S02 - Att9 - Drawings 6of11 - Fire Protection.pdf

PDF 8 MB Posted

Attached to
Construct EHRM Infrastructure Upgrades - Philadelphia, PA Federal contract opportunity
Solicitation number
36C77626R0063_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a Fire Protection Drawings set for the EHRM Infrastructure Upgrades project at the Philadelphia VA Medical Center, comprising detailed architectural plans and specifications for automatic wet pipe sprinkler system installation across five campus buildings (Buildings 1, 2, 3, 21, and 30). The drawings establish comprehensive requirements for fire protection contractors to design and install fully code-compliant sprinkler systems, with work to be performed in accordance with NFPA 13 (2025), NFPA 72 (2025), NFPA 75 (2024), the 2018 International Building Code, the VA Fire Protection Design Manual Version 9, and OSHA standards.

The scope encompasses automatic wet pipe systems across multiple floors with hazard classification designations: Light Hazard areas (offices, corridors, breakrooms) requiring 0.10 GPM/sq.ft. density over 1,500 sq.ft. hydraulic remote with 100 GPM hose stream allowance; Ordinary Hazard Group 1 areas (telecom, data, electrical rooms) requiring 0.15 GPM/sq.ft. with 250 GPM hose stream; and Ordinary Hazard Group 2 areas (storage rooms) requiring 0.20 GPM/sq.ft. with 250 GPM hose stream. Critical requirements include coordination with existing systems, verification of piping and equipment conditions, provision of tamper switches and flow switches on indicating valves, installation of drain valves and inspector test connections, fire stopping of penetrations through rated assemblies, placement of sprinklers in ceiling tile centers, and prohibition of piping above electrical equipment. The drawings specify enlarged detail plans for multiple treatment rooms (TRs) across all floors and include general notes addressing site familiarization, fire watch protocols for service interruptions exceeding four hours, temporary sprinkler protection during renovation, material removal and surface restoration, and coordination with mechanical, electrical, plumbing, and architectural trades to accommodate space constraints and equipment density.

View the file

Other files for this federal contract opportunity

Other files attached to Construct EHRM Infrastructure Upgrades - Philadelphia, PA, newest first.
File Type Posted
S06 - 0005 - Att1 - Technical Responses v2.xlsx XLSX spreadsheet
S06 - 0005 - 36C77626R0063_1 0005.pdf PDF
S06 - 0005 - Att2 - Wage Determination.txt TXT text file
S06 - 0004 - Att1 - Technical Responses.xlsx XLSX spreadsheet
S06 - 0004 - 36C77626R0063_1 0004.pdf PDF
S06 - 0004 - Att2 - Wage Determination.pdf PDF
S06 - 0003 - Att1 - Wage Determination.pdf PDF
S06 - 0003 - 36C77626R0063_1 0003.pdf PDF
S06 - 0002 - Att3 - Site Visit 4.23.26 Agenda.pdf PDF
S06 - 0002 - 36C77626R0063_1 0002.pdf PDF
S06 - 0002 - Att5 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.docx DOCX document
S06 - 0002 - Att4 - Wage Determination.txt TXT text file
S06 - 0002 - Att2 - Site Visit 4.23.26 Sign-in Sheet.pdf PDF
S06 - 0002 - Att1 - Campus Map - Meeting Location.png PNG image
P06 - 0001 - Att1 - Campus Map - Meeting Location.png PNG image
S06 - 0001 - 36C77626R0063 0001.pdf PDF
S02 - Att16 - Wage Determination.txt TXT text file
S02 - Att10 - Drawings 7of11 - Plumbing.pdf PDF
S02 - Att14 - Drawings 11of11 - Security.pdf PDF
S02 - Att11 - Drawings 8of11 - Mechanical.pdf PDF
S02 - Att7 - Drawings 4of11 - Architectural.pdf PDF
S02 - Att6 - Drawings 3of11 - Civil.pdf PDF
S02 - Att4 - Drawings 1of11 - General.pdf PDF
S02 - Att12 - Drawings 9of11 - Electrical.pdf PDF
S02 - Att5 - Drawings 2of11 - Hazmat.pdf PDF
S02 - Att15 - Limitations on Subcontracting.docx DOCX document
S02 - Att13 - Drawings 10of11 - Technology.pdf PDF
S02 - Att8 - Drawings 5of11 - Fire Alarm.pdf PDF
S02 - Att3 - BD Room A001 Addendum.pdf PDF
S02 - Att2 - Specifications Vol 2.pdf PDF
S02 - Att1 - Specifications Vol 1.pdf PDF
S02 - 36C77626R0063_1.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMON PIPING SYMBOLS &

ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

DIRECTION OF FLOW

BRANCH CONNECTION, BOTTOM

BRANCH CONNECTION, TOP

ELBOW, TURNED DOWN

ELBOW TURNED UP

SHUTOFF VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

PRESSURE GAUGE

UNION

PIPING CAP

RISER DESIGNATION

ABOVE FINISH FLOOR

AUTHORITIES HAVING JURISDICTION

ACCESS PANEL

BOTTOM OF PIPE

DIAMETER

DOWN

EXISTING

FINISHED FLOOR ELEVATION

GALLONS PER HOUR

GALLONS PER MINUTE

HORSEPOWER

INVERT ELEVATION

NORMALLY CLOSED

NOT TO SCALE

POUNDS PER SQUARE INCH

REVOLUTIONS PER MINUTE

ROUGH-IN

SHUTOFF VALVE

TOTAL DYNAMIC HEAD

VERIFY IN FIELD

POINT OF DISCONNECT

POINT OF CONNECTION

AFF

AHJ

AP

BOP

DIA

DN

EX OR EXIST

FFE

GPH

GPM

HP

IE OR INV. ELEV

NC

NTS

PSI

RPM

RI

SOV

TDH

VIF

X

PLAN MARK

EQUIPMENT NUMBER

SHEET NUMBER

LINE TYPE LEGEND

DRAWING REFERENCES

NEW WORK BY THIS CONTRACTOR

(DARK, SOLID LINE)

EXISTING TO REMAIN OR NEW WORK BY OTHERS

(LIGHT, SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK, DASHED LINE, DEMOLITION PLANS)

NORTH ARROW

PLAN DETAIL REFERENCE TITLE

KEYED NOTE DESIGNATION

PLAN MARK

EQUIPMENT NUMBER

EQUIPMENT DESIGNATION REFER TO MEP

SCHEDULE FOR CIRCUITING AND DEVICE

REQUIREMENTS AND FLOOR PLANS FOR

LOCATIONS

ENLARGED PLAN REFERENCE

PLAN MARK

SHEET NUMBER

A101

SIM

AHU

TITLE

SCALE

PLAN

NORTH

TRUE

NORTH

MATCHLINE

1 REVISION TAG

FIRE PROTECTION GENERAL NOTES

1. ALL WORK SHALL BE PERFORMED, INSTALLED, AND TESTED IN COMPLIANCE WITH THE CODES AND AMENDMENTS ADOPTED BY THE INSPECTION AUTHORITY. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK

NOT CONFORMING TO THESE CODES OR OTHERS APPLICABLE TO THIS PROJECT:

A. VA FIRE PROTECTION DESIGN MANUAL VERSION 9, NOVEMBER 1, 2023

B. 2018 - INTERNATIONAL BUILDING CODE (IBC)

C. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

D. NATIONAL FIRE PROTECTION ASSOCIATION EDITIONS LISTED IN THE IBC OR MOST CURRENT EDITIONS OF

THE FOLLOWING

a. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (2025)

b. NFPA 72: NATIONAL FIRE ALARM AND SIGNALING CODE (2025)

c. NFPA 75: STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT (2024)

2. THE WORK CONSISTS OF FURNISHING ALL LABOR AND MATERIALS NECESSARY TO INSTALL, COMPLETE AND READY CONTINUOUS OPERATION, THE FIRE PROTECTION SYSTEMS, APPARATUS AND EQUIPMENT FOR THIS

PROJECT, AS SHOWN REQUIRED BY THE CONTRACT DOCUMENTS AND NFPA 13.

3. THE CONTRACTOR SHALL INCLUDE IN THEIR BID, A FULLY CODE COMPLIANT AND COORDINATED SPRINKLER SYSTEM. PROJECT SHALL BE DESIGNED, CONSTRUCTED, AND TESTED PER THE NFPA STANDARDS AND VA FIRE

PROTECTION DESIGN MANUAL VERSION 9 REQUIREMENTS.

4. ALL SYSTEMS, EQUIPMENT, AND MATERIALS ARE TO BE INSTALLED IN A NEAT WORKMAN LIKE MANNER, WORK NOT

DONE SO SHALL BE REMOVED AND REINSTALLED SATISFACTORILY.

5. THE FIRE PROTECTION BID IS A DELEGATED DESIGN/BID/BUILD CONTRACT. BEFORE SUBMITTING THE BID, THE CONTRACTOR SHALL VISIT THE SITE AND BECOME THOROUGHLY FAMILIAR WITH ALL EXISTING CONDITIONS AND VERIFY LOCATIONS, ELEVATIONS, AND SIZES OF ALL UTILITIES AT SITE PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS, OR ERRORS MADE AS A RESULT OF THE FAILURE TO BECOME FULLY FAMILIAR WITH EXISTING CONDITIONS. EXISTING SYSTEMS AND STRUCTURE

SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF FIRE PROTECTION PIPING.

6. WHEN PLACING NEW SPRINKLERS AND ROUTING NEW SPRINKLER PIPING, CONTRACTOR SHALL VERIFY LOCATIONS OF POTENTIAL OBSTRUCTIONS FROM MECHANICAL EQUIPMENT AND ARCHITECTURAL FEATURES PRIOR TO BID

AND PRICE ACCORDINGLY TO MAKE ALLOWANCES IN BID.

7. SUBMIT ACCURATE AS-BUILT DRAWINGS TO THE ENGINEER AND OWNER.

8. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS CONTRACTOR SHOULD OBTAIN THE ENGINEER’S WRITTEN EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE INTERPRETATION OF THE

ENGINEER.

9. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING PLANS, SPECIFICATIONS, AND FILED SURVEYS. THE EXACT LOCATION OF PIPING AND EQUIPMENT MAY DEVIATE FROM THE LOCATION INDICATED BY THESE DRAWINGS. EXTREME ACCURACY IS NOT GUARANTEED.

THIS CONTRACTOR SHALL BE PREPARED TO MAKE ALTERATIONS TO NEW AND/OR EXISTING SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES WHICH PREVENT THE

INSTALLATION OF WORK AS SHOWN.

10. IT IS ASSUMED THAT AREAS OUTSIDE THE SCOPE OF WORK ARE TESTED, MAINTAINED, AND MEET THE CODE

REQUIREMENTS WHEN IT WAS INSTALLED.

11. THE SPRINKLER CONTRACTOR PRIOR TO TIME OF BID SHALL EVALUATE THE SITE AND VERIFY ALL SPRINKLER PIPING AND EQUIPMENT THAT IS EXISTING TO REMAIN WITHIN OR SERVING THE SCOPE OF WORK, IS IN GOOD

WORKING CONDITION.

12. FURNISH AND INSTALL TAMPER SWITCHES ON ALL INDICATING VALVES AND FLOW SWITCHES PER NFPA 13

REQUIREMENTS AND PER THE DESIGN DOCUMENTS BY THE CONTRACTOR.

13. THE CONTRACTOR SHALL FURNISH DRAIN VALVES AND INSPECTOR’S TEST CONNECTIONS AS REQUIRED BY NFPA

13 REQUIREMENTS.

14. ALL OPENINGS THROUGH FIRE RATED FLOORS, WALLS, OR PARTITIONS SHALL BE FIRE STOPPED WITH UL RATED ASSEMBLIES OF EQUAL OR GREATER FIRE RATING. REFER TO FIRE STOPPING NOTES FOR ADDITIONAL

INFORMATION.

15. COORDINATE WITH STRUCTURAL ENGINEER WHEN SAW-CUTTING THROUGH CONCRETE FLOOR OR WALL CONSTRUCTION. LEAVE SUFFICIENT REBAR EXPOSED TO TIE NEW REINFORCING REPLACEMENT CONCRETE

AND/OR OTHER STRUCTURAL ATTACHMENTS FOR NEW CONSTRUCTION.

16. VALVES, TAMPER SWITCHES, OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD CEILING, UNLESS PROVIDED WITH EQUIVALENTLY RATED ACCESS AND SIGNAGE MEETING NFPA 13

REQUIREMENTS.

17. SPRINKLERS SHALL BE LOCATED IN THE CENTER OF CEILING TILES, COORDINATE FINAL LAYOUT WITH ARCHITECT, AND OTHER DISCIPLINES.

18. EXTENDED COVERAGE SPRINKLERS ARE NOT PERMITTED. CONTRACTOR SHALL VERIFY ADDITIONAL PRESSURE

REQUIREMENTS IF THIS TYPE IS SELECTED.

19. THE SPRINKLER CONTRACTOR SHALL OBTAIN AND UTILIZE THE ARCHITECTURAL REFLECTED CEILING PLAN FOR THE LOCATING OF SPRINKLER HEADS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR CEILING DEVICE

LOCATIONS AND THE SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS.

20. PIPING SHALL BE INSTALLED ABOVE FINISHED CEILING ELEVATION TO ALLOW FOR SUITABLE ACCESS ABOVE

CEILING.

21. INSTALL NO PIPING IN A LOCATION OR MANNER WHICH WILL ALLOW FREEZING.

22. COORDINATE PIPE ROUTING NEAR ELECTRICAL EQUIPMENT PER NFPA 70. PIPING IS NOT TO BE ROUTED ABOVE ELECTRICAL PANELS, TRANSFORMERS, COMPUTER RACKS ETC. FIELD VERIFY AND COORDINATE WITH ELECTRICAL CONTRACTOR ALL EXISTING AND NEW ELECTRICAL LOCATIONS PRIOR TO DESIGN OF THE FIRE

PROTECTION PLANS.

23. ROUTING OF SPRINKLER MAINS, BRANCHLINES, AND HEADS SHALL BE THOROUGHLY COORDINATED WITH ALL OTHER DISCIPLINES AND BUILDING STRUCTURE PRIOR TO SUBMISSION OF COORDINATED SHOP DRAWINGS. THIS IS OF THE UTMOST IMPORTANCE ESPECIALLY WHERE SPACE IS LIMITED. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR COORDINATING, PREPARING, AND SUBMITTING COORDINATION DRAWINGS FOR

APPROVAL/REVIEW.

24. ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST 10 DAYS PRIOR TO BID DATE, TO

ALLOW CLARIFICATION BY WRITTEN ADDENDUM.

25. WHEN WORK REQUIRES TEMPORARY INTERRUPTIONS OF FIRE PROTECTION SERVICES OR UTILITIES THE

FOLLOWING ACTIONS WILL BE TAKEN:

A. COORDINATION WITH MAINTENANCE PERSONNEL TO SHUT OF SERVICES AT NEAREST MAIN.

B. PROVIDE TEMPORARY AND ACCESSIBLE ISOLATION VALVES CLOSE TO THE POINT OF WORK.

C. ENSURE BUILDING OPERATIONS CONTINUE WITH MINIMAL INTERRUPTIONS AND OPERATION OF EXISTING

SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS POSSIBLE EXCEPT IN VACATED AREAS.

D. WORK INTERFERING WITH OPERATION OF DOWNTIME WILL BE SCHEDULED AFTER CONSULTATION WITH

AND PERMISSION GIVEN BY OWNER 10 DAYS PRIOR TO ANTICIPATED INTERRUPTION OF SYSTEMS.

E. SUCH WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE OF NORMAL WORKING HOURS.

F. REFER TO FIRE WATCH NOTES FOR DISRUPTION OF FIRE SPRINKLER SYSTEMS IN OCCUPIED BUILDINGS

WHEN DISRUPTION EXCEEDS 4 HOURS.

26. SPRINKLERS INSTALLED WITHIN TELECOM ROOMS ARE TO BE STANDARD RESPONSE TYPE AND PROVIDED WITH

PROTECTIVE CAGES.

27. REMOVE ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS, SPRINKLER HEADS, SPRINKLER HEAD ESCUTCHEON, ECT.) AS REQUIRED TO COMPLETE THE SCOPE INDICATED IN THE CONSTRUCTION DOCUMENTS (SEE ARCHITECTURAL, TECHNOLOGY, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS). REPLACE, REINSTALL, OR COORDINATE REINSTALLATION WITH OTHER TRADES FOR ALL ITEMS REMOVED TO ACCOMMODATE THE INSTALLATION/ REMOVALS OF ANY SPRINKLER PIPE, SPRINKLER HEAD, PLUMBING PIPE, FIXTURE, EQUIPMENT, OR OTHER TRADES WORK, USING WORKERS QUALIFIED IN THE APPROPRIATE TRADE. REPLACE CEILING TILES

DAMAGED WITH THIS WORK TO MATCH, REPAIR WALLS BACK TO THE ORIGINAL FINISH.

28. FIRE PROTECTION CONTRACTOR SHALL PROVIDE ONE OF THE FOLLOWING AFTER HOURS OF NORMAL WORK TIME:

A. EXISTING SPRINKLERS WITHIN WORK AREAS.

B. TEMPORARY SPRINKLER PROTECTION THROUGHOUT THE WORK AREA.

C. COMBINATION OF EXISTING SPRINKLER AND TEMPORARY SPRINKLER PROTECTION THROUGHOUT WORK

AREA.

D. A FIRE WATCH.

29. ANY UNUSED SPRINKLER PIPING WITHIN NEW/ REMODELED TELECOM AND DATA ROOMS SHALL BE REMOVED TO A

POINT OUTSIDE OF ROOM AND CAPPED.

30. ARCHITECTURAL, TECHNOLOGY PLUMBING, MECHANICAL, AND ELECTRICAL DEMOLITION AND NEW WORK PLANS/

DRAWINGS SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.

31. NEW SPRINKLER WORK SHALL BE CONTAINED WITHIN THE ASSOCIATED SMOKE ZONE. WHERE NEW PIPING CROSSES INTO ANOTHER SMOKE ZONE, CONTRACTOR SHALL NOTIFY THE COR AND ENGINEER OF RECORD PRIOR

TO INSTALLATION.

32. BUILDING 3 IS NOT PROVIDED WITH AN AUTOMATIC SPRINKLER SYSTEM. SPRINKLER COVERAGE WILL NOT BE

PROVIDED IN THE BUILDING 3 TR 121 PENDING APPROVAL FROM THE VA.

FIRE PROTECTION SYMBOLS & ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

AIR VENT (AUTOMATIC)

DOUBLE CHECK VALVE ASSEMBLY

DRY PIPE VALVE

ELECTRONIC SUPERVISED INDICATING VALVE

FIRE DEPARTMENT VALVE (FDV)

FLOW SWITCH

PREACTION VALVE

PRESSURE RELIEF VALVE

SOLENOID VALVE

DRAIN LINE

DRY PIPE

FIRE MAIN (BULK)

SPRINKLER MAIN/BRANCH PIPING

DRIP CONNECTION

FIRE DEPARTMENT CONNECTION-FREE STANDING

FIRE DEPARTMENT CONNECTION-WALL MOUNT

FLUSH TYPE FIRE DEPARTMENT INLET CONNECTION

FIRE PUMP TEST HEADER-WALL MOUNT

FIRE PUMP TEST HEADER-FREE STANDING

EXSTING SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO BE REMOVED

SPRINKLER HEAD (SEE SCHEDULE FOR TYPE)

SIDEWALL SPRINKLER HEAD (SEE SCHEDULE FOR TYPE)

D

EX

EX

DRY

F

SPR

ACCESS PANEL

AIR COMPRESSOR

AUTOMATIC SPRINKLERS

BACKFLOW PREVENTER

BRANCH TO CONNECTION

CAST IRON

DOUBLE CHECK VALVE ASSEMBLY

DRY PIPE VALVE

DRY STANDPIPE PIPING

DRY STANDPIPE VALVE

FIRE DPARTMENT CONNECTION

FIRE DEPARTMENT VALVE

FIRE EXTINGUISHER CABINET

FIRE HOSE CABINET

FIRE PUMP

FIRE PUMP CONTROLLER

FIRE PUMP TEST HEADER

JOCKEY PUMP

JOCKEY PUMP CONTROLLER

NO AUTOMATIC SPRINKLERS

NOT IN CONTRACT

POST INDICATOR VALVE

SUMP PUMP

TAMPER SWITCH

AP

AC

AS

BFP

BTC

CI

DCVA

DPV

DSP

DSV

FDC

FDV

FEC

FHC

FP

FPC

FPTH

JP

JPC

NAS

NIC

PIV

SP

TS

FIRESTOPPING NOTES

1. MATERIALS: USE ONLY FIRESTOP PRODUCTS THAT HAVE BEEN UL 1479,

ASTM E-814, OR UL 2079 TESTED FOR SPECIFIC FIRE RATE CONSTRUCTION

CONDITIONS CONFORMING TO CONSTRUCTION ASSEMBLY TYPE,

PENETRATING ITEM TYPE, ANNULAR SPACE REQUIREMENTS, AND FIRE

RATING INVOLVED FOR EACH SEPARATE INSTANCE.

2. FOR SINGLE PIPING PENETRATIONS: A READY-TO-USE LATEX BASED

INTUMESCENT SEALANT IS REQUIRED TO MAINTAIN THE FIRE RATING OF THE

ASSEMBLY PENETRATED. THE SEALANT MUST HAVE UL LISTING FOR BOTH

SLEEVED AND NON-SLEEVED APPLICATIONS.

3. FOR LARGE OPENINGS: CONTAINING MULTIPLE PENETRATIONS (2 OR MORE),

A READY-TO-USE FOAM INTUMESCENT BLOCK MATERIAL MUST BE ABLE TO

BE REMOVED AND REINSTALLED WITHOUT COMPROMISING FIRE

PROTECTION INTEGRITY. COMPLY WITH MANUFACTURER'S RECOMMENDED

PROCEDURES AND PRECAUTIONS. DO NOT USE DAMAGED OR EXPIRED

MATERIALS.

FIRE PROTECTION DEMOLITION NOTES

1. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG WITH THE

PIPING.

2. PROTECT PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT AND

DEBRIS.

3. ALL FIRE EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE

REMOVED FROM THE PREMISES AND PROPERLY DISPOSED OF BY THE

DEMOLITION CONTRACTOR.

4. THE CONTRACTOR SHALL PLUG OR CAP ALL PIPING OUTLETS NOT INTENDED

FOR REUSE.

5. CEILING REMOVAL, STORAGE, AND REPLACEMENT WILL BE MADE BY THE

CONTRACTOR AND IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO

REPAIR THE EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN

COMPLETED. REPAIR INCLUDES BUT SHALL NOT BE LIMITED TO, ANY EXISTING

WALL, CEILING, OR FLOOR THAT IS SCHEDULED TO REMAIN. REPAIR,

PAINTING, AND PATCHING SHALL BE COMPLETED BY AN APPROPRIATE

CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.

6. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION

OPERATIONS, THE CONTRACTOR WILL NOTIFY BUILDING OWNER OF THE

HAZARDOUS MATERIAL.

7. ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS SHALL BE

READ IN CONJUNCTION WITH THESE DRAWINGS.

8. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH PROJECT’S

PHASING SCHEDULE PRIOR TO ANY WORK

HAZARD GROUP AND DENSITY REQUIREMENTS

A. TELECOM ROOMS, DATA ROOMS, AND ELECTRICAL ROOMS TO BE PROVIDED WITH

A DENSITY OF 0.15 GPM/SQ.FT. OVER THE HYDRAULIC REMOTE 1500 SQ.FT.

(ORDINARY HAZARD GROUP 1) WITH A HOSE STREAM ALLOWANCE OF 100 GPM.

B. STORAGE ROOMS TO BE PROVIDED WITH A DENSITY OF 0.20 GPM/SQ.FT. OVER

THE HYDRAULIC REMOTE 1,500 SQ. FT. (ORDINARY HAZARD GROUP 2) WITH A

HOSE STREAM ALLOWANCE OF 250 GPM.

C. CORRIDORS/ BREAKROOMS/ OFFICES/ AND OTHER ROOMS ALIKE SHALL BE

PROVIDED WITH A DENSITY OF 0.10 GPM/ SQ.FT. (LIGHT HAZARD) OVER THE

HYDRAULIC REMOTE 1500 SQ.FT. WITH A HOSE STREAM ALLOWANCE OF 100 GPM

FIRE PROTECTION - FIRE WATCH

FIRE WATCH

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF FIRE PROTECTION SERVICE

1. DURING THE TIME THAT FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE

PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR

SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A "FIRE WATCH" ON THE FACILITY.

2. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY.

THE TERM "FIRE WATCH" IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHOSE SOLE

RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN ESTABLISHED AREA.

3. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OR FM GLOBAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY DURING THE TIME PERIOD OF THE FIRE PROTECTION

RENOVATION WORK.

4. IN ADDITION, THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED 'OUT OF SERVICE'. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE NFPA 101

SECTIONS 3.3.110 AND 9.6.1.6 AND NFPA 72 SECTION 10.21).

5. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF

PERFORMANCE, THE PERSONS PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM

ANY OTHER DUTIES.

6. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND

TO BE TRAINED IN ITS USE.

7. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH

FLOOR, LEVEL, AND ROOM OF THE FIRE AREA IS COVERED.

8. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS:

A. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING.

B. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE.

C. ACTIVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE SMOKE

DAMPERS AND SHUT DOWN FANS.

9. IF BUILDING OCCUPANTS ASSIST WITH FIRE WATCH DUTIES, THE PROCEDURES FOR CONTACTING EMERGENCY PERSONNEL AND EVACUATING THE BUILDING ARE TO BE DISTRIBUTED TO BUILDING OCCUPANTS. FOR PLANNED OUTAGES, THE PROCEDURES ARE TO BE SENT OUT TO THE BUILDING

OWNER FOR DISTRIBUTION.

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

FIRE PROTECTION SYMBOLS, NOTES, AND ABBREVIATIONS

MP CM

1-FP001

1 1 1 1 1 1 1 1 1

A

4 -<1

TH

I o sy Introba c □ M P A N i i i i i i i i i

O

O-

S

A matt.pak Image matt.pak Text Box 1/16/2026

STOR

A001B

TR

A001D

TR

B022B

ELECTRICAL

ROOM

B022A

ELECTRICAL

ROOM

A001E

FINANCE / FISCAL

MY HEALTHE VET

BIOMED

FACILITIES MANAGEMENT SHOPS

LIBRARY

MORGUE

Radiator

Radiator

Radiator RadiatorRadiator

STAIR #2

STAIR #3

STAIR #4

LOADING DOCK

STORAGE B002A

STORAGE

B035A

SYSTEMS

ENGINEER B033

ELECTRIC

SHOP

B026

M/R CHIEF

B032

ELECTRIC

SHOP A

B027 PLUMBING

SHOP

STORAGE

B031A

LOCK

SHOP

B038

OXYGEN

STOR.

B039

OXYGEN

STOR.

B040

PLUMBING

SHOP

B031

SOILED

LINEN

A027

A028

PASSENGER

ELEVATORS

SERVICE

ELEVATORS

A001A

MECH.

ROOM

A001C

OLD

COMPUTER

ROOM

A001

FIRE

ALARM

ROOM

A004A

SOILED

LINEN A006

ELECTRIC

ROOM

A009

PHONE

EQUIP.

A008D

ENGINEERING

MECHANICAL

ROOM

A005

MEN'S TOILET

ROOM

GC113

ELEVATOR

MACHINE

ROOM

GC112

O.R.

PREP RM.

A028C

UNIFORM

STORAGE

A028D

H.A.C.

GC110

WOMEN'S

TOILET ROOM

GC111

STORAGE

GC115

PC

VIEWING

GC129

CLERK

GC123

BOOK

PROCESSING &

STORAGE

GC122

CLERK

AREA

GC121

LIBRARIAN'S

OFFICE

GC125

ELECTRICAL

ROOM

GC128

STAIRS

GCS1

TO BUILDING 2

A/C MACH.

ROOM

B009

POLICE

TRAINING

ROOM

B007

ED

ELEVATOR

CANTEEN

OFFICE

B007A

JAN.

CLO.

B006

SOILED

LINEN

B005

CORRIDOR

CA-10

LOCKER

ROOM

B004

STORAGE

B003

STORAGE

B003A

CORRIDOR

CA-11

TO

RESEARCH

WING

STORAGE

B002

POLICE

SECURITY

STORAGE

A015A

POLICE

SECURITY

STORAGE

A015B

BIOMED

A015

MECHANICAL

A014

MECHANICAL

A014

FMS TLT &

LOCKER RM

A008E

IT/ MECHANICAL

A008C

IT/ MECHANICAL

A008B

MECHANICAL

A008A

PATIENT

CLOTHING

A007

CORRIDOR

CA-6

MECH

A004

ELEVATOR

LIBRARY

GC120 MY HEALTHE

VET

GC126

CORRIDOR

CA-5A

OFFICE

GC103

OFFICE

GC102

HR

OFFICE

GC101

HR

OFFICE

GC100

CORRIDOR

CA-3A

CORRIDOR

CA-4

SIGN ROOM

A019

CORRIDOR

CA-3

MEDICAL WASTE

ROOM

A018

EMS DIRTY

STORAGE

A017

EMS CLEAN

STORAGE

A017A

SERVICE

ELEVATOR

LOBBY

CA-2

CANTEEN STORAGE

A016B

ELEVATOR LOBBY

CA-1

IT CLO

A013C

IT CLO

A013B

CORRIDOR

CA-1A

POLICE

STOR

A016A

ELEC

CLO

A012

FMS CLO

A013A

STAIR #1

ELEC

CLO

A011

FAMILY

VIEWING

ROOM

B019

RADIATION

SAFETY

B020

SPS

STORAGE

B020

CORRIDOR

CA-12

CORRIDOR

CA-9

TO BUILDING 2

CARPENTER

SHOP

FOREMAN

B034

CORRIDOR

CA-13

PAINT

SHOP

B035

CORRIDOR

CA-15

TO BUILDING 2 CORRIDOR

CA-8

MASONRY

SHOP

B036

PAINT

SHOP

B037

CORRIDOR

CA-7

A016E

CORRIDOR

CA-14

EMS

STORAGE

A021

EMS

STORAGE

A020

TRASH ROOM

A022

MORGUE

ENTRANCE

A023

WASH RM

A023B

AUTOPSY AREA

A023C

MORGUE

BOX

A023D

EMS

OFFICE

A025

VAULT

A026A

VAULT

A026B

POLICE

LOCKER RM

A026

EMS LINEN ROOM

LINEN ROOM

A028B

ELEVATOR

CORRIDOR

CA-5

FINANCE

GC104

CANTEEN

A016H

CANTEEN

A016G

CANTEEN

A016E

ELEC CLO

A016J

CANTEEN

A016C

CANTEEN

A016D

MACH. RM.

A016K

EMS OFFICE

A024

A/C UNIT

A028A

OI&T

B022

TRANSFORMER

ROOM

A010

CARPENTER

SHOP

B035

MACHINE

SHOP

B030

A/C SHOP BO28

MECHANICAL

ROOM

BO29

1-FP205

1-FP205

1-FP205

1-FP205

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION BASEMENT OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL BASEMENT PLAN - FIRE PROTECTION

MP CM

1-FP105

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1

L — — □ □ □ □ □/L _/ _/LM

1L — FEIJ A4 □ □ □]

IT

Ari J 4r I T l □n 2VJ_Y1 1/ a 3

AI I JP FI J n T Il[

NLCJ ft

— i—

Ld P1 L □ □flri ri ri

1 riri •• □L

A JET:.I - Ek Ek □4 — —

58■

□ ri □ □ □ F ft r L

5 IF H - 3

L T ftrz□ ft

E □ D■ft •r 1

— iL [ ]

9——ft I1to H hri—H ft □ F□ ft J II I II IL — — ft to E ft- — — ft□ ft

I □ □

□ ft

0 □□

□ p 7 ft L ftI 1M 1Li ft

1]ft toE

I ft

Q ri.

ET □ ri ri Ek toi

J sy Introba c □ M P A N

I I I I I I I I I

III

ft

■to ri A

J A

JL

matt.pak Image matt.pak

Family Toilet Rm

B101

Women's Toilet Rm

B102

Lactation Room B103

EXAM

#1

B137

EXAM #2

B138

STORAGE

B139

STAIR

NO 4

CORRIDOR

C1-15C

LAB

B136

TOUCH

DOWN

B135

CORRIDOR

C1-15

ISO

EXAM #3

B140

ISO

EXAM #4

B141

ISO

EXAM #5

B142

EXAM #7

B144

EXAM #6

B143

EXAM #9

B147

SOCIAL/

EXAM #8

B146

ELEC

CLO

B145

SOILED

HOLDING

B134

PHARM

OFFICE

B133

MEDS

B132

CORRIDOR

C1-15A EXAM #10

B148

EXAM #11

B149

EXAM #12

B150

MECHANICAL

ROOM

B151

TOUCH

DOWN

B131

TRIAGE

B130 CORRIDOR

C1-14

MOD E

RECEPTION

B134

MOD E

WAITING

B132

HAC

B124

CORRIDOR

C1-13

MEN

TLT

HC

B122

STAIR

NO 3

ELEC

B122FEC

GALLERY

B121

ACCESS

FROM B2ACCESS

FROM B2

CORRIDOR

C1-12

CORRIDOR

TO ED

SUICIDE

PREVENTION

B118

HAS

B117

ED AO

B116

NUTRITION

FUTURE ED

BREAK

B115

ELEVATOR

ED

EXAM

ROOM

B112

UNISEX

TOILET

B111

ED

EXAM

ROOM

B110

ED

EXAM

ROOM

B109

ED

EXAM

ROOM

B108

ED

EXAM

ROOM

B107

ED

EXAM

ROOM

B106

ED

EXAM

ROOM

B105

ED

EXAM

ROOM

B104

CORRIDOR

C1-11

CORRIDOR

C1-10

FOOD

COURT

A142

FOOD LINE

A142B

FOOD LINE

A142C

FOOD LINE

A142A

CANTEEN

DINING

AREA

A140

DISHWASHER

A144A

COOLERS

A143

KITCHEN

A144

CAGE

STORAGE

A146

CAGE

STORAGE

A145A

CANTEEN

DINING

AREA

A145

A148 A149 A150

ELE CLO

A151

SERVICE

ELEVATOR

C1-2

MEN

TOILET HC

A153

PRIVACY

OFFICE

A154

CONGRESSIONAL

LIASON

A154B

STAIR

NO 5

WOMEN

TOILET HC

A155

VISN 4

CONFERENCE

ROOM

A157

VISN

OFFICE

A157A

CORRIDOR

C1-4

ELEC

CLO

A158

CONFERENCE

ROOM

A160

OFFICE

A161

OFFICE

A162

OFFICE

A162A

OFFICE

A163

PATIENT

ADVOCATE

FUTURE

PCS

A159

DECEDENT AFFAIRS

AFFAIRS

A164

OFFICE

1C101

OFFICE

1C111

WORK

ROOM

1C110

OFFICE

1C109

OFFICE

1C108

OFFICE

1C107

OFFICE

1C106

OFFICE

1C105

OFFICE

1C104

OFFICE

1C103

PCS

1C100

WAITING

1C102

FUTURE

QUALITY

MANAGEMENT

1C122

1C127

OFFICE

1C126

PRIVACY

OFFICE

1C125

OFFICE

(FRONT OFFICE)

1C124

OCC

OFFICE

1C123

CONFERENCE

ROOM

1C138

CHIEF OF

STAFF

1C137

1C136

1C135

1C134

1C133

STAIR

NO 1

1C-S1

1C132

1C129A1C131

CHIEF OF

STAFF OFFICE

1C129

CORRIDOR

C1-5

STORAGE

1C121

ELEVATOR

P.

ELEC

CLO

1C118

TELE

CLO

1C120

A174F

A174E

A174DA174CA174B

ASSISTANT

DIRECTOR

A175

BOARD ROOM

VESTIBULE

A177A

DIRECTOR'S

SUITE

A174

WOMEN

STAFF

ONLY HC

1C117

MEN STAFF

ONLY HC

1C115

HAC

1C114

CLOSET

1C113

COMPLIANCE

OFFICER

A156

A174G

A174I

A174H

CORRIDOR

C1-3A

CORRIDOR

C1-3

BOARD ROOM

A177

CORRIDOR

C1-1A

VA POLICE

OPERATIONS

A101

STAFF

A101A

TELEPHONE

OPERATOR

A102

CORRIDOR

C1-6

TLT

A103

HAC

A104

COPY/ EQUIPMENT

ROOM

A105A

OFFICE

A105B

OFFICE

A105C

OFFICE

A105F

OFFICE

A105G

OFFICE

A105H

STUDIO

A105E

MEDICAL

MEDIA

PERSONNEL

A105D

CORRIDOR

C1-7

MEDICAL

MEDIA

A105

HOLDING

ROOM

A106A

HOLDING

ROOM

A106B

VA POLICE

HOLDING

ROOM

A106

STAFF

OFFICE

A107C

UNISEX

TLT RM

A107B

CONFERENCE

ROOM

A107D

STAFF

AREA

A107E

PRINTER

AREA

A107A

OFFICE

A107I

STORAGE

A107H

TELE

CLOSET

A107F

OFFICE

A107G

QM

OFFICE

A108B

QM

OFFICE

A108C

QM/ FUTURE

PATIENT ADVOCATE

A108

QM

OFFICE

A108A

QM

A107

QM

A108D

QM/ FUTURE

DECEEDENT

AFFAIRS

A109

ELEC

CLO

A119

CARD

SAFE

A111A

PIV

A111

VA POLICE

SERVICE

A112

CORRIDOR

C1-8

STAIR

NO 2

VA CRIMINAL

INVESTIGATOR

A113

ASSISTANT

CHIEF OF POLICE

A114

CHIEF

OF

POLICE

A115

VA POLICE

ADMINISTRATION

A116

STAIR

NO 1

ELEC

CLO

A135

ELEC

CLO

A136

TELE

CLO

A136A

FEC

STORAGE

A39B

ELEVATOR LOBBY

C1-1

MECHANICAL

ROOM

1D102

OFFICE

A139C

RETAIL STORE

A139A

CORRIDOR

C1-9

CORRIDOR

C1-15B

B113

B113A

LAUNDRY

CHUTE

B113D

TR

A154A

TR

B112A

CLOSET

A154B

F E

C

GATE

GATE

CONSTRUCTIONCONSTRUCTION

TO SOUTH BUILDING

(BUILDING 2)

TO SOUTH BUILDING

1-FP210

1-FP210

1-FP210

1-FP210

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION FIRST FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL FIRST FLOOR PLAN - FIRE PROTECTION

MP CM

1-FP110

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1

I n u P r

L(ID J

C / / E

L i/

□ □ □ □ Dt r•L 5 V□O T

L(I □7]] I 11 PE1 55/[ 1Rn

1 n

D —□

TO T

O 1J [ NLCI 1

11 C1

gg) \-O 8 n □LPT

! IE X

&rmi i L ][

0LET□ H 1DE o -oA2 r[

1,B

INHEDNFDES ]I H

Y V rAl L — d H LIT

H I u L

B(()

••AJn//inLE 5 7 JTL TEI

-E •7 [VRT7 yn Pupo——2i TEEPEE 1VNlal IJ if

20( "I I.1 920B— 1EP—=j 1 ]1 1 EL••

I

X

X □ □ 7— W Q o

J

I 5SP □o &Qil I

1es I a[ —• — LP ]

L

11) I c Xtf rx

X sy Introba c □ M P A N

I I I I I I I I I

I

Q r

I a

I

I a

T

I

LL

E

X

•al

LE

I I

P L

X

L matt.pak Image matt.pak

TR

A207

TR

B228A

WALL PASS THRU N.I.C.

TO BUILDING 2

ACCESS PANEL

21" HIGH

TO

RESEARCH

WING

INPATIENT PHARMACY

REHABILITATION

IMPACT, BH, PCS & HAS

REHABILITATION

Printer

PASS-THRU REFRIG.

PASS-THRU FREEZER

LF

HOOD

N.I.C.

LF

HOOD

N.I.C.

LF

HOOD

N.I.C.

RESEARCH

B228D

RESEARCH

B228E RESEARCH

B228F

STAIR #4

CORRIDOR

C2-15

B228GRESEARCH

B228C

RESEARCH

B228B

CL

B228H

CL.

B228J

OFFICE

POOL

B228

INTERVIEW

B227

INTERVIEW

B226

OFFICE

B225A

OFFICE

B225B

WAITING

B225

CORRIDOR

C2-14

CORRIDOR

C2-13

MEN'S

TOILET

B224

STAIR #3

ELEC

B223FEC

B222

BOARD RM/

CONFERENCE

B221

ELEC

CLO

B221A

CORRIDOR

C2-122

CONFERENCE

VESTIBULE

B220H.A.C.

B219

STORAGE

B220A

BEHAVIORAL

HEALTH

OFFICE

B218

BEHAVIORAL

HEALTH

OFFICE

B217

BEHAVIORAL

HEALTH

OFFICE

B216

BEHAVIORAL

HEALTH

OFFICE

B215

BEHAVIORAL

HEALTH

OFFICE

B214

BEHAVIORAL

HEALTH

OFFICE

B213

BEHAVIORAL

HEALTH

OFFICE

B212

ED

ELEVATOR

BEHAVIORAL

HEALTH

OFFICE

B210

BEHAVIORAL

HEALTH

OFFICE

B209

BEHAVIORAL

HEALTH

OFFICE

B208

ELEC

CLO

B207

CESATE

B206

BEHAVIORAL

HEALTH

B205B

BEHAVIORAL

HEALTH

B203

BEHAVIORAL

HEALTH

B202C

BEHAVIORAL

HEALTH

B202B

BEHAVIORAL

HEALTH

B202A

BEHAVIORAL

HEALTH

B201

EEO

B205A

EEO

B204

CORRIDOR

C2-10A

CORRIDOR

C2-10

BULK

STORAGE

A237

CORRIDOR

C2-9

STAGING

AREA

RECEIVING

AREA

FILL

AREA

A236I

SUPERVISOR

INPATIENT

PHARMACY

A236H

ANTE

ROOM

A236F

IV

SOLUTION

ROOM

A236G

RESEARCH

A236E

COMPOUNDING

ROOM

A236D

CONTROLLED

SUBSTANCE

VAULT

A236C

PROCUREMENT

TECH

A236B

WORK

ROOM

A236J

INPATIENT

PHARMACY

A236

DUMB

WAITER

HAC

A236A

STAIR

NO 1

FEC

A235E ELEC

CLO

A235D

ELEC

A235C

CORRIDOR

C2-1A

ELEVATOR

LOBBY

C2-1

ELEC

CLO

A253F

REHAB

WAITING

A202

OFFICE

A203

OFFICE

A204

OFFICE

A231

OFFICE

A230

BEHAVIORAL

HEALTH

TOUCHDOWN

A229

ELEC

A228 CL

A229A

IMPACT

EXAM

ROOM

A227

STAIR #2

IMPACT

PHYSICIAN

A226B

IMPACT

NURSING

A226A

IMPACT

NURSING

A225

IMPACT

TOUCH

DOWN

A224

ASST. NURSE

MANAGERS

A223

NURSE

RESEARCHERS

A222

NURSING

A221

NURSING

A220

SAFE PATIENT

HANDLING

A219

HAS

SUPERVISORS

A218

IMPACT

TOUCHDOWN

A217

CORRIDOR

C2-8

IMPACT

EXAM ROOM

A216

TOILET

A215

TOILET

A214

VACANT

A213

VACANT

A212

ISO

A211

BEHAVIORAL HEALTH

TOUCHDOWN

A210

HAS

A209

GI

STOR

A208

IMPACT

RECEPTION

A206

CORRIDOR

C2-7

CORRIDOR

C2-6A

IMPACT

WAITING

A205

CORRIDOR

C2-6

RECEPTION

A201

OFFICE

A200

REHAB

OFFICE

A262

6 PERSON

TOUCHDOWN

A260

ELEC

A261

LOW

VISION

A259A

LOW

VISION

A259

LOW

VISION

A258

CHIEF OF

REHAB-

ILITATION

A257

SCI

CLINIC

A256 REHAB

A255

REHAB

A255A

RESIDENT'S

OFFICE

A254

OFFICE

A253

OFFICE

A252

OFFICE

A251

CORRIDOR

C2-5

WOMEN

STAFF

TLT HC

A250

MEN

STAFF

TLT HC

A249

CORRIDOR

C2-3A

HAC

A248

EXAM

A247

EXAM

A246

EXAM

A245

EXAM

A244

OT

A243A

OCCUPATIONAL

THERAPY

A243

ELEC

CLO

A242

ADL

BATH

A243B

ADL

KITCHEN

A243C CORRIDOR

C2-4

STORAGE

A241

STAIR

NO 5

EXAM

A240D

EVALUATION

ROOM

A240C

STAFF

AREA

A240B

STORAGE

A240A

CORRIDOR

C2-3

PHYSICAL

THERAPY

A239

MEN

TLT HC

A237

WOMEN

TLT HC

A238

CLEAN

LINEN

A239A

SERVICE

ELEVATOR

LOBBY

C2-2

CLO

A239B

ELEC CLO

A239C

SERVICE

ELEVATORS

SIGNAL

A235B

DATA

A235A

PASSENGER

ELEVATORS

CHANGING

ROOM

A239E

CHANGING

ROOM

A239F

STORAGE

A239D

UTILITY

SUPPLY

A239G

PROSTHETICS

REPRESENTATIVES

B238G

PROSTHETICS

RECEPTION

B238

PROSTHETICS

REPRESENTATIVES

B238F

ORTHOTIST

EXAM

B238E

ORTHOTIST

SHOP

B238D

PROSTHETICS

CHIEF

B238C

PROSTHETICS

REPRESENTATIVES

B238B

PROSTHETICS

REPRESENTATIVES

B238A

FILES

B233A

RECEPTION/

WORK

B233

WOMEN'S

TOILET

B232

EXAM/

INTERVIEW

B231

SPECIMEN

B230

EXAM/

INTERVIEW

B229

CORRIDOR

C2-11

ROOF

ROOF

1-FP220

1-FP220

1-FP220

1-FP220

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION SECOND FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL SECOND FLOOR PLAN - FIRE

PROTECTION

MP CM

1-FP120

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1

□ I □ □

BCTr Si—a E I I IT 6 [

Q E I

I

< I NLPT

i

— L 4

V LV •l o

El—

4/ LL□ □

11 u)1

1/I / IfA-

Ei6 3 rI□

Ji II

— E[/

□ 1L □E

—□ □ r IDI4 fl 1

Iu11 H //LL- in1

—C

— RAMALtXIULL •r L I

P B—I•E l [H HIKT 1□ r j I

CV5 ID LYLE 11 IIH I«1 XV

IJ 0 jm[F__/|I I

] □ IFOR K II

I o

9l.Q .

ni H

I II L

I

1 T II II

15 11 NI

fla H

I IEHl

T H H

JEEl IHi sy Introba c □ M P A N Y

1 1 I I I I I I I

EL in

H

Hl

H

H

H

SA [

6=

I

1I I L

JEL

L5

E

I Q

J

L

I nL t p—L

J□ matt.pak Image matt.pak

HAS

B317

TR

B317A

TR

A361

TO BUILDING 2 CHAPLAIN SERVICES

TO RESEARCH

WING

EYE CLINIC

SURGERY CLINICS

DF

Mail

Hood

ELEVATORS

SERVICE

STAIR #1

DumbwaiterISO

OFFICE

B323

CHAPLAIN

OFFICE

B322

CHAPLAIN

OFFICE

B321

CHAPLAIN

RECEPTION/

SECRETARY

B320 CHAPLAIN

SERVICE

B319

ELEVATOR

CORRIDOR

C3-12

WOMEN'S

TOILET

B324

MEN'S

TOILET

B324A

EUCHARISTIC

ROOM

3B168

LAB

B316C CLOSET

B316D

B316

LAB

B316B

OFFICE

B315A

OFFICE

B315

OFFICE

B312

OFFICE

B311

CONFERENCE

ROOM

B310

OFFICE

B309

OFFICE

B308

CORRIDOR

C3-11

DENTAL

RECEPTION

B307

DENTAL

WAITING

B306

HAC

B313

STOR

B314

DENTAL

CORRIDOR

C3-10A

CORRIDOR

C3-10

STO

3B169A STO

3B168A

CHAPEL

VEST.

3B171

HAC

B325

CHAPEL

3B169B

CHANCEL

3B169B

STORAGE

3B168C

SACRISTY/

STORAGE

3B169D

INTERVIEW

3B170

STAIR #3

TOILET

B326

OR

B327

CLO

B328

STAFF

B329

CLOSET

B330

CLO

B331

EXAM

B332

DENTAL

EXAM

B333

CORRIDOR

C3-13

CLO

B334

EXAM

B335

EXAM

B336

CLO

B337

DENTAL

LAB

B338

PORCELAIN

ROOM

B339

STAFF

LOUNGE

B339A

LOCKER

AREA

B339C

TOILET

ROOM

B339B

STAIR #4

CLO

B340

EXAM

B341

EXAM

B343

EXAM

B344

EXAM

B346

EXAM

B348

EXAM

B349

CLO

B342

CLO

B345

CLO

B347

STAFF

B350

STAFF

B351

OR

B352

STORAGE

B354

CLO

B353

MEN'S

ROOM

B355

WOMEN'S

ROOM

B356

CORRIDOR

C3-9C

B383

EXAM

ROOM

B382

PHOTO-

GRAPHY

ROOM

B380

CORRIDOR

C3-9D

PROCEDURE/

LASER ROOM

B379

OFFICE

B378

OFFICE

B378A OFFICE

B376

OFFICE

B374

CORRIDOR

C3-9E

EXAM

ROOM

B372

EXAM

ROOM

B370

EXAM

ROOM

B369

EXAM

ROOM

B381

EXAM

ROOM

B377

EXAM

ROOM

B375

EXAM

ROOM

B373

EXAM

ROOM

B3759

EXAM

ROOM

B361

EXAM

ROOM

B363

EXAM

ROOM

B364 EXAM

ROOM

B365

VISUAL

FIELDS

B371

VISUAL

FIELDS

B368

VISUAL

FIELDS

B366

CORRIDOR

C3-9F

CORRIDOR

C3-9B

EXAM

ROOM

B357

EXAM

ROOM

B358

EXAM

ROOM

B360

EXAM

ROOM

B362

CORRIDOR

C3-9A

CORRIDOR

C3-9

CORRIDOR

C3-9G

PASSENGER

ELEVATORS

ELEVATOR

LOBBY

C3-1

ELECTRICAL

ROOM

B367

B367A

SERVICE

ELEVATOR

LOBBY

C3-2

UNISEX

TLT RM

A342

STAFF

TLT RM

A341

CORRIDOR

C3-3

3 WEST

WAITING ROOM

A343

3 WEST

RECEPTIONIST

A345

STAIR

#5 FEC

MECHANICAL

A346

MECHANICAL

A346A

CORRIDOR

C3-4 CLOSET

A346B

CORRIDOR

C3-3A

CLO

A346C SOILED

UTILITY

A347

MEDICINE

ROOM

A348

EXAM

ROOM

A349

EXAM

ROOM

A350

EXAM

ROOM

A351

EXAM

ROOM

A352

EXAM

ROOM

A353

EXAM

ROOM

A354

CORRIDOR

C3-5

EXAM

ROOM

A355

EXAM

ROOM

A356

EXAM

ROOM

A357

EXAM

ROOM

A358

EXAM

ROOM

A359

EXAM

ROOM

A360

CAST

ROOM

A362

IMPACT

EXAM ROOM

A363

IMPACT

EXAM ROOM

A364

IMPACT

EXAM ROOM

A365

RESIDENT'S

ROOM

A300

WOMENS

ROOM

A301B

MENS

ROOM

A301A

CORRIDOR

C3-1A

TELE

A336D

TELE

A336E

CLO

A336B

CLO

A336C

FEC

ELEC

A336A

OFFICE

B300OFFICE

B301

HAC

B302

CLOSET

B303

VESTIBULE

C3-1B

RECEPTIONIST

B304

EYE

CLINIC

WAITING

B305

3 EAST

WAITING

ROOM

A301

CORRIDOR

C3-6

COMMUNICATIONS

CENTER

COUNTER

A335

CLEAN

SUPPLY

ROOM

A334

CENTRAL

EXAM

A333

CORRIDOR

C3-6A

HAC

A302

UTIL/

ELEC

A303

PROCEDURE

ROOM

A304

PODIATRY

EXAM #1

A305

PODIATRY

EXAM #2

A306

PODIATRY

EXAM #3

A307

GRINDING

ORTHODICS

A308

PODIATRY

ATTENDINGS

A309

PODIATRY

RESIDENTS

A310

PODIATRY

CHIEF

A311

PODIATRY

EXAM #4

A312

PODIATRY

EXAM #5

A313

PODIATRY

EXAM #6

A314

NURSES

WORK

ROOM

A315

SOILED

LINEN

A317

ENT STAFF

A318

ENT EXAM

ROOM #1

A319

ENT EXAM

ROOM #2

A320

ENT EXAM

ROOM #5

A321

SHARED EXAM

ROOM

A322

VASCULAR

REC/ SUPP

A323

VASCULAR

EXAM

ROOM

A324

VASCULAR

EXAM

ROOM

A325

VASCULAR

TECH OFFICE

A326

EXAM

ROOM

A327

CORRIDOR

C3-8

STERILIZ

ROOM

A328

ENT EXAM

ROOM #3

A329

ENT EXAM

ROOM #4

A330

STAFF

RESTROOM

A332 ENT

SUPPLY

A331

CORRIDOR

C3-6B

STAIR

#2

EXIST

FEC

PENTHOUSE

3D100C

CORRIDOR

C3-7

CLOSET

A363A

R a d ia to r

R a d ia to r

R a d ia to r

R a d ia to r

R a d ia to r

R a d ia to r

1-FP230

1-FP230

1-FP230

1-FP230

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION THIRD FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL THIRD FLOOR PLAN - FIRE PROTECTION

MP CM

1-FP130

08 16 3241216

SCALE: 1/16"=1'-0"

N

SR

RN1

A p

J I

1E I

C n

E T_E

T J h

L

■p

•E

Q fl l

6/ i r D

EH

H nJ

S3

G n nr h i

C ak

L

El

J J

F I

EFL

I

Q

L/ H

LL

i n o s I a d C gh

I

L

3fl

H H l H

E

V

H

C Q

T

V C

J

E r o a

H

=r L r

J

□a a a

G L

ETA

A 1111111 iL ad

Ll

E=

J i O se —

Tp

T;

E

C L

J

L

□V r— g

J l

EL

L

□u

D H i— ii gl

I

I

L l

D E

L r

D L r r

I I

I

II

EL

O

I I a d d

E 5I!

Ill

J— L

1H

III

E

U I

E fl

□N

Lal t

/p

L

R fj l

F b

-D ai matt.pak Image matt.pak

PASSENGER

ELEVATORS

SERVICE

ELEVATORS

MECHANICAL

ROOM

B446A

CORRIDOR

C4-13B

SOILED

UTILITY

B446

STAFF

TOILET

B445

ENDO

B444

SCOPE CLEAN/

STORAGE

B443

ENDO

B442

CLEAN

STORAGE

B441

TECH

WORKROOM

B440

EXAM

ROOM 5

B438

STOR

B439

EXAM

ROOM 4

B437

EXAM/

OFFICE

B435

HAC

B436

EXAM/

OFFICE

B434

TRIAGE

B433

STAIR #3

ELEC

B432

ELEC

B431

SHARED GI

PROVIDER

OFFICE

B4303 PERSON

OFFICE

B429

3 PERSON

OFFICE

B428

ELEC

B427

OFFICE

B426

OFFICE

B425

OFFICE

B424

OFFICE

B423

CORRIDOR

C4-12

GI

PROVIDER

OFFICE

B422

OFFICE

B421

OFFICE

B420

OFFICE

B419

ELEVATOR

GI NURSE

STAFF

B416

SOILED

UTILITY

B415

STAFF

B414

EXAM

ROOM

B413

EXAM

ROOM

B412

EXAM

ROOM

B411

EXAM

ROOM

B410

UNISEX

TOILET

B409

H.A.C.

B408

UROLOGY

RAMP UP

TLT/ DRESSING

ROOM

B407A

CYSTOSCOPY

ROOM

B407

EQUIPMENT

CLEANING

B406

MEDICATION

ROOM

B405

EXAM

ROOM

B404

EXAM

ROOM

B403

EXAM

ROOM

B402

GI/ UROLOGY

RECEPTION

B401

CORRIDOR

C4-10A

GI/ PULMONARY

WAITING AREA

B457

TLT

B456

EXAM/

OFFICE

B455

EXAM

ROOM 3

B454

EXAM

ROOM 2

B452

CORRIDOR

C4-13

STOR

B453

GI

EXAM

ROOM 1

B451

CODE

CART

B450

PREP/

RECOVERY

B448

CORRIDOR

C4-13A

TLT

B448B

DRESS

B448A

ERCP

B447

PULMONARY

RECEPTION

B457

TELEHEALTH

B458

NEUROLOGY

OFFICE

B459

NEUROLOGY

OFFICE

B432

CORRIDOR

C4-10

UROLOGY/ GI

WAITING AREA

B400

UNISEX

TLT

B400A

UNISEX

TLT

B400B

PFT

A431

CORRIDOR

C4-9

PFT

A430 SLEEP LAB

A429

CLINICAL

RESEARCH

A433

TOUCH

DOWN

A433A

TOUCH

DOWN

A433B

EXAM/

BLOOD

DRAW

A433C

INTERVIEW

A433D

INTERVIEW

A433I

MECH

A433E

TLT

A433F

ELEVATOR

LOBBY

C4-1

ELEC

A433H

STOR

A433G

SERVICE

ELEVATOR

LOBBY

C4-2

H.C.

TLT

A435

NEUROLOGY/

PADRECC

WAITING

A472

CORRIDOR

C4-3

NEUROLOGY/

PADRECC

WAITING

A436

OFFICE

A437

ADMIN

OFFICER

A438

STOR

A439

OFFICE

A440

H.C.

TLT

A441

CORRIDOR

C4-3A

CHARTS

A442

STAIR #5

CORR.

C4-4

STOR

A443B

WORK

ROOM

A443

ELEC CLO

A443A

LAB

A445A

H.C.

TLT

A444

LAB

A445

CORRIDOR

C4-4A

OFFICE

A446

OFFICE

A447

OFFICE

A448

CHIEF

NEUROLOGY

A449

OFFICE

A451

OFFICE

A452

ADMIN

ASSIST

A450

OFFICE

A453

OFFICE

A454

SOILED

LINEN

A456

HAC

A457

EXAM

A458

EXAM

A459 EXAM

A460

EXAM

A461

EXAM

A462

STORAGE

A463

INTERVIEW

A464

EXAM

ROOM

A465

EXAM

A466EXAM

A467

EMG

EXAM

A468

EEG

EXAM

A469

CLEAN

LINEN

A470

NEUROLOGY/

PADRECC

RECEPTION

A471

OFFICE

A473

HOPTEL

ROOM #1

A400

TELE

A427B

TELE

A427C

CORRIDOR

C4-1A

DUMB

WAITER

CREDIT

UNION

A428 STAIR #1

FEC

ELEC

A427A

ELEC

A426

ELEC

CLO

A425

TOILET

A400A

TOILET

A401A

ON CALL

ROOM #2

A401

WAITING

SLEEP

LAB

A402

TLT

A424

TLT

A423A

ON CALL

ROOM #1

A423

CORRIDOR

C4-2

HOPTEL

ROOM #2

A422

TLT

A422A

CLO

A422B

TLT

A421A CLO

A421B

HOPTEL

ROOM #3

A41

STAIR

#2

FEC

H.A.C A420

CORRIDOR

C4-8

MECHANICAL

ROOM

A419

MECHANICAL

ROOM

A419A

CLEAN

LINEN

A418

D/

UTILITY

A415

CLO

A417

S/

LINEN

A416

S.C.

NURSE

A414

OFFICE/

EXAM

A413

CPAP.

SET

UP

A412

SLEEP LAB

A411

SLEEP

LAB

A409

TLT

A410

CLO

SLEEP

LAB

A408

TLT

A407

SLEEP

LAB

A406

MONITOR

RM

A405

CLO

CORRIDOR

C4-7

STO/

LINEN

A404

CORRIDOR

C4-6A

COPY

ROOM

A403

ADMIN

A403A

CORRIDOR

C4-5

CLO

TR

B418

CONFERENCE

ROOM

A455

TR

A455A

FEC

SLEEP LAB

PADRECC

O N

C A

L L

H O

P T

E L

H O

P T

E L O

N C

A L L

TO BUILDING 2

TO ROOF

TO RESEARCH WING

PULMONARY

CLINICAL RESEARCH

Radiator

R a d ia to r

Radiator Radiator Radiator

HS

H S

HS

HS

UP

DNUP

1-FP240

1-FP240

1-FP240

1-FP240

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION FOURTH FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL FOURTH FLOOR PLAN - FIRE PROTECTION

MP CM

1-FP140

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1

1— L

Ka ST T2 A HrH H

•l

0 [H] [

1 1 Ih ?

O0

C aLMBBT 0 IHr

— [62 J

Q/

3P N

□ l•]

L L

]E 0Eboo—r J □ gp

Tloor Eloaf

— L 1//n /L]H maIL

V VA¥W 17 inJRI II

7I 1Etgi p1 II 11ft•3 El 0

Q/ 9G—=f eta16— 1 □ u □

M □ □

Dm 1 □

IFSEE mUTrt □

L 13 i □ n □■jp I u □ sy Introba c □ M P A N

I I I I I I I I I g

H H

/L

E

•l==

E C u ffl

E

J

E a D

I I n

J

* L f

6) l n

P

. T dilo a

°8.

d

L EE=z fl 2

- I I D

EtB

E

Q

I

C matt.pak Image matt.pak

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

RAD RAD

H e a d w a ll

H e a d w a ll

H e a d w a ll

Headwall

Headwall Headwall

Headwall Headwall

Headwall

H e a d w a ll

H e a d w a ll

H e a d w a ll

H e a d w a ll

H e a d w a ll

H e a d w a ll

RAD RADRAD RAD

RADRAD

TR

A502

STOR

A502A

ROOF

5 SOUTH SWING WARD

TO BUILDING 2

SURGERY TOUCHDOWN

To Research Building

EWC

PASSENGER

ELEVATORS

SERVICE

ELEVATORS

1BED

B530

1 BED

B529

1BED

B527

TLT

RM

B528

TLT

RM

B531

TOUCH

DOWN

B526

1 BED

B524

NEW

TLT RM

B524A

CLEAN

LINEN

B523

TOILET

ROOM

B518A

SOILED

LINEN

B521

HAC

B520

CLO

B522

1 BED

B516

2 BEDS

B515

TOILET ROOM

B514

2 BEDS

B513

2 BEDS

B512

TOILET ROOM

B511

2 BEDS

B510

MEDICATION

ROOM

B508

TLT

B508A

STORAGE

B507

STORAGE

B506

TOILET

ROOM

B503A

NORISH-

MENT

KITCHEN

B505

2 BEDS

B503

TOUCH

DOWN

B502

QUALITY

MANAGEMENT

B501

CASE

MANAGERS

A534

SOCIAL

WORK

A533

PHARMACY

OFFICE

A532

DUMB

WAITER

STAIR # 1

A528

2 BEDS

CLO

A527

TLT

A528A

CL

A526

CL

A525

TLT

A524A

A524

SINGLE

BED

CLO

A523

STORAGE

A522A

STORAGE

A522B

CLO

A521

CL

A520

STORAGE

A522C TLT

A519A

2BED

A519

DAY

ROOM

A518

STAFF

LOCKER

ROOM

A517

A BED

ISOLATION

A516

ANTE

A516A

TLT

A516B

1 BED

ISOLATION

A515

TLT

A515B

ANTE

A515A

TLT

A514B

ANTE

A514A

1 BED

ISOLATION

A514

STOR

A513

SOILED

A512

CLEAN

A511

MED.

A510 2 BEDS

A509 TLT

A508A

TLT

A509A

2 BEDS

A508

STORAGE

A507

2BED

A506

TLT

A506A

TLT

A505A

2 BEDS

A505A504B5 EAST

NURSE STATION

A504

A504A

ANTE

ROOM

A503A

1 BED

ISOLATION

A503

TLT

A503B

HEAD NURSE

OFFICE

A571

NURSE'S

WORKROOM

A570

STAFF

ROOM

A569

REHAB

WORKROOM

A568

CHARTING

ROOM

A567

5 WEST

NURSE

STATION

A566

A566A SEMI- PRIVATE

A565

TLT

A565A

STORAGE

A564

TLT

A563A

RADIATION

TREATMENT

ROOM

A563

VESTIBULE

C5-9

RADIATION

TREATMENT

ROOM

A562

TLT

A562A

TLT

A560A

STORAGE

A561

SEMI-PRIVATE

A560

CORRIDOR

C5-8

CORRIDOR

C5-7

MED.

RM.

A559

NOURISH-

MENT

A558

DIRTY

UTILITY

A557LAUNDRY

CHUTE

ELEC.

A556

JAN.

A555

SEMI- PRIVATE

A554

TLT

A553A

TLT

A554A

SEMI-

PRIVATE

A553

TLT

A551

STOR

A552

SEMI-PRIVATE

A551STORAGE

A550

DAY

ROOM

A549

SEMI-

PRIVATE

A548

STOR

A545A

TLT

A548A

ELEC

A547

CORRIDOR

C5-10

STORAGE

A546

CONGREGATE

BATH

A545

STAIR

S5

PRIVATE

A544

TLT

A544A

CLEAN

LINEN

A543

CLEAN

LINEN

A542TLT

A541A

CORRIDOR

C5-6

SEMI-PRIVATE

A541

STAFF

TLT

A540

PATIENT

STORAGE

A539

TELEHEALTH

A538H

TLT RM

A538G

CLO

A538I

FMS

CLO

A538J

TELPHONE

A537C

TELEPHONE

A537BELEVATOR LOBBY

C5-1

TOUCH

DOWN

A538F

TOUCH

DOWN

A538E

MECH

A538DTOUCH

DOWN

A538C

MOD F

STORAGE

A538B

SURGERY

TOUCH

DOWN

A538

TOUCH

DOWN

A538A

SPS TEMP

CLEANING

B546

TLT RM

B546ASTAFF

ROOM

B545

CLEAN

STORAGE

B540B

PATIENT TLT

B544

5 SOUTH

NURSE STATION

B540A

STORAGE

B539

ELEC

B538

STAIR #3

ANTE-

ROOM

B535

OLD

TLT

B535B

CHEMO

CONTINGENCY

B535A

CONGREGATE

BATH

B534

ELE

B533

1 BED

B532

FAN ROOM

ELEC

A537

ELEC

A536

ELEC

A535

FEC

A537A

1-FP250

1-FP250

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION FIFTH FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL FIFTH FLOOR PLAN - FIRE PROTECTION

MP CM

1-FP150

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1 r

- dJ E

!L L fl I—FP □ 4(

J □

G fl

E o

A E/L —• 1 n□

> IL ] [

fl0 □

□ O

L

A fl] •[ ru o □ lEl LEEE□

[ II□ t 7II_ 4 flJ 5—EE□ □

N_AL D_rnr

D V U IaAll □C E

□) fl[ ©

—=E Nfl ro I ——I J □ —L

( [51) fl C 1, □ HH —r

1 □ □•F flO lo0 □ ZeR ] BE fla 4 . r1Le[

1V0 HL□ Y L

-a[

3E 0 •_□ Bl7" Ap_ .- ]I flIr === 1 □

I

J

I □ 7 sy Introba c □ M P A N

I I I I I I I I I

— bur fl fl

Q fl

b. □

J D

B

La fl I

OF

matt.pak Image matt.pak

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

R A

D R

A D

RAD RAD

H e a d w a ll

H e a d w a ll

H e a d w a ll

FEC

EWC

PASSENGER

ELEVATORS

SERVICE

ELEVATORS

RENAL

EXAM

B624

B623A

RENAL

EXAM

B623

RENAL

LAB

B622

RENAL EXAM

NURSING

B621

HAC

B620

CLO

B619

SOILED

LINEN

B618

CORRIDOR

C6-10A

TLT RM

B617A

STORAGE

B617

SUPPLIES

B616

TLT

B616A

WORK

AREA

B615 TLT

B615A

CORRIDOR

C6-11

NURSE

STATION

B611A

HEMODIALYSIS

B611

ISOLATION

B610

TOUCH

DOWN

B609

TLT

B609A

OFFICE

B608

TLT

B608A

STORAGE

B607

TLT

B603A

NOURISH-

MENT

B606

CLEAN

LINEN

B605

RESPIRATORY

CARE

EQUIP.

B604

EPO

B603 CASE

MANAGERS

B602

PHARMACY

OFFICE

B601

CLINICAL

DIETITIONS

A635

DIALYSIS

OFFICE

A634

TLT

A634A

NURSING

OFFICE

A632

DUMB

WAITER

STAIR

#1 ELEC

A629

FEC

A631A

ELECTRIC

A631

CLO

A630

2 BEDROOM

PATIENT

ROOM

A628

TLT

A628A

TLT

A624A

STAFF

TLT

A627

CLEAN

LINEN

A626

CLEAN

UTILITY

A625

1 BEDROOM

PATIENT

ROOM

A624

STAIR

#2

FEC

TELE

CLO

A623

CONGREGATE

BATH

A622

STOR

CLO

A622

TLT

A619A

ELEC

A621

ELEC

A620

2 BEDROOM

PATIENT

ROOM

A619

HOSPITALISTS

A618

NEW DAY ROOM

A617

1 BEDROOM

ISOLATION

ROOM

A616

ANTE-

ROOM

A616A

TLT

A616A

1 BEDROOM

ISOLATION

ROOM

A615

TLT

A615B

ANTE-

ROOM

A615A

TLT

A614B

ANTE-

ROOM

A614A

1 BEDROOM

ISOLATION ROOM

A614

HAC

A613

SOILED

UTILITY

A612

NOURISH-

MENT

ROOM

A611

MEDICATION

ROOM

A610

2 BEDROOM

PATIENT ROOM

A609 TLT

A608A

TLT

A609A 2 BEDROOM

PATIENT ROOM

A608

STORAGE

ROOM

A607

2 BEDROOM

PATIENT ROOM

A606

TLT

A606A

TLT

A605A

2 BEDROOM

PATIENT ROOM

A605

A604B

NURSE

STATION

A604

NURSE

STATION

A604A

ANTE-

ROOM

A603A

CORRIDOR

C6-6

1 BEDROOM

ISOLATION ROOM

A603

TLT

A603B

NURSING

OFFICE

A602

HEAD NURSE

OFFICE

A669

NURSE

WORKROOM

A668

RESIDENT'S

ROUNDING ROOM

A667

NURSE

STATION

A666

A666A

2 BEDROOM

PATIENT ROOM

A665

TLT

A663A

TLT

A665A

2 BEDROOM

PATIENT ROOM

A663

ASST.

NURSE

MGR

A662

2 BEDROOM

PATIENT ROOM

A661

TLT

A661A

TLT

A660A

2 BEDROOM

PATIENT ROOM

A660

MEDICATION

ROOM

A659

NOURISH-

MENT

ROOM

A658

DIRTY

UTILITY

A657LAUNDRY

CHUTE

ELEC

A656

HAC

A655

2 BEDROOM

PATIENT ROOM

A654

TLT

A653A

TLT

A654A

2 BEDROOM

PATIENT ROOM

A653

STOR

ROOM

A652

TLT

A651A

2 BEDROOM

PATIENT ROOM

A651

STOR

ROOM

A650

DAY

ROOM

A649

2 BEDROOM

PATIENT ROOM

A648

STOR

ROOM

A645A

TLT

A648A ELEC

A647

STORAGE

ROOM

A646CONGREGATE

BATH

A645

STAIR

#5

1 BEDROOM

PATIENT ROOM

A644

TLT

A644A

CLEAN

LINEN

A643

TLT

A641A

TELE

ROOM

A642

2 BEDROOM

PATIENT ROOM

A641

STOR

A639

STAFF

TLT

A640

SERVICE

ELEVATORS

C6-2CLO

A638A

ELEC

A638B

RESIDENT'S

WORKROOM

A639B

OFFICE

A637B

VOLUNTARY

A637

OFFICE

A637A

ELEVATOR LOBBY

C6-1

TELEPHONE

A631C

TELEPHONE

A631B

CORRIDOR

C6-9

VOLUNTARY

STORAGE

A636

ESCORT

SERVICE

B639

TLT

B639ARENAL

NURSE

B638

CORRIDOR

C6-10

STAFF

TLT

B637

OFFICE

B636

DIALYSIS/

RENAL

RECEPTION

B634

DIALYSIS

STORAGE

B634A

MECHANICAL

ROOM

B633

ELEC

B632FEC

B631

STAIR #3

ANTE

B629

RENAL

EXAM ROOM

B629A

TLT

B629B

MEDICAL

STAFF

OFFICE

STORAGE

B628

CLO

B627

CORRIDOR

C6-12

RENAL

EXAM

B626B625A

RENAL

EXAM

B625

CORRIDOR

C6-1A

TR

A601

LIFT

TO BUILDING 2

ROOF

BUILT UP ROOF

Printer

H e a d w a ll

U n it

RadiatorRadiatorRadiatorRadiator

Radiator Radiator Radiator Capped Steam Pipes

1-FP260

1-FP260

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED LIGHT HAZARD WITH A MINIMUM

SPRINKLER DISCHARGE DENSITY OF 0.10 GPM/SQ. FT. FOR THE

MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND A 100 GPM

HOSE STREAM, UNLESS OTHERWISE NOTED ON THE DRAWINGS.

FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE

CODE COMPLIANT AUTOMATIC WET PIPE SYSTEM . ALL AREAS

NOTED ARE TO BE CONSIDERED ORDINARY HAZARD GROUP I

WITH A MINIMUM SPRINKLER DISCHARGE DENSITY OF 0.15

GPM/SQ. FT. FOR THE MOST HYDRAULICALLY REMOTE 1,500 SQ.

FT. AND A 250 GPM HOSE STREAM. SPRINKLER HEAD SPACING

SHALL NOT EXCEED MAXIMUM SPACING DISTANCES SET FORTH

BY NFPA 13.

AREA NOT IN CONTRACT / NO SPRINKLER WORK REQUIRED (NIC)

HAZARD CLASSIFICATION LEGEND

NFPA 13

1/16" = 1'-0"

FIRE PROTECTION SIXTH FLOOR OVERALL PLAN

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG 1 OVERALL SIXTH FLOOR PLAN - FIRE PROTECTION

MP CM

1-FP160

08 16 3241216

SCALE: 1/16"=1'-0"

1 1 1 1 1 1 1 1 1

I rj □ (5

I fl

J j°

II Q

□1 I L

2 ■

E fl4 I□

> T6 Q0

WB□ □O

L fll l•[ flfl □1 J LEEHLEE] flJ

11 a□ F T L—fl r l fl□ [] 5 flE /TP_[ flTD/ ru rrT

E 1 flU HT |fl UTTM U IT 5L fl T flfl

□ "l N□fl flLF nl [ JL EEI a—_____ I ■r □

[J I Ui l -e otl d L IL □

Zfl[ L of] B DXC e

DSS]

AT

□rT I ] aJ

] □O n

]•b

2E fl fl fl□ □ fl

J sy Introba c □ M P A N

I I I I I I I I I

B a fl 1 fl Q

) o o

A a

]D1

IA

y fl J-

H

TTT

I |

DE1

I

D_

F

I matt.pak Image matt.pak

A741

C .G

7 WEST WARD

TO BUILDING 2

7 EAST WARD

PASSENGER ELEVATOR

CORRIDOR

C7-1A

ELEVATOR

LOBBY

C7-1

CORRIDOR

C7-3

SERVICE

ELEVATOR

CORRIDOR

C7-6

CORRIDOR

C7-8

CORRIDOR

C7-8a

CORRIDOR

C7-5 CORRIDOR C7-5a

CORRIDOR

C7-4

EXAM

ROOM #7

B727

EXAM

ROOM #5

B726

EXAM

ROOM #3

B725

TELE

HEALTH

EXAM

ROOM

B724

TOUCH

DOWN

B723A

ELEVATOR

TOUCHDOWN

B723

STOR

B722

TLT

B718A

EXAM

ROOM

B718

TLT

B717A

EXAM

ROOM

B717

EXAM

ROOM

B716

EXAM

ROOM

B715A

EXAM

ROOM

B715B

EXAM

ROOM

B714

EXAM

ROOM

B713

EXAM

ROOM

B712

EXAM

ROOM

B711

EXAM

ROOM

B710

EXAM

ROOM

B709

TLT

B709A

EXAM

ROOM

B708

HAC

B707 TLT

B708A

LAB

B706

LACTATION

ROOM

B705

BEHAVIORAL

HEALTH

C&P

SUPERVISOR

B704

REC.

THERAPY

B703

BEHAVIORAL

HEALTH

B702

BEHAVIORAL

HEALTH

B704

OFFICE

A737

OFFICE

A736

OFFICE

A735

DUMB

WAITER

OFFIC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .