S02 - ATTACHMENT 2 - Chicago EHRM - Design Narratives.pdf
PDF 2 MB Posted
- Attached to
- EHRM Infrastructure Upgrades West Campus – North Chicago - Construction Federal contract opportunity
- Solicitation number
- 36C77623B0019
About this file
This document package includes architectural, structural, mechanical, electrical, and site narratives along with design drawings to support an infrastructure upgrade project at the Captain James A. Lovell Federal Health Care Center - West Campus in North Chicago, Illinois. The project involves upgrading 98 telecommunications rooms and expanding or replacing electrical, HVAC, fire protection, and low voltage systems to enable a new Electronic Health Records Modernization system. Key work includes installing new rack-mounted UPS systems, evaluating room sizes and power configurations, adding secondary containment for piping, and ensuring emergency power and grounding meet standards. The narratives provide design criteria, equipment specifications, and clarification of demolition and new construction scope. This project aims to expedite infrastructure upgrades on an aggressive schedule at the West Campus to deploy the EHRM system.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
PROJECT NAME
556-21-701 (2113) North Chicago EHRM- West Campus
SUBMITTAL Issued for Bid & Construction SUBJECT Architectural Narrative
Architecture 1
Project Overview and Background
Spur Design is providing professional A/E services to design an expedited, compliant, and complete construction and activation of a new Electronic Health Record Modernization
(EHRM) system at the Captain James A. Lovell Federal Health Care Center – West Campus, Chicago, IL. The scope includes, but is not limited to, the following infrastructure improvements: electrical (normal and emergency power distribution panel upgrades and receptacles), grounding-bonding, UPS, building management system interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, and renovation of existing space, physical security upgrades, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, upgrade fiber infrastructure backbone campus-wide within buildings and between buildings, install diversified path to datacenter for WAN, provide a new main fiber line coming into the building from the provider point, redundant fiber upgrades between the West and East Campuses, and replace or upgrade communication infrastructure (new data outlets, patch panels, and upgrade to Cat 6A cable) throughout all buildings. Patch, repair and paint existing rooms no longer going to function as TR rooms and provide new storage lockset door hardware to match rest of facility.
There are 98 tele-data rooms throughout the West Campus located in Buildings 1, 3, 4, 5, 6, 7, 9, 11, 32, 36, 37, 46, 48, 66, 92, 131, 133, 133EF, 133CA, 134, 135, 138, 140, 187, 188, 195, 201, 202, 205, 206, Green Bay Road Guard Shack, Lewis Guard Shack, and Tramway.
A total of 3 site visits have been conducted to visually inspect all existing TR spaces and approved TR locations. Items that were looked at were:
• Existing Room Names and Numbers to ensure our existing plans were true to what was currently on site.
• Existing floor areas served by each TR room.
• Existing building functions and departments surrounding each TR room.
• Number of existing racks currently in each TR room.
• Existing telecommunication cabling types.
556-21-701 (2113) North Chicago EHRM- West Campus
Architecture 2
• Verification of adjacent spaces to ensure that the required TR expansions would be able to be accommodated within that space.
• Existing room dimensions to ensure our as-builts were accurate in size and location
• Existing electrical outlet layouts in each TR room.
• Existing Data drop locations for all buildings within scope.
Waivers were submitted to DCIE as well as multiple meeting to discuss rooms with issues.
Multiple waivers were approved, however items not approved at 95% resubmittal were addressed with an exception letter detailing plan of action. See attached Approval Schedule
The VA has a separate contract to update PACS, cameras, and other sensors inside the TR rooms. Those items are shown on our drawings for compliance but will be installed by a different contractor. VA is responsible to make sure they meet full requirements at the time of installation. We are replacing the door and frame assembly to account for the continuous hinge requirement as part of this contract.
Occupancy & Classifications
The James A. Lovell Federal Health Care Center – West Campus located in Chicago, IL the following Buildings fall under the Healthcare Occupancy under NFPA 101-2021.
• 7, 11, 66, 131, 132, 133, 133ca,133ef, 134, 201, 202, 205, 206
The following buildings fall under the Business Occupancy under NFPA 101-2021.
• 1, 3, 9, 46, 48, 135, Green Bay Road Guard Shack, Lewis Guard Shack, and Tramway
The following buildings fall under the Industrial Occupancy under NFPA 101-2021.
• 32, 36, 37, 92, 187, 188, 195
The following buildings fall under the Service Occupancy under NFPA 101-2021.
• 4, 5, 6, 140
The following building falls under the Warehouse Occupancy under NFPA 101-2021.
• 138
556-21-701 (2113) North Chicago EHRM- West Campus
Architecture 3
Construction Phasing
Project to be phased to not interrupt current health care services provided throughout the existing facility. Plans to be developed by the Contractor and approved by the VA to eliminate interruptions or kept to an absolute minimum. Emergency egress shall not be compromised during construction. Contractor parking and staging areas have not been identified. Staging for construction materials will be available as close as possible to affected buildings, if necessary, during construction. Contractor is responsible for building construction/demolition remediation throughout construction process until the work is accepted by the VA. Contractor to coordinate with VA COR prior to all construction phasing and staging while on station.
Applicable Codes, Standards, and Guidelines
The following codes, standards, and guidelines will be followed throughout the design of this project:
• Design Manuals (By discipline) PG-18-10
• Design and Construction Procedures PG-18-3
• A/E Submission Instructions, PG-18-15, Minor and NRM Projects Vol. C
• Standard Details and CAD Standards PG-18-4
• Equipment Guide List PG-18-5
• Equipment Guide List Index
• Architectural Barrier Act (ABA) Standards
• VA Barrier Free Design Standard (A Supplement to the ABA) PG-18-13
• Asbestos Abatement Design Manual
• VA Signage and Wayfinding Design Manual PG-18-10
• Master Construction Specifications PG-18-1
• VA Design Alerts
• VHA Fire Protection Design Manual
• VHA National BIM/CAD Standards
• Physical Security and Resiliency Design Manual, July 2022 Revision
• Whole Building Commissioning Process Manual
• VA Sustainable Design Manuals
556-21-701 (2113) North Chicago EHRM- West Campus
Architecture 4
• VHA Directive 1061 – Prevention of Healthcare-Associated Legionella Disease and
Scald Injury from Potable Water Distribution Systems
• National Codes and Standards: (Most recent Editions) o NFPA o IBC o NEC o EPA o NSPC o OSHA
1. FEW TRS ARE EXACTLY ALIKE. OIT SHALL DESIGN OR CONDUCT DESIGN REVIEWS OF ALL PROJECTS INVOLVING NEW OF RENOVATED TRS TO ASSURE THAT THE POWER, COOLING, AND ROOM LAYOUT ARE CONSISTENT WITH VA AND INDUSTRY
STANDARDS.
2. EVALUATION FACTORS FOR TR ROOMS INCLUDE THE FOLLOWING:
A. FLOOR AREA SERVED
B. NUMBER OF WAO SERVED
C. HORIZONTAL DISTRIBUTION DISTANCE
3. FOR NON-MEDICAL SPACES, PROVIDE A MINUMUM OF 80SF FOR ONE RACK TR WITH AN ADDITIONAL 20SF PER ADDITIONAL RACK
REQUIRED.
4. FOR HEALTHCARE FACILITY TR'S, PROVIDE A MINIMUM OF 170SF (NEW CONSTRUCTION), 100SF (EXISTING) FOR THE STANDARD
FOUR-RACK CONFIGURATION WITH AN ADDITIONAL 20SF PER ADDITIONAL RACK REQUIRED.
5. VA SHALL NOT DESIGN, BUILD OR USE "SHALLOW ROOMS" OR SIMULAR SMALL SPACES
6. THERE SHALL BE A MINIMUM OF ONE STANDARDIZED TR PER FLOOR. GENERALLY ADDITIONAL STANDARD TR ROOMS SHOULD BE
PROVIDED WHEN
A. THE FLOOR AREA TO BE SERVED EXCEEDS 10,000SF
B. THE HORIZONTAL DISTRIBUTION DISTANCE TO THE WORK AREA EXCEEDS 295FT.
7. TRS ARE A SUBSET OF THE NETWORK SUPPORT CENTERS (NSC )CLASSIFICATION ARCHETYPE WITH LESS STRINGENT
ENVIRONMENTAL CONTROL REQUIREMENTS.
8. VA OIT TO HELP IN CLASSIFYING TR'S NSC'S PRIMARY ATTRIBURE PER THE INFRASTRUCTURE STANDARDS FOR
TELECOMMUNICATION SPACES VERSION 3.1, TABLE 3.
A. IT WILL BE ASSUMED ALL TR ROOMS ARE ID #4 (NETWORK SUPPORT CENTERS (NSC) UNLEASS OTHERWISE NOTED.
GENERAL WAIVER NOTES
PROJECT NUMBER
PROJECT NAME
SUBMITTAL
SUBJECT
556-21-701 (2113)
EHRM INFRASTRUCTURE UPGRADES, WEST
CAMPUS - NORTH CHICAGO
ISSUE FOR BID & CONSTRUCTION
APPROVAL SCHEDULE
APPROVAL SCHEDULE
ROOM NO
BUILDING
FUNCTION
ROOM
TYPE
OIT
CLASS
ACTUAL
AREA
PROG.
AREA
WAIVER NEEDED FOR
VA ApprovalROOM
SIZE
AREA
SERVED
OVER
10,000SF
ELEC
BLDG- 140
03-140 SERVICE TE 4 47 SF 0 SF NO NO YES APPROVED - VARIANCE
BLDG- 187
06-187 INDUSTRIAL TE 4 647 SF 80 SF NO NO YES APPROVED - VARIANCE
BLDG- 188
102-188 INDUSTRIAL TE 4 111 SF 80 SF NO YES YES APPROVED - VARIANCE
BLDG- 195
114-195 INDUSTRIAL TE 4 101 SF 80 SF NO YES YES APPROVED - VARIANCE
122-195 INDUSTRIAL TE 4 32 SF 80 SF YES YES YES APPROVED - VARIANCE
BLDG- 201
128-201 HOSPITAL TE 4 27 SF 0 SF NO NO YES APPROVED - EXCEPTION LETTER
BLDG- 202
128-202 HOSPITAL TE 4 27 SF 0 SF NO NO YES APPROVED - EXCEPTION LETTER
BLDG- 205
132-205 HOSPITAL TE 4 27 SF 0 SF NO NO YES APPROVED - EXCEPTION LETTER
BLDG- 206
132-206 HOSPITAL TE 4 27 SF 0 SF NO NO YES APPROVED - EXCEPTION LETTER
TOTAL: 89
APPROVAL SCHEDULE
ROOM NO
BUILDING
FUNCTION
ROOM
TYPE
OIT
CLASS
ACTUAL
AREA
PROG.
AREA
WAIVER NEEDED FOR
VA ApprovalROOM
SIZE
AREA
SERVED
OVER
10,000SF
ELEC
2E224-133 HOSPITAL TR 4 99 SF 120 SF YES YES YES APPROVED - VARIANCE
2D146-133 HOSPITAL TR 4 75 SF 100 SF YES YES YES APPROVED - VARIANCE
2D174-133 HOSPITAL TR 4 168 SF 100 SF NO YES YES APPROVED - VARIANCE
2A106-133 HOSPITAL TR 4 120 SF 120 SF NO YES YES APPROVED - VARIANCE
3D100-133 HOSPITAL TR 4 185 SF 100 SF NO YES YES APPROVED - VARIANCE
3B123-133 HOSPITAL TR 4 84 SF 100 SF YES NO YES APPROVED - VARIANCE
3F119-133 HOSPITAL TR 4 99 SF 120 SF YES YES YES APPROVED - VARIANCE
3F323-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
3E203-133 HOSPITAL TR 4 1381 SF 0 SF NO YES YES APPROVED - VARIANCE
3A148-133 HOSPITAL TR 4 74 SF 100 SF YES YES YES APPROVED - VARIANCE
BD129-133 HOSPITAL TR 4 130 SF 100 SF NO YES YES APPROVED - EXCEPTION LETTER
BD139-133 HOSPITAL TR 4 94 SF 100 SF YES YES YES APPROVED - VARIANCE
1D225-133 HOSPITAL TR 4 124 SF 100 SF NO YES YES APPROVED - EXCEPTION LETTER
1D226-133 HOSPITAL TR 4 123 SF 100 SF NO YES YES APPROVED - EXCEPTION LETTER
2D129-133 HOSPITAL TR 4 123 SF 100 SF NO YES YES APPROVED - EXCEPTION LETTER
3D111-133 HOSPITAL TR 4 169 SF 100 SF NO YES YES APPROVED - EXCEPTION LETTER
3D126-133 HOSPITAL TR 4 172 SF 100 SF NO NO YES APPROVED - EXCEPTION LETTER
BA130B-133 HOSPITAL TR 4 172 SF 100 SF NO APPROVED - VARIANCE
BD149-133 HOSPITAL TR 4 88 SF 0 SF NO APPROVED - VARIANCE
BLDG- 134
A104-134 HOSPITAL TR 4 196 SF 120 SF NO YES YES APPROVED - VARIANCE
A206-134 HOSPITAL TR 4 198 SF 100 SF NO YES YES APPROVED - VARIANCE
B216-134 HOSPITAL TE 4 58 SF 0 SF NO YES APPROVED - VARIANCE
B318-134 HOSPITAL TE 4 58 SF 0 SF NO YES APPROVED - VARIANCE
A305-134 HOSPITAL TR 4 198 SF 0 SF NO YES YES APPROVED - VARIANCE
C017-134 HOSPITAL TR 4 1352 SF 0 SF NO YES YES APPROVED - VARIANCE
B116-134 HOSPITAL TE 4 58 SF 0 SF NO YES APPROVED - EXCEPTION LETTER
BLDG- 135
A29A-135 OFFICE TR 4 98 SF 100 SF YES YES YES APPROVED - VARIANCE
142A-135 OFFICE TR 4 95 SF 120 SF YES YES YES APPROVED - VARIANCE
242A-135 OFFICE TR 4 120 SF 120 SF NO YES YES APPROVED - VARIANCE
BLDG- 138
K1-138 WAREHOUSE TE 4 18 SF 0 SF NO YES YES APPROVED - VARIANCE
APPROVAL SCHEDULE
ROOM NO
BUILDING
FUNCTION
ROOM
TYPE
OIT
CLASS
ACTUAL
AREA
PROG.
AREA
WAIVER NEEDED FOR
VA ApprovalROOM
SIZE
AREA
SERVED
OVER
10,000SF
ELEC
BLDG- 1
100-1 OFFICE TR 4 143 SF 120 SF NO YES YES APPROVED - VARIANCE
201-1 OFFICE TR 4 136 SF 120 SF NO YES YES APPROVED - VARIANCE
300-1 OFFICE TR 4 143 SF 120 SF NO YES YES APPROVED - VARIANCE
BLDG- 3
102-3 OFFICE TR 4 122 SF 100 SF NO YES YES APPROVED - VARIANCE
202-3 OFFICE TR 4 105 SF 100 SF NO NO YES APPROVED - VARIANCE
BLDG- 4
111-4 SERVICE TR 4 104 SF 120 SF YES YES YES APPROVED - VARIANCE
185-4 SERVICE TE 4 83 SF 0 SF NO YES YES APPROVED - VARIANCE
208-4 SERVICE TR 4 128 SF 100 SF NO YES YES APPROVED - VARIANCE
BLDG- 6
120-6 SERVICE TR 4 130 SF 100 SF NO YES YES APPROVED - VARIANCE
130-6 SERVICE TR 4 183 SF 100 SF NO YES YES APPROVED - VARIANCE
BLDG- 7
130B-7 HOSPITAL TR 4 92 SF 100 SF YES YES YES APPROVED - VARIANCE
227B-7 HOSPITAL TR 4 147 SF 100 SF NO YES YES APPROVED - VARIANCE
BLDG- 9
210A-9 OFFICE TR 4 104 SF 100 SF NO YES YES APPROVED - VARIANCE
116-9 OFFICE TR 4 224 SF 100 SF NO YES APPROVED - VARIANCE
BLDG- 11
105-11 HOSPITAL TR 4 81 SF 100 SF YES NO YES APPROVED - VARIANCE
BLDG- 32
5-32 INDUSTRIAL TE 4 78 SF 80 SF YES YES YES APPROVED - VARIANCE
BLDG- 36
10-36 INDUSTRIAL TE 4 351 SF 0 SF NO YES APPROVED - VARIANCE
BLDG- 37
5A-37 INDUSTRIAL TE 4 542 SF 0 SF NO NO YES APPROVED - VARIANCE
BLDG- 46
114-46 OFFICE TR 4 130 SF 100 SF NO NO YES APPROVED - VARIANCE
214-46 OFFICE TR 4 128 SF 100 SF NO NO YES APPROVED - VARIANCE
BLDG- 66
9A-66 HOSPITAL TR 4 164 SF 100 SF NO YES YES APPROVED - VARIANCE
125-66 HOSPITAL TR 4 86 SF 100 SF YES YES YES APPROVED - VARIANCE
226-66 HOSPITAL TR 4 87 SF 100 SF YES YES YES APPROVED - VARIANCE
BLDG- 92
103-92 INDUSTRIAL TE 4 43 SF 0 SF NO NO YES APPROVED - VARIANCE
BLDG- 131
1H-131 HOSPITAL TR 4 92 SF 120 SF YES YES YES APPROVED - VARIANCE
101B-131 HOSPITAL TR 4 108 SF 120 SF YES YES YES APPROVED - VARIANCE
207-131 HOSPITAL TR 4 110 SF 100 SF NO YES YES APPROVED - VARIANCE
302-131 HOSPITAL TR 4 88 SF 100 SF YES YES YES APPROVED - VARIANCE
402A-131 HOSPITAL TR 4 111 SF 100 SF NO YES YES APPROVED - VARIANCE
BLDG- 132
105A-132 OFFICE TE 4 240 SF 0 SF NO APPROVED - VARIANCE
BLDG- 133
1E344-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
1E226-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
1F347-133 HOSPITAL TR 4 99 SF 120 SF YES YES YES APPROVED - VARIANCE
1F101F-133 HOSPITAL TR 4 91 SF 100 SF YES YES YES APPROVED - VARIANCE
1A120A-133 HOSPITAL TR 4 90 SF 100 SF YES NO YES APPROVED - VARIANCE
1E104-133 HOSPITAL TR 4 100 SF 100 SF NO NO YES APPROVED - VARIANCE
1B117A-133 HOSPITAL TR 4 81 SF 100 SF YES YES YES APPROVED - VARIANCE
1D117-133 HOSPITAL TR 4 178 SF 120 SF NO YES YES APPROVED - VARIANCE
BD105-133 HOSPITAL TR 4 150 SF 120 SF NO YES YES APPROVED - VARIANCE
BC113-133 HOSPITAL TR 4 179 SF 100 SF NO YES YES APPROVED - VARIANCE
BB101C-133 HOSPITAL TR 4 280 SF 0 SF NO NO YES APPROVED - VARIANCE
BF117-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
BF329-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
BE405-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
BE215-133 HOSPITAL TR 4 96 SF 100 SF YES YES YES APPROVED - VARIANCE
4B117-133 HOSPITAL TR 4 94 SF 100 SF YES NO YES APPROVED - VARIANCE
4A115-133 HOSPITAL TR 4 112 SF 100 SF NO YES YES APPROVED - VARIANCE
2F311-133 HOSPITAL TR 4 99 SF 100 SF YES YES YES APPROVED - VARIANCE
2F123-133 HOSPITAL TR 4 99 SF 120 SF YES YES YES APPROVED - VARIANCE
2E408-133 HOSPITAL TR 4 99 SF 120 SF YES YES YES APPROVED - VARIANCE
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
SUBJECT Site Narrative
Site 1
This narrative provides supplemental information to further define the infrastructure upgrades for the EHRM North Chicago project. This narrative is intended to provide additional guidance for Issued for Bid & Construction level pricing to be provided by the design team. Also, these plans and narrative will be reviewed by the VA. The information provided herein was obtained from conversations with the VA, surveys provided by the VA, GIS data, and visual site reconnaissance.
Geotechnical
No subsurface exploration has been completed, nor is planned to be completed, for this project.
Pavement
The contractor shall replace all sidewalks, curbs, and pavement damaged during construction of the new duct banks.
Sanitary Sewer
No sanitary sewer service or sanitary main extensions are required as part of this project.
Storm Drainage
No storm sewer service or storm sewer main extensions are required as part of this project.
General Utilities
There will not be any water, fire, or gas line extensions as part of this project. Refer to the plans for additional information. It was determined that new communication duct banks and communication manholes will be required as shown on sheets GS013-GS016. Reference Technology plans for additional information and communication duct bank rehabilitations that may be needed.
Detention and Water Quality and Sediment Basin
No Detention or Water Quality improvements are anticipated as a part of this project.
Contractor will be responsible for installing erosion control measures as needed to control sediment migration and sediment tracking off the site. See erosion control plans and details as shown on sheets GS017-GS021.
556-21-701 North Chicago EHRM- West Campus
SUBMITTAL ISSUED FOR BID & CONSTRUCTION
SUBJECT Structural Narrative
Structural 1
EHRM Upgrades for North Chicago West Campus.
Design Criteria
Design Manuals - PG-18-10 – Structural
IBC 2021
MEP Support
Equipment bracing details are provided on the structural drawings conceptually showing the lateral bracing requirements for new equipment and rack hanger details.
Equipment Weight Verification
Roof top units (RTU’s) are being added to the roofs. The units weigh 263 lb (use 300 lb for design). A diagram is shown on the following page. This is 78 psf. Many of the existing roof structures are not known and will not be able to be verified until construction starts. Notes have been added to the structural drawings with the assumptions which need to be verified during construction.
Calculations confirming the existing roofs have been included where information was available.
It is likely that other roofs are similarly constructed, but this will need to be confirmed during construction.
556-21-701 North Chicago EHRM- West Campus
SUBMITTAL ISSUED FOR BID & CONSTRUCTION
SUBJECT Structural Narrative
Structural 2
556-21-701 (Spur 21113) North Chicago EHRM- West Campus
SUBMITTAL 100% Construction Documents SUBJECT Fire Protection Narrative
Fire Protection 1
Fire Protection Design Basis of Design
Criteria
The project will be designed in accordance with the following criteria:
• VA Fire Protection Design Manual – Eighth Edition, June 1, 2021
• Physical Security and Resiliency Design Manual, July 2022 Edition
• NFPA 1, Fire Code, 2021 Edition
• NFPA 10, Standard for Portable Fire Extinguishers, 2022 Edition
• NFPA 13, Standard for the Installation of Sprinkler Systems, 2022 Edition
• NFPA 70, National Electrical Code, 2023 Edition
• NFPA 72, National Fire Alarm and Signaling Code, 2022 Edition
• NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating
Systems, 2021 Edition
• NFPA 99, Health Care Facilities Code, 2021 Edition
• NFPA 101, Life Safety Code, 2021 Edition
• International Building Code, 2021 Edition
The existing automatic fire sprinkler system will be modified to accommodate the new floorplan for each IT Closet and Server Room. The existing fire risers/fire pump and all associated valves and components in the Scope of Work (SOW) Buildings will not need to be modified for this project. Modification to the existing systems will include the expansion of the systems or the replacement of sprinklers which will be completed in accordance with the VA Fire
Protection Design Manual and NFPA 13.
Hydraulic design calculations for the sprinkler system in the IT Closets will not be provided due to the work in these areas being minimal and not expected to affect the demand of the sprinkler system. All new systems will be installed in accordance with the pipe schedule method. All existing sprinkler system alarms are electrically powered and supervised by the fire alarm system. Fire sprinkler piping will be routed, distributed, and concealed above the suspended ceilings.
556-21-701 (Spur 21113) North Chicago EHRM- West Campus
Fire Protection 2
Sprinkler finish shall match existing sprinklers within the SOW Areas, semi-recessed with chrome escutcheons. Sprinklers installed in finished spaces will be in ACT ceilings and approved guards will be provided for low ceilings, below ducts, beams and/or other sprinkler heads less than 7 feet above the finished floor. Sprinkler piping in unfinished areas such as mechanical and electrical rooms will be exposed with upright sprinklers. The contractor is responsible for field-verifying that sprinklers are not obstructed. Where sprinkler piping is to be located over equipment, contractor to provide troughs under sprinkler piping in accordance with the VA Fire Protection Design Manual.
The systems will use the existing Fire Department Connections (FDC) for each SOW Building.
All scope of work areas will be protected with automatic sprinkler protection unless otherwise noted on the design drawings. All areas within the scope of work will be classified as Light
Hazard occupancies. Areas classified as Light Hazard will be provided with 0.10 gpm/ ft2 over the most demanding 1500 ft2.
All piping will be steel piping. Piping 2 inches or less will be a minimum schedule 40 and all piping larger than 2 inches will be a minimum schedule 10.
The automatic sprinkler system will be tested to assure that equipment and components function as intended. Upon completion of specified tests, the material and test certificates will be submitted to the VA. After hydrostatic testing, the sprinkler system will be flushed per NFPA
13.
Portable fire extinguishers will be provided throughout the scope of work areas in accordance with NFPA 10 as required by the VA Fire Protection Design Manual. Fire extinguisher cabinet locations shall comply with NFPA 10 and NFPA 75 as required by the VA Fire Protection
Design Manual. These locations will be shown on the Life Safety Drawings developed by Spur.
556-21-701 (Spur 21113) North Chicago EHRM- West Campus
Fire Protection 3
If awarded during the construction period, Poole Fire Protection will review and approve the fire suppression shop drawings developed by the fire suppression contractor. Additionally, Poole Fire Protection will witness the acceptance testing of the fire sprinkler system installed in the scope of work area.
Fire Alarm
The existing Voice-Evacuation Fire Alarm systems located in each SOW Building will be modified to accommodate the new floorplans. All equipment, devices, appliances, and pathways will be installed to conform to VA Fire Protection Design Manual, NFPA 70, NFPA
72, and NFPA 90A. The provided system components must be compatible with the existing system. The scope of work areas will use the existing Fire Alarm Control Panels (FACP) and will be expanded as needed.
Per NFPA 70, all fire alarm components will be powered by electrical panels dedicated to fire protection features. In accordance with the VA Fire Protection Design Manual, Section 7.2.E, wiring which shall be installed in metal raceway. All pathways for the Fire Alarm system will comply with a Class B pathway designation and provide requisite circuit supervision.
New notification appliances shall be provided as shown the design drawings. New appliance finish shall match the existing notification appliances.
Existing manual pull stations will remain. No modifications are needed for these.
The FA system will be fully tested in accordance with the requirements of NFPA 72, Section
14.4.2, reacceptance testing. Upon completion of specified tests, the material and test certificates will be submitted to the VA. Record drawings, replacement parts, and warranty response time will be provided.
Existing smoke detectors in telecommunications spaces will be removed per the VA Fire
Protection Design Manual requirements as they are not required.
556-21-701 (Spur 21113) North Chicago EHRM- West Campus
Fire Protection 4
If awarded during the construction period, Poole Fire Protection will review and approve the fire alarm shop drawings developed by the fire alarm contractor. Additionally, Poole Fire
Protection will witness the acceptance testing of the fire alarm system installed in the scope of work area.
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
SUBJECT HVAC Narrative
HVAC 1
HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
1. GENERAL
A. Spur Design is providing professional A/E services to design an expedited, compliant, and complete construction and activation of a new Electronic Health Record
Modernization (EHRM) system at the Captain James A. Lovell Federal Health Care
Center – West Campus, Chicago, IL. The project scope consists of design upgrades to the facilities’ electrical and IT infrastructure to allow for the new Electronic Health
Record Modernization (EHRM) System. The mechanical design work encompasses the addition of new HVAC equipment or upgrades to existing HVAC equipment serving new or relocated Telecommunications Rooms. The existing HVAC equipment serving
TR’s that are to remain were evaluated to determine if the equipment meets the EHRM requirements.
There are approximately 90 tele-data rooms in-scope throughout the West Campus located in Buildings 1, 3, 4, 6, 7, 9, 11, 32, 36, 37, 46, 66, 92, 131, 132, 133, 134, 135, 138, 140, 187, 188, 195, 201, 202, 205, and 206.
New Telecom rooms with telecom racks installed will have two indoor units working together, served by a common condensing unit based on direction from VA Data
Center and Infrastructure Engineering (DCIE). Condensing units were located on a case-by-case basis, with some being on rooftops, and some being located on the ground. Rooms with telecom enclosures were assessed on a case-by-case basis.
New HVAC systems to be installed for those spaces will be a single indoor unit served by its own condensing unit.
B. Existing Systems Description and extent of renovation:
1. Refer to drawings.
C. New System Description
1. Telecommunication Rooms
a) Basis of Design – Variable Refrigerant Flow DX heat pump system with ductless wall mounted indoor units. Indoor units will be served by associated outdoor condensing units. Condensing units will be roof mounted when necessary. Each TR room will have two indoor units working in tandem.
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
HVAC 2
b) Units have been sized to account for the heat gain from the telecom racks (1 rack = 5kw, 2 = 7kw, 3 = 8.5kw, 4 =10kw), lighting load, heat load from walls/roofs/windows/etc., and electrical panels throughout the room. In rooms with telecom racks, two indoor units are used to prevent short cycling. The DX split unit sizing has taken derating due to the length of the piping run into account. New units will be tied to the existing BAS system.
Secondary drip trays are being installed underneath all existing to remain mechanical piping, and new refrigerant piping being installed in the rooms.
The purpose of these drip trays is to protect the racks and various electrical equipment in the room. These drip trays will be drained by new condensate lines, with new float switches that are tied to the BAS monitoring the fill levels within each room. The condensate lines will be routed to the nearest mop sink, floor drain, or outside to a condensate pit.
2. Server Rooms
a) HVAC systems of server rooms are not in the scope of this project; however, there are TR racks within existing server rooms. These spaces will utilize the existing CRAC units with raised floor air distribution.
D. Selective Demolition
1. Telecommunication Rooms – reference demolition sheets for specific information.
a) Existing HVAC systems including window mounted AC units, unit heaters, and fan coil units will be demolished.
b) All existing duct, air devices, and accessories that are within the new TR room boundaries and not served from a dedicated AC unit will be demolished back to the main branch and capped. If ductwork or piping is serving another space it will be rerouted if possible. In the event a duct or pipe cannot be rerouted drip trays, fire/smoke dampers, and security bars will be provided where necessary.
c) Existing radiators and associated piping serving the TRs will be demolished.
All other forms of existing supplementary heat will be demolished.
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
HVAC 3
d) In rooms with hard ceilings or otherwise inaccessible mechanical systems, systems limited to that room shall be demolished, and other systems left in place when rerouting is not possible. If existing piping is to remain in place it shall have new secondary drip trays installed to protect the equipment underneath.
2. Telecom Enclosures – where possible, existing HVAC systems are to remain in place and be re-used.
E. Testing, Adjusting, and Balancing for HVAC
1. Pre-testing is not required for this project.
2. Final testing of systems will be performed and reviewed during the commissioning functional performance testing of the systems.
F. Vibration Control
1. New roof or pad mounted equipment will be mounted with neoprene waffle isolation restraints as required by VA AHJ and local codes.
G. Seismic Requirements
1. Not required
2. APPLICABLE CODES
A. IMC – International Mechanical Code – 2021
B. IPC – International Plumbing Code - 2021
C. NFPA – National Fire Protection Association - 90A, 96, 99, 101 - 2021
3. APPLICABLE STANDARDS
A. ASHRAE 90.1 – 2019 Energy Standard for Buildings Except Low Rise Residential
Buildings
B. VA HVAC Design Manual – Rev. 2021
C. VA Physical Security & Resiliency Design Manual (PSRDM) – Rev. July 2022
D. Office of Information & Technology (OIT) Infrastructure Standard for
Telecommunications Spaces v3.1 (1 July 2021)
4. OUTDOOR CLIMATE CONDITIONS:
A. ASHRAE Climate Zone 5A (Moist)
B. ASHRAE 2017 Fundamentals – Location: North Chicago, IL (MSL 612)
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
HVAC 4
1. Heating: 0.5 (99.6% °F DB); Extreme annual: -5.8 / -6.7 (°F DB/WB)
2. Cooling: 91.9 / 74.7 (0.4% °F DB/WB); Extreme annual: 96.9 / 80.5 (°F DB/WB)
3. Dehumidification: 74.9 °F / 133.6 / 84.0 °F (0.4% DP/HR/MCDB)
5. INDOOR DESIGN CONDITIONS:
A. Per VA Design Guide/Manual:
1. HVAC Design Manual – 2020 – Room Data Sheets
2. OEHRM Site Infrastructure and End User Device Requirements V2.0 – 2021
3. Infrastructure Standard for Telecommunications Spaces V3.1 - 2021
a) SOCAMES Design Alerts 1-4
4. TR Room Temperature Requirements:
a) Heating DB – 81 °F
b) Cooling DB – 64 °F
c) Max. RH% - 60%
d) Min. RH% - 30%
e) Telecom Rooms are stated to require positive pressurization in the HVAC design guide, a variance has been submitted by the COR to DCIE to allow for these rooms to be designed with neutral pressurization.
6. ENERGY SUPPLY
A. Electrical power supply available: Varies by building.
B. No Central Plant utilities will be utilized for this project.
7. CONTROLS
A. New unitary HVAC controls will be integrated into the current ECC system platform as part of this work. The existing BAS and ECC is designed around Automated Logic
Company of Chicago.
END HVAC DESIGN NARRATIVE
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
SUBJECT Electrical Narrative
Electrical 1
DIVISION 26 - ELECTRICAL
1. GENERAL
A. The electrical portion of this project will include support for the following on the Captain James A. Lovell VA Medical Center campus:
1. Provision of normal and essential power required for the modifications to the existing telecommunications rooms.
2. Renovation of OI&T closets as indicated to include room modifications.
3. Additional power and data drops for end user deployment equipment.
4. Design in accordance with VA design guides and applicable standards and codes.
B. Specific provisions for this project will include evaluating the electrical service to each of the buildings being affected, providing new rack-mounted UPS systems, and expanding electrical distribution as required. Each telecommunications room (TR) will be evaluated to have the required number of circuits & receptacles for the number of data racks. The critical branch of the essential electrical system (EES) will be used to serve circuits in the TR’s where critical power is available. All telecommunication rooms will be evaluated to ensure all equipment complies with single point grounding per OEHRM design guidelines.
2. ELECTRICAL CODES AND STANDARDS
A. Architectural Barriers Act (ABA) Standards
B. VA Barrier Free Design Standard (A Supplement to the ABA)
C. ASHRAE Standard 90.1-2019 – Energy Standard for Buildings Except Low-Rise Residential Buildings
D. Illuminating Engineering Society (IES) Handbook, 10th Edition
E. IEBC 2021 – International Existing Building Code
F. IECC 2021 – International Energy Conservation Code
G. JCAHO EC 7.40 – Emergency Electrical Power System Inspection, Maintenance, and Testing
H. NFPA 70-2020 - National Electrical Code (NEC)
I. NFPA 99-2021 – Health Care Facilities Code
J. NFPA 101-2021 – Life Safety Code
K. NFPA 110-2022 – Standard for Emergency and Standby Power Systems
L. NFPA 111-2022 – Standards on Stored Electrical Energy Emergency and Standby Power Systems
M. NFPA 780-2020 – Standard for the Installation of Lightning Protection Systems
N. VA PG-18-10 Electrical Design Manual, December 2019
O. VA PG-18-10 Lighting Design Manual, January 2022
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 2
P. VA PG-18-10 Telecommunications and Special Telecommunications Systems Design Manual – February 2016
Q. Office of Information and Technology (OIT) Infrastructure Standard for Telecommunications Spaces v3.1 (1 July 2021)
R. OEHRM Site Infrastructure Requirements
S. VA PG-18-10 Physical Security and Resiliency Design Manual, July, 2022
3. ELECTRICAL DEMOLITION
Demolition of electrical work will include:
A. Removal of all existing rack-mounted UPS’s in the TR’s.
B. Removal of all existing rack-mounted receptacles in the TR’s, including all conduit and conductors.
C. Receptacles located in each server room will be analyzed to confirm they are on the proper branch of the EES. Any outdated, hazardous, or improper receptacles will be demolished, or new conductors will be provided from the critical branch of the EES.
D. Each TR’s lighting will be analyzed to ensure it is meeting the current VA design manuals. If non-compliant, light fixtures will be demolished and replaced with new.
4. SITE POWER DISTRIBUTION SYSTEMS
A. Modifications to the campus’ underground emergency distribution system is expected for the following buildings:
1. Between generator building 156 and building 1.
2. Between generator building 155 and building 66.
3. Between generator building 151 and building 131.
B. Modifications include demolition of the existing underground conduit and feeder conductors. Each will be replaced with new concrete-encased duct banks as required to upsize the existing building feeds.
5. BUILDING POWER DISTRIBUTION SYSTEMS
A. The existing buildings throughout campus are fed from multiple exterior, pad-mounted, medium-voltage transformers of various sizes. The medium-voltage transformers then step-down to feed low-voltage distribution equipment. Modifications to the existing 480Y/277V and 208Y/120V are expected as part of this project.
1. A load analysis for each of the TR’s was completed between October 4-7, 2021.
The results of this load analysis determined the loading requirements for each TR.
The results of this study can be found in Appendix B: Electrical Analysis. The following option has been recommended as the best path moving forward.
a) Utilize the information gathered while on site and include additional safety factors for future growth. Provide UPS’s and additional electrical equipment that is sized based off of this analysis. Equipment in each TR will meet the latest VA OIT Design Manual, however, the upstream equipment will not be modified unless determined that future growth is unachievable with the current
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 3 configuration. This option does not meet all the current VA design guidelines, but it is fully sufficient to meet all the current EHRM requirements and provide sufficient capacity for the existing equipment. An addition 25% safety factor has also been applied to allow for additional equipment implementation in the future.
B. Many TR’s do not have power from the critical branch of the EES. In some cases, the TR’s are fed from the incorrect branch of the EES and a few do not have emergency power at all.
1. All TR’s will be modified to ensure critical power is being provided where critical power is available. This will include refeeding existing panelboards that are located within the TR’s, provided new branch circuits from existing critical branch panelboards located outside of the TR’s, or providing new panelboards that are fed from the upstream critical distribution panel.
C. The TR’s through-out the campus are not properly grounded. If a main ground bar is existing at the main electrical service of each building, then a new main telecommunications ground bar (MTGB) will be established for the main TR in each building. If a main building ground is not established at the main electrical service of any building, then a new earth ground will be established, tied to a new main electrical service ground, and then extended to establish a new MTGB for the main TR in that building. If TR’s do not have a copper ground bar, then they will be replaced. Refer to Appendix A for additional information.
6. RACK-MOUNTED UPS SYSTEM
A. A traditional rack-mounted UPS system is planned to be utilized for all of the TR’s.
This will include a rack-mounted zone power distribution unit (PDU) in each space and dedicated rack-mounted UPS’s for each rack.
1. Each zone PDU has two (2) inputs. Each input will require it’s own power source.
One side of the PDU will be powered by a critical power panelboard and the other from a normal power panelboard.
2. The size and location of the zone PDU is determined based off of the latest VA specifications. Each scenario can be seen in Appendix A.
B. In buildings with dedicated generator backup, each UPS will be sized to provide a minimum of 10-minute run-time for all connected loads in accordance with the latest VA Physical Security and Resiliency Design Manual.
C. In buildings without a dedicated generator, each UPS will be provided with additional battery modules to achieve a minimum of 1 hour worth of runtime.
7. BUILDING LIGHTING SYSTEMS
A. The lighting in each TR will be analyzed to ensure it is up to the latest VA standards. If the standards are not being met, then new lighting will be provided in the TR.
8. ELECTRICAL CALCULATIONS
A. Voltage drop calculations will be performed for all new feeders and branch circuits.
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 4
Feeders and branch circuits will be sized to limit voltage drop to the levels recommended by the energy code (2% for feeders, 3% for branch circuits, with the combined drop no more than 5%).
B. Preliminary fault currents will be calculated to determine the available interrupting current (AIC) rating for all new electrical equipment. These calculations will be performed via SKM PowerTools for Windows software. Final fault current and arc-flash calculations will be performed by the electrical equipment supplier and based upon installed equipment on the project. A protective device coordination study will also be performed by the electrical equipment supplier and all recommended settings will be implemented at the time of installation.
C. If required for existing system/building modifications, lightning protection calculations will be performed in accordance with Annex L Lightning Risk Assessment of NFPA 780.
D. Energy code compliance will be performed via COMCheck software.
9. GENERAL ELECTRICAL EQUIPMENT
A. Building Lightning Protection
1. Requirement for a building lightning protection system will be calculated based on Annex L of NFPA 780, if required.
B. Switchboards and Distribution Panelboards
1. New distribution panelboards will be sized for the loads they serve and include 30% spare capacity and spare space. Panelboard bussing will be copper. The distribution panelboard ampere interrupting current (AIC) rating will be fully rated and sized based on the available fault current. Floor mounted distribution panelboards will be mounted on a 4” tall concrete house-keeping pad.
2. New circuit breakers in existing switchboard and distribution panelboards will have available ampere interrupting current (AIC) ratings to match the panelboard.
C. Surge Protection
1. A Type 2 Surge Protective Device (SPD) will be provided at panelboards that serve sensitive electronic equipment.
D. Panelboards
1. New panelboards will be provided as required for the project. Panelboards will include main circuit breakers where required by the NEC and bolt-on style circuit breakers. 20% spare capacity will be provided per the VA Electrical Design Manual. Bussing will be copper. Fault currents will be calculated to determine the AIC rating for the panelboard and circuit breakers. All panelboards and circuit breakers will be fully rated.
2. Panelboards will be provided with clear, concise schedules.
E. Disconnect Switches
1. New disconnect switches will be provided for HVAC equipment. Switches will be heavy duty style, rated for the environment installed in and fused if required to
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 5 protect equipment from high available fault currents. Disconnecting means will be provided within sight of all motors and other equipment.
2. Motor-rated disconnect switches will be provided for any fan-powered boxes.
F. Building Feeders, Branch Circuits, and Raceways
1. All conductors will be copper and routed within raceways.
2. A copper ground conductor will be routed with all circuits except building service entrance feeders.
3. Minimum raceway size will be 3/4” above grade and 1” below grade.
G. Wiring Devices
1. Receptacles will be hospital grade, NEMA 5-20R grounding type, and ivory in color as required by the VA design guide.
2. Cover plates will be 302 brushed stainless steel. Cover plates for devices fed from emergency circuits will be 302 brushed stainless steel and engraved with “EMERGENCY” with red letters.
3. Tamper-resistant receptacles will be hospital grade, NEMA 5-20R grounding type, and gray in color.
4. Ground-fault circuit interrupter (GFCI) style duplex receptacles will be provided within 6’ of all sinks.
5. Exterior receptacles will be weather-resistant, GFCI style duplex receptacles and be provided with while-in-use covers.
H. Grounding and Bonding
1. Equipment grounding conductors will be installed with all feeders, and power and lighting branch circuits.
2. All metallic raceways will be grounded and the equipment grounding conductor will be bonded to all junction boxes, pull boxes, enclosures and panelboards.
3. New equipment installed will comply with single point grounding per
ANSI/NECA/BICSI 607-C.
4. Each telecommunications room will be analyzed to ensure it is meeting VA design standards for internal Communications Circulating Grounding System (CCGS).
This includes:
a) Ensuring all equipment is properly grounded to the Telecommunication Ground Bar (TGB)
b) Ensuring the TGB is connected to the Telecommunications Main Grounding Busbar (TMGB).
5. See Appendix A for General Grounding and Bonding Diagram for each telecommunications room
6. See Appendix A for General Grounding and Bonding requirements for each building (per 2016 VA Telecommunications Design Guide, Appendix A).
I. Labeling/Nameplates
1. All new and/or modified low-voltage building electrical distribution equipment will be provided with new phenolic resin labels screwed to the equipment. Normal
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 6 power distribution equipment will have white lettering on a black background.
Essential electrical distribution equipment will have white lettering on a red background. Lettering will be ½” tall and include the name of the equipment, name of the equipment it is fed from, and the sizes of the conductors that it is fed with.
2. All new wiring device cover plates will be labeled with a permanent adhesive label listing panel and circuit feeding the wiring device.
10. GENERAL LIGHTING EQUIPMENT
A. Building Lighting
1. TR lighting will consist of strip light style fixtures with LED light sources with integral lamps and drivers. Drivers will be a minimum of 85% efficient at full load, have a power factor greater than 95%, total harmonic distortion less than 20%, and operate with a universal 120/277V input. All lights will be serviceable from below the ceiling. All light fixtures in the TR’s will be connected to the critical branch of the EES.
B. Lighting Controls
1. Standard manual light switches will be quiet toggle type, specification grade and ivory in color as required by the VA design guide. Manual light switches will be utilized in spaces where automatic control of lights is detrimental to the occupant, such as in electrical and mechanical rooms.
11. PHYSICAL SECURITY
1. This project will address all physical security deficiencies as outlined by the physical security consultant as outlined in the “Physical Security Risk Mitigation Design Guidance”. This will include, but is not limited to, intrusion detection, access controls, security cameras, and panic-duress.
END DIVISION 26 DESIGN NARRATIVE
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 7
Appendix A: Drawings
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 8
General Grounding and Bonding Diagram for each telecommunications room:
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 9
General Grounding and Bonding requirements for each building (per 2016 VA Telecommunications Design Guide, Appendix A):
Rack-mounted Equipment
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 10
(per 2020 VA Infrastructure Standard for Telecommunications Spaces):
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 11
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 12
Appendix B: Electrical Analysis
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 13
Building TR Room
Number Total # of Existing Racks
Emergency
Power Available?
UPS in
Space?
If Yes, what is current load percentage?
Lighting Need
Replaced?
Copper Ground Bar?
Sufficiently Sized?
Grounding Conductors back to TMBG?
100 2 Floor Yes Yes 20% No No Ground Bar N/A New ground bar, UPS, and lighting
201 1 Floor Yes Yes 33% Yes No Ground Bar N/A New ground bar, UPS, and lighting
301A 1 Floor Yes Yes 60% Yes Not Copper No New ground bar, UPS, and lighting
102 1 Floor No Yes 25% Yes Not Copper No New ground bar, UPS, and lighting
202 1 Floor No Yes <20% Yes No Ground Bar N/A New ground bar, UPS, and lighting
107 1 Floor Yes Yes not visible Yes No Ground Bar N/A New ground bar, UPS, and lighting
209 1 Floor Yes Yes <20% Yes Copper (not sufficiently sized) N/A
New ground bar, UPS, and lighting
109 1 Floor Yes Yes 100% Yes No Ground Bar N/A New ground bar, UPS, and lighting
120 1 Floor Yes Yes not visible Yes Not Copper Yes New ground bar, UPS, and lighting
106 1 Floor, 1 Wall No Yes 43% Yes No Ground Bar N/A New ground bar, UPS, and lighting
148 1 Floor Yes Yes 20% Yes No Ground Bar N/A New ground bar, UPS, and lighting
233A 1 Wall Yes Yes 34% Yes No Ground Bar N/A New ground bar, UPS, and lighting
103 1 Floor Yes Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
210 1 Floor Yes Yes 57% Yes No Ground Bar N/A New ground bar, UPS, and lighting
11 109A 1 Floor No Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
32 5 1 Floor No Yes 20% Yes No Ground Bar N/A New ground bar, UPS, and lighting
36 24 1 Wall No Yes <20% Yes No Ground Bar N/A New ground bar, UPS, and lighting
37 04 Fiber Junction Box No Yes <20% Yes No Ground Bar N/A New ground bar, UPS, and lighting
114 1 Floor No Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
214 1 Floor No Yes 20% Yes Not Copper No New ground bar, UPS, and lighting
125 1 Floor Yes Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
226 1 Floor Yes Yes 0% Yes No Ground Bar N/A New ground bar, UPS, and lighting
9 1 Floor Yes Yes 25% Yes No Ground Bar N/A New ground bar, UPS, and lighting
92 103 1 Wall No No N/A No No Ground Bar N/A New ground bar, UPS, and lighting
1H 1 Floor, 1 Wall Yes Yes 57% Yes No Ground Bar N/A New ground bar, UPS, and lighting
101B 1 Floor Yes Yes 60% Yes No Ground Bar N/A New ground bar, UPS, and lighting
207 1 Floor Yes Yes 40% Yes Yes No New UPS and lighting
364 1 Floor Yes Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
464 1 Floor Yes Yes 40% Yes No Ground Bar N/A New ground bar, UPS, and lighting
Power
Existing Conditions
Required Modifications
Location
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electrical 14
132 105A 1 Wall Yes No n/a No No Ground Bar N/A New ground bar and
UPS
BA140 1 Wall Yes Yes 80% Yes No Ground Bar No New ground bar, UPS, and lighting
BB101E Demarc Room Yes Yes 10% Yes Yes N/A No electrical work in space.
BB101H
Main Computer
Room Yes No n/a No No Ground Bar No
No electrical work in space.
BC113 0 Yes Yes 40% Yes No Ground Bar No New ground bar, UPS, and lighting
1A120 2 Floor Yes Yes 21% No Copper (not sufficiently sized) No
New ground bar and
UPS
1A143 1 Floor Yes Yes 7% No No Ground Bar No New ground bar and
UPS
1B103 0 Yes No n/a No No Ground Bar No No electrical work in space.
1B117A 1 Floor Yes Yes 39% Yes No Ground Bar No New ground bar, UPS, and lighting
1C100D 1 Wall Yes Yes 10% Yes No Ground Bar No New ground bar, UPS, and lighting
2A106 2 Floor Yes Yes 16% Yes No Ground Bar No New ground bar, UPS, and lighting
2A111 1 Floor Yes Yes 10% No No Ground Bar No New ground bar and
UPS
2B117A 1 Floor Yes Yes 17% Yes Yes No New UPS and lighting
3A120 or 3D120 1 Floor Yes Yes 80% Yes No Ground Bar No New ground bar, UPS, and lighting
3B123 1 Floor, 1 Wall Yes Yes 10%, 6% Yes No Ground Bar No New ground bar, UPS, and lighting
4A118 1 Floor Yes Yes 40% Yes No Ground Bar No New ground bar, UPS, and lighting
4B117 1 Floor, 1 Wall Yes Yes 12% Yes Yes No New UPS and lighting
BD105 2 Floor Yes Yes 60% Yes Not Copper No New ground bar, UPS, and lighting
BD129A 1 Floor Yes Yes 10% Yes Not Copper No New ground bar, UPS, and lighting
BD139A 1 Floor Yes Yes 22% Yes Not Copper No New ground bar, UPS, and lighting
1D117 2 Floor Yes Yes 10%, 20% Yes No Ground Bar No New ground bar, UPS, and lighting
1D225A 1 Floor Yes Yes 16% Yes No Ground Bar No New ground bar, UPS, and lighting
1D226A 1 Floor Yes Yes 20% Yes No Ground Bar No New ground bar, UPS, and lighting
2D129A 1 Floor Yes Yes 0% No No Ground Bar No New ground bar and
UPS
2D146A 1 Floor, 1 Wall Yes Yes 44%, 9% Yes No Ground Bar No New ground bar, UPS, and lighting
2D174 1 Floor, 1 Wall Yes Yes 40% Yes Not Copper No New ground bar, UPS, and lighting
2D211 1 Floor Yes Yes 12% No No Ground Bar No New ground bar and
UPS
3D100 2 Floor, 1 Wall Yes Yes 19%, 23% Yes Not Copper No New ground bar, UPS, and lighting
3D111A 1 Floor Yes Yes 3% No No Ground Bar No New ground bar and
UPS
3D126A 1 Floor Yes Yes 10% No No Ground Bar No New ground bar and
UPS
133CA
556-21-701 (Spur 2113) North Chicago EHRM- West Campus
Electric…
This is the start of the file's text. The full file is on GovTribe.