This is a technical design and specification document for a welded steel storage tank (Tank #1) for the VA Medical Center in San Juan, Puerto Rico. The document consists of detailed engineering drawings, bills of materials, and specifications prepared by Alonso & Carus and CGN Engineering Corp., with an approval date of February 8, 2005.

The tank is designed with a capacity of 1,000,000 gallons and includes comprehensive technical specifications for fabrication and assembly. Key components include: shell plates (referenced as P21-P27A with various dimensions), roof plates (P25-P26A), bottom plates, anchor bolts, manhole assemblies with two shell configurations, railing systems, ladders (L1 and L2), column and rafter details, and venting systems. The design incorporates detailed dimensional drawings showing elevation views, orientation plans, cross-sectional views, and cutting diagrams for all structural elements. Materials specifications indicate the use of welded steel construction with ASTM standards compliance. The document includes detailed bills of materials listing quantities, descriptions, weights, and remarks for all components. Specific design features noted include anchor lug details for 24-REQD configurations, roof piping connections, liquid level indicators, and shell nozzles with schedules detailing sizes, materials, pressures, and hole specifications. The drawings are marked "FOR APPROVAL" and serve as the basis for fabrication and construction of this large-capacity storage tank installation.

View the file

Other files

File Type Posted
S06 - AMENDMENT 36C24826R0133 0001 Response to RFIs.pdf PDF
S02 - 36C24826R0133 - DB - Repair Water Tanks Deficiencies - Issued 09-03-2026.pdf PDF
S02 - Attachment 12 - 852.219-75 VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction - JAN 2023 - 2 pages.docx DOCX document
S02 - Attachment 11 - Subcontractor Past Performance Consent Form - 1 page.pdf PDF
S02 - Attachment 03 - Specialized Experience Form - 3 pages.pdf PDF
S02 - Attachment 10 - Infection Control Guidelines on Construction and Renovation 11B-17-05 - 11 pages.pdf PDF
S02 - Attachment 06 - Letter of Commitment Key Subcontractors - 1 page.pdf PDF
S02 - Attachment 02 - Key Personnel Resume Form - 1 page.pdf PDF
S02 - Attachment 01-E- TANK 2 - NDP - API 653 Out-of-Service Inspection Report - 62 Pages.pdf PDF
S02 - Attachment 1-A - 672-26-110_Site Plan - 1 page.pdf PDF
S02 - Attachment 1-D - Specifications Repair Water Tanks Deficiencies -120 pages.pdf PDF
S02 - Attachment 1-B - 672-26-110 Location Plan - 1 page.pdf PDF
S02 - Attachment 04 - Base Offer Price Breakdown - 1 Page.xlsx XLSX spreadsheet
S02 - Attachment 08 - Letter of Commitment for Key Personnel - 1 page.pdf PDF
S02 - Attachment 05 - EMR Form - 1 page.pdf PDF
S02 - Attachment 01-F - TANK 1 - NDP - API 653 Out-of-Service Inspection Report - 65 Pages.pdf PDF
S02 - Attachment 09 - Letter of Commitment for Design Firm Teaming Arrangement - 1 page.pdf PDF
S02 - Attachment 07 - Past Performance Questionnaire - 4 pages.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S1-8-9-2011_20110908_0001

S1-8-9-2011_20110908_0002
S1-8-9-2011_20110908_0003
S1-8-9-2011_20110908_0004
S1-8-9-2011_20110908_0005
S1-8-9-2011_20110908_0006
S1-8-9-2011_20110908_0007

File details come from the government source that posted it. Updated .