S02. 3rd Flr Amb Care - Final Drawings.pdf

PDF 48 MB Posted

Attached to
Y1DA - RENOVATE 3RD FLOOR AMB CARE FOR SPECIALTY CARE CLINIC - 541-23-101
Solicitation number
36C25025B0011
Issued by

About this file

This is a set of final architectural/engineering drawings for the renovation project of the 3rd Floor Ambulatory Care area at the Louis Stokes Cleveland VA Medical Center. The drawings detail the planned renovation of approximately 11,600 square feet of existing Specialty Care Clinic Space within the Third Floor Ambulatory Care Wing.

The drawings support solicitation #36C25025B0011, which is a 100% SDVOSB set-aside construction project with an estimated value between $5-10 million. The renovation work will be performed at 10701 East Boulevard, Cleveland, OH 44106, and requires contractors to coordinate with the VA Contracting Officer and COR. The RFI submission deadline is January 15, 2025 at 3:30 PM EST, and bidders must be verified in VetCert and registered in SAM to be eligible for award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPT. OF VETERANS AFFAIRS

VA CONTRACT NUMBER: 36C25023C0022

VA PROJECT NUMBER: 541-23-101

VETERANS HEALTH CARE SYSTEM

10701 East Blvd., Cleveland OH 44106

RENOVATE 3RD FLOOR AMB CARE

FOR SPECIALTY CARE CLINIC

o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

A

B

C

D

E

F

G

5 4 3 2 1678910

A

B

C

D

E

F

G

5 4 3 2 1678910

Project Number

Building Number

Drawing NumberLocation

Issue Date

Project Title

Checked Drawn

Drawing Title

Approved:

Phase

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

REVISIONS: DATE:

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

101 North Seventh Street Louisville, KY 40202 Phone: 440-262-3063 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI000

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

COVER SHEET FINAL CONSTRUCTION DOCUMENT

SUBMISSION

A101

SIM

A101

SIM

BUILDING ELEVATION/SECTIONDetail No.

Sheet No.

Reference Label

Detail No.

Sheet No.

Reference Label

Room No.

Door/Room No.

Key Note No.

ALIGN

WALL SECTION

DETAIL SECTION/CALLOUT

ROOM TAG

DOOR TAG

PARTITION TAG

KEYNOTE

ALIGNED SURFACES

Room Name

Area

AREA TAG

Area NameArea Name

150 SF

SCOPE OF PROJECT

Project Limit Line

Grid No.

CENTERLINE

COLUMN GRID LINE

Level/Datum Elevation AFF

LEVEL MARKER

Level/Datum Name

Window Type WINDOW TYPE TAG1t

Highpoint @ Tail SLOPE INDICATOR

Starting Point @ Center DIMENSION CROSSHAIR

NORTH ARROW

Plan North Reference Label

0 1 Revision Reference Number

Revision Cloud Depicting Area Revised

REVISION

CEILING TAG

A101

SIM

Detail No.

Sheet No.

Reference Label

XX-1

1'-0"A.F.F. Clg Height

Clg Type

Xx.x

Xx.x

Sheet No.

Detail No.

Partition Traits

Partition Configuration

X#x

#X ##

ELEVATION

Room Name

OFA01 Room Code.

P-3 FINISH TAG

Name Elevation

1. WORK INCLUDES APPLYING AND PAYING FOR REQUIRED PERMITS AND INSPECTIONS.

2. NOTIFY ARCHITECT OF ANY CLARIFICATIONS NEEDED PRIOR TO COMMENCING WORK.

3. EMPLOY ONLY SKILLED WORKERS, EXPERIENCED IN THEIR RESPECTIVE TRADES.

4. COORDINATE WORK OF VARIOUS TRADES. ENSURE EACH HAS ADEQUATE SPACE AND RESOURCES FOR PROPER INSTALLATION OF THE WORK.

5. SCALING DRAWINGS IS DISCOURAGED AND PERFORMED AT CONTRACTOR’S SOLE RISK. NOTIFY ARCHITECT IF ADDITIONAL DIMENSION

INFORMATION OR CLARIFICATION IS REQUIRED.

6. COORDINATE SCHEDULE FOR WORK INDICATED TO BE PROVIDED BY OTHERS. ALLOW ACCESS, SPACE FOR PERFORMANCE OF WORK AND

STORAGE AND OTHER RESOURCES.

7. DRAWINGS OF EXISTING CONDITIONS ARE BASED UPON OWNER PROVIDED DRAWINGS AND OTHER DOCUMENTS AND UPON CURSORY ON-SITE OBSERVATION. THEY ARE INTENDED AS A REASONABLE PRESENTATION OF EXISTING CONDITIONS. THEY ARE NOT A COMPLETE OR

EXHAUSTIVE REPRESENTATION OF EXISTING CONDITIONS.

8. EXISTING FACILITY WILL REMAIN OPERATIONAL DURING CONSTRUCTION. SEE PHASING DRAWINGS FOR ICRA REQUIREMENTS AND PHASING.

SOME AREAS OF WORK WILL REQUIRE WORK DURING OFF HOURS OR WEEKENDS IN ORDER TO MEET ICRA REQUIREMENTS AND MAINTAIN A

FULLY OPERATIONAL FACILITY.

PLAN

NORTH

ACTUAL

NORTH

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI001

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

DRAWING INDEX, ABBREVIATIONS,

GENERAL NOTES AND SYMBOLS

FINAL CONSTRUCTION DOCUMENT

SUBMISSION

PROJECT LOCATION MAP (NTS)

PROJECT DIRECTORY

SHEET INDEX

PROJECT LOCATION

LEGEND

ABBREVIATIONS

PROJECT GENERAL NOTES

BUILDING KEY PLAN (NTS)

PROJECT LOCATION

ARCHITECT CONTACT:

ELAINE LEWIS

elaine.lewis@l2eoculus.com

314-730-2779

L2e-OCULUS JV

20 SOUTH SARAH STREET

ST. LOUIS, MO 63108

MEP, TECH ENGINEER CONTACT:

CHRIS CAMPBELL

Christopher.P.Campbell@imegcorp.com

440-546-9776

IMEG CORP.

672 E. ROYALTON RD.

BROADVIEW HEIGHTS, OH 44147

CLIENT CONTACT:

RICHARD CLARK

Richard.Clark8@va.gov

216-791-2300 #46133

DEPARTMENT OF VETERAN AFFAIRS

10701 EAST BLVD.

CLEVELAND, OH 44106

COST ESTIMATING CONTACT:

KYLE VEATER

kveater@ocmi.com

469-431-0571

OCMI, INC.

