S02 - Attachment 03 - Specialized Experience Form - 3 pages.pdf

PDF 126 KB Posted

Attached to
R e p a i r W a t e r T a n k s D e f i c i e n c i e s
Solicitation number
36C24826R0133
Issued by

About this file

This is a Specialized Experience Form template used by federal contractors to demonstrate relevant project experience as part of proposal submissions to government procurements.

The form requires contractors to document exactly three (3) projects, with submissions containing more than three projects not evaluated and fewer than three potentially resulting in lower ratings. For each project, contractors must provide comprehensive information including: contractor details (firm name, address, DUNS number, CAGE code, contact information); contract/task order number and award date; project title and location; work role (prime contractor, subcontractor, joint venture, or other); percentage of work performed by the company; prime contractor information if applicable; and government agency/contracting officer contact details. The form additionally requires detailed descriptions of project scope, the offeror's specific roles and responsibilities, relevance to the current solicitation, difficulties and obstacles encountered with resolution steps, unforeseen conditions and their resolution, performance period with contract start and completion dates, actual completion date with explanation if incomplete, project completion percentage (with notation that projects less than 50% complete may receive lower ratings), contract termination status if applicable, and original versus final contract pricing with explanation of any differences. Continuation sheets are permitted for additional information as necessary.

View the file

Other files

File Type Posted
S06 - AMENDMENT 36C24826R0133 0001 Response to RFIs.pdf PDF
S02 - 36C24826R0133 - DB - Repair Water Tanks Deficiencies - Issued 09-03-2026.pdf PDF
S02 - Attachment 1-A - 672-26-110_Site Plan - 1 page.pdf PDF
S02 - Attachment 1-D - Specifications Repair Water Tanks Deficiencies -120 pages.pdf PDF
S02 - Attachment 01-E- TANK 2 - NDP - API 653 Out-of-Service Inspection Report - 62 Pages.pdf PDF
S02 - Attachment 02 - Key Personnel Resume Form - 1 page.pdf PDF
S02 - Attachment 05 - EMR Form - 1 page.pdf PDF
S02 - Attachment 08 - Letter of Commitment for Key Personnel - 1 page.pdf PDF
S02 - Attachment 10 - Infection Control Guidelines on Construction and Renovation 11B-17-05 - 11 pages.pdf PDF
S02 - Attachment 1-B - 672-26-110 Location Plan - 1 page.pdf PDF
S02 - Attachment 1-C - Reference Drawings VA Water Tanks - 7 pages.pdf PDF
S02 - Attachment 01-F - TANK 1 - NDP - API 653 Out-of-Service Inspection Report - 65 Pages.pdf PDF
S02 - Attachment 04 - Base Offer Price Breakdown - 1 Page.xlsx XLSX spreadsheet
S02 - Attachment 06 - Letter of Commitment Key Subcontractors - 1 page.pdf PDF
S02 - Attachment 11 - Subcontractor Past Performance Consent Form - 1 page.pdf PDF
S02 - Attachment 12 - 852.219-75 VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction - JAN 2023 - 2 pages.docx DOCX document
S02 - Attachment 07 - Past Performance Questionnaire - 4 pages.pdf PDF
S02 - Attachment 09 - Letter of Commitment for Design Firm Teaming Arrangement - 1 page.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE FORM

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences: