This document is an enlarged floor plan for a 2-story, 4,895 square foot addition to Building 3 at the VAMC Brockton in Brockton, MA. The addition will house a new MRI and CT Radiology suite, including spaces like a waiting area, reception, interview rooms, medical rooms, and support spaces. The floor plan provides detailed dimensions and specifications for the new construction, including wall types, equipment, fixtures, and other details.

The related federal contract opportunity is a solicitation (Solicitation Number 36C24124B0030) for project 523A5-24-011 to install a new MRI generator underground storage tank (UST) at the VAMC Brockton. The solicitation is an invitation for bid from the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1.

View the file

Other files

File Type Posted
S06 RFI 523A5-24-011 MRI Generator UST 5-22-24.pdf.pdf PDF
36C24124B0030 0005.docx DOCX document
S02 MA20240012 03-22-24.pdf PDF
S06 523A5-24-011 Bid Opening Conference line Amend 5.pdf PDF
36C24124B0030 0004.docx DOCX document
36C24124B0030 0003.docx DOCX document
36C24124B0030 0002.docx DOCX document
S02 WD MA20240012 - 4-17-2024.pdf PDF
S06 Site Visit Sign In 523A5-24-011 MRI.pdf PDF
S06 RFI Q-A 523A5-24-011 MRI Generator UST 4-16-24 Final.pdf PDF
S06 Eaton 93PM 180kW 3-Wire Maintenance Bypass Sidecar Installation Information 7-21-16 Red-Lined.pdf PDF
S06 Eaton-93pm-ups-brochure and specs.pdf PDF
S06 Bid Opening Conference Line 36C24124B0030.pdf PDF
S06 Eaton 93PM 180kW 3-Wire UPS Installation Information 7-29-16 Red Lined.pdf PDF
36C24124B0030 0001.docx DOCX document
36C24124B0030_1 Final Re-Issue.pdf PDF
S02 26321l-Enginer-Generator-Startup_2020-11-30( COR).pdf PDF
S02 261219-Engine-Generator-Re-Submittal-Review_2018-09-06 (COR).pdf PDF
S02 523A5-24-011 SOW r3 8-24-23.pdf PDF
36C24124B0030_1.docx DOCX document
S02 523A5-24-011 - Emg Gen BOUND DRAWINGS-211221.pdf PDF
S02 MRI Emg Generator Specs.pdf PDF
S02 523A5-24-003_PCRA and ICRA signed.pdf PDF
S02 BLDG 3 Radiology Addition104 E2.03.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

1HR. FIRE-RATED WALL CONSTRUCTION

(TIGHT TO UNDERSIDE OF STRUCTURE ABOVE)

2HR. FIRE-RATED WALL CONSTRUCTION

(TIGHT TO UNDERSIDE OF STRUCTURE ABOVE)

3HR. FIRE-RATED WALL CONSTRUCTION

(TIGHT TO UNDERSIDE OF STRUCTURE ABOVE)

ROOM TAG

LEAD-LINED WALL CONSTRUCTION

(LEAD SHIELDING TO 7'-0"AFF MIN.)

DOOR TAG, SEE SHEET A5.1

WINDOW TAG, SEE SHEET A5.1

WALL TYPE TAG, SEE SHEET A1.1

ACCESSIBLE SPACE/ITEM

EXTERIOR ELEVATION TAG

INTERIOR ELEVATION TAG

BUILDING SECTION TAG

WALL SECTION TAG

DETAIL TAG

X

AX

X

AX

XX

XX

X

X

X

X

AX.X X

AX.X

X

X

XX

X

AX

NEW WALL CONSTRUCTION

TIGHT TO STRUCTURE ABOVE

EXISTING CONSTRUCTION TO REMAIN

ROOM NAME

SIGNAGE, SEE SHEET G0.1 FOR SIGN TYPES

X

A AIR

APR (CC) APRON RACK

AWP ACOUSTIC WALL PANEL

BG BUMPER GUARD

CG (CC) CORNER GUARD

CR CRASH RAIL

EG (CC) END GUARD

EWC ELECTRIC WATER COOLER

FEC-R(CC) RECESSED FIRE EXTINGUISHER

AND CABINET

FRP FIBER REINFORCED PANEL

GB (CC) GRAB BAR

GBH(CC) GLOVE BOX HOLDER

HD (CC) HAND DRYER

HK (CC) COAT/ROBE HOOK

HR HANDRAIL

HS (VV) HAND SANITIZER

MB (VV) MARKERBOARD

MHK(CC) MOP HOOK

MIR (CC) MIRROR

O2 OXYGEN

PTD (VC) PAPER TOWEL DISPENSER

SD (VC) SOAP DISPENSER

SH (VV) SHARPS CONTAINER

SND(CC) SANITARY NAPKIN DISPENSER

SNW(CC) SANITARY NAPKIN WASTE

TB (VV) TACKBOARD

TPD (VC) TOILET PAPER DISPENSER

V VACUUM

WR (CC) WASTE RECEPTACLE

WS (VV) WIRE SHELVING

WP WALL PROTECTION

WP-H WALL PROTECTION HYGIENIC SHEETS

NOTE: ALL ITEMS INDICATED ON DOCUMENTS ARE TO BE FURNISHED AND

INSTALLED BY CONTRACTOR, UNLESS NOTED OTHERWISE.

(CC)FURNISHED AND INSTALLED BY CONTRACTOR

(VC) FURNISHED BY VA, INSTALLED BY CONTRACTOR

(VV) FURNISHED AND INSTALLED BY VA

EXIST. BUILDING 3

6 STORIES

(B Use Group) 36,809sf.

AREA OF WORK

NEW ADDITION

2 STORIES

(B Use Group)

Type IIA

4,895 DGSF

5,030 GSF

AREA OF NEW ADDITION (INSIDE FACE OF

EXTERIOR WALL):

NEW ADDITION = 4,895sf.

AREA OF NEW ADDITION (OUTSIDE FACE OF

EXTERIOR WALL):

NEW ADDITION = 5,030sf.

'W'

30'-0"

'W

'-0

MAIN ENTRANCE

STAIR NO. 7 UNDER SEPARATE CONTRACT

VA PROJECT 523-395 VAMC BROCKTON

LIFE SAFETY RENOVATIONS

STAIR NO. 8 UNDER SEPARATE CONTRACT

VA PROJECT 523-395 VAMC BROCKTON

LIFE SAFETY RENOVATIONS

423'-4"

8'

-0

A2.1

A

C

D

1 4 5 7

E

A2.1

A7.127

A7.1 35

A7.1

A7.1 12

A7.1 810

B

2 3

A7.2

A7.2

A7.1

WAITING

B123

RECEPTION

B124

INTERVIEW

B125

MED

B126

TOILET

B127

CT SCAN

B128

CONTROL

B128A

CT EQUIPMENT

B128B

DRESS

B129

OFFICE

B130

EQUIPMENT

B131

DRESS

B132

VIEW

B134

CLEAN

STORAGE

B133

SOILED

HOLDING

B136

CORRIDOR

CRB103

CORRIDOR

CRB105

PROJECT

NORTH

MOP

SINK

U

T

B123A S

T

B124

S

T

B125

S

T

B126

S

B127

X

LL

B128A

S

LL,V

B128B

S

G

B129

S

T

B130

U

T

B131

S

G

B132

S

T

B134

U

T

B133

X

ADO,CR,T

CRB105

S

F,T

B136

S

G

B139

(3

L O

C K

E R

S

(3

L O

C K

E R

S

JT

JT

JT

VV

ADO,CR,T

CRB103

U

CR,T

B123B

PP

PP

EXP.

JT.

EXP.

JT.

FEATURE WALL -

WALL PANELING,

SEE INT. ELEVS.

1A

1A

6A

4B 4B

4D

A

V1

V2

SD

PTD

MIR

SD

PTD

TPD-R

SD

PTD

4B

4B

CL

4B

MED

GASES

4E 4E

4E 4E

MIRPTD

CG

CG

EG

CG

CG

CG

CG

CG

CG

CG

EG

CG

FEC-R

CG

CGCG

CG

CG

A

AAA

AD

A

A

B

A

A

A

A

A

A

CG

CALL

FOR

AID

CALL

FOR

AID

A

4D

4D

4D

4D

4B

4C

4B

4B

4A4F

4E

4B

4E

4E

4F

4D 4A

4D

4D 4D

5 5 5 5

5 5 5 5

EXP. JT.

2"

8'-11 1/2" +/-4'-0"11'-6"12'-7 1/2"6'-7"8'-0"7'-10 1/2"

9" 2"

E X

P . J

T.

7' -0

/8

E

E

7' -1

/2

4' -8

/2

6'

-2

/8

1/

8"

3' -3

1' -6

1'

-8

2'-6 1/2"5 1/8"5'-0 3/8"4'-1"3'-9 1/2"7'-4"8"6 1/4"8'-10 3/4"

'-3

1' -0

2'-5"6 1/2"5'-0"2'-1 1/2"

8' -1

0" 2'

-5

3' -3

1/ 4"

'-0

4'

-0

4' -0

5'

-8

3' -4

4'

-0

E X

P . J

T.

2"

4'-0"21'-0"9"

4' -0

17'-0 5/8"

2' -9

/2

9"

1/

4" 3'

-9

/4

2' -7

8'

-2

/2

6' -1

1/

2" 9"

5'-4 3/4"10'-9"2'-1"5'-9"6'-11"6"

5'-3 3/4"1'-0" 8 3/4"

5'-11 1/4"9'-2" 1'-11"5 5/8"

6" 2'

-1

1/ 2"

7' -1

0" 7'

-1 0"

3' -6

3'

-5

1' -6

3'

-6

1' -6

E

Q

7"1'-2"12'-1 1/2"1'-7 1/2"4'-8 3/4"

3/

4"

6" 6'

-1

1/ 2"

'-8

7'

-5

2"8'-11 1/2" +/-10'-0"2'-10"

3' -6

/2

2'

-5

5' -8

/2

6'

-1

1/ 2"

6"

EQEQ

CL

(S C

A N

N E

R C

E N

TE

R

'-8

(SCANNER CENTER)

6'-8"

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.1

A6.2

A6.2

4D

4D

A3.1

A TYP.

CG

4B

4A

6C 4B

4A 4B

4A

4F

4A

CG

CG CG

CGCG

CG

CG

CG CG

EG

4D

GROMMET, TYP

A7.15 3

A7.1 4

A7.210 11

A7.29

A7.29

SIM

A7.1 7

6' -4

HK

7" 2'-

0"

45°

X

B128D

X

B128C

AA

EG

4D

4E

CR

PP

PP

MHK

2'

/2 A4.1

/2 A4.1

5'-0"

EMERG.

SHUT-OFF

7' -5

6'-0"3'-2 1/4"

MILLWORK

WORK COUNTER

CR

CG

CG

A

CG

MILLWORK

COUNTER

MILLWORK UPPER AND

LOWER CABINETS

E

Q TV

SCREEN

HB

RWL

MILLWORK UPPER AND

LOWER CABINETS

B E

N C

H

B E

N C

H

PTD

SD

LINE OF SOFFIT

ABOVE

LINE OF

SOFFIT

ABOVE

TRENCH DUCT

A3.2

VV

VV

A3.1

A3.1

TYP.

CR

MIR

MIR

FULL-LENGTH

MIRROR ON BACK

OF DRESSING

ROOM DOOR, TYP.

FULL-LENGTH

MIRROR ON BACK

OF DRESSING

ROOM DOOR, TYP.

S

DPS

B128E

HK

HK

A2.1

G

5 7

E

A7.1

H

J

K

A2.1

A7.2 8

F

EMERG. ELEC

B137

ELEC

B138

MRI EQUIPMENT

B142

MRI SUITE

B141

MRI

B143 CONTROL

B141A

TOILET

B139

JAN

B140

MOP

SINK

S

B140

S

G

B139

S

B137

S

B138

U

CR,T

B141B

U

B142

X

CR,T

B141A

X

RF

B143

C

B

JTJT

JT

JT

JT

CORRIDOR

CRB104

S

DPS

CRB104

1B

1B

1B

4E 4E

4E

4E 4E

4D

4D

4D

CG

EG

V3

SD

MIR

TPD-R

PTD

SD

PTD

EMERG.

SHUT-OFF

4A

4D

4A

FEC-R

MED

GASES

CG

A

D

A

A A

A

A

A

4B

4D

4D 4D

4E

6" 6"

3/

4"

9' -5

/4

8'

-0

6"

EXP. JT.

2"

8'-11 1/2" +/-4'-2" 8 1/2"

7'-11 1/2"5'-8"8'-11"10'-2 1/4"

8' -0

2'-8"

1/

2"

7'-8 1/4"4'-9"24'-4 1/2"

4' -6

4'

-9

2' -8

5'

-0

8' -2

EQ

EQ

CL

E Q

E Q

CL

2'-10"8'-0"

'-8

/2

2'

-7

/2

6' -2

3'-5"4'-0"

A6.1

A6.1

A6.1

A6.2

A6.2

A6.2

A6.2 22 A6.2

A6.2

A6.2

A7.1

A7.123

CG

CG

7B 7B 7B

4C

CG

CG

CG

CG

CG

CG

A7.15 3

4E

MILLWORK CABINET

CR

CR

MHK

2'

/1 A4.1

/1 A4.1

FEC-R

TR

E A

D S

'-6

6' -1

0"

+0"

-46"±

NEW CONC. WALK,

SEE CIVIL DWGS.

5'-0"

A6.2

A6.2

9'-8" 7"

1' -0

9'-4"

'-4

19'-2"9" 9"

9" 8'

-5

3' -4

4B

CG

CG

CURTAIN

AND

TRACK

(MAGNET CENTER)

12'-0"

(M A

G N

E T

C E

N

TE

R

'-0

MILLWORK UPPER AND

LOWER CABINETS

MILLWORK UPPER AND

LOWER CABINETS

GROMMET

SD

LINE OF SOFFIT

ABOVE

VV

4D

CG

A3.1

A3.1

A TYP.

CG EG

EMERG.

SHUT-OFF

EMERG.

SHUT-OFF

NOTE: PROVIDE 1/8"THICK VINYL

FLOORING FILLER BENEATH

FINISH FLOORING AT MRI ROOM

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

(860) 563-6164

WETHERSFIELD, CT. 06109

30 JORDAN LANE

architects nelson pilon moser

Revisions: Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of Facilities

Management

Dwg. of

100% CONSTRUCTION DOCUMENT SUBMISSION

"FULLY SPRINKLERED"

Enlarged Floor Plans - Level 1

A4.1

02/12/2016 JB CM

BUILDING 3

MRI/CT Radiology Addition

Boston Healthcare System - Brockton Campus

523-398

940 Belmont Street Brockton, MA 02301

Legend

Accessories/Wall Protection Legend

Key Plan

1/4" = 1'-0"A4.1

1 Level 1 Floor Plan

1/4" = 1'-0"A4.1

2 Level 1 Floor Plan

1 - 100% CONSTRUCTION DOCUMENT SUBMISSION 04/08/2016

A4.1 Enlarged Floor Plans - Level 1

File details come from the government source that posted it. Updated .