1722 ROUTH STREET, STE. 900

DALLAS, TX 75201

PLAN

NORTH

ACTUAL

NORTH

SHEET # SHEET NAME REV. # REV. DATE

00 - GENERAL

GI000 COVER SHEET

GI001 DRAWING INDEX, ABBREVIATIONS, GENERAL NOTES AND SYMBOLS

GI100 LIFE SAFETY ANALYSIS

GI110 LIFE SAFETY PLAN - PROPOSED

GI111 LIFE SAFETY PLAN - DURING CONSTRUCTION

GI120 PHASING PLAN

GI121 PHASING PLAN - PLUMBING ACCESS

GI122 PHASING PLAN - TILE RECONSTRUCTION

GI123 PHASING PLAN - TILE RECONSTRUCTION

02 - DEMOLITION

AD110 DEMOLITION THIRD FLOOR PLAN

AD210 DEMOLITION REFLECTED CEILING PLAN

03 - ARCHITECTURAL

AE010 WALL & PARTITION ASSEMBLIES

AE011 TYPICAL PARTITION DETAILS

AE012 TYPICAL MOUNTING DETAILS

AE020 DOOR SCHEDULE, DOOR & FRAME TYPES & ELEVATIONS

AE021 DOOR & FRAME DETAILS

AE030 CASEWORK DETAILS

AE040 CEILING DETAILS

AE110 ARCHITECTURAL THIRD FLOOR PLAN

AE111 ARCHITECTURAL FOURTH FLOOR PLAN, RCP & ROOF PLAN

AE150 EQUIPMENT THIRD FLOOR PLAN

AE151 ENLARGED EQUIPMENT PLANS

AE210 ARCHITECTURAL REFLECTED CEILING PLAN

AE400 INTERIOR ELEVATIONS

AE401 INTERIOR ELEVATIONS

AE402 INTERIOR ELEVATIONS

AE403 INTERIOR ELEVATIONS

AE404 INTERIOR ELEVATIONS

AE405 INTERIOR ELEVATIONS

AE600 INTERIOR DETAILS

06 - INTERIORS

IG010 SIGNAGE TYPES

IG011 SIGNAGE TYPES

IG400 ENLARGED INTERIOR SIGNAGE PLAN AND SCHEDULE

IN010 FINISH LEGEND AND DETAILS

IN110 INTERIOR DESIGN THIRD FLOOR FINISH PLAN

07 - ELECTRICAL

E000 ELECTRICAL COVERSHEET

E001 ELECTRICAL SYSTEMS COVERSHEET

E002 BASEMENT FLOOR ELECTRICAL KEY PLAN

E003 THIRD FLOOR ELECTRICAL KEY PLAN

E103 THIRD FLOOR DEMOLITION PLAN - LIGHTING

E104 THIRD FLOOR DEMOLITION PLAN - POWER & SYSTEMS

E203 THIRD FLOOR PLAN - LIGHTING

E213 THIRD FLOOR PLAN - POWER

E215 PENTHOUSE/ROOF PLAN - POWER

E223 THIRD FLOOR PLAN - SYSTEMS

E300 ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DETAILS

E401 ELECTRICAL DETAILS

E500 ELECTRICAL ONE-LINE DIAGRAM

E600 ELECTRICAL SCHEDULES

E700 ELECTRICAL PANEL SCHEDULES

E701 ELECTRICAL PANEL SCHEDULES

08 - FIRE PROTECTION

F000 FIRE PROTECTION COVERSHEET

F103 THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN

F203 THIRD FLOOR FIRE PROTECTION PLAN

F501 FIRE PROTECTION DETAILS

13 - MECHANICAL

M000 MECHANICAL COVERSHEET

M103 THIRD FLOOR HVAC DUCTWORK DEMOLITION PLAN

M105 FIFTH FLOOR/ROOF HVAC DUCTWORK DEMOLITION PLAN

M113 THIRD FLOOR HVAC PIPING DEMOLITION PLAN

M203 THIRD FLOOR HVAC DUCTWORK PLAN

M204 FOURTH FLOOR HVAC DUCTWORK PLAN

M205 FIFTH FLOOR ROOF HVAC DUCTWORK PLAN

M213 THIRD FLOOR HVAC PIPING PLAN

M303 THIRD FLOOR AIR BALANCE PLAN

M501 HVAC DETAILS

M502 HVAC DETAILS

M601 HVAC SCHEDULES

M701 TEMPERATURE CONTROLS

M702 TEMPERATURE CONTROLS

15 - PLUMBING

P000 PLUMBING AND MEDICAL GAS COVERSHEET

P102 SECOND FLOOR PLUMBING DEMOLITION PLAN

P103 THIRD FLOOR PLUMBING DEMOLITION PLAN

P202 SECOND FLOOR PLUMBING PLAN

P203 THIRD FLOOR PLUMBING PLAN

P213 THIRD FLOOR MEDICAL GAS PLAN

P501 PLUMBING AND MEDICAL GAS DETAILS

P502 PLUMBING DIAGRAMS

20 - TECHNOLOGY

T000 TECHNOLOGY COVERSHEET

T001 SECOND FLOOR TECHNOLOGY KEY PLAN

T002 THIRD FLOOR TECHNOLOGY KEY PLAN

T103 THIRD FLOOR PLAN DEMOLITION PLAN - TECHNOLOGY

T203 THIRD FLOOR PLAN - TELECOMMUNICATIONS

T204 THIRD FLOOR PLAN - NURSECALL

T205 THIRD FLOOR PLAN - SECURITY

T300 TECHNOLOGY ENLARGEMENTS

T400 TECHNOLOGY DETAILS

T401 TECHNOLOGY DETAILS

T402 TECHNOLOGY DETAILS

T500 TECHONOLOGY DIAGRAMS

T501 TECHNOLOGY DIAGRAMS

T600 TECHNOLOGY SCHEDULES

AB ANCHOR BOLT

ABV ABOVE

AC AIR CONDITIONING

ACC ACCESS

ACOUS ACOUSTICAL

ACP ACOUSTIC CEILING

PANEL

ACR ACRYLIC PANEL

ACT ACOUSTIC CEILING TILE

AD ACCESS DOOR

ADD ADDENDUM

ADH ADHESIVE

ADJ ADJUSTABLE

ADJC Adjacent

AFF Above Finished Floor

AHU Air Handling Unit

AL/ALUM Aluminum

ALT Alternate

ANC Anchor/Anchorage

ANOD Anodized

AP Acoustical Panel

APPROX Approximate

ARCH Architect (ural)

ASB Asbestos

AUX Auxillary

B/D Bottom of Deck

BD Board

BEL Below

BET Between

BEV Beveled

BIT Bituminous

BLDG Building

BLK/G Blocking

BM Beam

BOT Bottom

BRG Bearing

BRG PL Bearing Plate

BRK Brick

BS Both Sides

BSMT Basement

BUR Built Up Roofing

BW Both Ways

C Conduit

CAB Cabinet

CC Center to Center

CCTV Closed Circuit Television

CEM Cement

CER Ceramic

CFL Counter Flashing

CG Corner Guard

CIRC Circumference

CJ Construction Joint

CK Caulk (ing)

CLG Ceiling

CLS Closure

CMU Concrete Masonry Unit

CO Clean Out

COL Column

COMP Compress (ed), (ion), (ible)

CONC Concrete

CONN Connection

CONST Construction

CONT Continuous or Continue

CORR Corridor

CPT Carpet (ing)

CR Card Reader

CTR Center/Counter

CTSK Countersink

DEMO Demolish, Demolition

DEPR Depressed

DET Detail

DF Drinking Fountain

DIA Diameter

DIAG Diagonal

DIM Dimension

DIV Division

DMT Demountable

DN Down

DP Damp Proofing

DR Door

DS Downspout

DWG Drawing

DWR DRAWER

EA EACH

EB Expansion Bolt

EG Exterior Grade

EJ Expansion Joint

EL Elevation

ELEC Electric (al)

ELEV Elevator

EMERG Emergency

ENAM Enamel

ENT Entrance

EQ Equal

EQUIP Equipment

EST Estimate

EWC Electric Water Cooler

EXF Exhaust Fan

EXH Exhaust

EXP Exposed/Expansion

EXT Exterior

EXTG Existing

F/CONC Face of Concrete

F/FIN Face of Finish

F/MAS Face of Masonry

FA Fire Alarm

FAB Fabric

FAS Fasten, Fastener

FBO Furnished By Others

FD Floor Drain

FDN Foundation

FE Fire Extinguisher

FEC Fire Extinguisher Cabinet

FF Finished Floor/Face

FGL Fiberglass

FHC Fire Hose Cabinet

FHS Fire Hose Station

FIN Finish (ed)

FLASH Flashing

FLX Flexible

FPRFG Fireproofing

FR Fire Resistant

FRP Fiber Reinforced Plastic

FS Face of Studs

FSZ Full Size

FT Feet/Foot

FTG Footing

FURR Furring

GA Gage, Guage

GALV Galvenized

GB Grab Bar

GC General Contract (or)

GFI Ground Fault Interrupt

GL Glass, Glazing

GVL Gravel

GWB Gypsum Wall Board

GYP/BD Gypsum (Board)

HB Hose Bib

HC Hollow Core

HM Hollow Metal

HORIZ Horizontal

HP High Point/Horsepower

HR Handrail

HT Height

HTG Heating

HVAC Heating/Ventilating/AC

ID Inside Diameter

IF Inside Face

INCL Include (d), (ing)

INFO Information

INSUL Insulate (d), (ion)

INT Interior

INV Invert

JBOX Junction Box

JC Janitor's Closet

JT Joint

KD Knock Down

KO Knockout

KP Kick Plate

L Long

LAB Laboratory

LAM Laminate (d)

LAV Lavatory

LB Pound

LP Low Point

LT Light

LVT Luxury Vinyl Tile

MAINT Maintenance

MAS Masonry

MAT Material (s)

MAX Maximum

MCB Metal Corner Bead

MDF Medium Density Fiberboard

MECH Mechanic (al)

MED Medium

MET Metal

MFR Manufacture (r)

MIN Minimum

MIR Mirror

MISC Miscellaneous

MO Masonry Opening

MTL Material

MULL Mullion

N/A Not Applicable

NIC Not in Contract

NOM Nominal

NRC Noise Reduction Coefficient

NTS Not To Scale

OA Overall

OC On Center

OD Outside Diameter

OH Opposite Hand

OHD Overhead

OPNG Opening

OPP Opposite

OTO Out To Out

PD Panic Device

PFB Prefabricate (d)

PFN Pre-Finished

PLYWD Plywood

PNT Paint

POL Polished

PROP Property

PRT Partial/Preservative Treated

PTD Painted

PTN Partition

PTR Paper Towel Dispenser

PVC Polyvinyl Chloride

QT Quarry Tile

QZ Quartz

RAD Radius

RD Roof Drain

RDC Roof Drain Conductor

REF Reference

REFL Reflect (ed), (ive), (or)

REINF Reinforce (d)

REQD Required

REV Revision (s), Revised

RFG Roofing

RM Room

RO Rough Opening

RS Resinous Floor

RSF Resilient Sheet Flooring

S Sink

SC Sealed Concrete

SCH Schedule

SECT Section

SFGL Safety Class

SIM Similar

SNT Sealant

SQ Square

SS Stainless Steel

SSM Solid Surface Material

STA Station

STD Standard

STG Seating

STL Steel

STRUCT Structural

SUSP Suspended

SYM Symmetry (ical)

SYS System

T Tile

T&G Tongue And Groove

T/S Top of Slab

T/W Top of Wall

TEL Telephone

TERR Terrazzo

TH Threshold

THK Thick (ness)

TKS Tack Strip

TLB Towel Bar

TO Top Of

TOL Tolerance

TOS Top of Steel

TP Toilet Partition

TPD Toilet Paper Dispenser

TRAN Transition

TYP Typical

UNF Unfinished

UNO Unless Noted Otherwise

UR Urinal

VCT Vinyl Composition Tile

VERT Vertical

VIF Verify In Field

VIN Vinyl

VPB Vapor Barrier

W/ With

W/O Without

WB Wall Base

WC Water Closet

WD Wood

WG Wired Glass

WH Water Heater

WIN Window

WP Waterproofed

WPF Weather Proofing

WPT Working Point

WSCT Wainscot

WT Window Treatment

WWF Welded Wire Fabric

XFMR Transformer

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI100

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

LIFE SAFETY ANALYSIS FINAL CONSTRUCTION DOCUMENT

SUBMISSION

LIFE SAFETY - BUILDING CODE ANALYSIS

PROJECT NAME: RENOVATE 3RD FLOOR AMB CARE FOR SPECIALTY CARE CLINIC

CITY: CLEVELAND

COUNTY: CUYAHOGA

STATE: OHIO

AUTHORITY HAVING JURISDICTION: DEPARTMENT OF VETERAN AFFAIRS

APPLICABLE CODES AND STANDARDS 2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2023 NFPA 70, NATIONAL ELECTRICAL CODE

2024 NFPA 101, LIFE SAFETY CODE (LSC)

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE

(PG-18-13)

BASIC BUILDING INFORMATION

CONSTRUCTION TYPE (NFPA TABLE 21.1.6.1) EXISTING TYPE I (332) PROPOSED TYPE I (332)

OCCUPANCY CLASSIFICATION (NFPA 6.1.1) EXISTING AMBULATORY HEALTH CARE OCCUPANCIES

MIXED OCCUPANCIES (NFPA6.1.14.3.2) THE BUILDING SHALL COMPLY WITH THE MOST RESTRICTIVE REQUIREMENTS OF THE OCCUPANCIES INVOLVED, UNLESS SPEARATE

SAFEGUARDS ARE APPROVED.

HEIGHT & AREA LIMITATIONS ANALYSIS (IBC TABLE 504.3)

ALLOWABLE HEIGHT: 5 STORIES & 180 FT

ACTUAL HEIGHT (EXISTING): 4 STORIES & 60 FT

ALLOWABLE AREA (IBC TABLE 506.2): UL

ACTUAL BUILDING AREA / FLOOR (EXISTING): 27,725 SQ FT

ALLOWABLE AREA PER OCCUPANT (NFPA TABLE 7.3.1.2): 150 SF

ACTUAL OCCUPANTS: 3RD FLOOR RENOVATION: 11,915 SF ÷ 150 SF PER OCCUPANT = 80 OCCUPANTS

FIRE-RESISTANT BUILDING ELEMENTS NFPA 5000 TABLE 7.2.1.1)

STRUCTURAL FRAME: 3 HOURS

EXTERIOR BEARING WALLS: 3 HOURS

INTERIOR BEARING WALLS: 3 HOURS

INTERIOR NONBEARING WALLS: 0 HOURS

FLOOR CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS: 2 HOURS

ROOF CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS: 1.5 HOURS

EXTERIOR OPENINGS: PROTECTED: NOT REQUIRED

UNPROTECTED: UNLIMITED

PASSIVE FIRE SAFETY FEATURES - TRAVEL DISTANCES

EXIT TRAVEL DISTANCE - WITH SPRINKLERS (NFPA 21.2.6): 200 FT MAXIMUM ALLOWED

ACTUAL EXIT TRAVEL DISTANCES: SEE LIFE SAFETY PLANS

COMMON PATH DISTANCE - WITH SPRINKLERS (NFPA 20.2.5.2.1): 100 FT MAXIMUM ALLOWED

ACTUAL COMMON PATH DISTANCES: SEE LIFE SAFETY PLANS

DEAD END DISTANCE (NFPA 20.2.5.2.1): 50 FT MAXIMUM ALLOWED

ACTUAL DEAD END DISTANCES: SEE LIFE SAFETY PLANS

EXIT CAPACITY:

MINIMUM NUMBER OF EXITS PER FLOOR (NFPA 21.2.4) 3RD FLOOR RENOVATION: 2 EXITS

3RD FLOOR RENOVATION - 80 OCCUPANTS EXITS REQUIRED - 2 EXITS PROVIDED - 2

STAIRWAYS (NFPA TABLE 7.2.2.2.1.1(b))

REQUIRED: 36"

PROVIDED: STAIR 1 = 44"

STAIR 2 = 44"

DOORS (NFPA 7.2.1.2.3.2)

REQUIRED: 32"

PROVIDED: ACTUAL DOOR WIDTHS: SEE LIFE SAFETY PLANS

STAIR ENCLOSURE CONSTRUCTION 2 HR CONSTRUCTION WITH 60 MINUTE OPENING PROTECTIVES

SHAFT ENCLOSURE CONSTRUCTION 2 HR CONSTRUCTION

OCCUPANCY SEPARATION ALL SEPARATION REQUIREMENTS PER NFPA TABLE 6.1.14.1(A & B).

ACTIVE FIRE SAFETY FEATURES

AUTOMATIC SPRINKLER SYSTEM: REQUIRED, PROVIDED THROUGHOUT THE BUILDING

FIRE ALARM SYSTEM: PROVIDED

DETECTION SYSTEM: REQUIRED (NFPA 90A, ASME 17.1)

SMOKE CONTROL SYSTEM: NOT REQUIRED, NOT PROVIDED.

PORTABLE FIRE EXTINGUISHERS: PROVIDED PER NFPA 10. 75' TRAVEL DISTANCE.

EXIT IDENTIFICATION: REQUIRED, PROVIDED

EXIT ILLUMINATION: REQUIRED, PROVIDED

NOTE:

REFER TO THE FIRE ALARM AND FIRE SUPPRESSION ENGINEERING DRAWINGS FOR SPECIFIC

REQUIREMENTS REGARDING SUPPRESSION, DETECTION AND NOTIFICATION SYSTEMS.

INFORMATION ABOVE SHOWN FOR REFERENCE ONLY.

F

F

F F

F

F

F

EXIT SIGN CONNECTED TO LIFE SAFETY POWER (SHADING INDICATES

ILLUMINATED SIDE OF SIGN) (COORDINATE W/ ELECTRICAL)

FIRE EXTINGUISHER CABINET - EXTINGUISHER BY VA

(COORDINATE W/ FIRE MARSHAL)

ONE HOUR SMOKE BARRIER CONSTRUCTION

PATH OF TRAVEL - (FEET)

ONE HOUR FIRE WALL CONSTRUCTION

TWO HOUR FIRE WALL CONSTRUCTION

ONE HOUR FIRE WALL SMOKE BARRIER CONSTRUCTION

FIRE ALARM STROBE - WALL MOUNTED

(COORDINATE W/ FIRE MARSHAL)

X

W

Y

EXIT ACCESS DOOR

W = DOOR CLEAR WIDTH

X = CALCULATED OCCUPANT LOAD

Y = CODE REQUIRED OCCUPANT LOAD

FIRE ALARM STROBE - CEILING MOUNTED

(COORDINATE W/ FIRE MARSHAL)S

50 51 52 53 5453A

M

N

O

K

L

PATH C

PATH A

PATH B

P A

T H

C P

A T

H D

PATH B

137' - 3"

50'-0" MAX DEAD END CORRIDOR

37'-4 7/8"

CHECK IN

3AC322

SC183

CHECK OUT

3AC336

SC183

EKG EXAM

3AC346

CCD01

EXAM 1

3AC345

CCD06

EXAM 2

3AC342

CCD06

PATIENT RR

3AC343

SB201

EXAM 3

3AC341

CCD06

EXAM 10

3AC355

CCD06

EXAM 5

3AC350

CCD06

EXAM 4

3AC340

CCD06

DIALYSIS RR

3AC370A

SB159

DIALYSIS

TRAINING

3AC370

SC273

EXAM 6

3AC354

CCD06

EXAM 7

3AC356

CCD06

LARGE EXAM 1

/ALT EKG EXAM

3AC348

CCD16

EXAM 8

3AC358

CCD06

PATIENT RR

3AC353

SB201

EXAM 9

3AC351

CCD06

EXAM 12

3AC359

CCD06

EXAM 11

3AC357

CCD06LARGE EXAM 2

3AC349

CCD16

SOILED UTILITY

3AC352

SB743

CLEAN SUPPLY

3AC368

SB737

STERILE SUPPLY

3AC374

CS116

MEDICATION

3AC372

SV583

OFFICE -

CARDIOLOGY

3AC369

SS204

BREAK ROOM

3AC367

SS262

LARGE

CONFERENCE

3AC361

SS101

SMALL

CONFERENCE

3AC362

SS101

TEAMING

3AC363

SS218

ELEC

3AC337

H/W ALCOVE

3AC321

STRETCHER

ALCOVE

3AC332

NURSE STATION

3AC347

NURSE STATION

3AC375

NURSE STATION

3AC344

PATIENT

CORRIDOR

3AC339

STAFF CORRIDOR

3AC364

STAFF RR

3AC365

SB191

STAFF RR

3AC366

SB191

LOBBY

3AC310

PATIENT

CORRIDOR

3AC333

CORRIDOR

3AC332

PATIENT

CORRIDOR

3AC320

PATIENT

CORRIDOR

3AC360

PATIENT

CORRIDOR

3AC376

PATIENT

CORRIDOR

3AC338

SCHEDULING

ALCOVE

3AC332A

OIT ROOM

3AC371

ELECTRICAL

ROOM

3AC373

STAIR A

3S1

OIT ROOM

3AC335

JANITORIAL -

HAZARDOUS

ROOM

3AC334

STAIR B

3S3

PROJECT LIMIT LINE

PROJECT LIMIT LINE

P R

O V

ID

E

S P

R

IN

K

LE

R S

A T

W

IN

D O

W S

T O

A

R

IU

M

, R E

F E

R T

O F

IR

E

P R

O T

E C

T

IO

N

D R

A W

IN

G

P R

O V

ID

E

S P

R

IN

K

LE

R S

A T

W

IN

D O

W S

O

A

R

IU

M

, R E

F E

R T

O F

IR

E

P R

O T

E C

T

IO

N

D R

A W

IN

G

PROVIDE SPRINKLERS AT WINDOWS TO

ATRIUM, REFER TO FIRE PROTECTION

DRAWING

44"

44"

S

S

S S

S

S S S

SSS

S S S

S

S

S

S

SS

S S

S S

SS S

S

S

S

S

S

S

S

S

S

S

S

P A

T H

E

P A

T H

E

PATH D

STORAGE

3AC323

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI110

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

LIFE SAFETY PLAN - PROPOSED FINAL CONSTRUCTION DOCUMENT

SUBMISSION

EXIT ACCESS TRAVEL DISTANCE

Path ID Common Path

Distance Allowable Common

Path Actual Travel

Distance Allowable Travel

Distance

A 62' - 1" 75' - 0" 198' - 6" 200' - 0"

B 21' - 9" 75' - 0" 115' - 4" 200' - 0"

C 63' - 4" 75' - 0" 149' - 1" 200' - 0"

D 19' - 5" 75' - 0" 93' - 11" 200' - 0"

E 29' - 8" 75' - 0" 119' - 5" 200' - 0"

GENERAL NOTES

LEGEND

0' 4' 8' 16' 32'

3/16" = 1'-0"G10 LIFE SAFETY THIRD FLOOR PLAN

PLAN

NORTH

ACTUAL

NORTH

A. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. THE HEIGHT OF DOORS SHALL NOT

BE LESS THAN 80 INCHES.

B. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR

ANY SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS TO HAVE PANIC HARDWARE. PANIC

HARDWARE SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. FORCE

REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS.

C. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE

LEVEL.

D. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE

IS PERMITTED IN ANY EGRESS PATHS.

E. SPRINKLERS TO MEET THE REQUIREMENTS OF NFPA 101 8.6.7.1 (C). REFER TO FIRE PROTECTION

DRAWINGS FOR SPRINKLER LOCATIONS.

F. ALL NEW PROPOSED FIRE EXTINGUISHER LOCATIONS ARE DETERMINED BY THE DIRECTION OF THE LOCAL

AUTHORITY.

G. THE INFORMATION CONTAINED IN THESE LIFE SAFETY PLANS ARE IN REFERENCE TO THE PROJECT SCOPE OF WORK (PROJECT LIMIT LINE) CONTAINED IN THE ARCHITECTURAL PLANS. A COMPLETE LIFE SAFETY REVIEW OF THE FACILITY WAS NOT COMPLETED AS PART OF THIS SCOPE OF WORK. AREAS OUTSIDE OF THE SCOPE OF WORK (PROJECT LIMIT LINE) OF THESE DOCUMENTS WERE PROVIDED BY VAMC FOR REFERENCE BY THE DESIGN TEAM AND ARE ASSUMED TO BE ACCURATE AND COMPLETE FOR USE IN THESE CONSTRUCTION DOCUMENTS. COORDINATE WITH VAMC FOR ANY ADDITIONAL LIFE SAFETY

INFORMATION OUTSIDE OF THIS SCOPE OF WORK.

H. REPLACE ANY CEILING TILES REMOVED FOR CONSTRUCTION ACTIVITIES AT THE END OF EACH SHIFT IN

AREAS OUTSIDE OF THE RATED CONSTRUCTION BARRIER.

EXIT SIGN CONNECTED TO LIFE SAFETY POWER (SHADING INDICATES

ILLUMINATED SIDE OF SIGN) (COORDINATE W/ ELECTRICAL)

FIRE EXTINGUISHER CABINET - EXTINGUISHER BY VA

(COORDINATE W/ FIRE MARSHAL)

ONE HOUR SMOKE BARRIER CONSTRUCTION

PATH OF TRAVEL - (FEET)

ONE HOUR FIRE WALL CONSTRUCTION

TWO HOUR FIRE WALL CONSTRUCTION

ONE HOUR FIRE WALL SMOKE BARRIER CONSTRUCTION

FIRE ALARM STROBE - WALL MOUNTED

(COORDINATE W/ FIRE MARSHAL)

X

W

Y

EXIT ACCESS DOOR

W = DOOR CLEAR WIDTH

X = CALCULATED OCCUPANT LOAD

Y = CODE REQUIRED OCCUPANT LOAD

FIRE ALARM STROBE - CEILING MOUNTED

(COORDINATE W/ FIRE MARSHAL)S

50 51 52 53 5453A

M

N

O

K

L

PATH F

PATH F

PROJECT LIMIT LINE

PROJECT LIMIT LINE

44"

S

S

S S

WAITING AREA

3AC313

CORRIDOR

3AC314

AISLE

3AC354

CONFERENCE

3AC344A

CORRIDOR

3AC345

OFFICE 17

3AC342

OFFICE 16

3AC340

OFFICE 19

3AC349

OFFICE 20

3AC350

OIT ROOM

3AC335

JANITORIAL

3AC334

OFFICE 18

3AC348

FILE ROOM

3AC347

WORK ROOM

3AC346

WOMEN

3AC341

MEN

3AC339

OFFICE 14

3AC337

OFFICE 11

3AC334

BREAK ROOM

3AC333

OFFICE 15

3AC338

OFFICE 13

3AC336

OFFICE 12

3AC335

OFFICE 9

3AC332

OFFICE 7

3AC330

RESIDENT

3AC328A

OFFICE 5

3AC327

OFFICE 4

3AC326

OFFICE 3

3AC325

OFFICE 2

3AC324

OFFICE 1

3AC323

OIT ROOM

3AC371

ELECTRICAL

ROOM

3AC373

STAIR A

3S1

OFFICE 8

3AC331

OFFICE 6

3AC329

CONSTRUCTION

ANTEROOM

3AC300T

STAIR B

3S3

LOBBY

3AC310

WAITING

3AC310B

EYE CLINIC

WAITING

3AC210

CORRIDOR

3AC281

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI111

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

LIFE SAFETY PLAN - DURING

CONSTRUCTION

FINAL CONSTRUCTION DOCUMENT

SUBMISSION

EXIT ACCESS TRAVEL DISTANCE

GENERAL NOTES

LEGEND

0' 4' 8' 16' 32'

3/16" = 1'-0"G10 LIFE SAFETY THIRD FLOOR PLAN - CONSTRUCTION

PLAN

NORTH

ACTUAL

NORTH

A. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. THE HEIGHT OF DOORS SHALL NOT

BE LESS THAN 80 INCHES.

B. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR

ANY SPECIAL KNOWLEDGE OR EFFORT. ALL EGRESS DOORS TO HAVE PANIC HARDWARE. PANIC

HARDWARE SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. FORCE

REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS.

C. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE

LEVEL.

D. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO STORAGE

IS PERMITTED IN ANY EGRESS PATHS.

E. SPRINKLERS TO MEET THE REQUIREMENTS OF NFPA 101 8.6.7.1 (C). REFER TO FIRE PROTECTION

DRAWINGS FOR SPRINKLER LOCATIONS.

F. ALL NEW PROPOSED FIRE EXTINGUISHER LOCATIONS ARE DETERMINED BY THE DIRECTION OF THE LOCAL

AUTHORITY.

G. THE INFORMATION CONTAINED IN THESE LIFE SAFETY PLANS ARE IN REFERENCE TO THE PROJECT SCOPE OF WORK (PROJECT LIMIT LINE) CONTAINED IN THE ARCHITECTURAL PLANS. A COMPLETE LIFE SAFETY REVIEW OF THE FACILITY WAS NOT COMPLETED AS PART OF THIS SCOPE OF WORK. AREAS OUTSIDE OF THE SCOPE OF WORK (PROJECT LIMIT LINE) OF THESE DOCUMENTS WERE PROVIDED BY VAMC FOR REFERENCE BY THE DESIGN TEAM AND ARE ASSUMED TO BE ACCURATE AND COMPLETE FOR USE IN THESE CONSTRUCTION DOCUMENTS. COORDINATE WITH VAMC FOR ANY ADDITIONAL LIFE SAFETY

INFORMATION OUTSIDE OF THIS SCOPE OF WORK.

H. REPLACE ANY CEILING TILES REMOVED FOR CONSTRUCTION ACTIVITIES AT THE END OF EACH SHIFT IN

AREAS OUTSIDE OF THE RATED CONSTRUCTION BARRIER.

Path ID Common Path

Distance Allowable Common

Path Actual Travel

Distance Allowable Travel

Distance

F 163' - 4" 75' - 0" 163' - 4" 200' - 0"

* VA OCCUPATIONAL HEALTH & SAFETY (OH&S) SERVICE TO CREATE AN INTERIM LIFE

SAFETY MEASURE (ILSM) TO ADDRESS THE REDUCED MEANS OF EGRESS CAPACITY

AS A RESULT OF STAIR A NOT BEING ACCESSIBLE DURING THE CONSTRUCTION OF

THIS PROJECT

50 51 52 53 5453A

M

N

O

K

L

WAITING AREA

3AC313

CORRIDOR

3AC314

AISLE

3AC354

CONFERENCE

3AC344A

CORRIDOR

3AC345

OFFICE 17

3AC342

OFFICE 16

3AC340

OFFICE 19

3AC349

OFFICE 20

3AC350

OIT ROOM

3AC335

JANITORIAL

3AC334

OFFICE 18

3AC348

FILE ROOM

3AC347

WORK ROOM

3AC346

WOMEN

3AC341

MEN

3AC339

OFFICE 14

3AC337

OFFICE 11

3AC334

BREAK ROOM

3AC333

OFFICE 15

3AC338

OFFICE 13

3AC336

OFFICE 12

3AC335

OFFICE 9

3AC332

OFFICE 7

3AC330

RESIDENT

3AC328A

OFFICE 5

3AC327

OFFICE 4

3AC326

OFFICE 3

3AC325

OFFICE 2

3AC324

OFFICE 1

3AC323

OIT ROOM

3AC371

ELECTRICAL

ROOM

3AC373

STAIR A

3S1

OFFICE 8

3AC331

OFFICE 6

3AC329

CONSTRUCTION

ANTEROOM

3AC300T

PROJECT LIMIT LINE

PROJECT LIMIT LINE

1'-0"

1' -0

'-3

/8

1'- 0"

1' -0

7"

8'-0" 2'-3"

.0

5'-10"

T302

T301

STAIR B

3S3

LOBBY

3AC310

WAITING

3AC310B

EYE CLINIC

WAITING

3AC210

CORRIDOR

3AC281

T2

T2T2

T2

T1

T1

T1

T2

T2

T2

'-1

1/ 4"

10'-1"T2 T2T2

52 53 5453A

N

O

3' -6

12'-9 7/8"

5'-0"

T2

T2T2

T2

T

T

5' -0

" T2

TREATMENT AREA

4AC355

TREATMENT AREA

4AC354

TREATMENT AREA

4AC353

SPD STERILE STORAGE

4AC347

TREATMENT AREA

4AC346

TREATMENT AREA

4AC357

HAC

4AC356

TOILET STAFF

4AC380 LOCKERS/LOUNGE

4AC379

CORRIDOR

4AC370

OFFICE

4AC378

CORRIDOR

4AC350

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI120

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

PHASING PLAN FINAL CONSTRUCTION DOCUMENT

SUBMISSION

GENERAL NOTES

0' 4' 8' 16' 32'

3/16" = 1'-0"G10 PHASING THIRD FLOOR PLAN - PHASE I

A. PROJECT CLASSIFIED AS ICRA LEVEL IV

B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING

CONSTRUCTION.

C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:

SUBMITTAL PHASE: 90 DAYS DAY 001 - 090

PHASE 1: 365 DAYS DAY 091 - 455

D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE

ON WEEKEND HOURS.

E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT. THESE DRAWINGS GRAPHICALLY ILLUSTRATE AND DIMENSION MANUFACTURER’S RECOMMENDED MAINTENANCE CLEARANCES. ON MECHANICAL PROJECTS, COORDINATION DRAWINGS INCLUDE STRUCTURAL STEEL, DUCTWORK, MAJOR PIPING AND ELECTRICAL CONDUIT AND SHOW THE ELEVATIONS AND LOCATIONS OF THE ABOVE COMPONENTS. COORDINATION DRAWINGS TO BE DEVELOPED USING A NAVISWORKS BIM MODEL FOR VIRTUAL CROSS-CHECKING OF

PROJECT DISCIPLINES THROUGHOUT CONSTRUCTION.

F. CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE

OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND

FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS

WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE

NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.

2. CONTRACTOR IS TO HIRE A GLAZER AND REMOVE A WINDOW TO VENT DIRECTLY TO THE OUTSIDE AND

NOT USE EXISTING RETURN AIR OR EXHAUST AIR DUCTWORK FOR NEGATIVE AIR.

3. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST

REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF

CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR

EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST

TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS:

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS

AND LOOSE MATERIAL.

LEVEL II: ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER

SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST

AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO

REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM

5. SEAL DOORS, TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF

TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED

CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT

TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED

CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON

FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA

VACUUMING SURFACES AT LEAST DAILY.

LEVEL III: ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST

EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT

PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING

(OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING

APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.

EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED

EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL

MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT

NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

LEVEL IV: ALL CONTROL MEASURES IN LEVEL I, II, AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL, ANTEROOM MUST BE

LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS

ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK

AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

PLAN

NORTH

ACTUAL

NORTH

3/32" = 1'-0"D10 PHASING FOURTH FLOOR PLAN

KEYNOTES

10 SEAL DOORS FOR CONSTRUCTION SERVICES.

11 PERFORM FOURTH FLOOR CONSTRUCTION OVER WEEKEND HOURS. REOPEN FOURTH FLOOR AREA

AS SOON AS POSSIBLE.

N

O

K

L

1818 1818

ELECTRICAL ROOM

2A102

OIT ROOM

2A103

OFFICE

2A104

EXAM

2A105

EXAM

2A106

EXAM

2A107

EXAM

2A108

OFFICE

2A109

PROCEDURE ROOM

2A117

PROCEDURE ROOM

2A118

EXAM

2A116

EXAM

2A119

EXAM

2A115

EXAM

2A120

EXAM

2A114

EXAM

2A121

EXAM

2A113

EXAM

2A122

JANITOR

2A111

RESTROOM

2A112

RESTROOM

2A123

EXAM

2A124EXAM

2A125EXAM

2A126

EXAM

2A127

EXAM

2A127A

EXAM

2A134A

EXAM

2A134

EXAM

2A136

EXAM

2A138

EXAM

2A137

EXAM

2A135

EXAM

2A133

EXAM

2A132

RESTROOM

2A131A

EXAM

2A131B

EXAM

2A131D BREAK ROOM

2A140

STORAGE

2A142

EXAM

2A131E

PROCEDURE ROOM

2A131F

STORAGE

2A131H

OFFICE

2A146A

OFFICE

2A146B

OFFICE

2A144

OPEN

2A143

OPEN

2A141

LAB

2A110

CORRIDOR

2A102

JANITOR

2A146

PROCEDURE ROOM

2A131I

OFFICE

2A131J

PROCEDURE ROOM

2A131K

EXAM

2A131L

WOMENS RESTROOM

2A192

MENS RESTROOM

2A194

CORRIDOR

2A100F

CORRIDOR

2A100A

CORRIDOR

2A100C

NURSE STATION

2A100E

CORRIDOR

2A100D

CORRIDOR

2A100B

RECEPTION

2A128

RECEPTION

2A130

STAIR A

2S1

WAITING

2A195

WAITING

2A129

WAITING

2A193

STAIR B

2S3

OPEN

2A139

CORRIDOR

2A150

OPEN

2A151

CORRIDOR

2A150A

OPEN

2A152

OPEN

2A139A

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI121

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

PHASING PLAN - PLUMBING ACCESS FINAL CONSTRUCTION DOCUMENT

SUBMISSION

GENERAL NOTES

0' 4' 8' 16' 32'

A. PROJECT CLASSIFIED AS ICRA LEVEL IV

B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING

CONSTRUCTION.

C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:

SUBMITTAL PHASE: 90 DAYS DAY 001 - 090

PHASE 1: 365 DAYS DAY 091 - 455

D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE

ON WEEKEND HOURS.

E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT. THESE DRAWINGS GRAPHICALLY ILLUSTRATE AND DIMENSION MANUFACTURER’S RECOMMENDED MAINTENANCE CLEARANCES. ON MECHANICAL PROJECTS, COORDINATION DRAWINGS INCLUDE STRUCTURAL STEEL, DUCTWORK, MAJOR PIPING AND ELECTRICAL CONDUIT AND SHOW THE ELEVATIONS AND LOCATIONS OF THE ABOVE COMPONENTS. COORDINATION DRAWINGS TO BE DEVELOPED USING A NAVISWORKS BIM MODEL FOR VIRTUAL CROSS-CHECKING OF

PROJECT DISCIPLINES THROUGHOUT CONSTRUCTION.

F. CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE

OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND

FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS

WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE

NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.

2. CONTRACTOR IS TO HIRE A GLAZER AND REMOVE A WINDOW TO VENT DIRECTLY TO THE OUTSIDE AND

NOT USE EXISTING RETURN AIR OR EXHAUST AIR DUCTWORK FOR NEGATIVE AIR.

3. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST

REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF

CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR

EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST

TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS:

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS

AND LOOSE MATERIAL.

LEVEL II: ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER

SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST

AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO

REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM

5. SEAL DOORS, TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF

TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED

CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT

TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED

CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON

FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA

VACUUMING SURFACES AT LEAST DAILY.

LEVEL III: ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST

EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT

PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING

(OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING

APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.

EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED

EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL

MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT

NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

LEVEL IV: ALL CONTROL MEASURES IN LEVEL I, II, AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL, ANTEROOM MUST BE

LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS

ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK

AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

PLAN

NORTH

ACTUAL

NORTH

KEYNOTES

18 REMOVE CEILING TILES AS NECESSARY FOR PLUMBING INSTALLATION. PROTECT EXISTING FINISHES.

PERFORM PLUMBING DEMOLITION AND CONSTRUCTION OVER WEEKEND HOURS. REINSTALL

CEILINGS AND CLEAN WORK AREA PRIOR TO REOPENING SECOND FLOOR AREA FOR BUSINESS

HOURS. PATCH AND REPAIR ALL CEILING ELEMENTS IMPACTED BY CONSTRUCTION.

3/16" = 1'-0"G10 PHASING SECOND FLOOR PLAN - PHASE I

N

O

K

L

PROJECT LIMIT LINE

PROJECT LIMIT LINE

T2

T2

T2

T

T303

CONSTRUCTION

ANTEROOM

3AC301T

LOBBY

3AC310

5' -6

/2

'-8

/4

6'-0"

6' -2

/4

CHECK IN

3AC322

SC183

CHECK OUT

3AC336

SC183

EKG EXAM

3AC346

CCD01

EXAM 1

3AC345

CCD06

EXAM 2

3AC342

CCD06

PATIENT RR

3AC343

SB201

EXAM 3

3AC341

CCD06

EXAM 10

3AC355

CCD06

EXAM 5

3AC350

CCD06

EXAM 4

3AC340

CCD06

DIALYSIS RR

3AC370A

SB159

DIALYSIS

TRAINING

3AC370

SC273

EXAM 6

3AC354

CCD06

EXAM 7

3AC356

CCD06

LARGE EXAM 1

/ALT EKG EXAM

3AC348

CCD16

EXAM 8

3AC358

CCD06

PATIENT RR

3AC353

SB201

EXAM 9

3AC351

CCD06

EXAM 12

3AC359

CCD06

EXAM 11

3AC357

CCD06LARGE EXAM 2

3AC349

CCD16

SOILED UTILITY

3AC352

SB743

CLEAN SUPPLY

3AC368

SB737

STERILE SUPPLY

3AC374

CS116

MEDICATION

3AC372

SV583

OFFICE -

CARDIOLOGY

3AC369

SS204

BREAK ROOM

3AC367

SS262

LARGE

CONFERENCE

3AC361

SS101

SMALL

CONFERENCE

3AC362

SS101

TEAMING

3AC363

SS218

ELEC

3AC337

H/W ALCOVE

3AC321

STRETCHER

ALCOVE

3AC332

NURSE STATION

3AC347

NURSE STATION

3AC375

NURSE STATION

3AC344

PATIENT

CORRIDOR

3AC339

STAFF CORRIDOR

3AC364

STAFF RR

3AC365

SB191

STAFF RR

3AC366

SB191

LOBBY

3AC310

STAIR A

3S1

STAIR B

3S3

OIT ROOM

3AC335

JANITORIAL -

HAZARDOUS

ROOM

3AC334

ELECTRICAL

ROOM

3AC373

OIT ROOM

3AC371

PATIENT

CORRIDOR

3AC333

CORRIDOR

PATIENT

CORRIDOR

3AC320

PATIENT

CORRIDOR

3AC360

PATIENT

CORRIDOR

3AC376

PATIENT

CORRIDOR

3AC338

CORRIDOR

3AC281EYE CLINIC

WAITING

3AC210

WAITING

3AC310B

VENDING

3AC310A

SCHEDULING

ALCOVE

3AC332A

STORAGE

3AC323

Location

Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

REVISIONS: DATE:

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

A

4 3 2 1678910

5 4 3 2 1678910

B

C

D

E

F

G

A

B

C

D

E

F

G

Phase

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

STAMP

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:

Mechanical, Electrical, Plumbing & Technology Engineers:

IMEG Corp.

672 E. Royalton Rd.

Broadview Heights, OH 44147 Phone: 440-546-9696 Cost Estimating:

OCMI, Inc.

1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571

A/E:

L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Elaine Lewis

GI122

541-23-101RENOVATE 3RD FLOOR AMB CARE FOR

SPECIALTY CARE CLINIC

LOUIS STOKES CLEVELAND VAMC

October 1, 2024 BB CM

PHASING PLAN - TILE RECONSTRUCTION FINAL CONSTRUCTION DOCUMENT

SUBMISSION

GENERAL NOTES

0' 4' 8' 16' 32'

3/16" = 1'-0"G10 PHASING THIRD FLOOR PLAN - PHASE II - TILE RECONSTRUCTION

A. PROJECT CLASSIFIED AS ICRA LEVEL IV

B. ENSURE THAT ALL ELECTRICAL AND OIT ROOMS ARE ACCESSIBLE TO VA STAFF AT ALL TIMES DURING

CONSTRUCTION.

C. PHASING DURATIONS AND CONSTRUCTION TIMELINES:

SUBMITTAL PHASE: 90 DAYS DAY 001 - 090

PHASE 1: 365 DAYS DAY 091 - 455

D. COORDINATE MECHANICAL PIPING AND ELECTRICAL WIRING ON OTHER OCCUPIED FLOORS TO BE DONE

ON WEEKEND HOURS.

E. CONTRACTOR TO PROVIDE COMPREHENSIVE COORDINATION DRAWINGS SHOWING THE WORK OF ALL TRADES THAT ARE USED ON THIS PROJECT TO ILLUSTRATE THAT EQUIPMENT/ SYSTEMS CAN BE INSTALLED IN THE SPACE ALLOCATED WITHOUT COMPROMISING EQUIPMENT/ SYSTEM FUNCTION OR ACCESS FOR MAINTENANCE AND REPLACEMENT.