S02 - Attachment 04 - Base Offer Price Breakdown - 1 Page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
R e p a i r W a t e r T a n k s D e f i c i e n c i e s
Solicitation number
36C24826R0133
Issued by

About this file

This is a Base Offer Price Breakdown template for construction services related to the Repair Water Tanks Deficiencies project (Project Number: 672-26-110) at VA Caribbean Healthcare System in San Juan, Puerto Rico. The template is designed for offerors to submit pricing for design/build services under VISN 8 Caribbean Construction MATOC IDIQ contract holders, as this requirement is exclusively set aside for that contract vehicle. Offerors must complete the spreadsheet by entering labor costs, material costs, overhead percentage, profit percentage, and bond percentage across 24 construction divisions (General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, and others), with the template calculating totals automatically. The completed breakdown will serve as the overall base offer price for government price analysis, and offerors are required to provide additional detailed price breakdowns to avoid lump sum pricing approaches.

View the file

Other files

File Type Posted
S06 - AMENDMENT 36C24826R0133 0001 Response to RFIs.pdf PDF
S02 - 36C24826R0133 - DB - Repair Water Tanks Deficiencies - Issued 09-03-2026.pdf PDF
S02 - Attachment 12 - 852.219-75 VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction - JAN 2023 - 2 pages.docx DOCX document
S02 - Attachment 11 - Subcontractor Past Performance Consent Form - 1 page.pdf PDF
S02 - Attachment 03 - Specialized Experience Form - 3 pages.pdf PDF
S02 - Attachment 10 - Infection Control Guidelines on Construction and Renovation 11B-17-05 - 11 pages.pdf PDF
S02 - Attachment 1-C - Reference Drawings VA Water Tanks - 7 pages.pdf PDF
S02 - Attachment 06 - Letter of Commitment Key Subcontractors - 1 page.pdf PDF
S02 - Attachment 02 - Key Personnel Resume Form - 1 page.pdf PDF
S02 - Attachment 01-E- TANK 2 - NDP - API 653 Out-of-Service Inspection Report - 62 Pages.pdf PDF
S02 - Attachment 1-A - 672-26-110_Site Plan - 1 page.pdf PDF
S02 - Attachment 1-D - Specifications Repair Water Tanks Deficiencies -120 pages.pdf PDF
S02 - Attachment 1-B - 672-26-110 Location Plan - 1 page.pdf PDF
S02 - Attachment 08 - Letter of Commitment for Key Personnel - 1 page.pdf PDF
S02 - Attachment 05 - EMR Form - 1 page.pdf PDF
S02 - Attachment 01-F - TANK 1 - NDP - API 653 Out-of-Service Inspection Report - 65 Pages.pdf PDF
S02 - Attachment 09 - Letter of Commitment for Design Firm Teaming Arrangement - 1 page.pdf PDF
S02 - Attachment 07 - Past Performance Questionnaire - 4 pages.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .