About this file

This addendum provides updates to the specifications for federal contract number 36C77623B0019 for EHRM Infrastructure Upgrades at the West Campus of the North Chicago VA medical center. Key changes include updating normal construction hours to 7:00AM to 4:30PM Monday through Friday, requiring 72 hours' notice and approval from the contracting officer for after-hours work, revising submittal and RFI response times to 21 calendar days, adding missing specification sections for infection control, testing laboratory services, commissioning, nurse call and code blue systems, and public address systems. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades West Campus – North Chicago - Construction, newest first.
File Type Posted
36C77623B0019 0010 - EHRM N Chicago West - Conference Line_Wage Rates_52.204-27.pdf PDF
Updated Wage Rates - Lake County - 06.30.23.pdf PDF
36C77623B0019 0009 - Note and Site Visit 2 Sign In Sheet.pdf PDF
Site Visit 2 Sign-In Sheet - 556-21-701 EHRM West Campus.pdf PDF
S02 - 36C77623B0019 0008 - Extension and Additional Site Visit.pdf PDF
Revised Drawing Sheet GS007 - Item 133.pdf PDF
556-21-701 EHRM West PreBid RFIs 20JUN23.pdf PDF
36C77623B0019 0007 - EHRM North Chicago (West) - Revised RFI Responses.pdf PDF
36C77623B0019 0006 - EHRM North Chicago (West) - Technical Questions.pdf PDF
36C77623B0019 0005 - EHRM North Chicago (West) - Extension 6.26.23.pdf PDF
36C77623B0019 0004 - EHRM North Chicago (West) - Extension 3.16.23.pdf PDF
36C77623B0019 0003 - EHRM North Chicago (West) - Extension.pdf PDF
36C77623B0019 0003 - Updated Wage Rates - Lake County - 05.12.23.pdf PDF
36C77623B0019 0002 - Site Visit Sign-In Sheet - North Chicago (West).pdf PDF
West Campus Site Visit sign in sheet May 15 2023.pdf PDF
27 05 33 Raceways and Boxes for Communication Systems.pdf PDF
27 52 23 Nurse call.pdf PDF
01 45 29 Testing Laboratory Services.pdf PDF
36C77623B0019 0001 - EHRM North Chicago (West) - Addendum 01.pdf PDF
00 01 10- Table of Contents.pdf PDF
01 35 26 Safety Requirements.pdf PDF
01 35 33 Infection Control Requirements.pdf PDF
26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
27 51 16 Public Address and Mass Notification.pdf PDF
01 00 00 General Requirements.pdf PDF
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 91 00 General Commissioning Requirements.pdf PDF
S02 - SOLICITATION - 36C77623B0019_1 North Chicago EHRM (West Campus).pdf PDF
S02 - ATTACHMENT 1 - 556-21-701 Bid Specifications - Final.pdf PDF
S02 - ATTACHMENT 2 - Chicago EHRM - Design Narratives.pdf PDF
S02 - ATTACHMENT 6 - Safety Requirements.pdf PDF
S02 - ATTACHMENT 11 - Combined Drawings 1 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 14 - Combined Drawings 4 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 17 - Brand Name Justification - Redacted.pdf PDF
S02 - ATTACHMENT 3 - EHRM North Chicago-100 Cost Narrative.pdf PDF
S02 - ATTACHMENT 18 - Limitations on Subcontracting - Jan 2023.pdf PDF
S02 - ATTACHMENT 19 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATTACHMENT 20 - Wage Rates - Lake County - 01.20.23.pdf PDF
S02 - ATTACHMENT 4 - Environmental Comb - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 5 - 01 35 33 Infection Control Requirements FHCC 15NOV22.pdf PDF
S02 - ATTACHMENT 8 - Mechanical Calculations - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 16 - Combined Drawings 6 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 22 - Illinois Tax Memo - 1.26.2023.pdf PDF
S02 - ATTACHMENT 7 - Mechanical Equipment - EHRM Upgrade Chicago.pdf PDF
S02 - ATTACHMENT 9 - ICRA Form - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 10 - 556-21-701 EHRM West Const SOW 20 DEC22.pdf PDF
S02 - ATTACHMENT 12 - Combined Drawings 2 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 13 - Combined Drawings 3 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 15 - Combined Drawings 5 of 6 - EHRM Upgrades Chicago.pdf PDF
S02 - ATTACHMENT 21 - Site Visit Instructions.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM

PROJECT NUMBER 556-21-701 (2113)

PROJECT NAME EHRM Chicago West Campus

ADDENDUM NUMBER 01

DATE February 10, 2023

SUBJECT Updates to Specifications

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

THE FOLLOWING MODIFICATIONS, ADDITIONS, AND DELETIONS ARE HEREBY MADE A PART OF THE CONTRACT DOCUMENTS.

SEAL:

GENERAL: After VA review of Specification Documents with VA contracting, the below were noted for edits/request for changes prior to sending out for bid.

PROJECT MANUAL:

1. SPEC SECTION 01 00 00 GENERAL REQUIREMENTS

Item 1: (INSERT SECTION ) 1.2.a Normal working hours for this contract will be from 7:00AM to 4:30PM

(local time) Monday through Friday except for weekends and established Federal Holidays.

Item 2: (INSERT SECTION ) 1.2.b Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least

72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

Item 3: 1.2(B) states the following: “Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.” Please correct to read “Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting

Officer.”

2. SPEC SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

Item 1: The following states “E-mail electronic submittal documents smaller than 5MB in size to e-mail addresses as directed by the Contracting Officer. Please update to read “All documents (submittals) should be sent through FTP File Sharing system.”

Item 2: 1.10 (D) shows “VA review period is 15 working days for submittals”’ this needs to be updated to state “21 calendar days and the time for submittals”

Item 3: 1.10 (E) shows “VA review period is 10 working days for RFIs”, this needs to be updated to state

“21 calendar days and the time for RFIs”

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

Item 4: Please confirm that any updates to the RFI and Submittal response times will not negatively impact the period of performance for the project. If it does, we will need to update the performance period.

3. SPEC SECTION 01 35 26 SAFETY REQUIREMENTS

Item 1: Sections 1.19 CRANES have been removed from the spec, please verify that this was needed to be removed. I understand 1.19 might not apply but now section but they should just have “DOES

NOT APPLY underneath otherwise the spec does not match the til spec and the sections.

4. SPEC SECTION 01 35 33 INFECTION CONTROL REQUIREMENTS

Item 1: Missing from the specifications, please include in the specs.

5. SPEC SECTION 01 45 29 TESTING LABORATORY SERVICES

Item 1: Missing from the specification, please include in the specs.

6. SPEC SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

Item 1: Missing from the specifications, please include in the specs.

7. SPEC SECTION 26 05 33 RACEWAY AND BOXES FOR COMMUNICATION SYSTEMS

Item 1: FHCC has its own raceway (conduit) color-coding scheme that differs from that specified by VA via the TIL.

8. SPEC SECTION 27 05 33 RACEWAYS AND BOXES FOR COMMUNICATION SYSTEMS

Item 1: FHCC has its own raceway (conduit) color-coding scheme that differs from that specified by VA via the TIL.

9. SPEC SECTION 27 52 23 NURSE CALL AND CODE BLUE SYSTEM

Item 1: Missing from the specifications, please include in the specs. There are multiple references to this within the bids specifications.

10. SPEC SECTION 27 51 16 PUBLC ADDRESS AND MASS NOTIFICATION SYSTEM

Item 1: Missing from the specifications, please include in the specs. There is references to this within the bids specifications.

TOTAL: X Pages [8 ½ x 11]

END OF ADDENDUM NO. 01