This document appears to be an equipment schedule or bill of materials related to a federal contract opportunity for an MRI Generator UST project at the VA Medical Center in Brockton, MA.
The key details include:
- The MRI system requires specific grounding and electrical wiring configurations to be installed by the contractor, including three major ground points, an integrated electrical cabinet, EPO circuits, and a 480V 3-wire UPS.
- The electrical contractor is responsible for providing wiring as recommended by the manufacturer between the UPS and maintenance bypass sidecar.
- The solicitation number is 36C24124B0030 for project 523A5-24-011 MRI Generator UST at the VAMC Brockton. This is an invitation for bid issued by the Department of Veterans Affairs, Veterans Health Administration, VISN 1.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQ411
MR GROUNDING NOTES
THE INTERNAL GROUND WIRING OF THE MR SYSTEM MUST BE INSTALLED WITH MINIMUM GROUND
LOOPS. THIS IS TO PREVENT NOISE CURRENTS AND GENERAL DISTURBANCES FROM FLOWING
THROUGH THE GROUNDING PATH.
TO ACHIEVE SUCH GROUNDING, THREE MAJOR GROUND POINTS SHOULD BE USED.
EPOEPO
POWER SCHEDULE
ITEM QTY DESCRIPTION
UNLESS OTHERWISE NOTED, ALL ITEMS LISTED IN THIS SCHEDULE SHALL BE SUPPLIED
AND INSTALLED BY CUSTOMER/CONTRACTOR.
EPO
CONTROL
ROOM
EQUIPMENT
ROOM
EXAM
ROOM
RF ROOM -
FILTERS TO BE
FURNISHED AND
INSTALLED BY
SHIELDING
CONTRACTOR
IEC 1 INTEGRATED ELECTRICAL CABINET PROVIDED BY SIEMENS/INSTALLED
SURFACE MOUNTED BY ELECTRICAL CONTRACTOR. REFER TO DETAIL
1/E-102 ON SIEMENS DRAWINGS FOR ADDITIONAL REQUIREMENTS.
NCNC NC
NOTE #1
MR BREAKER
EPO CIRCUIT
POWER SOURCE
NOTE
#3
1) ALL WIRES MUST BE SAME SIZE.
NOTE: UNLESS OTHERWISE NOTED ALL BREAKERS WILL BE 80% RATED.
EPO VARIES NOTE 1 - EPO CIRCUIT #1
PROVIDED BY SIEMENS WITH THE INTEGRATED ELECTRICAL CABINET.
NORMALLY CLOSED. WIRED IN SERIES. INSTALLED BY THE ELECTRICAL
CONTRACTOR. CONNECTED TO IEC CABINET ONLY.
NOTE 2 - EPO CIRCUIT #2
EPO CONTACTS TO BE NORMALLY CLOSED, WIRED IN SERIES,
CONNECTED TO 93PM UPS ONLY.
NOTE 3 - EPO CIRCUIT #3
EPO CONTACTS TO BE NORMALLY CLOSED, WIRED IN SERIES,
CONNECTED TO 93PM POWER CONDITIONER
ONLY.
PC
NCNC NC
UPS
240V IS
APPLIED TO
THIS CIRCUIT
FROM THE UPS
NOTE
#2
EATON 93PM, 480V, 3
WIRE UPS SUPPLIED
BY SIEMENS,
INSTALLED BY
ELECTRICAL
CONTRACTOR
ICB
OCB
A
ELECTRONICS
CABINET
SUPPLIED AND
INSTALLED BY
SIEMENS
IEC
CHILLER
WCH
THE ELECTRICAL CONTRACTOR
SHALL PROVIDE WIRING AS
RECOMMENDED BY THE
MANUFACTURER BETWEEN THE
UPS AND THE MAINTENANCE
BYPASS SIDECAR
FILTER
FILTER
<24"
FILTER
AUXILARY AC POWER FOR EXAMINATION ROOM
TRANSFORMER
THE ELECTRICAL GROUND FOR ANY AUXILARY
EQUIPMENT USED BY THE OWNER MUST BE
ISOLATED FROM THE ELECTRICAL GROUND FOR THE
SIEMENS EQUIPMENT. CONNECTION OF THE GROUND
TO BUILDING STEEL, FOR EXAMPLE, TO THE SIEMENS
EQUIPMENT GROUND IS NOT PERMITTED AND WILL
CAUSE A GROUND LOOP. IF A GROUND LOOP DOES
EXIST THE ELECTRICAL CONTRACTOR WILL HAVE TO
INSTALL AN ISOLATION TRANSFORMER AS
DESCRIBED HERE.
POWER
FACILITY
PROTECTION
AND
OVERCURRENT
POWER
DISTRIBUTION120 VAC
ISOLATION
RF SHIELD
BUS BAR/
GROUND STUD
EQUIPMENT
ROOM
LIGHTS
RECEPTACLES
OTHER AC
WALL
N.T.S.
ELECTRICAL LEGEND
SYM SIZE DESCRIPTION REMARKS
SUPPLIED AND INSTALLED BY
CUSTOMER/CONTRACTOR
AB 3"∅
EPC GPA SEP
B AS REQUIRED
EPO ----
F1 ----
IEC
IN1 AS REQUIRED
IN2 AS REQUIRED
IN3 AS REQUIRED
MRC 4" x 4"
MS AS REQUIRED
PSC AS REQUIRED
SYV ----
UPS AS REQUIRED
WCH AS REQUIRED
CD1 24"x4"
CD2 12"x4"
CD3 24"x4"
HD1 4" x 2"
VD1 10" x 3-1/2"
1 (2) 2"C.
3 3/4"C.
6 2"C.
7 2"C.
8 3/4"C.
10 1"C.
11 (2) 2-1/2"C.
12 1-1/2"C.
13 1/2"C.
15 1"C.
16 2"C.
ON-SITE POWER
DISTRIBUTION PANEL MAIN
GROUND BUS
SIEMENS ELECTRONIC CABINET
(ACC/CCA/ECA)
MAIN GROUND CONNECTION FOR ALL
SYSTEM COMPONENTS
MRC CONSOLE
COOLING EQUIPMENT
(SEP/RCA/EFU)
RF PENETRATION PANEL
RF ROOM
MAGNET
UPS
(OPTIONAL)
EXTERNAL
CHILLER
(OPTIONAL)
ELECTRICAL INSTALLATION NOTES
1) INSTALL THE MR SYSTEM CIRCUIT BREAKER IN OR NEAR THE EQUIPMENT ROOM. THE PERMITTED
FRINGE FIELD FOR THE PANEL
IS UP TO 3mT. IF THE FRINGE FIELDS HAVE HIGHER VALUES, MAGNETIC SHIELDING MUST BE
PROVIDED OR THE DISTANCE FROM THE MAGNET MUST BE INCREASED.
2) AN ACCEPTABLE MEANS FOR SWITCHING MAIN POWER ON AND OFF SHOULD BE INSTALLED IN THE
MAIN BREAKER PANEL. INSTALL EMERGENCY SHUTDOWN BUTTONS IN EACH ROOM WHERE THERE IS
SIEMENS EQUIPMENT.
3) THE ELECTRICAL FEEDER TO THE SIEMENS EQUIPMENT MUST FEED ONLY THE IMAGING SYSTEM
AND BE KEPT SEPARATE FROM ELECTRICAL FEEDERS TO HVAC, MOTORS, PUMPS, COMPRESSORS, ELEVATORS AND OTHER POTENTIAL SOURCES OF ELECTRICAL INTERFERENCE.
4) THE EMERGENCY POWER OFF (EPO) BUTTONS ARE TO BE MUSHROOM TYPE WITH PUSH LOCK AND
PULL TO RELEASE.
5) WALL RECEPTACLES MADE OF FERROMAGNETIC MATERIALS ARE NOT PERMITTED IN THE EXAM
ROOM. PERIPHERAL UNITS (SUCH AS VENTILATORS) NOT APPROVED FOR USE IN A HIGH MAGNETIC
FIELD ENVIRONMENT CAN INFLUENCE THE MAGNETIC FIELD, COMPROMISING IMAGE QUALITY. THE
CUSTOMER IS RESPONSIBLE FOR INSTALLATION AND USE OF RECEPTACLES IN THE EXAM ROOM.
INSTALLATION OF RECEPTACLES AND THE FILTERS REQUIRED ARE TO BE COORDINATED WITH THE
RF SHIELDING SUPPLIER.
6) THE RF SHIELD MUST BE FITTED WITH A GROUND STUD OR BUS BAR, LOCATED WITHIN 24" OF THE
AUXILIARY FILTERS FOR ROOM LIGHTS AND OUTLETS, SUPPLIED AND INSTALLED BY THE RF SHIELD
SUPPLIER.
7) IN ORDER TO PREVENT GROUND LOOPS, ALL CUSTOMER OR CUSTOMER/CONTRACTOR SUPPLIED
AC POWER ENTERING THE EXAMINATION ROOM (I.E. OUTLETS, EPO, ETC.) SHOULD BE SUPPLIED VIA
AN ISOLATION TRANSFORMER. THE ISOLATION TRANSFORMER SECONDARY WINDING GROUND
CONDUCTOR SHOULD BE CONNECTED TO THE RF SHIELD GROUND STUD OR BUS BAR. SEE NOTE 6
ABOVE AND THE AUXILIARY AC POWER FOR EXAMINATION ROOM DETAIL.
CONTRACTOR SUPPLIED CABLES
FROM VIA TO DESCRIPTION REMARKS
EQ411 1 PC 6#4/0 & 2#3 GROUND
PC 2 IEC
IEC 3 EPO 3#12
EPO 4 PC
EPO 5 EPO
3#2/0 & 1#2/0 EQUIPMENT GROUND. TO REDUCE EMI (INTERFERENCE) THE POWER CABLES
MUST BE SHIELDED. THIS CAN BE ACHIEVED BY USING EMT, WHICH IS CONSIDERED A
SHIELDING DEVICE. IF CABLES ARE RUN IN FREE AIR SHIELDED CONDUCTORS MUST BE USED.
IEC 6 EPC
DATA CABLE PROVIDED BY KKT, INSTALLED BY ELECTRICAL CONTRACTOR.
IEC 7 WCH
6'-0" TAILS
POWER REQUIREMENTS
PC ----
WCS AS REQUIRED
CD4 12"x4"
3/4"C.
3/4"C.
3/4"C.
3/4"C.
17 2"C.
18 1"C.
TERMINATED BY ELECTRICAL
CONTRACTOR
3#4 & 1#4 GROUND
EPO 8 UPS
WCH 15 WCS
6#2/0 & 2#3 GROUND
3#12
3#12
3#12
SEE POWER SCHEDULE
NON-FERROUS CONDUIT FROM "PSC" TO "CD1".
NOT TO EXCEED 150'-0"CONDUIT FROM "IN2" TO "IN3" FOR INJECTOR CABLES.
NOT TO EXCEED 30'-0" IN EXAM
ROOM
NOT TO EXCEED 164'-0"
NOT TO EXCEED 15'-0"
NOT TO EXCEED 60'-0"
NOT TO EXCEED 60'-0"
NOT TO EXCEED 60'-0"
MAXIMUM LENGTH 29'-0"
MAXIMUM LENGTH 4'-0"
CONDUIT FROM "IEC" TO "WCH".
SEE POWER SCHEDULE,CONDUIT FROM "IEC" TO END AT "CD3" (EPC) VIA FLEX CONDUIT. THERE MUST BE A DIELECTRIC SEPARATION BETWEEN
THE CONDUIT AND THE CONNECTION AT THE SIEMENS EPC CABINET.
SEE POWER SCHEDULE,CONDUIT FROM "EPO" TO "EPO" TO BE NON-FERROUS WHEN INSIDE THE RF ROOM. ELECTRICAL CONTRACTOR IS TO
PROVIDE RF FILTERS FOR ALL NON-SIEMENS WIRING.
CABLE TRAY
REFER TO SIEMENS DETAIL 2/E-501
ALUMINUM LADDER TRAY, MOUNTED AT HEIGHT COORDINATED WITH SIEMENS PROJECT MANAGER IN EQUIPMENT ROOM MAINTAINING 12" CLEARANCE ABOVE THE TRAY FOR ACCESS. CABLE LADDER IS REQUIRED TO SUPPORT INTERCONNECTING CABLES BETWEEN THE EQUIPMENT ROOM AND THE RF FILTER PANEL (F1). AN 18" MINIMUM CLEARANCE IS REQUIRED BETWEEN THE LADDER TRAY AND THE FILTER PANEL. A 12" SEPARATION BETWEEN CD4 AND
CD3 MUST BE MAINTAINED.
CHILLER REMOTE CONTROL/STATUS
PANEL
PULLBOX MOUNTED FLUSH WITH FINISHED WALL IN LOCATION COORDINATED WITH SIEMENS PROJECT MANAGER, WIRES
ENTER CONTROL PANEL FROM THE BOTTOM.
EATON 93PM POWER CONDITIONERCONDUIT LANDING PLATE ON UPS PER MANUFACTURER'S INFORMATION
NON-FERROUS CONDUIT FROM "IN1" TO RF PENETRATION/FILTER PANEL (LOCATED NEAR "F1"). CABLES RUN FROM INJECTOR AT "IN1" THROUGH RF PENETRATION/FILTER PANEL TO "IN2" IN EQUIPMENT ROOM. COORDINATE EXACT
ELECTRICAL REQUIREMENTS WITH MANUFACTURERS SPECIFICATIONS PRIOR TO ROUH-IN.
CONDUIT FROM "WCH" TO "WCS".
NON-FERROUS CONDUIT FROM "MS" TO ""CD1" (B)
CONDUIT FROM "DS" TO EPC"
CONDUIT FROM "VD1" (AB) TO "EPC".
CONDUITS FROM "VD1" (MRC) TO "EPC".
CONDUIT FROM "UPS" TO "CD3" (EPC).
SURFACE MOUNTED FLEX CONDUIT FROM "UPS" TO SIEMENS PROVIDED UPS/EPO CONTROL BOX.
CONDUIT FROM "EPO" TO "UPS".
SEE POWER SCHEDULE,CONDUIT FROM "EPO" TO "PC".
SEE POWER SCHEDULE,CONDUIT FROM "IEC" TO "EPO"
SEE POWER SCHEDULE,CONDUIT FROM "PC" TO "IEC".
SEE POWER SCHEDULE,CONDUIT FROM EQ411 TO "PC".
VERTICAL DUCT MOUNTED FLUSH WITH FINISHED WALL IN CONTROL AREA FROM ABOVE FINISHED CEILING TO FLOORLINE
PROVIDED WITH REMOVABLE FINISHED COVERS.
WIREMOLD SURFACE MOUNTED ON WALL IN CONTROL AREA AT FLOORLINE AS SHOWN, FINISHED TO MATCH WALLS.
CABLE TRAY
REFER TO SIEMENS DETAIL 2/E-501
ALUMINUM LADDER TRAY, MOUNTED AT HEIGHT COORDINATED WITH SIEMENS PROJECT MANAGER IN EQUIPMENT ROOM MAINTAINING 12" CLEARANCE ABOVE THE TRAY FOR ACCESS. CABLE LADDER IS REQUIRED TO SUPPORT INTERCONNECTING CABLES BETWEEN THE EQUIPMENT ROOM AND THE RF FILTER PANEL (F1). AN 18" MINIMUM CLEARANCE IS REQUIRED BETWEEN THE LADDER TRAY AND THE FILTER PANEL. A 12" SEPARATION BETWEEN CD3 AND
CD4 MUST BE MAINTAINED.
CABLE TRAY
REFER TO SIEMENS DETAIL 2/E-501
ALUMINUM LADDER TRAY, MOUNTED AT HEIGHT COORDINATED WITH SIEMENS PROJECT MANAGER IN EXAM ROOM, MAINTAINING 12" CLEARANCE ABOVE THE TRAY FOR ACCESS. CABLE LADDER IS REQUIRED TO SUPPORT INTERCONNECTING CABLES BETWEEN THE FILTER PANEL AND THE MAGNET. A 15" MINIMUM CLEARANCE IS REQUIRED BETWEEN THE LADDER TRAY AND THE RF FILTER PANEL (F1). WHEN ROUTING ALL RACEWAYS REFER TO DETAIL 2/E-501, ON SIEMENS FINAL APPROVED SITE INSTALLATION DRAWINGS, TAKING CARE SO THAT MAXIMUM CABLE LENGTHS ARE NOT EXCEEDED. A 12" SEPARATION BETWEEN CD2 AND CD1 MUST BE MAINTAINED. DO NOT LOCATE THIS CABLE
TRAY ABOVE THE MAGNET.
CABLE TRAY
REFER TO SIEMENS DETAIL 2/E-501
ALUMINUM LADDER TRAY, MOUNTED AT HEIGHT COORDINATED WITH SIEMENS PROJECT MANAGER, IN THE EXAM ROOM, MAINTAINING 12" CLEARANCE ABOVE THE TRAY FOR ACCESS. CABLE LADDER IS REQUIRED TO SUPPORT INTERCONNECTING CABLES BETWEEN THE FILTER PANEL AND THE MAGNET. A 15" MINIMUM CLEARANCE IS REQUIRED BETWEEN THE LADDER TRAY AND THE RF FILTER PANEL (F1). WHEN ROUTING ALL RACEWAYS REFER TO DETAIL 2/E-501, ON SIEMENS FINAL APPROVED SITE INSTALLATION DRAWINGS, TAKING CARE SO THAT MAXIMUM CABLE LENGTHS ARE NOT EXCEEDED. A 12" SEPARATION BETWEEN CD1 AND CD2 MUST BE MAINTAINED. DO NOT LOCATE THIS CABLE
TRAY ABOVE THE MAGNET.
WATER CHILLERPULLBOX MOUNTED ADJACENT TO WATER CHILLER PROVIDED WITH FLEX-TITE CONDUIT FROM PULLBOX TO KNOCK OUT
PANEL ON CHILLER. COORDINATE WITH SIEMENS PROJECT MANAGER.
EATON 9130 UPSPULL BOX MOUNTED FLUSH WITH FINISHED WALL AT FLOORLINE IN SHOWN LOCATION PROVIDED WITH 2"∅ OPENING IN
FINISHED COVER.
SYNGO VIA SERVERSYNGO VIA SERVER LOCATION PROVIDED WITH (2) ETHERNET CONNECTIONS TO FACILITY NETWORK AND (2) 110 VOLT DUPLEX OUTLETS FED FROM CR211-21 VIA 2#12 & 1#12G., 3/4"C. CONFIRM EXACT LOCATION IN THE FIELD.
PATIENT SUPERVISION CAMERAPULLBOX MOUNTED FLUSH WITH FINISHED WALL REFER TO HEIGHT CHART A-501-3. THE PULLBOX CAN BE MOUNTED AT APPROXIMATELY 5'-0" ABOVE THE FINISHED FLOOR IN MOST CASES, DEPENDING ON THE DISTANCE FROM THE
MAGNET TO THE WALL.
MAGNET STOPNON-FERROUS SINGLE GANG BOX MOUNTED FLUSH WITH FINISHED WALL MOUNTED 6'-0" ABOVE FINISHED FLOOR.
PROVIDE NEATLY FINISHED AND REMOVABLE COVER WITH CABLE EXIT. EXACT LOCATION TO BE COORDINATED WITH THE
ARCHITECT.
HOST COMPUTEROPENING IN FACE OF RACEWAY IN SHOWN LOCATION
INJECTOR CONTROL CONSOLEPULLBOX MOUNTED FLUSH WITH FINISHED WALL IN CONTROL AREA, MOUNTED 2'-0" ABOVE FINISHED FLOOR. PROVIDE NEATLY FINISHED AND REMOVABLE COVER WITH CABLE EXIT. EXACT LOCATION TO BE COORDINATED WITH THE ARCHITECT.
INJECTOR POWER SUPPLYPULLBOX MOUNTED FLUSH WITH FINISHED WALL IN EQUIPMENT ROOM, MOUNTED 2'-0" ABOVE FINISHED FLOOR.
PROVIDE NEATLY FINISHED AND REMOVABLE COVER WITH CABLE EXIT. EXACT LOCATION TO BE COORDINATED WITH THE
ARCHITECT.
INJECTOR - MUST BE LOCATED
OUTSIDE OF 0.5mT FIELD
NON-FERROUS PULLBOX MOUNTED FLUSH WITH FINISHED WALL MOUNTED 2'-0" ABOVE FINISHED FLOOR. PROVIDE NEATLY FINISHED AND REMOVABLE COVER WITH CABLE EXIT. EXACT LOCATION TO BE COORDINATED WITH THE ARCHITECT.
SEE POWER SCHEDULEINTEGRATED ELECTRICAL CABINET SUPPLIED BY SIEMENS/INSTALLED BY ELECTRICAL CONTRACTOR
FILTER PANELSIEMENS RF FILTER PANEL TO BE MOUNTED ON RF SHIELDED WALL
EMERGENCY POWER OFF BUTTONS, SUPPLIED BY SIEMENS/INSTALLED BY ELECTRICAL CONTRACTOR. MOUNTED WITH CENTERLINE AT 5'-0" ABOVE FINISHED FLOOR. ALL PARTS ARE TO BE NONFERROUS INSIDE THE RF ROOM. EXACT
LOCATIONS ARE TO BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH-IN
MAGNET CABLE ACCESSLOCATION FOR CABLES TO DROP OUT OF BOTTOM OF RACEWAY.
ELECTRONICS CABINETSLOCATION FOR CABLES TO DROP OUT OF BOTTOM OF RACEWAY.
ALARM BOXOPENING IN FACE OF VERTICAL DUCT 5'-0" ABOVE FINISHED FLOOR IN LOCATION TO BE COORDINATED WITH THE
ARCHITECT.
A
CHILLER BREAKER SIZE
(B)
A kVA kVA
9.35 kW/1.8kW
ALL BREAKERS ARE RATED AT
80%
MR SYSTEM BREAKER SIZE
(A)
MOMENTARY
POWER
CONNECTION
VALUE
READY FOR MEASUREMENT/ PLUS
SEP
LINE IMPEDENCE: <140
mOHMS
FREQUENCY: 60 Hz ± 1.0 Hz
VOLTAGE VARIATION:480 VAC ±10% FOR ALL LINE AND LOAD
CONDITIONSVOLTAGE UNBALANCE: 2% MAXIMUM DIFFERENCE BETWEEN
PHASES
(2) 2"C.
(2) 2"C. UNDER SLAB
(2) 2"C. UNDER SLAB
J
J
P R
PR
RE
R E
G
5 7
H
J
K
F
DS
CD1
PSC
CD2
AB MR
C
VD1
IN3
HD1
MS
WCS
EPO
EP
O
FACILITY
POWER
SOURCE
IEC
EP
O
UPS
CD3
CD3
SEPGP
A
EPCIN2
PC
IN1
16F1
CR211-4
'X-RAY-IN-USE'
WARNING LIGHT
PROVIDED BY
E.C.
R. W. Sullivan Engineering
Phone: (617) 523-8227
MEP / FP Engineering . Code . Commissioning www.rwsullivan.com
The Schrafft Center, 529 Main St., Suite 203 Boston, Massachusetts 02129-1107
RWS JOB # 11675.00
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
(860) 563-6164
WETHERSFIELD, CT. 06109
30 JORDAN LANE
architects nelson pilon moser
Revisions: Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of 114
1 - 100% CONSTRUCTION DOCUMENT SUBMISSION 04/08/2016
AS-BUILT
"FULLY SPRINKLERED"
ELECTRICAL MRI ROOM
EQUIPMENT PLAN
E2.03
02/12/2016 AR AR
BUILDING 3
MRI/CT Radiation Addition
Boston Healthcare System - Brockton Campus
523-398
940 Belmont Street Brockton, MA 02301
MRI ROOM PART
PLAN
WCH
CHILLER LOCATED
ON ROOF
2 - BULLETIN #1 02/25/2019
3 - BULLETIN #1R 04/12/2019
Jim Bell Stamp
| G0.1.pdf |
| G0.0.pdf |
| G1.1.pdf |
| G1.2.pdf |
| AD1.1.pdf |
| AD1.2.pdf |
| AD1.2A.pdf |
| AD1.3.pdf |
| A0.0.pdf |
| A1.1.pdf |
| A1.2.pdf |
| A1.2A.pdf |
| A1.3.pdf |
| A2.1.pdf |
| A2.1A.pdf |
| A3.1.pdf |
| A3.2.pdf |
| A4.1.pdf |
| A4.2.pdf |
| A5.1.pdf |
| A6.1.pdf |
| A6.2.pdf |
| A6.3.pdf |
| A6.4.pdf |
| A7.1.pdf |
| A7.2.pdf |
| A7.3.pdf |
| A8.1.pdf |
| A8.2.pdf |
| A9.1.pdf |
| F1.0.pdf |
| F1.1.pdf |
| F1.2.pdf |
| FE1.1.pdf |
| FE1.2.pdf |
| 12-036 VA Boston Healthcare_Signed and Sealed.pdf |
| Sheets |
| S1.0 - Cover Sheet / Design Data |
| S1.1 - Level 1 Foundation Plan |
| S1.2 - Level 2 Floor Framing Plan |
| S1.3 - Level 3 Roof and Penthouse Framing Plan |
| S2.0 - Typical Foundation Details |
| S2.1 - Foundation Details |
| S2.2 - Foundation Details |
| S2.3 - Foundation Details |
| S3.1 - Framing Details |
| S3.2 - Framing Details |
| S3.3 - Framing Details |
| S4.0 - Moment Frame Elevations and Steel Framing Details |
| S5.1 - Column Schedule and Notes, Typical Details, and Base Plate Details |
| S6.1 - FIELD REPAIRS |
| FP As-Builts Stamped Signed.pdf |
| Sheets |
| FP1.01 - LEVEL 1 FIRE PROTECTION PLAN |
| FP1.02 - LEVEL 2 FIRE PROTECTION PLAN |
| Plumb As-Builts Stamped Signed.pdf |
| 11675-00-PLUM-V19_kma |
| P1.00 - PLUMBING UNDERGROUND PLAN |
| P1.00 - PLUMBING UNDERGROUND PLAN |
| P1.01 - LEVEL 1 PLUMBING PLAN |
| P1.00 - PLUMBING UNDERGROUND PLAN |
| P1.01 - LEVEL 1 PLUMBING PLAN |
| P1.02 - LEVEL 2 PLUMBING PLAN |
| P1.00 - PLUMBING UNDERGROUND PLAN |
| P1.01 - LEVEL 1 PLUMBING PLAN |
| P1.02 - LEVEL 2 PLUMBING PLAN |
| P1.03 - ROOF DECK LEVEL PLUMBING PLAN |
| 11675-00_P2.01_BASEMENT |
| Sheets and Views |
| 11675-00_P2.01_BASEMENT-30x42 |
| HVAC As-Builts Stamped Signed.pdf |
| 11675-00_H0-01_Legend-H0-01_30x42 |
| Sheets and Views |
| 11675-00_H0-01_Legend-H0-01_30x42 |
| 11675-00_H0-02_Schedules-H0-02_30x42 |
| Sheets and Views |
| 11675-00_H0-02_Schedules-H0-02_30x42 |
| 11675-00_H0-03_Chilled Water Piping Schematic-H0-03_30x42 |
| Sheets and Views |
| 11675-00_H0-03_Chilled Water Piping Schematic-H0-03_30x42 |
| 11675-00_H0-04-H0-05_Details-H0-04_30x42 |
| Sheets and Views |
| 11675-00_H0-04-H0-05_Details-H0-04_30x42 |
| 11675-00_H0-04-H0-05_Details-H0-05_30x42 |
| Sheets and Views |
| 11675-00_H0-04-H0-05_Details-H0-05_30x42 |
| 11675-00_H0-04-H0-05_Details-H0-06_30x42 |
| Sheets and Views |
| 11675-00_H0-04-H0-05_Details-H0-06_30x42 |
| 11675-00_H0-04-H0-05_Details-H0-07_30x42 |
| Sheets and Views |
| 11675-00_H0-04-H0-05_Details-H0-07_30x42 |
| 11675-00-HVAC-V19_do - Sheet - H1-01 - HVAC LEVEL 1 DUCTWORK PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H1-02 - HVAC LEVEL 2 DUCTWORK PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H1-03 - HVAC ROOF DUCTWORK PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H1-03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H2-00 - HVAC BASEMENT PIPING PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H2-01 - HVAC LEVEL 1 PIPING PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H2-02 - HVAC LEVEL 2 PIPING PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H2-03 - HVAC ROOF PIPING PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H2-03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00_H3-00_Control Legend-H3-00_30x42 |
| Sheets and Views |
| 11675-00_H3-00_Control Legend-H3-00_30x42 |
| 11675-00_H3-00_Control Legend-H3-01_30x42 |
| Sheets and Views |
| 11675-00_H3-00_Control Legend-H3-01_30x42 |
| 11675-00_H3-00_Control Legend-H3-02_30x42 |
| Sheets and Views |
| 11675-00_H3-00_Control Legend-H3-02_30x42 |
| 11675-00-HVAC-V19_do - Sheet - H4-00 - HVAC SITE PLAN |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H4-01 - HVAC GENERATOR & FUEL OIL DETAILS |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| 11675-00-HVAC-V19_do - Sheet - H4-02 - HVAC Schematic |
| Sheets |
| H1.01 - HVAC LEVEL 1 DUCTWORK PLAN |
| H1.02 - HVAC LEVEL 2 DUCTWORK PLAN |
| H1.03 - HVAC ROOF DUCTWORK PLAN |
| H1.03A - HVAC DEDUCT ALTERNATE ROOF DUCTWORK PLAN |
| H2.00 - HVAC BASEMENT PIPING PLAN |
| H2.01 - HVAC LEVEL 1 PIPING PLAN |
| H2.02 - HVAC LEVEL 2 PIPING PLAN |
| H2.03 - HVAC ROOF PIPING PLAN |
| H2.03A - HVAC DEDUCT ALTERNATE ROOF PIPING PLAN |
| H4.00 - HVAC SITE PLAN |
| H4.01 - HVAC GENERATOR & FUEL OIL DETAILS |
| H4.02 - HVAC Schematic |
| ELEC As-Builts Stamped Signed.pdf |
| Sheets |
| E0.00 - ELECTRICAL LEGEND AND GENERAL NOTES |
| E0.01 - ELECTRICAL SITE PLAN AND DETAILS |
| E0.02 - ELECTRICAL SITE DETAILS |
| E1.00 - ELECTRICAL LIGHTING LEVEL 1 PLAN |
| E1.01 - ELECTRICAL LIGHTING LEVEL 2 PLAN |
| E2.00 - ELECTRICAL POWER LEVEL 1 PLAN |
| E2.01 - ELECTRICAL POWER LEVEL 2 PLAN |
| E2.02 - ELECTRICAL POWER ROOF PLAN |
| E2.03 - ELECTRICAL MRI ROOM EQUIPMENT PLAN |
| E2.04 - ELECTRICAL CT SCAN ROOM EQUIPMENT PLAN |
| E2.05 - ELECTRICAL MAMMOGRAPHY/X-RAY EQUIPMENT PLANS |
| E3.00 - ELECTRICAL LOW VOLTAGE/SIGNAL LEVEL 1 PLAN |
| E3.01 - ELECTRICAL LOW VOLTAGE/SIGNAL LEVEL 2 PLAN |
| E4.00 - ELECTRICAL POWER RISER AND SCHEDULES |
| E4.01 - ELECTRICAL CAMPUS ONE-LINE |
| E4.02 - ELECTRICAL LOW VOLTAGE/SIGNAL RISERS |
| E5.00 - ELECTRICAL SCHEDULES |
| E5.01 - ELECTRICAL SCHEDULES |
| E6.00 - ELECTRICAL DETAILS |
| E6.01 - ELECTRICAL DETAILS |
| FA0.00 - FIRE ALARM LEGEND, GENERAL NOTES, RISER AND DETAILS |
| FA1.00 - FIRE ALARM LEVEL 1 PLAN |
| FA1.01 - FIRE ALARM LEVEL 2 PLAN |
| Sheets and Views |
| C1.0 |
| Sheets and Views |
| C1.1 |
| Sheets and Views |
| C1.2 |
| Sheets and Views |
| C1.3 |
| Sheets and Views |
| C1.4 |
| Sheets and Views |
| LP-101 |
| Sheets and Views |
| C3.0 |
| OLE1 |
| Sheets and Views |
| C3.1 |
| OLE1 |
| Sheets and Views |
| ASB1.0A |
| Sheets and Views |
| ASB1.0 |
| Sheets and Views |
| ASB1.1 |
| Sheets and Views |
| ASB1.2 |
| Sheets and Views |
| ASB1.3 |
| 11675-00-FP-V19_rla |
| FP0.00 - FIRE PROTECTION Legend |
| FP1.01 - LEVEL 1 FIRE PROTECTION PLAN |
| FP1.02 - LEVEL 2 FIRE PROTECTION PLAN |
| FP2.00 - FIRE PROTECTION SCHEMATIC |
| 11675-00-FP-V19_rla |
| FP0.00 - FIRE PROTECTION Legend |
| FP1.01 - LEVEL 1 FIRE PROTECTION PLAN |
| FP1.02 - LEVEL 2 FIRE PROTECTION PLAN |
| FP2.00 - FIRE PROTECTION SCHEMATIC |
| 11675-00-PLUM-V19_rla |
| P0.00 - PLUMBING LEGEND |
| P1.00 - PLUMBING UNDERGROUND PLAN |
| P1.01 - LEVEL 1 PLUMBING PLAN |
| P1.02 - LEVEL 2 PLUMBING PLAN |
| P1.03 - ROOF DECK LEVEL PLUMBING PLAN |
| P2.00 - PLUMBING SCHEMATIC |
| P2.01 - PLUMBING BASEMENT |
| Sheets and Views |
| Layout1 |
| 1-ASI-18-R3 |
| TELECOM |
| 2-ASI-18-2 |
| TELECOM 2 |
| 11675-00-ELEC-V15_ajr - Sheet - E2-01 - ELECTRICAL POWER LEVEL 2 PLAN |
| 11675-00-ELEC-V15_ajr - Sheet - E5-01 - ELECTRICAL SCHEDULES |
| 1-ASI-18-R3 |
| TELECOM |
| 2-ASI-18-2 |
| TELECOM 2 |
| 11675-00-ELEC-V15_ajr - Sheet - E2-01 - ELECTRICAL POWER LEVEL 2 PLAN |
| 11675-00-ELEC-V15_ajr - Sheet - E5-01 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .