This document is the Installation and Operation Manual for the Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (SIAC-B). It provides detailed instructions for the installation and setup of the SIAC-B, which is a field-installed accessory cabinet that integrates with the Eaton 93PM uninterruptible power supply (UPS). The manual covers site preparation requirements, mechanical installation, electrical connections, and power wiring for the SIAC-B. It includes specifications such as dimensional drawings, weight, clearance, and environmental considerations. The document also contains wiring diagrams, terminal block details, and recommended installation parts and tools. This manual is intended to be used in conjunction with the applicable Eaton 93PM UPS Installation and Operation manual during the installation of the SIAC-B.

The related federal contract opportunity is an invitation for bid for project 523A5-24-011 MRI Generator UST at the VAMC Brockton located in Brockton, MA. The solicitation is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. No additional details about the products or services required, response dates, award dates, pricing terms, set asides, incumbents, or other salient information are provided in the given materials.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eaton

180 k ® 93PM Maintenance Bypass Sidecar (SAIC-B) W Three-Wire Installation Information

Chapter 3 Installation Plan and Unpacking

This chapter includes planning for the Eaton 93PM 180 kW Sidecar Integrated Accessory Cabinet-Bypass

(SIAC-B).

Use the following basic sequence of steps to install the SIAC-B:

1. Create an installation plan for the SIAC-B.

2. Prepare your site for the SIAC-B.

3. Inspect and unpack the SIAC-B (refer to the applicable Eaton 93PM UPS Installation and Operation manual for inspection and unpacking instructions).

4. Unload and install the SIAC-B (refer to the applicable Eaton 93PM UPS Installation and Operation manual for inspection and unpacking instructions).

5. Externally wire the SIAC-B.

6. Have authorized service personnel perform preliminary operational checks and start up the system.

3.1 Creating an Installation Plan

Before installing the SIAC-B, read and understand how this manual applies to the system being installed. Use the procedures and illustrations in this section to create a logical plan for installing the SIAC-B.

3.2 Preparing the Site

For the UPS system to operate at peak efficiency, the installation site should meet the environmental parameters outlined in this manual. The operating environment must meet the weight, clearance, and environmental requirements specified for the applicable accessory cabinet. Specifications subject to change.

3.2.1 Environmental and Installation Considerations

The UPS system installation, including the SIAC-B, must meet the following guidelines:

● The system must be installed on a level floor suitable for computer or electronic equipment.

● The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional assistance with high altitude operation, contact an Eaton service representative.

● The system must be installed in a temperature and humidity controlled indoor area free of conductive contaminants.

Failure to follow guidelines may void your warranty.

NOTE

NOTE Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the warranty terms become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.

The SIAC-B is attached to and directly integrated with the UPS cabinet after field installation on site. This section must be used along with the applicable Eaton 93PM UPS Installation and Operation manual during installation planning and unpacking.

The basic environmental requirements for operation of the SIAC-B are:

Ambient Temperature Range: 5–40C (41–104F)

Recommended Operating Range: 5–40C (41–104F)

● Maximum Relative Humidity: 95%, noncondensing 3-1

Installation Plan and Unpacking The SIAC-B operating environment must meet the weight requirements shown in Table 3-1. The SIAC-B size requirements are shown in Figure 3-4 through Figure 3-6. Dimensions are in millimeters (inches).

The clearances required around the SIAC-B are the same as the attached UPS.

Table 3-1. SIAC-B Cabinet Weights

Model

Weight kg (lb)

Shipping Installed Point Loading

Eaton 93PM-180-4 Three-Wire UPS with Right-Mounted Three-Wire SIAC-B (2-Breaker) 815 (1795) 781 (1721) 8 at 98 (216)

Eaton 93PM-180-4 Three-Wire UPS with Right-Mounted Three-Wire SIAC-B (3, 4-Breaker) 828 (1825) 794 (1751) 8 at 100 (220)

Figure 3-4. Eaton 93PM 180 kW UPS with 93PM 180 kW SIAC-B Dimensions (Front View)

Dimensions are in millimeters [inches]

UPS with Right-Mounted SIAC-B 3-2

E0069194 Highlight

E0069194 Highlight

Figure 3-5. Eaton 93PM 180 kW UPS with 93PM 180 kW SIAC-B Dimensions (Top and Bottom Views)

UPS with Right-Mounted SIAC-B

Bottom View

Front

Front Top View

Dimensions are in millimeters [inches] 3-3

F

NOTE The 93PM 180 kW UPS is shown with a left-mounted SIAC-B. An UPS with a right-mounted SIAC-B is the mirror image.

igure 3-6. Eaton 93PM 180 kW UPS with Left-Mounted 93PM 180 kW SIAC-B – Center of Gravity

Dimensions are in millimeters [inches]

Weight and Center of Gravity with Right-Mounted 200 kW Three-Wire SIAC-B (letters A, B, and C map to Figure 3-6)

A mm (in)

B mm (in)

C mm (in)

Installed Weight kg (lb)

Eaton 93PM-180-4 UPS with 2-Breaker SIAC-B 970 (38.2) 559 (22.0) 517 (20.4) 781 (1721)

Eaton 93PM-180-4 UPS with 3, 4-Breaker SIAC-B 974 (38.3) 566 (22.3) 522 (20.6) 794 (1751) 3-9

E0069194 Highlight

E0069194 Highlight

3.2.2 Floor Mounting Brackets

Floor mounting brackets are optionally available to secure the UPS and SIAC-B to the facility floor. Figure 3-8 shows the mounting hole locations for the brackets.

Figure 3-8. Eaton 93PM 180 kW UPS Cabinet with SIAC-B Front and Rear Floor Mounting Bracket Mounting Dimensions

Dimensions are in millimeters [inches]

UPS with SIAC-B – Rear View

NOTE The 93PM 180 kW UPS is shown with a left-mounted SIAC-B. An UPS with a right-mounted SIAC-B is the mirror image.

3-12

3.2.3 SIAC-B Power Wiring Preparation

Read and understand the following notes while planning and performing the installation:

WARNING

As a result of the connected loads high leakage current is possible. Connection to earth ground is required for safety and proper product operation. Do not check SIAC-B operation by any action that includes removal of the earth (ground) connection with loads attached.

● Refer to national and local electrical codes for acceptable external wiring practices.

● For external wiring, use 75°C copper wire. Wire sizes listed in Table 3-2 are for copper wiring only. If wire is run in an ambient temperature greater than 40°C, higher temperature wire and/or larger size wire may be necessary. Wire sizes are based on using the specified breakers.

● Recommended wire sizes are based on NFPA National Electrical Code® (NEC®)70 Table 310.15(B)(16) 75°C ampacity with 40°C ambient correction factors.

● Three-wire SIAC-B models do not use a neutral.

● Refer to NEC Article 250 and local codes for proper grounding practices.

● Phase rotation must be clockwise starting with phase A (rotation A,B,C).

● Per NEC Article 300-20(a), all three-phase conductors must be run in the same conduit. A ground wire must be run in the same conduit as the phase conductors.

● Conduit is to be sized to accommodate three phase conductors and one ground conductor.

● Refer to the appropriate Eaton 93PM UPS Installation and Operation manual for UPS cabinet conduit and terminal specifications and locations.

● Material and labor for external wiring requirements are to be provided by the customer.

● If installing an external maintenance bypass, all feeds to the UPS must have a service disconnect independent of the maintenance bypass power path. Most maintenance bypass solutions provide UPS input feeds derived from but isolated from the maintenance bypass power path. If the maintenance bypass solution being installed does not provide such functionality, DO NOT use a single feeder breaker to supply both the UPS and the maintenance bypass.

● The term line-up-and-match refers to accessory cabinets that are physically located adjacent to the UPS. The term standalone refers to accessory cabinets that are located separate from the UPS.

3-14

T

A

A

B

For three-wire SIAC-B external power wiring requirements, including the minimum AWG size of external wiring, see Table 3-2. Wire sizes listed are for copper wiring only.

Table 3-2. External Power Wiring Requirements for the Eaton 93PM 93PM 180 kW Three-Wire SIAC-B

– Three Breaker Maintenance Bypass

Basic Unit Rating

Units Rating 60 Hz kW 180

Input/Output Voltage Volts 480/480

AC Input to Maintenance Bypass

(3) Phases, (1) Ground A

Maximum Amps 266

Minimum Conductor Size (Phase A, B, and C) Number per Phase

AWG or kcmil (each)

4/0 (2)

Minimum Conductor Size (Ground) Number per Phase

AWG or kcmil

(each)

(1)

AC Output to Critical Load Full Load Current

(3) Phases, (1) Ground C

Maximum Amps 217

Minimum Conductor Size (Phase A, B, and C) Number per Phase

AWG or kcmil (each)

2/0 (2)

Minimum Conductor Size (Ground) Number per Phase

AWG or kcmil

(each)

(1)

Building and Inter-Cabinet Ground Minimum Conductor Size (Ground) Number per Phase

— AWG or kcmil (each)

(1)

NOTE Callout letters A and C map to Figure 5-5.

Power wiring terminals E6 through E11 for the 93PM 180 kW Three-Wire SIAC-B are 2-hole bus bar mountings for standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are UL and CSA rated. See Table 3-8 for external power cable terminations, Table 3-10 for supplied external wiring terminal hardware, and Table 3-11 for recommended installation parts and tools not supplied by Eaton.

Figure 4-20 shows the location of the SIAC-B power cable terminals.

able 3-8. External Input Power Cable Terminations for the Eaton 93PM 180 kW Three-Wire SIAC-B

Terminal Function Terminal Function

Number and Size of Pressure Termination

(AWG or kcmil) Tightening Torque

Nm (lb ft) Size Screw and Type

C Input to Maintenance Bypass – Source 2 E6 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex Bolt

E7 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex Bolt

E8 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex Bolt

C Output to Critical Load E9 Phase A 2 – 2 bolt mounting 35 (26) M12 Hex Bolt

E10 Phase B 2 – 2 bolt mounting 35 (26) M12 Hex Bolt

E11 Phase C 2 – 2 bolt mounting 35 (26) M12 Hex Bolt uilding, Inter-Cabinet, and Load Ground TBG Ground 4 – #14–1/0 5.1 Nm (45 lb in) Slotted 3-15

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

3.2.4 SIAC-B Interface Wiring Preparation

Control wiring for features and options should be connected at the customer interface terminal block located inside the SIAC-B.

WARNING

Do not directly connect relay contacts to the mains related circuits. Reinforced insulation to the mains is required.

Read and understand the following notes while planning and performing the installation:

● Use Class 1 wiring methods (as defined by the NEC) for interface wiring from 30V to 600V. The wire should be rated for 600V, 1A minimum. 12 AWG maximum wire size.

● Use Class 2 wiring methods (as defined by the NEC) for interface wiring up to 30V. The wire should be rated for 24V, 1A minimum.

● Use twisted-pair wires for each input and return or common.

● All interface wiring and conduit is to be supplied by the customer.

● Interface wiring can be installed using the inter-cabinet wiring access pass-through or by routing wiring through conduit between cabinets.

● Install the interface wiring in separate conduit from the power wiring.

Table 3-10. Supplied External Wiring Terminal Hardware Kit

Part Size Quantity Terminal Used On Eaton Part Number

Bolt, Grade 5 M12 x 35 mm 12 – Three-Wire Bypass Input and Output to Critical Load 180500250-110

Flat Washer M12 12 – Three-Wire Bypass Input and Output to Critical Load 180500036-120

Conical Washer M12 12 – Three-Wire Bypass Input and Output to Critical Load 180500037-120

Nut M12 12 – Three-Wire Bypass Input and Output to Critical Load 180500157-006

Table 3-11. Recommended Installation Parts and Tools (Not Supplied by Eaton)

Part Size Quantity Manufacturer Part Number Notes

Long Barrel 2-Hole Lug

2/0 AWG

As Required

Thomas & Betts

54862BE

Copper wire only

3/0 AWG 54864BE

4/0 AWG 54866BE

250 MCM 54868BE

300 MCM 54870BE

Manual Hydraulic Crimp Tool 14 Ton 1 TBM14M

Die Set N/A 1 15506 3-21

3.3 Inspecting and Unpacking the SIAC-B

The SIAC-B is field installed on site. The field installed SIAC-B is shipped bolted to a separate metal and wood pallet (see Figure 3-11) with outer protective packaging material covering the cabinet. Refer to the applicable Eaton 93PM UPS Installation and Operation manual for inspection and unpacking instructions.

Figure 3-11. Eaton 93PM Field Installed SIAC-B as Shipped on Pallet 3-22

Chapter 4 Installation

This chapter includes installation instructions for the Eaton 93PM 180 kW Sidecar Integrated Accessory Cabinet-Bypass (SIAC-B).

4.1 Preliminary Installation Information

WARNING

Installation should be performed only by qualified personnel.

Refer to the following while installing the SIAC-B:

● Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.

● Do not tilt the cabinets more than ±10° during installation.

4.2 Unloading the Field Installed SIAC-B from the Pallet

The SIAC-B is bolted to a pallet consisting of four metal angle supports secured to two wood supports and four vertical braces.

WARNING

The SIAC-B is heavy (approximately 220 kgs/486 lbs). If unpacking and unloading instructions are not closely followed, the cabinet may tip and cause serious injury.

CAUTION

● Do not tilt cabinet more than 10° from vertical.

● Lift the cabinet only with a forklift or damage may occur.

NOTE The SIAC-B is attached to and directly integrated with the UPS cabinet after field installation on site. This section must be used along with the applicable Eaton 93PM UPS Installation and Operation manual during installation.

4-1

Installation To remove the pallet:

1. If not already accomplished, use a forklift or pallet jack to move the SIAC-B to the installation area, or as close as possible, before unloading from the pallet. Insert the forklift or pallet jack forks between the supports on the bottom of the pallet.

2. Remove the screw securing the bottom of the SIAC-B front panel. Lift the panel straight up to remove it from the panel hanger bracket at the top of the cabinet. Retain screw for later use.

3. Locate the four 1/2" jacking bolts from the parts kit and install them in the threaded holes in the front and rear supports as shown in Figure 4-1. Place a floor protector from the parts kit underneath each jacking bolt, and screw the bolts down against them.

The floor protectors protect the floor from being marred by the jacking bolts.

Figure 4-1. Removing the Pallet Skids and Supports – Eaton 93PM Field Installed SIAC-B

NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (approximately 220 kgs/486 lbs).

Cabinet Mounting Bolts (2 places front) (2 places rear)

Pallet Skid

Skid Mounting Bolts (4 places front) (4 places rear)

Floor Protectors (2 places front) (2 places rear)

Right Side Cabinet Support

Rear Cabinet Support

Jacking Bolts (2 places front) (2 places rear)

Front Cabinet Support

Cabinet Support Bolts (2 places at each corner)

Left Side Cabinet Support

Shipping Brace (2 places front) (2 places rear)

Shipping Brace Mounting Bolts (2 places front) (2 places rear)

Shipping Brace Mounting Screws (2 places front) (2 places rear)

Cabinet Side Wheels (2 places left side) (2 places right side) 4-2

WARNING

Do not remove or loosen the cabinet mounting or cabinet support bolts until instructed.

4. Loosen, but do not remove, the skid mounting bolts holding the pallet skids to the front and rear supports, and to the left and right side supports (see Figure 4-1).

WARNING

RISK OF INSTABILITY. Turning the jacking bolts unevenly may cause the cabinet to become unbalanced. To prevent tipping the cabinet, raise and lower the jacking bolts evenly.

CAUTION

CABINET MAY TIP. Raise the SIAC-B no more than 3 mm (1/8") above the floor (just enough to allow the removal of the pallet skids).

5. Turn each jacking bolt consecutively, two full turns, until the pallet skids clear the floor by approximately 3 mm (1/8").

6. Remove the hardware loosened in Step 4.

7. Pull the pallet skids out from under the metal angle supports without disturbing the jacking bolts. Recycle the pallet skids and hardware in a responsible manner.

CAUTION

CABINET MAY FALL. Do not loosen the hardware attaching the front supports to the cabinet base.

The cabinet must be lowered by the jacking bolts before the supports can be removed.

8. Carefully and evenly lower the cabinet by turning each jacking bolt consecutively two full turns

(maximum) until the cabinet side wheels contact the floor and the cabinet is no longer supported by the jacking bolts.

9. After the SIAC-B is resting on the floor, remove the jacking bolts and floor protectors. Recycle them in a responsible manner.

10. Remove the shipping brace screws securing the front left and right shipping braces to the cabinet (see Figure 4-1). Do not reinstall screws. Recycle the screws in a responsible manner.

11. Remove the bolts securing the front left and right shipping braces to the front cabinet support (see Figure 4-1). Remove the braces.

12. Remove the screws securing the back left and right shipping braces to the cabinet (see Figure 4-1).

Reinstall the screws (without the nylon washers) to secure the rear panel to the frame.

13. Remove the bolts securing the back left and right shipping braces to the rear cabinet support (see Figure 4-1). Remove the braces.

14. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together and remove the side supports (see Figure 4-1).

15. Remove the cabinet mounting bolts holding the front and rear supports to the cabinet base (see Figure 4-1).

16. Recycle the bolts along with the shipping braces and support brackets in a responsible manner.

17. Reinstall the SIAC-B front panel and secure with retained screw.

4-3

18. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinet as possible.

T

CAUTION

To prevent tipping when rolling the cabinet and damage to the front door, push the cabinet from the rear whenever possible. Do not push the cabinet from the sides.

19. Roll the cabinet close to the final installation location.

20. Proceed to paragraph 4.3

4.3 Mechanically Joining the UPS Cabinet and SIAC-B

To join the cabinets:

1. Lower all four leveling feet until nearly in contact with the floor.

2. Remove the two SIAC-B side wheels facing the UPS cabinet by removing the single bolt securing the wheel to the cabinet.

3. Move the SIAC-B into position against the UPS cabinet and remove the remaining two SIAC-B side wheels.

4. Use the leveling feet to align and level the SIAC-B vertically with the UPS cabinet.

5. Locate the top tie strap shipped attached to the SIAC-B (see Figure 4-2) and remove the screws securing the strap to the SIAC-B. Retain the hardware for later use.

6. Remove the screws securing the adjacent cabinet top panel. Retain the hardware for later use.

7. Install the top tie strap between the cabinets and secure the tie strap with the retained hardware.

8. Remove the screws securing the internal safety shield panel and remove the panel to gain access to the pass-through tie strap. Retain the hardware for later use.

9. Locate the pass-through tie strap at the bottom right or left side of the SIAC-B (see Figure 4-2) and remove the screws securing the strap to the SIAC-B.

10. Remove the corresponding screws at the bottom of the UPS cabinet pass-through. Retain the hardware for later use.

11. Install the pass-through tie strap between the cabinets and secure the tie strap with the retained hardware.

12. If necessary after the installing the attaching straps, secure the SIAC-B in position by adjusting the leveling feet until the cabinet is level and locked in place.

13. Proceed to paragraph 4.4.

NOTE In line-up-and-match installations, the SIAC-B and UPS cabinets should be located as shown in Figure 3-4.

NOTE A rear tie strap is attached to the back of the cabinet and is used only for seismic installations. Refer to the Eaton 93PM Cabinet Seismic Tie Strap Installation Instructions (P/N P-164000471) provided with the applicable seismic mounting kit.

4-4

Figure 4-2. Cabinet Attaching Brackets

Top Tie Strap

Pass-Through Tie Strap 4-5

4.4 Electrically Connecting the UPS Cabinet and SIAC-B

Use the following procedures to wire the SIAC-B to the UPS cabinet.

4.4.1 Installing SIAC-B Internal Power Wiring

To Install wiring:

1. Locate and remove the three internal power wiring phase harnesses and MBP interface harness packed inside the SIAC-B. Retain for later use.

2. Route the phase harness ends marked for the UPS Output, UPS Bypass, and UPS Input (if installed) from the SIAC-B through the bottom of the SIAC-B and UPS inter-cabinet wiring access pass-through to the UPS cabinet terminals. See Figure 4-4 for SIAC-B terminal locations. Refer to the applicable Eaton 93PM UPS Installation and Operation manual for the UPS pass-through and terminal locations.

3. In the UPS cabinet, locate the harness cable ends marked UPS Output. Connect marked phase A, B, and C cable ends to the corresponding output terminals of the UPS.

For termination requirements and a detailed view of the UPS output terminal blocks, refer to the applicable Eaton 93PM UPS Installation and Operation manual.

4. In the UPS cabinet, locate the harness cable ends marked UPS Bypass. Connect marked phase A, B, and C cable ends to the corresponding bypass input terminals of the UPS.

For termination requirements and a detailed view of the UPS bypass input terminal blocks, refer to the applicable Eaton 93PM UPS Installation and Operation manual.

5.

6.

In the SIAC-B, locate the harness cable ends marked MIS. Connect marked phase A, B, and C terminal number cable ends to the corresponding terminal number of the MIS breaker.

For a detailed view of the MIS breaker terminals, see Figure 4-5. Tighten terminals to 31Nm (275 lb in) torque.

7.

In the SIAC-B, locate the harness cable ends marked BIB. Connect marked phase A, B, and C terminal number cable ends to the corresponding terminal number of the BIB breaker.

For a detailed view of the BIB breaker terminals, see Figure 4-6. Tighten terminals to 31Nm (275 lb in) torque.

NOTE 1 In the following steps, only two phase harnesses are shipped if an RIB is not installed.

NOTE 1 When routing cable harnesses, ensure the cables ends marked UPS are routed to the UPS terminals.

NOTE 2 180 kW phase harnesses have ferrules attached to the SIAC-B cable ends and two-hole barrel lugs attached to the UPS cable ends.

Proceed to paragraph 4.4.2 4-6

Front

Figure 4-4. Right-Mounted SIAC-B – BIB, and MIS Breaker Terminal Locations

AC Input from UPS Output A, B, C) (See Figure 4-5 for detail.)

AC Output to UPS Bypass A, B, C) (See Figure 4-6 for detail.)

Ground Terminals Ground Terminals

Output Neutral to UPS (Gray Connector) (Four-Wire Model Only)

Bypass Neutral to UPS (Red Connector) (Four-Wire Model Only)

Optional Rectifier Input Breaker (RIB) is not applicable to Siemens UPS configurations.

4-9

E0069194 Highlight

E0069194 Line

Line

Figure 4-5. 93PM SIAC-B MIS Input Terminal Detail

Figure 4-6. 93PM SIAC-B BIB Output Terminal Detail

MIS

Phase A (MIS-2)

Phase C (MIS-6)

Phase B (MIS-4) AC Input from UPS Output

BIB

Phase A (BIB-2)

Phase C (BIB-6)

Phase B (BIB-4) AC Output to UPS Bypass 4-10

4.4.2 Installing SIAC-B Interface Connections

To Install wiring:

1. Locate the MBP interface harness removed from inside the SIAC-B in paragraph 4.4.1.

2. Route the SIAC-B MBP auxiliary contact control interface wiring harnesses from the SIAC-B through the bottom of the SIAC-B and UPS inter-cabinet wiring access pass-through to the UPS cabinet terminals. See Figure 4-9 for SIAC-B terminal locations, and Figure 4-12 for UPS terminal locations. Refer to the applicable Eaton 93PM UPS Installation and Operation manual for the UPS pass-through location.

NOTE 1 The SIAC-B is attached to and directly integrated with the UPS cabinet after field installation on site. This section must be used along with the applicable Eaton 93PM UPS Installation and Operation manual during installation.

NOTE 2 Keep interface wiring separate from power wiring.

NOTE When routing the MBP interface cable harness, ensure the green ten position terminal header end is routed to the SIAC-B terminal block.

3. Connect the MBP interface harness green ten position header to the SIAC-B green terminal block.

4. Connect the MBP interface harness white two position connector to the UPS MBP interface terminal block connector (see Figure 4-13).

5. Refer to the applicable Eaton 93PM UPS Installation and Operation manual to complete the mechanical installation of the UPS and SIAC-B. After completing the mechanical installation return to paragraph 4.7.

4-11

Figure 4-9. 93PM 180 kW SIAC-B Interface Terminal Location

Interface Terminal Block (See Figure 4-10 for detail.)

NOTE The 93PM 180 kW UPS is shown with a left-mounted SIAC-B. A UPS with a right-mounted SIAC-B is the mirror image.

4-13

Figure 4-10. SIAC-B Interface Terminal Detail

Table 4-1. SIAC-B Interface Wiring Terminal Block Terminations

Terminal Function Size of Pressure

Termination Tightening Torque

Nm (lb in) Type Screw Comments

Auxiliary Contacts #26–#16 0.4 (3.5) - 0.8 (7.1) Slotted Use twisted-pair wires for each input and return or common. Strip wire insulation back 10 millimeters to wire terminal blocks.

Use wire rated for 600V and Class 1 wiring methods.

NOTE 1 The removable terminal block header faces out for a right-mount SIAC-B.

NOTE 2 UPS building alarm signals are customer programmable. Customer interface wiring for the SIAC-B MBP assumes that the UPS Building Alarm is programmed to monitor Normally Open (NO) contacts.

MBP Auxiliary Contacts

MBP Aux1 NC

MBP Aux1 NO

MBP Aux1 COM

MBP Aux2 NC

MBP Aux2 NO MBP Aux2 COM

UPS MBP NC (TB-3)

UPS MBP Common (TB-2)

Not Used

Not Used

Not Used

Not Used

Customer Interface Wiring (Removable Terminal Block Header)

Factory Interface Wiring

Not Used

Not Used

Not Used

Not Used

SIAC-B

Table 4-2. SIAC-B MBP Interface Terminals

SIAC-B

Terminal Name UPS Terminal Description

TB-1 Not Used —

TB-2 MBP Aux 1 COM UPS MBP Return Output: Normally Open (NO) contact used to indicate whether the MBP is closed and the UPS system is on maintenance bypass. Contacts are closed when the MBP is closed.

TB-3 MBP Aux 1 NC UPS MBP

TB-4 Not Used —

TB-5 Not Used —

TB-6 Not Used —

TB-7 Not Used —

TB-8 Not Used —

TB-9 Not Used —

TB-10 Not Used —

NOTE UPS building alarm signals are customer programmable. Customer interface wiring for the SIAC-B MBP assumes that the UPS Building Alarm is programmed to monitor Normally Open (NO) contacts.

NOTE “Return“ indicates connection to electronics circuit ground. “Common” indicates connection to common side of isolated relay contact 4-14

Figure 4-12. 93PM 180 kW SIAC-B UPS MBP Interface Terminal Location

MBP Interface Terminal Block (See Figure 4-13 for detail.)

NOTE The 93PM 180 kW UPS is shown with a left-mounted SIAC-B. A UPS with a right-mounted SIAC-B is the mirror image.

4-16

Figure 4-13. UPS MBP Interface Terminal Detail

MBP Interface Terminal Block

4.7 Two-Hole Barrel Lug Terminations to Bus Bar Installation

Paragraph 4.8 may require connecting input and output power wiring using 2-hole barrel lugs (see Table 3-11 for recommended lugs). See Figure 4-14 for the hardware sequence when installing the lugs to the bus bars.

Tighten the bolt to the torque value listed in Table 3-8.

Proceed to paragraph 4.8.

NOTE Conical washers are special purpose washers that look similar to flat washers, except for a slight conical shape. When installing conical washers, the top of the dome should be next to the bolt head and the base of the washer should be against a flat surface such as a bus bar, flat washer, or large terminal.

Conical Washer Lug

Bus Bar

Bolt Head

Flat Washer

Single Lug Installation

Conical Washer Lug

Bus Bar

Bolt Head

Flat Washer

Lug

Nut with Washer

Nut with Washer

Double Lug Installation 4-17 Figure 4-14. Typical Bus Bar Barrel Lug Mounting – Hardware Assembly Sequence

4.8 Installing SIAC-B External Power Wiring

To install wiring:

1. Remove the screw securing the bottom of the SIAC-B front panel. Lift the panel straight up to remove it from the panel hanger bracket at the top of the cabinet. Retain screw for later use.

2. Remove the screws securing the internal safety shield panel and remove the panel to gain access to the maintenance bypass input, critical load output, and rectifier input (if installed) terminals. Retain the hardware for later use.

3. If wiring the SIAC-B using top entry wiring access, proceed to Step 4; otherwise, proceed to Step 7.

4. Top Entry Wiring. Remove the top conduit landing plate (see Figure 4-16) from the top of the SIAC-B.

Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the top cover prior to mounting on the SIAC-B. Install the top conduit plate and install all conduit runs into the top cover.

5. Route the maintenance bypass input and critical load output cables (phase A, B, and C, Ground) through the conduit on the top of the SIAC-B to the SIAC-B terminals. See Figure 4-16 for SIAC-B wiring access information, and Figure 4-20 for terminal locations.

6. Proceed to Step 9.

7. Bottom Entry Wiring. Remove the bottom conduit landing plate (see Figure 4-16) from the bottom of the SIAC-B. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the bottom conduit plate prior to mounting on the SIAC-B. Install the conduit plate and install all conduit runs into the plate.

8. Route the maintenance bypass input and critical load output cables (phase A, B, and C, Ground) through the conduit on the bottom of the SIAC-B to the SIAC-B terminals. See Figure 4-16 for SIAC-B wiring access information and Figure 4-20 for terminal locations.

9.

10.

Locate the external wiring terminal hardware kit (see Table 3-10) packed at the bottom of the SIAC-B.

11.

Using hardware from the external wiring terminal hardware kit, connect phase A, B, and C, and Ground bypass input power wiring from the utility source to the SIAC-B maintenance bypass input terminals. See paragraph 3.2.3, Table 3-2 and Table 3-8 through Table 3-11 for SIAC-B wiring and termination requirements

For SIAC-B terminal phase wiring assignments, see Figure 4-20.

Using hardware from the external wiring terminal hardware kit, connect phase A, B, and C, and Ground output power wiring from the SIAC-B output terminals to the critical load. See paragraph 3.2.3, Table 3-2 and Table 3-8 through Table 3-11 for SIAC-B wiring and termination requirements.

For SIAC-B terminal phase wiring assignments, see Figure 4-20.

NOTE 1 The SIAC-B Bypass Input Breaker (BIB) to UPS bypass input, the output from UPS, and ground wiring have been wired using the procedures in paragraph 4.4.

NOTE 2 External power wiring can be routed either through the top or bottom of the SIAC-B.

NOTE 3 Remove the SIAC-B top or bottom conduit landing plate to drill or punch conduit holes (see Figure 4-16).

12. Connect phase A, B, and C and Ground bypass input power wiring from the utility source to the SIAC-B maintenance bypass input terminals. See paragraph 3.2.3, Table 3-2 and Table 3-8 for SIAC-B wiring and termination requirements.

For SIAC-B terminal phase wiring assignments, see Figure 4-20.

13. Connect phase A, B, and C and Ground output power wiring from the SIAC-B output terminals to the critical load. See paragraph 3.2.3, Table 3-2 and Table 3-8 for SIAC-B wiring and termination requirements.

For SIAC-B terminal phase wiring assignments, see Figure 4-17 or Figure 4-18.

14. Reinstall the internal safety shield panel and secure with retained screws.

15. Reinstall the SIAC-B front panel and secure with retained screw.

4-20

16. After the SIAC-B is wired, return to the applicable Eaton 93PM UPS installation and operation manual to complete the UPS wiring.

Figure 4-16. 93PM 180 kW SIAC-B Conduit Landing Wire Entry Locations

Top Entry Conduit Landing.

(Remove plate to drill or punch conduit holes.)

Bottom Entry Conduit Landing.

(Remove plate to drill or punch conduit holes.)

UPS with Right-Mounted SIAC-B

UPS with Right-Mounted SIAC-B

Front

Front

Top View

Bottom View 4-23

Figure 4-20. 93PM 180 kW Three-Wire SIAC-B Right-Mounted Bypass Power Input, Power Output, and Ground Terminal Locations

Front

Ground Terminals

AC Output to Critical Load

AC Input to Maintenance Bypass (Source 2)

Phase A (E6)

Phase B (E7)

Phase C (E8)

Phase A (E9)

Phase B (E10)

Phase C (E11)

Output Neutral (E12) (Not present on Three-Wire Model)

Bypass Neutral (E12) (Not present on Three-Wire Model)

Optional Rectifier Input Breaker (RIB) is not applicable to Siemens UPS configurations.

4-27

E0069194 Highlight

E0069194 Highlight

E0069194 Highlight

E0069194 Line

Line

Onelines and Schematics Figure 5-5. Eaton 93PM 180 kW Three-Wire UPS with Three-Breaker 93PM 180 kW Three-Wire SIAC-B System Oneline

NOTE Callout letters A and C map to Table 3-2.

Mini-Slot Interface

Interface Board

Remote EPO

UPS

UPM 4

E4, E5

Battery Switchgear

Battery Converter

Fuse

Rectifier

Fuse

Rectifier Switchgear

Fuse

Inverter

Inverter Switchgear

Single-Feed Jumper

E1, E2, E3

E9, E10, E11

Bypass Switchgear

Static Switch

Fuse

AC Input to Bypass 3 Wire A-B-C Rotation

E6, E7, E8

AC Output to Critical Load

Battery Breaker

EXTERNAL BATTERY

CABINET

(Not supplied with Power Conditioner)

SIAC-B

Maintenance Bypass Breaker

(MBP)

Maintenance Isolation Switch

(MIS)

UPM 1 UPM 2 UPM 3

Bypass Input Breaker

(BIB)

A

C

E6, E7, E8

E9, E10, E11

NOTE: 200 kW Frame models contain a maximum of four UPMs.

5-6

Onelines and Schematics Figure 5-11. Eaton 93PM 180 kW Three-Wire SIAC-B Three-Breaker Schematic

E8

E6

E7

G

G

G

G

FROM BUILDING GROUND

TO LOAD GROUND

TO UPS GROUND

AC INPUT TO BYPASS

480V (3Ø)

TBGG

TBCTRL

GND

MBP

BIB

MIS

TO UPS BYPASS

480V (3Ø)

BIB: BYPASS INPUT BREAKER

MBP: MAINTENANCE BYPASS BREAKER

MIS: MAINTENANCE ISOLATION BREAKER

E11

E9

E10

A B C

A B C

A B C

A B C

MBP1 of MCU--STS

FROM UPS

480V (3 Ø)

CRITICAL LOAD

480V (3Ø)

AC OUTPUT TO

OUTPUT

LEGEND

Factory Wiring (105C Insulation)

Customer Wiring (75C Insulation)

EATON 93PM 180 kW BYPASS SIDECAR

(480V 3-WIRE)

(3-Breaker Version) 5-12

Eaton® 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW SIAC-B Three-Wire, 150 kW SIAC-B Four-Wire, 200 kW SIAC-B Three-Wire, and 200 kW SIAC-B Four-Wire) Installation and Operation Manual
Chapter 3 Installation Plan and Unpacking
3.1 Creating an Installation Plan
3.2 Preparing the Site
3.2.1 Environmental and Installation Considerations
3.2.2 Floor Mounting Brackets
3.2.3 SIAC-B Power Wiring Preparation
3.2.4 SIAC-B Interface Wiring Preparation

3.3 Inspecting and Unpacking the SIAC-B

Chapter 4 Installation
4.1 Preliminary Installation Information
4.2 Unloading the Field Installed SIAC-B from the Pallet
4.3 Mechanically Joining the UPS Cabinet and SIAC-B
4.4 Electrically Connecting the UPS Cabinet and SIAC-B
4.4.1 Installing SIAC-B Internal Power Wiring
4.4.2 Installing SIAC-B Interface Connections
4.5 Removing and Reinstalling the Factory Installed SIAC-B
4.5.1 Electrically Disconnecting the UPS Cabinet and SIAC-B
4.5.2 Mechanically Disconnecting the UPS Cabinet and SIAC-B

4.8 Installing SIAC-B External Power Wiring