S02 26321l-Enginer-Generator-Startup_2020-11-30( COR).pdf

PDF 3 MB Posted

Attached to
Y1GC--523A5-24-011 MRI Generator UST
Solicitation number
36C24124B0030
Issued by

About this file

This document is a submittal transmittal related to a generator start-up and load bank test for a federal contract opportunity.

The submittal includes the generator start-up report, a 6-hour load bank test report, and previous factory test results for a 300 kW diesel generator set. The generator is being installed as part of the MRI/CT Radiology Addition project at the VA Medical Center in Brockton, Massachusetts under Contract No. VA241-17-C-0132. The start-up and load testing were performed by the subcontractor Monument Construction. The submittal was reviewed by the project engineer R.W. Sullivan with no exceptions taken. The related federal contract opportunity is Solicitation No. 36C24124B0030 for the MRI Generator UST project at the same VA facility.

View the file

Other files

File Type Posted
S06 RFI 523A5-24-011 MRI Generator UST 5-22-24.pdf.pdf PDF
36C24124B0030 0005.docx DOCX document
S02 MA20240012 03-22-24.pdf PDF
S06 523A5-24-011 Bid Opening Conference line Amend 5.pdf PDF
36C24124B0030 0004.docx DOCX document
36C24124B0030 0003.docx DOCX document
36C24124B0030 0002.docx DOCX document
S02 WD MA20240012 - 4-17-2024.pdf PDF
S06 Site Visit Sign In 523A5-24-011 MRI.pdf PDF
S06 RFI Q-A 523A5-24-011 MRI Generator UST 4-16-24 Final.pdf PDF
S06 Eaton 93PM 180kW 3-Wire Maintenance Bypass Sidecar Installation Information 7-21-16 Red-Lined.pdf PDF
S06 Eaton-93pm-ups-brochure and specs.pdf PDF
S06 Bid Opening Conference Line 36C24124B0030.pdf PDF
S06 Eaton 93PM 180kW 3-Wire UPS Installation Information 7-29-16 Red Lined.pdf PDF
36C24124B0030 0001.docx DOCX document
36C24124B0030_1 Final Re-Issue.pdf PDF
S02 A4.1_EnlargedFloorPlans-Level1.pdf PDF
S02 261219-Engine-Generator-Re-Submittal-Review_2018-09-06 (COR).pdf PDF
S02 523A5-24-011 SOW r3 8-24-23.pdf PDF
36C24124B0030_1.docx DOCX document
S02 523A5-24-011 - Emg Gen BOUND DRAWINGS-211221.pdf PDF
S02 MRI Emg Generator Specs.pdf PDF
S02 523A5-24-003_PCRA and ICRA signed.pdf PDF
S02 BLDG 3 Radiology Addition104 E2.03.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Transmittal

R.W. Sullivan, Inc. | 529 Main Street, Suite 203 Boston MA 02129-1107 United States

PROJECT VA Brockton-MRI/CT Radiology Addition 11675

DATE SENT 11/30/2020

SUBJECT 2238 - MRI/CT Radiology Addition:

Action Required for Submittal (#172.0: Generator Start Up Information)

SUBMITTAL ID 11675-00-087R0

TYPE Submittal TRANSMITTAL ID 00281

PURPOSE Reviewed VIA Email

SPEC SECTION:

FROM

NAME COMPANY EMAIL PHONE

Maria Conti 529 Main Street, Suite Boston MA 02129-1107 United States

R.W. Sullivan, Inc. mc@rwsullivan.com 617-523-8227

TO

NAME COMPANY EMAIL PHONE

jchadwick@mpn-arch.com jchadwick@mpn-arch.com

Jim Bell Moser Pilon Nelson Architects 30 Jordan Lane Wethersfield, CT 06109

Moser Pilon Nelson Architects jbell@mpn-arch.com 860-563-6164

Shawn Buckley Moser Pilon Nelson Architects sbuckley@mpn-arch.com

REMARKS:

COPIES:

Aaron Roy (R.W. Sullivan, Inc.)

mc submittal mc Stamp mc Typewritten Text

AJR 11-30-20

R.W. Sullivan Engineering MEP/FP Engineering . Code . Commissioning

SUBMITTAL REVIEW

Project:

VA Brockton Bldg 3 MRI/CT Addition RWS#: 11675.00

Submittal: Generator Start-up Submittal #: 11675.00.087r0

Sub-Contractor: Monument Construction Architect: Moser Pilon Nelson

Reviewer: Aaron J. Roy Architect/GC#: 2238-172

Date: November 30, 2020 Spec Section: 260000

ITEM STATUS REVIEW COMMENTS

Generator

Start-up Report Reviewed

NET = NO EXCEPTION TAKEN RNR = REVISE NO RESUBMISSION

AAN = ACCEPTED AS NOTED R&R = REVISE AND RESUBMIT

REJ = REJECTED RWA= RETURNED WITHOUT ACTION

SSI = SUBMIT SPECIFIED ITEM Reviewed = Review for conformance with the concept of the project

All comments must be addressed in writing by the Contractor.

Corrections or comments made on the shop drawings during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of the general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming, correlating and coordination of all quantities and dimensions; selecting fabrication processes and techniques of construction (means and methods);

coordination of his work with that of all of the other trades; and performing his work in compliance with all pertinent codes in a safe manner.

J:\2012\11675-00\5_CA\Submittals\Electrical\11675-00-087R0-262313-172-0 Generator Start Up\11675-00- 087R0_E_Generator-Startup-Submittal-Review_2020-11-30.docx

Monument Construction 21 Factory Street, Suite 1 Nashua, New Hampshire 03060 United States

Submittal Submittal 172: Generator Start Up Information

APPROVERS (ASSIGNEES): CREATED BY:

Roy, Aaron (RW Sullivan) Chadwick, Joseph (Moser Pilon Nelson, Architects, LLC) Smith, Stephen (Department of Veterans Affairs) Doyon, Andre (Department of Veterans Affairs)

Paige Millen

PROJECT: ISSUE DATE:

2238 - MRI/CT Radiology Addition 940 Belmont Street Brockton, Massachusetts 02301 United States

10/28/20

PROJECT NUMBER: SUBMITTAL NO / REVISION:

VA241-17-C-0132 172 / 0

COST CODE: SUBMIT BY:

SUBMITTAL TYPE: STATUS:

Document Open

SPEC SECTION: BALL IN COURT:

26 23 13 - Generator Start Up Information Roy, Aaron (RW Sullivan)

RECEIVED FROM: RECEIVED DATE:

10/28/20

COPIES TO: REQUESTED REPLY DATE:

Chadwick, Joseph (Moser Pilon Nelson, Architects, LLC) Doyon, Andre (Department of Veterans Affairs) Gearan, Mike (Monument Construction LLC) Smith, Stephen (Department of Veterans Affairs) Welsh, Christopher (Monument Construction LLC)

11/16/20

DESCRIPTION:

Please see attached 26 32 13 - 172 - Generator Start Up Information

REFERENCES / ATTACHMENTS

• 26 32 13 - 172 - Generator Start Up Information - Signed.pdf

APPROVER RESPONSES

APPROVER NAME DATE SENT DATE

RETURNED STATUS ATTACHMENTS COMMENTS

Joseph Chadwick 10/28/20 10/28/20 Forwarded For Review

26 32 13 - 172 - Generator Start Up Information - Signed.pdf

Aaron Roy 10/28/20 Pending None

Andre Doyon Pending None https://storage.procore.com/v4/d/us-east-1/pro-core.com/prostore/20201028183648_production_2553940348.pdf?sig=d2c685e9729688251c19cf8d5b58d9ee5d3276d9aa455f04b43d4988ad1adfca https://app.procore.com/utilities/prostore_local/38fb9f1447a8246423e8ba0feee3065f0d36 https://app.procore.com/utilities/prostore_local/38fb9f1447a8246423e8ba0feee3065f0d36 https://app.procore.com/utilities/prostore_local/38fb9f1447a8246423e8ba0feee3065f0d36

Stephen Smith Pending None

BY DATE COPIES TO

PREVIOUS EDITION IS OBSOLETE.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

TO: (Contracting Officer)

PROJECT NUMBER

FOR GOVERNMENT USE ONLY

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503.

Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.

FROM: (Contractor)

DATE

For Evaluation and Action

TO: (Base Civil Engineering Officer/ COR)

TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

APPROVED

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

TO: (Contractor)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

DATE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

MODIFIED AF FORM 3000, SEP 91 (EF)

SUBMITTALSUBMISSION NUMBERCONTRACT NUMBER

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Mfg., etc. & file name of attachments)

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

AP-

PROVED

DISAP-

PROVED

TO BE COMPLETED BY CONTRACTOR

DATE TYPE OR PRINT NAME AND TITLE

SIGNATURE

FOR GOVERNMENT USE ONLY

Form Approved OMB No 9000-0062 Expires Apr 30, 1993

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

marcel.cartier Text Box marcel.cartier Text Box marcel.cartier Text Box marcel.cartier Text Box marcel.cartier Text Box Moser Pilon Nelson Architects marcel.cartier Text Box VA Engineer/COTR marcel.cartier Text Box Contracting

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings (*.DWG or *.PDF format), Manufacturer's Literature and Certificates (scanned as *.PDF) to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared, signed, and E-mailed to the contracting officer with appropriate attachments. One paper format copy is to be submitted also.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract. One paper copy of the submittal is to be hand signed for Contracting Officers records.

MODIFIED AF FORM 3000, SEP 91 (E-MAIL FORMAT) (EF) (REVERSE)

marcel.cartier

Technician:

“We serve every customer as family and each generator as our own.”

Date:

Contact Name: Phone #: Customer:

Location Address:

Generator Engine ATS Make

Model # Serial # Spec #

KW

Make Model #

Serial # Spec #

Cyl.

Make Model # Serial # Spec #

Amps

Addtl. Info Hours

Fuel Phase

Voltage

Cooling

Power Management System (if applicable)

Model #:

Serial#:

Is there a generator disconnect?

Is there a service disconnect?

Yes No

Yes No

Gas Pressure

Gas Pipe After Regulator Size:

Length:

AC Output: Frequency

Check Block Heater/Cold Weather Kit/Carb Heater: Yes No

No

VDC

No

Time:

Check Batter Charger

Connected: Yes

Battery Charge Rate:

Transfer Switch Tested: Yes

Time Out:

Customer Signature:

Site Notes

Start Up Form

Contactor

Location Description:

Parts Used

Fuel Level Monitor Panel #

Time In:

Demonstrated System Operation to:

Set Exercise Day:

Photos Taken of ATS & Generator: Yes No

John Deere

6090HFG86

RG6090L136482

RE555012

Diesel Three

277/480

3/4

N/A

N/A

(1) MF50/50

N/A

N/A

N/A

277/480 60.0

I visually inspected the unit. I confirmed block heater was operating properly. I installed batteries (incorrect batteries we will have to install the correct batteries at the next visit - 2 group 31). I connected the battery charger and confirmed operation. I checked fluid levels and topped off the coolant. I confirmed there are no leaks. I removed the tape on the exhaust flap. I removed the return fuel line and flushed by running engine and putting return line in a bucket - I ran until off-road diesel came out of the return. I ran the unit up to temp while monitoring output, temps, and checking for leaks - all ok. After the start up I performed the 6 hour load bank at 100% load, see load bank report. I left the unit down and removed the batteries. The remote annuciator still needs to be hooked up and tested.

Riley Coleman

Unchanged 12: 45 PM

8 45 AM

9 30 AM

28.308 (9.5A), 28.523 (56A)

940 Belmont Street, Brockton, MA 02301

2020-05-15

Annese Electrical Services Frank Brady 781-337-6462

Left side of the building

Kohler 12.7 300REOZJ Liquid

33CYGMGC0007

GM66100-GA7

mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line

Connect:

Warmup:

Hour Meter Reading Load Voltage Load Bank Test Report

Amps Oil Pressure Coolant Tempurature Exhaust

Cool-down

Disconnect

Additional Notes

Set-Up Notes(e.g. times, loads, conditions)

Process-End Notes

Date:

Contact Name: Phone #: Customer:

Location Address:

Generator Engine ATS Make

Model # Serial # Spec #

KW

Make Model #

Serial # Spec #

Cyl.

Make Model # Serial # Spec #

Amps

Addtl. Info Hours

Fuel Phase

Voltage

Cooling

Fuel Level

Location Description:

Tech Time In:

Tech Time Out:

2020-05-15

Annese Electrical Services Frank Brady 781-337-6462

940 Belmont Street, Brockton, MA 02301 Left side of the building

Kohler 12.7

300REOZJ

33CYGMGC0007

John Deere

Liquid

Diesel Three

277/480

3/4

I disconnected the ats leads and connected the load bank cables to the output breaker I allowed a five minute warm up time, unloaded

6.5/10:00(Am. Air- 83*F, Out - 63*F) 301.0 kW (100.3%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 362, B- 362, C- 362 42 psi (Fuel - 3 psi) 167*F Clear (1040*F) 7.0/10:30(Am. Air- 85*F, Out - 64*F) 300.1 kW (100.0%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 361, B- 361, C-361 35 psi (Fuel - 3 psi) 174*F Clear (1047*F) 7.5/11:00(Am. Air- 87*F, Out - 74*F) 300.1 kW (100.0%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 361, B- 361, C-361 34 psi (Fuel - 3 psi) 188*F Clear (1074*F) 8.0/11:30(Am. Air- 91*F, Out - 74*F) 300.1 kW (100.0%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 361, B- 361, C-361 34 psi (Fuel - 3 psi) 184*F Clear (1091*F) 8.5/12:00(Am. Air- 95*F, Out - 78*F) 300.1 kW (100.0%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 361, B- 361, C-361 34 psi (Fuel - 3 psi) 186*F Clear (1093*F) 9.0/12:30(Am. Air- 97*F, Out - 78*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 361, C- 359 34 psi (Fuel - 3 psi) 185*F Clear (1100*F) 9.5/1:00(Am. Air- 108*F, Out - 84*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 361, C- 359 34 psi (Fuel - 3 psi) 187*F Clear (1111*F) 10.0/1:30(Am. Air- 116*F, Out - 87*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 361, C- 359 34 psi (Fuel - 3 psi) 190*F Clear (1108*F) 10.5/2:00(Am. Air- 113*F, Out - 86*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 360, C- 360 34 psi (Fuel - 3 psi) 184*F Clear (1100*F) 11.0/2:30(Am. Air- 114*F, Out - 85*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 360, C- 360 34 psi (Fuel - 3 psi) 186*F Clear (1103*F) 11.5/3:00(Am. Air- 116*F, Out - 80*F) 300 kW (100.0%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 361, B- 362, C- 359 34 psi (Fuel - 3 psi) 185*F Clear (1109*F) 12.0/3:30(Am. Air- 116*F, Out - 78*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 360, C- 360 33 psi (Fuel - 3 psi) 189*F Clear (1111*F) 12.5/4:00(Am. Air- 85*F, Out - 64*F) 299.3 kW (99.8%) A-B 480, B-C 480, A-C 480 (60.0 Hz) A- 360, B- 360, C- 360 32 psi (Fuel - 3 psi) 194*F Clear (1113*F)

Allowed the unit to cool down for 10 mins under no load Disconnected the load bank cables and reconnected the ats leads

I performed the six hour load bank at 100% load. Everything went well

9 30 AM

5 00 PM Riley Coleman mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line mteal Line

� MONUMENT CONSTRUCTION, LLC

21 Factory Street, Nashua NH 03060

P: (603) 966-4578 | F: (603) 966-4599

Page Intentionally Left Blank jim.patiernojr

Previously Approved Factory testing results - see submittal 143

KOHLER

POWER SYSTEMS

Special Test : ST-3959

Sales Order # : 1017320864

Genset Serial Number : 33CYGMGC0007

Genset Model: 300REOZJ

Tests Performed:

302 High Potential 6 hours @ 100% load 0.8 pf readings every 15 minutes

2/22/2019 Eric Groth Date

Kohler Test Engineer

I:\SHARED\8172\Special Tests\ 302-1b.doc

Eric Groth 1/31/00

KOHLER Special TeST Form

HIGH POTENTIAL TEST HI-POT COIL-TO-COIL

Reference to: MIL-STD-705C, METHOD 302.1b Kohler Procedure REL 090 002 Sales Order: 1017320864 Serial No.: 33CYGMGC0007

Date: 2/21/2019 Spec No.:GM66100-GA7

Job No.: 14366374 Test No.: ST-3959

Model: 300REOZJ Observer: 00815

Date Time Winding AC Volts Result Leakage

2/21/2019 8:54 1/10 to 2/11 2000 PASS 5.61 mA 8:56 1/10 to 3/12 2000 PASS 5.62 mA

8:57 2/11 to 3/12 2000 PASS 5.61 mA

8:58 1/10 to Gnd 2000 PASS 5.62 mA 9:00 2/11 to Gnd 2000 PASS 5.61 mA 9:01 3/12 to Gnd 2000 PASS 5.64 mA

9:08 F1/F2 to Gnd 1500 PASS 3.173 mA

Ambient Temperature: 64 F

Time Freq. VAB VBC VCA VAN VBN VCN IA IB IC kW P.F. Oil (psi) Air (F) water (F)

1:00 AM 60.02 481 480 479 277 277 277 452 453 456 302 0.802 37 80 174

1:15 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 35 79 172

1:30 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 35 81 172

1:45 AM 60.01 480 479 479 277 277 277 452 453 456 302 0.802 35 65 174

2:00 AM 60.01 480 480 479 277 277 277 452 453 456 302 0.802 35 63 174

2:15 AM 60.01 480 480 479 277 277 277 452 453 455 302 0.802 35 52 170

2:30 AM 60.00 480 480 479 277 277 277 452 453 455 302 0.802 35 51 170

2:45 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 35 45 172

3:00 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 35 52 172

3:15 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 34 66 174

3:30 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 68 174

3:45 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 68 172

4:00 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 67 172

4:15 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 66 174

4:30 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 35 65 176

4:45 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 34 60 172

5:00 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 62 172

5:15 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 64 172

5:30 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 35 52 170

5:45 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 63 170

6:00 AM 60.00 480 480 479 277 277 277 452 454 456 302 0.802 34 59 170

6:15 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 57 170

6:30 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 66 172

6:45 AM 60.02 480 480 479 277 277 277 452 454 456 302 0.802 35 72 172

7:00 AM 60.01 480 480 479 277 277 277 452 454 456 302 0.802 34 70 172

TEMPERATURES

Model: 300REOZJ Observer: 3437

VOLTS VOLTS PHASE CURRENT

Job No.: 14366374 Test No.: ST-3959

Sales Order: 1017320864 Serial No.: 33CYGMGC0007 Date: 2/21/2019 Spec No.: GM66100-GA7 shall Rectangle shall Rectangle shall Rectangle shall Rectangle shall Rectangle shall Rectangle https://mykohlerinsider.kohlerco.com/irj/portal 1/1

Certified Generator Set Test Record

Print/Save

Model #: 300REOZJ Serial #: 33CYGMGC0007

Type of Fuel: Diesel Engine Serial #: RG6090L136482

Material: 300REOZJ-CP1

Volts Amperes Watts Hertz

Light Load 482 0 0 60

1/4 Load 481 110 73039 60

1/2 Load 481 221 147479 60.01

3/4 Load 480 340 225289 60.01

Full Load 480 454 302714 60.01

Power Factor: 0.8 Temperature: 81 F

Altitude: 600 FT Tested By: 3437

Date Tested: 2019-02-26

We hereby certify that the results were developed during the actual factory test of the generator set indicated.

CERTIFIED CORRECT

KOHLER POWER SYSTEMS

Submittal Transmittal

R.W. Sullivan, Inc. | 529 Main Street, Suite 203 Boston MA 02129-1107 United States

PROJECT VA Brockton-MRI/CT Radiology Addition 11675

DATE SENT 4/3/2019

SUBJECT 2238 - MRI/CT Radiology Addition:

Action Required for Submittal (#143.0: 26 32 13 Generator Factory Test )

SUBMITTAL ID 11675-00-072R0

TYPE Submittal TRANSMITTAL ID 00214

PURPOSE No Exceptions Taken VIA Email

SPEC SECTION: 11675-00

FROM

NAME COMPANY EMAIL PHONE

Aaron Roy 529 Main Street, Suite Boston MA 02129-1107 United States

R.W. Sullivan, Inc. ajr@rwsullivan.com 617-523-8227

TO

NAME COMPANY EMAIL PHONE

Jim Bell Moser Pilon Nelson Architects jbell@mpn-arch.com 860-563-6164

Shawn Buckley Moser Pilon Nelson Architects sbuckley@mpn-arch.com jchadwick@mpn-arch.com jchadwick@mpn-arch.com

NO EXCEPTION TAKEN

ACCEPTED AS NOTED

REJECTED

SUBMIT SPECIFIED ITEM

REVISE-NO RESUBMISSION

REQUIRED

REVISE & RESUBMIT

RETURNED WITHOUT

ACTION

REVIEWED

Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general comformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for: continuing and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating their work with that of all other trades, and performing their work in a safe and satisfactory manner.

ROBERT W. SULLIVAN, INC.

Consulting Engineers

By:________________________________ Date:________________AJR 4-3-19

R.W. Sullivan Engineering MEP/FP Engineering . Code . Commissioning

SUBMITTAL REVIEW

Project:

VA Brockton Bldg 3 MRI/CT Addition RWS#: 11675.00

Submittal:

Generator Factory Test Submittal Submittal #: 11675.00.072r0

Sub-Contractor: Monument Construction Architect: Moser Pilon Nelson

Reviewer: Aaron J. Roy Architect/GC#: 2238-143

Date: April 3, 2019 Spec Section: 263213

ITEM STATUS REVIEW COMMENTS

Generator Load

Test NET

NET = NO EXCEPTION TAKEN RNR = REVISE NO RESUBMISSION

AAN = ACCEPTED AS NOTED R&R = REVISE AND RESUBMIT

REJ = REJECTED RWA= RETURNED WITHOUT ACTION

SSI = SUBMIT SPECIFIED ITEM

All comments must be addressed in writing by the Contractor.

Corrections or comments made on the shop drawings during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of the general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming, correlating and coordination of all quantities and dimensions; selecting fabrication processes and techniques of construction (means and methods);

coordination of his work with that of all of the other trades; and performing his work in compliance with all pertinent codes in a safe manner.

J:\2012\11675-00\5_CA\Submittals\Electrical\11675-00-072R0-143-0-263213 generator factory test\11675-00- 072R0_E_Generator-Factory-Test-Submittal-Review_2019-04-03.docx jim.patiernojr Text Box Operations and Maintenance Manuals Transmittal Manual are on site for Turn over to owner during training. If the VA would like these prior - Please contact Chris Welsh jim.patiernojr

Following NFPA 110 information extracted from initial product submittal previously approved

Standard Features

• Kohler Co. provides one-source responsibility for the generating system and accessories.

• The generator set and its components are prototype-tested, factory-built, and production-tested.

• The 60 Hz generator set offers a UL 2200 listing.

• The generator set accepts rated load in one step.

• The 60 Hz generator set meets NFPA 110, Level 1, when equipped with the necessary accessories and installed per NFPA standards.

• A one-year limited warranty covers all systems and components.

Two- and five-year extended warranties are also available.

• Tier 3 EPA-certified for Stationary Emergency Applications

Alternator Features

• The unique Fast-Response II excitation system delivers excellent voltage response and short circuit capability using a permanent magnet (PM)-excited alternator.

• The brushless, rotating-field alternator has broad range reconnectability.

Other Features

• Controllers are available for all applications. See controller features inside.

• The low coolant level shutdown prevents overheating (standard on radiator models only).Integral vibration isolation eliminates the need for under-unit vibration spring isolators.

• An electronic, isochronous governor delivers precise frequency regulation.

• Multiple circuit breaker configurations.

Generator Set Ratings Standby130C Ratings

Alternator Voltage Ph Hz kW/kVA Amps

4UA13 277/480 3 60 300 / 375 451

RATINGS: All three-phase units are rated at 0.8 power factor.

Standby Ratings: Standby ratings apply to installations served by a reliable utility source. The standby rating is applicable to varying loads for the duration of a power outage.

There is no overload capability for this rating. Ratings are in accordance with ISO-3046/1, BS 5514, AS 2789, and DIN 6271.

Prime Power Ratings: Prime power ratings apply to installations where utility power is unavailable or unreliable. At varying load, the number of generator set operating hours is unlimited.

A 10% overload capacity is available for one hour in twelve. Ratings are in accordance with ISO-8528/1, overload power in accordance with ISO-3046/1, BS 5514, AS 2789, and DIN 6271. For limited running time and base load ratings, consult the factory.

Obtain the technical information bulletin (TIB-101) on ratings guidelines for the complete ratings definitions.

The generator set manufacturer reserves the right to change the design or specifications without notice and without any obligation or liability whatsoever.

GENERAL GUIDELINES FOR DERATION: Altitude: Derate 1.3% per 100 m (328 ft.) elevation above 762 m (2500 ft.). Temperature: Derate 1.0% per 10?C (18?F) temperature above 25?C (77?F).

300REOZJ

Diesel jim.patiernojr Line jim.patiernojr Highlight

SUBMITTAL REVIEW
REVIEW COMMENTS
STATUS
ITEM
NET = NO EXCEPTION TAKEN RNR = REVISE NO RESUBMISSION
20201028183648_production_2553940348.pdf
072R0_E_Generator-Factory-Test-Submittal-Review_COR.pdf
SUBMITTAL REVIEW
REVIEW COMMENTS
STATUS
ITEM
NET = NO EXCEPTION TAKEN RNR = REVISE NO RESUBMISSION
2238 - 143 MRI Generator Factory Test Submittal.pdf
2238 - 143 MRI Generator Factory Test Submittal cover sheet 2018
Brockton CT MRI Factory a nd Extended Certified Test Report -33CYGMGC0007
ST_CoverSheet
302-1b
6 Hr Data Form
Sheet1
Powers Loadbank Results.pdf
Sheet1
Blank Page
Blank Page
Start Up Report.pdf
Blank Page
Blank Page
Contracting Officer: Stephen Smith
Contractor: Monument Construction LLC
Contract #: VA241-13-C-0193
Submittal #: 263213 172
Prior Submittal #:
Project #: 523-398
New: Yes
Description 1: Generator Start up report
Description 2: Load Bank Test
Description 3: Factory Testing (For Reference)
Description 4:
Description 5:
Description 6:
Description 7:
Description 8:
Description 9:
Description 10:
Description 11:
Approval 1: Yes
Approval 2: Yes
Approval 3: Yes
Approval 4: Off
Approval 5: Off
Approval 6: Off
Approval 7: Off
Approval 8: Off
Approval 9: Off
Approval 10: Off
Approval 11: Off
Comments 1: Yes
Comments 2: Yes
Comments 3: Yes
Comments 4: Off
Comments 5: Off
Comments 6: Off
Comments 7: Off
Comments 8: Off
Comments 9: Off
Comments 10: Off
Comments 11: Off
Initial 1: JC
Initial 2: JC
Initial 3: JC
Initial 4:
Initial 5:
Initial 6:
Initial 7:
Initial 8:
Initial 9:
Initial 10:
Initial 11:
Date: 10/28/2020
Contractor Name: Paige Millen
Govt:
Approval: Yes
Contractor Name 2:
BCE:
Date of Eval: 12/01/20
Reviewer:
Contracting Office:
Date of Rec:
BCE/ COR: Andre Doyon
Date from KO:
KO: Stephen Smith
Resubmit:
KO Approval: Off
2020-12-01T08:52:37-0500
J Chadwick
2020-12-01T10:56:22-0500
Andre S. Doyon 222382
Item 1: 1
Spec Section 1: 263213-3.2.F
Item 2: 2
Spec Section 2:
Item 3: 3
Spec Section 3: Previously approved
Item 4: 4
Spec Section 4:
Item 5: 5
Spec Section 5:
Item 6: 6
Spec Section 6:
Item 7: 7
Spec Section 7:
Item 8: 8
Spec Section 8:
Item 9: 9
Spec Section 9:
Item 10: 10
Spec Section 10:
Item 11: 11
Spec Section 11:
Comment Field 1: Reviewed by RWS with no exceptions taken
Comment Field 2: Reviewed by RWS with no exceptions taken
Comment Field 3: Noted as for reference
Comment Field 4:
Comment Field 5:
Comment Field 6:
Comment Field 7:
Comment Field 8:
Comment Field 9:
Comment Field 10:
Comment Field 11:

File details come from the government source that posted it. Updated .