTANCE
GENERAL NOTES
LEGEND
0' 4' 8' 16' 32'
3/16" = 1'-0"G10 LIFE SAFETY THIRD FLOOR PLAN - CONSTRUCTION
PLAN
NORTH
ACTUAL
NORTH
A. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. THE HEIGHT OF DOORS SHALL NOT
BE LESS THAN 80 INCHES.
B. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR
ANY SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS TO HAVE PANIC HARDWARE. PANIC
HARDWARE SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. FORCE
REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS.
C. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE
LEVEL.
D. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE
IS PERMITTED IN ANY EGRESS PATHS.
E. SPRINKLERS TO MEET THE REQUIREMENTS OF NFPA 101 8.6.7.1 (C). REFER TO FIRE PROTECTION
DRAWINGS FOR SPRINKLER LOCATIONS.
F. ALL NEW PROPOSED FIRE EXTINGUISHER LOCATIONS ARE DETERMINED BY THE DIRECTION OF THE LOCAL
AUTHORITY.
G. THE INFORMATION CONTAINED IN THESE LIFE SAFETY PLANS ARE IN REFERENCE TO THE PROJECT SCOPE OF WORK (PROJECT LIMIT LINE) CONTAINED IN THE ARCHITECTURAL PLANS. A COMPLETE LIFE SAFETY REVIEW OF THE FACILITY WAS NOT COMPLETED AS PART OF THIS SCOPE OF WORK. AREAS OUTSIDE OF THE SCOPE OF WORK (PROJECT LIMIT LINE) OF THESE DOCUMENTS WERE PROVIDED BY VAMC FOR REFERENCE BY THE DESIGN TEAM AND ARE ASSUMED TO BE ACCURATE AND COMPLETE FOR USE IN THESE CONSTRUCTION DOCUMENTS. COORDINATE WITH VAMC FOR ANY ADDITIONAL LIFE SAFETY
INFORMATION OUTSIDE OF THIS SCOPE OF WORK.
H. REPLACE ANY CEILING TILES REMOVED FOR CONSTRUCTION ACTIVITIES AT THE END OF EACH SHIFT IN
AREAS OUTSIDE OF THE RATED CONSTRUCTION BARRIER.
Path ID Common Path
Distance Allowable Common
Path Actual Travel
Distance Allowable Travel
Distance
F 163' - 4" 75' - 0" 163' - 4" 200' - 0"
* VA OCCUPATIONAL HEALTH & SAFETY (OH&S) SERVICE TO CREATE AN INTERIM LIFE
SAFETY MEASURE (ILSM) TO ADDRESS THE REDUCED MEANS OF EGRESS CAPACITY
AS A RESULT OF STAIR A NOT BEING ACCESSIBLE DURING THE CONSTRUCTION OF
THIS PROJECT
50 51 52 53 5453A
M
N
O
K
L
WAITING AREA
3AC313
CORRIDOR
3AC314
AISLE
3AC354
CONFERENCE
3AC344A
CORRIDOR
3AC345
OFFICE 17
3AC342
OFFICE 16
3AC340
OFFICE 19
3AC349
OFFICE 20
3AC350
OIT ROOM
3AC335
JANITORIAL
3AC334
OFFICE 18
3AC348
FILE ROOM
3AC347
WORK ROOM
3AC346
WOMEN
3AC341
MEN
3AC339
OFFICE 14
3AC337
OFFICE 11
3AC334
BREAK ROOM
3AC333
OFFICE 15
3AC338
OFFICE 13
3AC336
OFFICE 12
3AC335
OFFICE 9
3AC332
OFFICE 7
3AC330
RESIDENT
3AC328A
OFFICE 5
3AC327
OFFICE 4
3AC326
OFFICE 3
3AC325
OFFICE 2
3AC324
OFFICE 1
3AC323
OIT ROOM
3AC371
ELECTRICAL
ROOM
3AC373
STAIR A
3S1
OFFICE 8
3AC331
OFFICE 6
3AC329
CONSTRUCTION
ANTEROOM
3AC300T
PROJECT LIMIT LINE
PROJECT LIMIT LINE
1'-0"
1' -0
'-3
/8
1'- 0"
1' -0
7"
8'-0" 2'-3"
.0
5'-10"
T302
T301
STAIR B
3S3
LOBBY
3AC310
WAITING
3AC310B
EYE CLINIC
WAITING
3AC210
CORRIDOR
3AC281
T2
T2T2
T2
T1
T1
T1
T2
T2
T2
'-1
1/ 4"
10'-1"T2 T2T2
52 53 5453A
N
O
3' -6
12'-9 7/8"
5'-0"
T2
T2T2
T2
T
T
5' -0
" T2
TREATMENT AREA
4AC355
TREATMENT AREA
4AC354
TREATMENT AREA
4AC353
SPD STERILE STORAGE
4AC347
TREATMENT AREA
4AC346
TREATMENT AREA
4AC357
HAC
4AC356
TOILET STAFF
4AC380 LOCKERS/LOUNGE
4AC379
CORRIDOR
4AC370
OFFICE
4AC378
CORRIDOR
4AC350
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI120
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
PHASING PLAN FINAL CONSTRUCTION DOCUMENT
SUBMISSION
GENERAL NOTES
0' 4' 8' 16' 32'
3/16" = 1'-0"G10 PHASING THIRD FLOOR PLAN - PHASE I
A. PROJECT CLASSIFIED AS ICRA LEVEL IV
B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING
CONSTRUCTION.
C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:
SUBMITTAL PHASE: 90 DAYS DAY 001 - 090
PHASE 1: 365 DAYS DAY 091 - 455
D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE
ON WEEKEND HOURS.
E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT. THESE DRAWINGS GRAPHICALLY ILLUSTRATE AND DIMENSION MANUFACTURER’S RECOMMENDED MAINTENANCE CLEARANCES. ON MECHANICAL PROJECTS, COORDINATION DRAWINGS INCLUDE STRUCTURAL STEEL, DUCTWORK, MAJOR PIPING AND ELECTRICAL CONDUIT AND SHOW THE ELEVATIONS AND LOCATIONS OF THE ABOVE COMPONENTS. COORDINATION DRAWINGS TO BE DEVELOPED USING A NAVISWORKS BIM MODEL FOR VIRTUAL CROSS-CHECKING OF
PROJECT DISCIPLINES THROUGHOUT CONSTRUCTION.
F. CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE
OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE
NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.
2. CONTRACTOR IS TO HIRE A GLAZER AND REMOVE A WINDOW TO VENT DIRECTLY TO THE OUTSIDE AND
NOT USE EXISTING RETURN AIR OR EXHAUST AIR DUCTWORK FOR NEGATIVE AIR.
3. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST
REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF
CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST
TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS:
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS
AND LOOSE MATERIAL.
LEVEL II: ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER
SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST
AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO
REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM
5. SEAL DOORS, TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF
TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED
CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT
TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED
CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON
FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA
VACUUMING SURFACES AT LEAST DAILY.
LEVEL III: ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST
EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT
PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING
(OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING
APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED
EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL
MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT
NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV: ALL CONTROL MEASURES IN LEVEL I, II, AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL, ANTEROOM MUST BE
LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS
ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK
AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
PLAN
NORTH
ACTUAL
NORTH
3/32" = 1'-0"D10 PHASING FOURTH FLOOR PLAN
KEYNOTES
10 SEAL DOORS FOR CONSTRUCTION SERVICES.
11 PERFORM FOURTH FLOOR CONSTRUCTION OVER WEEKEND HOURS. REOPEN FOURTH FLOOR AREA
AS SOON AS POSSIBLE.
N
O
K
L
1818 1818
ELECTRICAL ROOM
2A102
OIT ROOM
2A103
OFFICE
2A104
EXAM
2A105
EXAM
2A106
EXAM
2A107
EXAM
2A108
OFFICE
2A109
PROCEDURE ROOM
2A117
PROCEDURE ROOM
2A118
EXAM
2A116
EXAM
2A119
EXAM
2A115
EXAM
2A120
EXAM
2A114
EXAM
2A121
EXAM
2A113
EXAM
2A122
JANITOR
2A111
RESTROOM
2A112
RESTROOM
2A123
EXAM
2A124EXAM
2A125EXAM
2A126
EXAM
2A127
EXAM
2A127A
EXAM
2A134A
EXAM
2A134
EXAM
2A136
EXAM
2A138
EXAM
2A137
EXAM
2A135
EXAM
2A133
EXAM
2A132
RESTROOM
2A131A
EXAM
2A131B
EXAM
2A131D BREAK ROOM
2A140
STORAGE
2A142
EXAM
2A131E
PROCEDURE ROOM
2A131F
STORAGE
2A131H
OFFICE
2A146A
OFFICE
2A146B
OFFICE
2A144
OPEN
2A143
OPEN
2A141
LAB
2A110
CORRIDOR
2A102
JANITOR
2A146
PROCEDURE ROOM
2A131I
OFFICE
2A131J
PROCEDURE ROOM
2A131K
EXAM
2A131L
WOMENS RESTROOM
2A192
MENS RESTROOM
2A194
CORRIDOR
2A100F
CORRIDOR
2A100A
CORRIDOR
2A100C
NURSE STATION
2A100E
CORRIDOR
2A100D
CORRIDOR
2A100B
RECEPTION
2A128
RECEPTION
2A130
STAIR A
2S1
WAITING
2A195
WAITING
2A129
WAITING
2A193
STAIR B
2S3
OPEN
2A139
CORRIDOR
2A150
OPEN
2A151
CORRIDOR
2A150A
OPEN
2A152
OPEN
2A139A
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI121
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
PHASING PLAN - PLUMBING ACCESS FINAL CONSTRUCTION DOCUMENT
SUBMISSION
GENERAL NOTES
0' 4' 8' 16' 32'
A. PROJECT CLASSIFIED AS ICRA LEVEL IV
B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING
CONSTRUCTION.
C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:
SUBMITTAL PHASE: 90 DAYS DAY 001 - 090
PHASE 1: 365 DAYS DAY 091 - 455
D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE
ON WEEKEND HOURS.
E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT. THESE DRAWINGS GRAPHICALLY ILLUSTRATE AND DIMENSION MANUFACTURER’S RECOMMENDED MAINTENANCE CLEARANCES. ON MECHANICAL PROJECTS, COORDINATION DRAWINGS INCLUDE STRUCTURAL STEEL, DUCTWORK, MAJOR PIPING AND ELECTRICAL CONDUIT AND SHOW THE ELEVATIONS AND LOCATIONS OF THE ABOVE COMPONENTS. COORDINATION DRAWINGS TO BE DEVELOPED USING A NAVISWORKS BIM MODEL FOR VIRTUAL CROSS-CHECKING OF
PROJECT DISCIPLINES THROUGHOUT CONSTRUCTION.
F. CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE
OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE
NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.
2. CONTRACTOR IS TO HIRE A GLAZER AND REMOVE A WINDOW TO VENT DIRECTLY TO THE OUTSIDE AND
NOT USE EXISTING RETURN AIR OR EXHAUST AIR DUCTWORK FOR NEGATIVE AIR.
3. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST
REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF
CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST
TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS:
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS
AND LOOSE MATERIAL.
LEVEL II: ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER
SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST
AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO
REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM
5. SEAL DOORS, TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF
TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED
CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT
TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED
CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON
FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA
VACUUMING SURFACES AT LEAST DAILY.
LEVEL III: ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST
EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT
PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING
(OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING
APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED
EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL
MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT
NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV: ALL CONTROL MEASURES IN LEVEL I, II, AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL, ANTEROOM MUST BE
LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS
ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK
AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
PLAN
NORTH
ACTUAL
NORTH
KEYNOTES
18 REMOVE CEILING TILES AS NECESSARY FOR PLUMBING INSTALLATION. PROTECT EXISTING FINISHES.
PERFORM PLUMBING DEMOLITION AND CONSTRUCTION OVER WEEKEND HOURS. REINSTALL
CEILINGS AND CLEAN WORK AREA PRIOR TO REOPENING SECOND FLOOR AREA FOR BUSINESS
HOURS. PATCH AND REPAIR ALL CEILING ELEMENTS IMPACTED BY CONSTRUCTION.
3/16" = 1'-0"G10 PHASING SECOND FLOOR PLAN - PHASE I
N
O
K
L
PROJECT LIMIT LINE
PROJECT LIMIT LINE
T2
T2
T2
T
T303
CONSTRUCTION
ANTEROOM
3AC301T
LOBBY
3AC310
5' -6
/2
'-8
/4
6'-0"
6' -2
/4
CHECK IN
3AC322
SC183
CHECK OUT
3AC336
SC183
EKG EXAM
3AC346
CCD01
EXAM 1
3AC345
CCD06
EXAM 2
3AC342
CCD06
PATIENT RR
3AC343
SB201
EXAM 3
3AC341
CCD06
EXAM 10
3AC355
CCD06
EXAM 5
3AC350
CCD06
EXAM 4
3AC340
CCD06
DIALYSIS RR
3AC370A
SB159
DIALYSIS
TRAINING
3AC370
SC273
EXAM 6
3AC354
CCD06
EXAM 7
3AC356
CCD06
LARGE EXAM 1
/ALT EKG EXAM
3AC348
CCD16
EXAM 8
3AC358
CCD06
PATIENT RR
3AC353
SB201
EXAM 9
3AC351
CCD06
EXAM 12
3AC359
CCD06
EXAM 11
3AC357
CCD06LARGE EXAM 2
3AC349
CCD16
SOILED UTILITY
3AC352
SB743
CLEAN SUPPLY
3AC368
SB737
STERILE SUPPLY
3AC374
CS116
MEDICATION
3AC372
SV583
OFFICE -
CARDIOLOGY
3AC369
SS204
BREAK ROOM
3AC367
SS262
LARGE
CONFERENCE
3AC361
SS101
SMALL
CONFERENCE
3AC362
SS101
TEAMING
3AC363
SS218
ELEC
3AC337
H/W ALCOVE
3AC321
STRETCHER
ALCOVE
3AC332
NURSE STATION
3AC347
NURSE STATION
3AC375
NURSE STATION
3AC344
PATIENT
CORRIDOR
3AC339
STAFF CORRIDOR
3AC364
STAFF RR
3AC365
SB191
STAFF RR
3AC366
SB191
LOBBY
3AC310
STAIR A
3S1
STAIR B
3S3
OIT ROOM
3AC335
JANITORIAL -
HAZARDOUS
ROOM
3AC334
ELECTRICAL
ROOM
3AC373
OIT ROOM
3AC371
PATIENT
CORRIDOR
3AC333
CORRIDOR
PATIENT
CORRIDOR
3AC320
PATIENT
CORRIDOR
3AC360
PATIENT
CORRIDOR
3AC376
PATIENT
CORRIDOR
3AC338
CORRIDOR
3AC281EYE CLINIC
WAITING
3AC210
WAITING
3AC310B
VENDING
3AC310A
SCHEDULING
ALCOVE
3AC332A
STORAGE
3AC323
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
672 E. Royalton Rd.
Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis
GI122
541-23-101RENOVATE 3RD FLOOR AMB CARE FOR
SPECIALTY CARE CLINIC
LOUIS STOKES CLEVELAND VAMC
October 1, 2024 BB CM
PHASING PLAN - TILE RECONSTRUCTION FINAL CONSTRUCTION DOCUMENT
SUBMISSION
GENERAL NOTES
0' 4' 8' 16' 32'
3/16" = 1'-0"G10 PHASING THIRD FLOOR PLAN - PHASE II - TILE RECONSTRUCTION
A. PROJECT CLASSIFIED AS ICRA LEVEL IV
B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING
CONSTRUCTION.
C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:
SUBMITTAL PHASE: 90 DAYS DAY 001 - 090
PHASE 1: 365 DAYS DAY 091 - 455
D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE
ON WEEKEND HOURS.
E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .