S02 - Att8 - Drawings 5of11 - Fire Alarm.pdf
PDF 2 MB Posted
- Attached to
- Construct EHRM Infrastructure Upgrades - Philadelphia, PA Federal contract opportunity
- Solicitation number
- 36C77626R0063_1
About this file
This is a set of fire alarm system design and installation drawings for the EHRM Infrastructure Upgrades project at the Coatesville VA Medical Center (CMCVAMC), a U.S. Department of Veterans Affairs facility located in Philadelphia, Pennsylvania. The 100% Bid Documents include comprehensive specifications and visual details for fire alarm installation work across multiple buildings and floor levels.
The scope encompasses fire alarm general notes, demolition requirements, fire watch protocols, device installation standards, and system sequence of operations. Key requirements include: compliance with ADAAG and ABA accessibility guidelines; conduit concealment in walls, partitions, and above ceilings unless otherwise indicated; field coordination of equipment mounting locations to avoid conflicts with other trades; repair and restoration of all openings made during installation; fire-rated wall and floor penetration sealing per ASTM E814 standards; welding performed to American Welding Society standards with certified welders; installation of permanent directories per National Electrical Code Article 230; and removal of all unused wiring and cables back to their source. Fire watch personnel must be maintained onsite whenever fire protection systems are out of service for more than four hours in occupied areas, with procedures requiring adequate coverage of all floors and levels, readily available fire extinguishing equipment, and trained personnel. Installation heights are dimensioned to device centerlines, and all materials must be removed from the project site except those designated for relocation or owner turnover. The drawings include overall basement and floor plans for Buildings 1 and 2, enlarged demolition plans for specific areas, device mounting height details, and a fire alarm sequence of operation matrix, with scale notations of 1/16" = 1'-0" for most plans and 1/4" = 1'-0" for enlarged areas.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. MAKE ALL INSTALLATIONS IN ACCORDANCE WITH THE [AMERICANS WITH DISABILITIES ACT
ACCESSIBILITY GUIDELINES (ADAAG) AND/OR ARCHITECTURAL BARRIERS ACT (ABA).
2. MOUNTING HEIGHTS INDICATED WITHIN PLANS AND SCHEDULES ARE DIMENSIONED TO THE
CENTER LINE OF THE DEVICE, EQUIPMENT, ETC. UNLESS OTHERWISE NOTED.
3. COORDINATE EXACT EQUIPMENT LOCATIONS WITH OTHER TRADES. EQUIPMENT LOCATIONS
SHOWN ON ELECTRICAL PLANS ARE DIAGRAMMATICAL ONLY AND MIGHT NOT BE EXACT.
4. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILINGS, AND IN FLOOR SLABS, ETC.
UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT ROUTED IN
MECHANICAL ROOMS, ELECTRICAL ROOMS, AND STORAGE ROOMS WITHOUT CEILINGS MAY BE
ROUTED EXPOSED.
5. COORDINATE VERTICAL CONDUIT ROUTING TO WALL MOUNTED DEVICES TO ENSURE DEVICES
LOCATED WITHIN AN 18-INCH HORIZONTAL DIMENSION WILL BE CENTER-ALIGNED VERTICALLY.
6. FIELD COORDINATE ALL ELECTRICAL AND TELECOMMUNICATIONS EQUIPMENT MOUNTING
LOCATIONS TO AVOID ENCROACHMENT OF OPERATION AND ACCESS TO EQUIPMENT FROM
OTHER TRADES. COORDINATE THE APPROPRIATE MOUNTING LOCATION WITH THE AFFECTED
DISCIPLINES WHEN EQUIPMENT IS SPECIFIED TO BE MOUNTED ONTO THE SURFACE OF ANOTHER
DISCIPLINE'S EQUIPMENT.
7. REPAIR ALL OPENINGS MADE IN EXISTING WALLS, PARTITIONS, ETC TO ACCOMMODATE WORK OF THIS DISCIPLINE TO MATCH THE SURROUNDING CONDITIONS, USING WORKERS QUALIFIED IN THE
APPROPRIATE TRADE. APPROPRIATELY GROUT OR SEAL ALL CONDUITS THROUGH WALLS.
8. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS MUST HAVE
BEEN TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF
THROUGH-PENETRATION FIRESTOPS.
9. INSTALL A PERMANENT DIRECTORY ACCORDING TO THE NATIONAL ELECTRICAL CODE, ARTICLE
230 AT EACH SERVICE ENTRANCE AND POWER SOURCE.
10. PERFORM ALL WELDING ACCORDING TO AMERICAN WELDING SOCIETY STANDARDS. FURNISH
CERTIFICATES QUALIFYING EACH WELDER TO THE ARCHITECT OR ENGINEER PRIOR TO START OF
WORK. THE ARCHITECT OR ENGINEER RESERVES THE RIGHT TO REQUIRE QUALIFYING
DEMONSTRATION, AT NO ADDITIONAL EXPENSE, OF ANY WELDERS ASSIGNED TO THE JOB.
11. REPLACE OR REINSTALL ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS, ETC) REMOVED
TO ACCOMMODATE THE INSTALLATION OF ANY ELECTRICAL DEVICE, EQUIPMENT, ETC., USING
WORKERS QUALIFIED IN THE APPROPRIATE TRADE.
1. REMOVE, CAP AND RELOCATE EQUIPMENT, OUTLETS, CONDUIT, WIRE, ETC., AS SHOWN AND
SPECIFIED ON DRAWINGS, AND AS MAY BECOME NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS. VISIBLY EXAMINE ALL EXISTING WALLS DESIGNATED FOR REMOVAL TO
DETERMINE THE CONDUIT AND THE WIRING THAT WILL REQUIRE CAPPING AND REMOVAL,
WHETHER OR NOT SUCH CONDITIONS ARE INDICATED ON THE DRAWINGS. FAILURE TO VISIT
THE SITE AND TO TAKE ALL EXISTING CONDITIONS INTO ACCOUNT WILL NOT ALLOW FOR
CHANGES TO THE SCOPE OF WORK.
2. REMOVE ALL UNUSED WIRING AND CABLES BACK TO THEIR SOURCE. REMOVE ALL UNUSED
CONDUIT THAT IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS WHICH IS AFFECTED BY OR IS IN
THE AREA OF THE DEMOLITION WORK.
3. THE INTENTION OF THE FIRE ALARM DEMOLITION DRAWINGS IS TO DISCONNECT AND REMOVE
ALL ELECTRICAL WORK MADE VOID BY THE SCOPE OF THE CONSTRUCTION AND ALTERATION.
FIELD VERIFY EXACT MATERIAL QUANTITIES REQUIRED TO BE REMOVED.
4. DISCONNECT AND REMOVE ALL EXISTING FIRE ALARM EQUIPMENT, DEVICES, ASSOCIATED
RACEWAYS, SUPPORTING HARDWARE, AND WIRING, WHICH HAVE BEEN MADE OBSOLETE BY
THE WORK OR IS SHOWN DASHED ON THE ELECTRICAL DEMOLITION DRAWINGS, UNLESS
OTHERWISE NOTED. ALTHOUGH AN ATTEMPT HAS BEEN MADE TO INDICATE ALL OF THIS WORK,
TOTAL ACCURACY IS NOT GUARANTEED. VISIBLY EXAMINE ALL AREAS AND WALLS AND
CEILINGS SCHEDULED FOR REMOVAL TO DETERMINE EXISTING ELECTRICAL ITEMS TO REMAIN.
5. WHERE FIRE ALARM EQUIPMENT, CONDUIT, BOXES, AND SUPPORTING HARDWARE ARE
REMOVED, PATCH AND FINISH THE SURFACE AS REQUIRED TO MATCH THE EXISTING, USING
WORKERS QUALIFIED IN THE APPROPRIATE TRADE.
6. WHERE BURIED CONDUITS EXTENDING OUT OF A CONCRETE SLAB BECOME ABANDONED, CUT
AND GRIND THE CONDUITS OFF FLUSH WITH TOP OF SLAB AND PLUG WITH NON-
SHRINKWATERPROOF GROUT FILL.
7. TAKE ALL REMOVED MATERIALS FROM THE PROJECT SITE, EXCEPT FOR THOSE TO BE
RELOCATED, STORED, OR TURNED OVER TO THE OWNER.
8. ACCEPTANCE OF CONTRACT MEANS INSTALLER ACCEPTS EXISTING CONDITIONS.
9. COORDINATE ALL DEMOLITION WORK WITH ALL OTHER TRADES.
10. PROVIDE A BLANK COVER OVER THE OUTLET WHERE A FLUSH DEVICE IS BEING REMOVED FROM
FLOORS AND WALLS THAT ARE TO REMAIN. MATCH THE COLOR AND MATERIAL TO THE
EXISTING REMAINING COVERS IN THE ROOM OR SPACE.
11. MODIFY EXISTING PANEL DIRECTORIES (OR REPLACE) FOR PANELBOARDS WHICH HAVE HAD
ALTERATIONS TO THE CIRCUITS ORIGINATING THEREIN. DESCRIBE THE LOAD AND LOCATION.
TYPE, DO NOT HAND LETTER NEW PANELBOARD DIRECTORIES
FIRE ALARM GENERAL NOTES FIRE ALARM DEMOLITION NOTES
1. THE FIRE ALARM CONTENT SHOWN ON THE DRAWINGS REPRESENTS A
SCHEMATIC LAYOUT WITH CERTAIN SPECIFIC REQUIREMENTS IDENTIFIED.
PROVIDE ENGINEERED SHOP DRAWINGS (SIGNED AND SEALED) AND FINAL
INSTALLATION IN COMPLIANCE WITH THESE FIRE ALARM GENERAL NOTES,
THE SCHEMATIC FIRE ALARM CONTENT AND REQUIREMENTS SET FORTH BY
THESE DRAWINGS, AND ANY ADDITIONAL REQUIREMENTS ESTABLISHED BY
CODE, THE AUTHORITIES HAVING JURISDICTION, OR UNFORESEEN
CONDITIONS. FURNISH THESE ENGINEERED FIRE ALARM SHOP DRAWINGS
TO BOTH THE AUTHORITIES HAVING JURISDICTION (AHJ) AND THE
ARCHITECT FOR REVIEW.
2. PROVIDE ENGINEERED FIRE ALARM SHOP DRAWINGS THAT INCLUDE ALL
DEVICES, EQUIPMENT, AND APPURTENANCES AS REQUIRED BY APPLICABLE
CODES OR AS NECESSARY TO FOR A COMPLETE, FUNCTIONAL, FIRE ALARM
SYSTEM INCLUDING INTERFACES WITH OTHER SYSTEMS AS DESCRIBED IN
THE CONSTRUCTION DOCUMENTS.
3. SPECIAL REQUIREMENTS FOR CIRCUIT BREAKERS PROVIDING
OVERCURRENT PROTECTION TO FIRE ALARM SYSTEM CLASS I CIRCUITS:
PROVIDE VISUALLY-DISTINGUISHABLE RED CIRCUIT BREAKERS WITH LOCK-
ON DEVICE AND 'FIRE ALARM SYSTEM' LABEL.
FIRE ALARM SYSTEM
FIRE ALARM
CONTROL PANEL
FIRE ALARM
ANNUNCIATOR PANEL
MANUAL PULL STATION
GENERATOR
ANNUNCIATOR PANEL
HORN
WALL-MOUNTED
HORN/STROBE
WALL-MOUNTED
STROBE
WALL-MOUNTED
HEAT DETECTOR
FIXED TEMPERATURE
HEAT DETECTOR
RATE OF RISE
SMOKE DETECTOR
PHOTOELECTRIC TYPE
FACP DOOR HOLDER
EOL RESISTOR
CONTROL RELAY
ADDRESSABLE
MONITOR MODULE
ADDRESSABLE
SMOKE DAMPER
DUCT-MOUNTED
SMOKE DETECTOR
PHOTOELECTRIC TYPE
FAAP
GAP
F
F
F#
F#
HF
HR
DH
FR
FM
SD
DS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
S
FIRE PROTECTION - FIRE WATCH
FIRE WATCH
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF FIRE PROTECTION SERVICE
1. DURING THE TIME THAT FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE
PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR
SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A "FIRE WATCH" ON THE FACILITY.
2. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY.
THE TERM "FIRE WATCH" IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHOSE SOLE
RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN ESTABLISHED AREA.
3. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OR FM GLOBAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY DURING THE TIME PERIOD OF THE FIRE PROTECTION
RENOVATION WORK.
4. IN ADDITION, THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED 'OUT OF SERVICE'. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE NFPA 101
SECTIONS 3.3.110 AND 9.6.1.6 AND NFPA 72 SECTION 10.21).
5. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF
PERFORMANCE, THE PERSONS PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM
ANY OTHER DUTIES.
6. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND
TO BE TRAINED IN ITS USE.
7. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH
FLOOR, LEVEL, AND ROOM OF THE FIRE AREA IS COVERED.
8. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS:
A. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING.
B. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE.
C. ACTIVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE SMOKE
DAMPERS AND SHUT DOWN FANS.
9. IF BUILDING OCCUPANTS ASSIST WITH FIRE WATCH DUTIES, THE PROCEDURES FOR CONTACTING EMERGENCY PERSONNEL AND EVACUATING THE BUILDING ARE TO BE DISTRIBUTED TO BUILDING OCCUPANTS. FOR PLANNED OUTAGES, THE PROCEDURES ARE TO BE SENT OUT TO THE BUILDING
OWNER FOR DISTRIBUTION.
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
FIRE ALARM SYMBOLS, NOTES, AND ABBREVIATIONS
MP CM
1-FA001
1/16/2026
1 1 1 1 1 1 1 1 1
0'IKIIl,, X' '/ sy Introba C □ M P A N
0,/.42170 111,, 1 1 1 1 1 1 1 1 1 k w : C JW. s
AOE.MAA)’”, SWRHWs4 0270 J •
/VIe- x min''
STOR
A001B
TR
A001D
TR
B022B
ELECTRICAL
ROOM
B022A
ELECTRICAL
ROOM
A001E
FINANCE / FISCAL
MY HEALTHE VET
BIOMED
FACILITIES MANAGEMENT SHOPS
LIBRARY
MORGUE
Radiator
Radiator
Radiator RadiatorRadiator
STAIR #2
STAIR #3
STAIR #4
LOADING DOCK
STORAGE B002A
STORAGE
B035A
SYSTEMS
ENGINEER B033
ELECTRIC
SHOP
B026
M/R CHIEF
B032
ELECTRIC
SHOP A
B027 PLUMBING
SHOP
STORAGE
B031A
LOCK
SHOP
B038
OXYGEN
STOR.
B039
OXYGEN
STOR.
B040
PLUMBING
SHOP
B031
SOILED
LINEN
A027
A028
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
A001A
MECH.
ROOM
A001C
OLD
COMPUTER
ROOM
A001
FIRE
ALARM
ROOM
A004A
SOILED
LINEN A006
ELECTRIC
ROOM
A009
PHONE
EQUIP.
A008D
ENGINEERING
MECHANICAL
ROOM
A005
MEN'S TOILET
ROOM
GC113
ELEVATOR
MACHINE
ROOM
GC112
O.R.
PREP RM.
A028C
UNIFORM
STORAGE
A028D
H.A.C.
GC110
WOMEN'S
TOILET ROOM
GC111
STORAGE
GC115
PC
VIEWING
GC129
CLERK
GC123
BOOK
PROCESSING &
STORAGE
GC122
CLERK
AREA
GC121
LIBRARIAN'S
OFFICE
GC125
ELECTRICAL
ROOM
GC128
STAIRS
GCS1
TO BUILDING 2
A/C MACH.
ROOM
B009
POLICE
TRAINING
ROOM
B007
ED
ELEVATOR
CANTEEN
OFFICE
B007A
JAN.
CLO.
B006
SOILED
LINEN
B005
CORRIDOR
CA-10
LOCKER
ROOM
B004
STORAGE
B003
STORAGE
B003A
CORRIDOR
CA-11
TO
RESEARCH
WING
STORAGE
B002
POLICE
SECURITY
STORAGE
A015A
POLICE
SECURITY
STORAGE
A015B
BIOMED
A015
MECHANICAL
A014
MECHANICAL
A014
FMS TLT &
LOCKER RM
A008E
IT/ MECHANICAL
A008C
IT/ MECHANICAL
A008B
MECHANICAL
A008A
PATIENT
CLOTHING
A007
CORRIDOR
CA-6
MECH
A004
ELEVATOR
LIBRARY
GC120 MY HEALTHE
VET
GC126
CORRIDOR
CA-5A
OFFICE
GC103
OFFICE
GC102
HR
OFFICE
GC101
HR
OFFICE
GC100
CORRIDOR
CA-3A
CORRIDOR
CA-4
SIGN ROOM
A019
CORRIDOR
CA-3
MEDICAL WASTE
ROOM
A018
EMS DIRTY
STORAGE
A017
EMS CLEAN
STORAGE
A017A
SERVICE
ELEVATOR
LOBBY
CA-2
CANTEEN STORAGE
A016B
ELEVATOR LOBBY
CA-1
IT CLO
A013C
IT CLO
A013B
CORRIDOR
CA-1A
POLICE
STOR
A016A
ELEC
CLO
A012
FMS CLO
A013A
STAIR #1
ELEC
CLO
A011
FAMILY
VIEWING
ROOM
B019
RADIATION
SAFETY
B020
SPS
STORAGE
B020
CORRIDOR
CA-12
CORRIDOR
CA-9
TO BUILDING 2
CARPENTER
SHOP
FOREMAN
B034
CORRIDOR
CA-13
PAINT
SHOP
B035
CORRIDOR
CA-15
TO BUILDING 2 CORRIDOR
CA-8
MASONRY
SHOP
B036
PAINT
SHOP
B037
CORRIDOR
CA-7
A016E
CORRIDOR
CA-14
EMS
STORAGE
A021
EMS
STORAGE
A020
TRASH ROOM
A022
MORGUE
ENTRANCE
A023
WASH RM
A023B
AUTOPSY AREA
A023C
MORGUE
BOX
A023D
EMS
OFFICE
A025
VAULT
A026A
VAULT
A026B
POLICE
LOCKER RM
A026
EMS LINEN ROOM
LINEN ROOM
A028B
ELEVATOR
CORRIDOR
CA-5
FINANCE
GC104
CANTEEN
A016H
CANTEEN
A016G
CANTEEN
A016E
ELEC CLO
A016J
CANTEEN
A016C
CANTEEN
A016D
MACH. RM.
A016K
EMS OFFICE
A024
A/C UNIT
A028A
OI&T
B022
TRANSFORMER
ROOM
A010
CARPENTER
SHOP
B035
MACHINE
SHOP
B030
A/C SHOP BO28
MECHANICAL
ROOM
BO29
1-FA205
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL BASEMENT PLAN - FIRE ALARM
MP CM
1-FA105
1/16" = 1'-0"
FIRE ALARM BASEMENT OVERALL PLAN
08 16 3241216
SCALE: 1/16"=1'-0"
PLAN
NORTH
1/16/2026
1 1 1 1 1 1 1 1 1
/ /C
—I FE1 AA □ □ □S ]
Al ¥ J 4Er T l DP o J □2XT ft ftI I
■ I P ftp
FL
J ft ft r — □ □
L uft □ □ I ft flfl □L—
] ft
A EIri a □ □ft -o-
[ ]AII
4 1□ □ □ ft ft □ r 7 L
9 Jd E LFF H ft ft □ i c[ ] [ ] J o□ ft J p □
UVt A•er— 1
— n t ] ft fllm fl—H fl Aft ft n□ J
A ft—
J ft — — ft□ ft
□ I □ □ ft
0 □ □
□ ft o ftMIGft
0ft
&A□
I ft ft ft □ ft
E— 7l
J sy Introba c □ M P A N
0,/.42170 111,, 1 1 1 1 1 1 1 1 1 ft r I
G t T
I t
L
H fl
I I
A fl 1 ft w
A
: C W.
A?
116.9........... "I, OF. MARY, SWRHWs4 0270 fl
111111'''
• 1=1 r
A
-o ■.
TR
A932
ROOF
ROOF
PCS / WOMEN'S HEALTH / MISC OFFICES
E D
U C
A T
IO
N
W O
M E
N 'S
H E
A L T
H
STAIR #3
STAIR #2
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
COATS
A901C
ELEC
B907
CONFERENCE
ROOM
B906
WORK
ROOM
B905
OFFICE
B904
OFFICE
B903
OFFICE
B902
OFFICE
B901
RECEPTION
B900
OFFICE
B908A
B908
OFFICE
B908B
CORRIDOR
C9-6
OFFICE
B909
COPY/
PRINTER
FAX
AREA
B910
OFFICE
B911
UNISEX
TLT RM
A934
PALLIATIVE CARE
A933
WOMEN'S
HEALTH
TOUCH
DOWN
A931
STAIR #1
PASSENGER
ELEVATOR LOBBY
C9-1
ELEC
A928
TELE
A927
FACILITIES
CLO
A926
ELEC
A901B
DIRECTOR
A901A
MULTI
PURPOSE
A917
EXAM
(NURSE)
TYPE B
A916
EXAM
(NURSE)
TYPE B
A914
MULTI-PUR
EXAM TYPE B
A913
PATIENT
TLT
A911A
PROCEDURE
ROOM/
EXAM
A911
GYN EXAM
TYPE A
A910
ALCOVE
A909
ALCOVE
A911B
CORRIDOR
C9-5A
PATIENT
TLT
A908
GYN
EXAM
TYPE A
A907
MULTI- PURP
EXAM TYPE A
A906
STORAGE
A911C
STAFF
STATION
A905
LAB/
MICROSCOPE
A905B
CLEAN/
HOLDING/
MEDS
A905A
CORRIDOR
C9-5
SOILED
HOLDING
A904
PROGRAM
MANAGER
A902
PATIENT
TLT
A903
CORRIDOR
C9-4A
CORRIDOR
C9-4CONSULT
A901D
CONSULT/
INTERVIEW
CHILD PLAY
A900A
WAITING
A900
RECEPTION
A901
CORRIDOR
C9-1A
WOMEN'S
TLT RM
A958
MEN'S
TLT RM
A957
ELEC
A956
WORK ROOM
A955
STAFF
A954
SIM LAB
A953A
CLASS
ROOM
A953
CLASSROOM
A952
OFFICE
A951
STAIR #5
OFFICE
A949
OFFICE
A948
OFFICE
A947
COPY
AREA
A946A
EDUCATION
RECEPTION
A946
OFFICE
A945
OFFICE
A945A
ADP
CLASSROOM
A936A
ADP
CLASSROOM
A936
ELEC
A937
ELEC
A938
SERVICE
ELEVATOR
LOBBY
C9-2
MECH
A939
DATA
A940
CORRIDOR
C9-1B
CORRIDOR
C9-3
FEC
A929
HAC
A941
HAC
A935
HAC
A915
FAC
A912
U P
D N
ROOF
ROOF
1-FA205
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL NINTH FLOOR PLAN - FIRE ALARM
MP CM
1-FA190
1/16" = 1'-0"
FIRE ALARM NINTH FLOOR OVERALL PLAN
1/16/2026
1 1 1 1 1 1 1 1 1
I1
J I
I NN rC 4 v
I
4 [H □I —I
X 3E—=E== a v —L1 J L j6
@00 Q
4 rid vy I[m—D AnJ L DJ
74 _/L [EDE TEU "nr□ □ □
[ ] f
Q
I 1 /
/C
B
X' '/ sy Introba C □ M P A N
0,/.42170 wli
1 1 1 1 1 1 1 1 1
OOP
B o
I T i i
AOE.MAA)’”, SWRHEWs 0270
•E 5
-518 w l
: C W.s
I I
111111'''
-0 •
I1
E
OI&T
B022A
STAIR #3
RADIATION SPS
STORAGE
B020
CORRIDOR
CA-12
OI&T
B022 EDUCATION
STORAGE
A932
PALLIATIVE CARE
A933
WOMEN'S
HEALTH
TOUCH
DOWN
A931
STAIR #1
ELEVATOR LOBBY
C9-1
S
S SSS
S S S
1 1
F
S
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 ENLARGED PLANS - TR-B022B, TR-A932, TR-A455A
MP CM
1-FA205
1/4" = 1'-0"
FIRE ALARM BASEMENT ENLARGED DEMO PLAN - TR-B022B
02 4 8134
SCALE: 1/4"=1'-0"
SHEET KEYNOTES
1. REMOVE EXISTING SMOKE DETECTOR(S). REMOVE
ASSOCIATED WIRING BACK TO SOURCE.
2. REMOVE EXISTING STROBE. REMOVE ASSOCIATED
WIRING BACK TO SOURCE.
1/4" = 1'-0"
FIRE ALARM NINTH FLOOR ENLARGED DEMO PLAN - TR-A932
1/16/2026
1 1 1 1 1 1 1 1 1
L
8L
I
] [ ] 1 I 1[ I
J sy Introba c □ M P A N w l 1 1 1 1 1 1 1 1
: C W.s
111,,111111'''
<SSIIIII,,, OF. MARY, SWRHWs4 0270 -o
81-4217 %GAPoAA V
TR
B3B116A
CLINICAL INFO
B3B116
TR
B3A151A
VESTIBULE
B3B116B
MEGAVOLT
B3A103
CORRIDOR
CB3-2
ELEC
CLOSET
B3A102
TELE
CLOSET
B3A101
HAC
B3A100
STAIR
#11 D LEVEL GARAGE
ELEVATOR LOBBY
CB3-1
PASSENGER
ELEVATOR #17
P-17
PASSENGER
ELEVATOR #18
P-18
CORRIDOR
CB3-10
ELEVATOR
MACHINE
ROOM
B3A153
STAFF
B3A151
MULTI
PURPOSE
B3A150
OFFICE
B3A146
OFFICE
B3A145
HR
WORKSTATIONS
B3A148
CART
LIFT
STORAGE
B3A149
HR/ CACS/ MSO
CORRIDOR
CB3-11
RECEPTION
B3A143
WAITING
B3A142
RADIATION
THERAPY
OFFICE
B3A140A
RADIATION
THERAPY
STORAGE
B3A141
RADIATION
THERAPY
CONFERENCE
ROOM
B3A140
EQUIPMENT
ROOM
B3A139
RACK
TELECOM
B3A138D
STORAGE
B3A138C
COMPUTER
ROOM
B3A138
FITS
STAFF
B3A138B
STORAGE
B3A138A
OFFICE
B3A137A
AFGE
UNION
B3A137
PASSENGER
ELEVATOR
LOBBY
CB3-14
PASSENGER
ELEVATOR #13
P-13
PASSENGER
ELEVATOR #14
P-14
PASSENGER
ELEVATOR #15
P-15
PASSENGER
ELEVATOR #16
P-16
EMS
STORAGE
B3B100
CORRIDOR
CB3-12
SERVICE
ELEVATOR
LOBBY
CB3-16
SERVICE
ELEVATOR #9
S-9
SERVICE
ELEVATOR #10
S-10
SERVICE
ELEVATOR #12
S-12
SERVICE
ELEVATOR #11
S-11
MALE TLT
& LKR
B3B112
SHOWER
B2B112A
ENGINEERING
OFFICE
B3B111B
MECHANICAL
EQUIPMENT ROOM
B3B111
MECHANICAL
EQUIPMENT
ROOM (AIR
HANDLERS)
B3B111A
FIRE
PUMP
B3B111C
STAIR #8
ISO
OFFICE
B3B103
MSO
MALE LKR
B3B105
MALE TLT
B3B105A
SHOWER
B3B105B
STAIR #10
CORRIDOR
CB3-17
AFGE
UNION
B3B113
STORAGE
B3B114B
STORAGE
B3B114A
HELP
DESK
B3B114
FITS
RECEPTION
B3B115
CONFERENCE
ROOM
B3B115A
WORK
ROOM
B3B115B
CORRIDOR
CB3-18
OFFICE
B3B115C
OFFICE
B3B115D
FITS
STAFF
B3B115E
FREIGHT
ELEVATOR #19
F-19
ELEVATOR
MACHINE
ROOM
B3B110
CORRIDOR
CB3-19
STAIR #9
FITS
STAFF
B3B115F
FEMALE LKR
B3B104
FEMALE TLT
B3B104A
SHOWER
B3B104B
FEMALE TLT
B3B106A
FEMALE LKR
B3B106
CORRIDOR
CB3-15
MALE LKR
B3B107
MALE TLT
B3B107AISO
OFFICE
B3B108
WAREHOUSE
STORAGE
B3B109
HAC
B3B101
OI&T
B3A136C
OI&T
B3A136B
PERIPHERALS
B3A136
OI&T
B3A136A
ELEVATOR PIT
F-20
B3A135
CORRIDOR
CB3-8
ELEC
CLOSET
B3A134
STORAGE
B3A133
WAITING
B3A132
WAITING
B3A131
B3A130
ULTRASOUND
B3A129
CT SIMULATOR
B3A128
CONTROL
ROOM
B3A128A
FILE
ROOM
B3A127
CHILLER
ROOM
B3A127ASTORAGE
B3A127C
STORAGE
OLD SEED
ROOM
B3A127B
LINEAR
ACCELERATOR
B3A105
CORRIDOR
CB3-4
CONTROL
AREA
B3A104
EQUIP
ROOM
B3A104A
TLT
B3A110
TLT
B3A111
CORRIDOR
CB3-5
EXAM
ROOM
B3A114
CORRIDOR
CB3-3
WORK
ROOM
B3A115
OFFICE
B3A116
OFFICE
B3A118
OFFICE
B3A119
OFFICE
B3A120
RECEPTION
B3A123
STORAGE
B3A112
EXAM
ROOM
B3A106
EXAM
ROOM
B3A107
EXAM
ROOM
B3A108
STORAGE
B3A117
CORRIDOR
CB3-6
STAFF
B3A121
MULTI-VIEW
WORKROOM
B3A109
SOILED
UTILITY
B3A122
IV ROOM
B3A126
TLT RM
B3A125
DRESSING
B3A124
CORRIDOR
CB3-7
CORRIDOR
CB3-11A
OFFICE
B3A147
CORRIDOR
CB3-9
CACS &
MSO
B3A144
OFFICE
B3B102
AFGE
CORRIDOR
CB3-13
DRESS
-ING RM
B3A113
DRESS
-ING
RM
B3A113A
ELECTRIC
B3A152
ACCESS PANEL
RAD. ONCOLOGY
OI&T
2-FA-202
2-FA-201-R
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 2 OVERALL SUBBASEMENT PLAN - FIRE
ALARM
RF CM
2-FA-100-R
1/16" = 1'-0"
FA03 - SUBBASEMENT
08 16 3241216
SCALE: 1/16"=1'-0"
PLAN
NORTH
1/16/2026
1 1 1 1 1 1 1 1 1 fl
]□ o a
••on T n - /
(—1
IT
n
DFI n ai r— all.
I
IIII
D
[ RRH
□□ r dhB
P[
W[ I L
Q
D V
It 1
II
I I
I
IZLI 7
___]I ][ n ]tl n L
J oiHinn, sy Introba c □ M P A N Y
0,/.42170 li l 1 I I I I I I I
□ In iii
—E=) /
L w : C .4. A
............"'ll, X OF. MARY, SWRHWs, 0270
1 _5
-0 ■
.s 1111»11
J
# SF
# SF
TR
B2B105D
TR
B2A119A
NORMAL
POWER
B2A106A
EMERGENCY
POWER
B2A106B
EXISTING MER
MECH.
EQUIP.
SHAFT
E.C.
B2A102
TEL.
CLO.
B2A101
STOR.
B2A100
STAIR #11
ELEVATOR
LOBBY
CB2-1
PASSENGER
ELEVATOR #18
P-18
PASSENGER
ELEVATOR #17
P-17
SPS LOUNGE
B2A107
CORRIDOR
CB2-3CORRIDOR
CB2-2
MALE LKR
B2A108A
VESTIBULE
B2A108
ANTE-ROOM
B2A109J
STORAGE
B2A109D
H.A.C.
B2A109C
STAIR #2
ELEC CLO
B2A109F
MECH.
EQUIP.
B2A109E
MECH.
EQUIP.
B2A109H
CART
LIFT
SOILED
CART
LIFT
DECONTAMINATION
ROOM
B2A109
ULTRASONIC
STERILIZERS
WASHERS
NEW
STERILIZER
ETO
B2A112
EQUIP
WASH
B2A109B
VESTIBULE
B2A110
FEMALE
LOCKERS
B2A110A
AUTO
WASH
B2A109A
WATER
SOFTENER
B2A111
CLEAN CART
STORAGE
CLEAN
CART
LIFT
CART
LIFT
SPS
PREP
STERILIZATION
B2A112
EYE WASH
SURGICAL
STORAGE
B2A112C
SURGICAL
CART PACKING
AND STORAGE
B2A112B
CORRIDOR
CB2-4
ROOM
B2A122
FORMS
ROOM
B2A121
OI&T WAREHOUSE
B2A120
WAREHOUSE
B2A106
EXISTING
ELECTRICAL
MECHANICAL
EQUIPMENT
B2A105
EXIST
EC
EXISTING
CRAWL
SPACE
ANTE- ZONE
SCOPE
DRY
B2A113A
SCOPE
PROCESSONG
B2A113
ANTE- ZONE
STERILE
STORAGE
B2A118
BREAK
DOWN
B2A118A
CLERICAL
B2A119C
OFFICE
B2A119B
HALL
B2A119
CORRIDOR
CB2-8A
CORRIDOR
CB2-8
PICK-UP
EXIST
HAC
EXISTING
TELE
B2A117
EXISTING
ELEC
B2A116
MENS TLT
B2A115B
MENS
LOCKER
B2A115A
HALL-
WAY
B2A115
PPE
WOMENS TLT
B2A115C
WOMENS
LOCKER
B2A115D
SPD
OFFICE
B2A114A
CLERICAL
B2A114
SPD
OFFICE
B2A114C
SPD
CHIEF
OFFICE
B2A114B
LOBBY
CB2-5
ELEVATOR
F-20
ELEV.
MECH.
ROOM
B2B105E
PANDEMIC
STORAGE
B2B105K
NARCOTICS VAULT
& PHARMACY CACHE
B2B105D
PANDEMIC
STORAGE
B2B105J
STORAGE
B2B105A
STORAGE &
REFRIGERATOR
B2B105C
PHARMACY
CACHE
B2B105C
ELECTRIC
ROOM
B2B106
SUBSTANCE STO.
REFRIGERATOR
B2B105B
BATTERY
CHARGING
B2B105I
STAIR #9
VEST.
B2B107
EXIT
CORRIDOR
CB2-13
VEST.
B2B108
EMPLOYEE
LOUNGE
B2B105A
ELEV.
#F-19
WAREHOUSE
B2B105
TEL. CLO.
B2B105G
E.C.
B2B105H
MEN'S
TOILET
B2B105F
WAREHOUSE
WAREHOUSE
SUPERVISOR
B2B113A
CORRIDOR
CB2-12
LEAD
MATERIALS
HANDLER
B2B114
VESTIBULE
B2B113GAS STO.
B2B112
GAS STO.
B2B111
FLAMMABLE
STOR. VAULT
B2B110
MECHANICAL
EQUIP.
B2B109
LOADING DOCK
CORRIDOR
CB2-7
PASSENGER
ELEV. LOBBY
CB2-6
PASSENGER
ELEVATOR #13
P-13
PASSENGER
ELEVATOR #14
P-14
PASSENGER
ELEVATOR #16
P-16
PASSENGER
ELEVATOR #15
P-15
MECH.
SHAFT
CORRIDOR
CB2-8
SPD OFFICE
B2B100
W/C
STAFF
TLT
B2B101
CORRIDOR
CB2-11
W/C
STAFF
TLT
B2B102
H.A.C.
B2B103
CORRIDOR
CB2-9
SERVICE
ELEVATOR #9
S-9
SERVICE
ELEVATOR #10
S-10
SERVICE
ELEVATOR #12
S-12
SERVICE
ELEVATOR #11
S-11
PATIENT
SERVICE
ELEV.
LOBBY
CB2-10
FOOD
SERVICE
ELEV.
LOBBY
B2B141
MECH.
SHAFT
DISHWASHING
B2B139B
SANITATION
SUPPLY
STO
B2B139B
CHIEF
B2B104
SEC./
WAITING
B2B137
PROG.
MGT. &
PLAN'G.
CHIEF
B2B138
CLEAN DISH STO.
B2B139
OFFICE
B2B140
STORAGE
B2B132B
TRAY MAKE UP
B2B132
CORRIDOR
CB2-17
NUTRITION & FOOD SERVICE
NUTRITION
THERAPY
CHIEF
B2B136 M. TLT.
B2B118
CAN WASH
& CRUSH
B2B115
F. TLT.
B2B117
H.A.C.
B2B120
CORRIDOR
CB2-15
STORAGE
B2B119
OFFICE
B2B131A
STORAGE
B2B135A
FOOD SERVICE
CENTER
B2B135
CONFERENCE
ROOM
B2B131
OFFICE
B2B131B
E.C.
B2B133
TEL.CLO.
B2B134
FOOD PROCESSING &
PREPARATION
B2B128
H.A.C.
B2B130
POT WASH
CENTER
B2B129
FOOD STORAGE
B2B121
INGREDIENT
CONTROL
B2B125
NON-FOOD STO.
B2B122
MEAT FREEZER
B2B123A
VEG. FREEZER
B2B124A
MEAT REFRIGERATOR
B2B123
VEG.
REFRIGERATOR
B2B124
DAIRY
REFRIGERATOR
B2B126
STAIR #8
MECHANICAL
ROOM
B2B143
STORAGE/
FUTURE MECH. SHAFT
B2B132A
ELECTRIC
ROOM
B2B127
F u tu re
R e lia n c e
PASS
THRU
F u tu re
R e lia n c e
T T
2-FA-205
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 2 OVERALL GROUND FLOOR PLAN - FIRE
ALARM
2-FA-101
1/16" = 1'-0"
FA03 - GROUND FLOOR
08 16 3241216
SCALE: 1/16"=1'-0"
PLAN
NORTH
1/16/2026
1 1 1 1 1 1 1 1 1
[•r ]□[ ] y □ □
Q•—D □ □ n □ □] L [ ••I 1
JL
A_G □ □0 i L
ITE
E
1 r
V Ca 0 ••
E n Co [ J oSe □ ]
IS
Lr r n P RI ]• = □ 01□
I
□ 0
•lAH B S 2u Ui ‘!TY‘s 15T/ III LI □ □M21 M 1
H aH H o4 Y| L□ □1O7 0 nj U □ L rI HH
O
2 Y| mm
H HXIIIIIIIII
TY| TYH LI H L
□□X J Lo o o o
1 MPm/]-/l ffB I 0RIH G
O oD DDD1 J Lo o o o
(E
J 1 Lo o o o
El I E1 i m । K /|| —
Hl ][ElU—DH IH H
— IILA
O
Z7+L 11111 OOLrL IEE - ]J rLu J sy Introba -J .
C □ M P A N Y O..
09'i 11111
I I I I I I I I I
MX
L —
IH
[I
[I
B
B
•L
[I
H D
I a
H
LX
: Or .4. A
.1V%‘..........."Il,, X OF. MARY, SWRHWs4 0270 q I
—B Qe
COMPUTER
ROOM
B3A138
STORAGE
B3A138A
OFFICE
B3A137A
FITS
STAFF
B3A138B
STORAGE
B3A138C
TELECOM
B3A138D
EQUIPMENT
ROOM
B3A139
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 2 ENLARGED SUB-BASEMENT PLAN - DATA
CENTER B3A138
RF CM
2-FA-201-R
1/4" = 1'-0"
FIRE ALARM BUILDING 2 ENLARGED PLANS - DATA CENTER NEW WORK
02 4 8134
SCALE: 1/4"=1'-0"
SHEET KEYNOTES#
1. TEMPORARILY RELOCATE EXISTING FIRE ALARM
DEVICES AND APPLIANCES ON CEILING AS NEEDED FOR
NEW TELECOMMUNICATION WORK. COORDINATE WITH
TELECOMMUNICATION CONTRACTOR. REINSTALL DEVICES
ONCE TELECOMMUNICATIONS WORK IS COMPLETE.
1/16/2026
1 1 1 1 1 1 1 1 1
LL J L J
I H to rIh 4 ILU IT r 5
IB I
L J
E
I
Z7
J sy Introba 9.
C □ M P A N Y 6,/.42170* 10099li ‘•it f 1111
I I I I I I I I I y 5.3
A"OFMAZ?, sW"s‘
CLINICAL
INFORMATION
SERVICE
B3B116
RECEPTION
FEMALE TLT
SHOWER
B3B104B
F2
TR
B3B116A
CLINICAL
INFO
B3B116
VESTIBULE
B3B116B
SHOWER
B3B104A
F
S
1 F
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 2 ENLARGED SUB-BASEMENT PLANS -
TR-B3116A
2-FA-202
1/4" = 1'-0"
FA03 - SUBBASEMENT - ENLARGED - TR-B3116A
02 4 8134
SCALE: 1/4"=1'-0"
SHEET KEYNOTES
1. REMOVE EXISTING SPEAKER STROBE. REMOVE
ASSOCIATED WIRING BACK TO SOURCE.
2. RELOCATED EXISTING SPEAKER STROBE TO LOCATION
SHOWN.
3. PROVIDE NEW 15 CANDELA SPEAKER STROBE AND NEW
SMOKE DETECTOR. CONNECT TO EXISTING FIRE ALARM
SYSTEM.
1/4" = 1'-0"
FAD03 - SUBBASEMENT - ENLARGED - DEMO - TR-B3116A
1/16/2026
1 1 1 1 1 1 1 1 1
8 8I I
La i ]
I i
I
Z7
J
0111’1111, X' sy Introba c □ M P A N Y 0,/.42170 li
I I l I I I I I I fi o o o o o w : C W.s
A%% OE.MAA)’, SWRHWs, 0270 -0 •
.s min''
F
OFFICE
B2A119B
CONFERENCE
B2A119A
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 2 ENLARGED GROUND FLOOR PLANS -
TR-2A119D
2-FA-205
1/4" = 1'-0"
FAD03 - GROUND FLOOR - DEMO - ENLARGED - TR B2A119D
02 4 8134
SCALE: 1/4"=1'-0"
SHEET KEYNOTES
1. REMOVE EXISTING STROBE. REMOVE ASSOCIATED WIRING
BACK TO SOURCE.
1/16/2026 o Q
C
J o <
O D in
.7 7
X
N K
I I
I ou d.
s
28 s/ L
U
: s yS
N s
O m
R te pm s.
‘I, A D
D
IT
IO
N
A L
O F
F
IC
E A
S T
O R
A G
E A
A A
S H
A R
E D
O F
F
IC
E A
C O
R R
ID
O
R A
C -2
C O
N F
E R
E N
C E
A 2A D
D
IT
IO
N
A L
O F
F
IC
E A
C O
R R
ID
O
R A
C -4
M E
N 'S
A
W O
M E
N 'S
A
D A
T A
A
E L E
C A
W A
T E
R S
Y S
T E
M
L A
B G
A S
S E
S A
S U
R G
E R
Y S
T E
R
IL
E S
T O
R A
G E
A
T R
A
S T
O R
A G
E A
A A
S H
A R
E D
O F
F
IC
E A
C O
R R
ID
O
R A
C -2
C O
N F
E R
E N
C E
A 2A D
D
IT
IO
N
A L
O F
F
IC
E A
C O
R R
ID
O
R A
C -4
M E
N 'S
A
W O
M E
N 'S
A
D A
T A
A
E L E
C A
W A
T E
R S
Y S
T E
M
L A
B G
A S
S E
S A
S U
R G
E R
Y S
T E
R
IL
E S
T O
R A
G E
A
F
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 21 ENLARGED FIRST FLOOR PLANS - TR
A108
21-FA210
1/4" = 1'-0"
FAD B21 - 1ST FLOOR - DEMO - ENLARGED TR A108
02 4 8134
SCALE: 1/4"=1'-0"
SHEET KEYNOTES#
1. REMOVE EXISTING SPEAKER STROBE. REMOVE
ASSOCIATED WIRING BACK TO SOURCE.
1/4" = 1'-0"
FA B21 - 1ST FLOOR - ENLARGED TR A108
1/16/2026
1 1 1 1 1 1 1 1 1
Y Y[ Y rI I I [3 _7 O« O O: O
0: GE
r r
Y
{L A L A L A L< A
L 5 5-
L [
LL
1I
X sy Introba O c □ N w l 1 1 1 1 1 1 1 y
(d y
- J
E
- J
E
M
T
7 : C7 .4.
AOFMAR’z, 5"si
111111'''
F
-o •S 10./.42174
P A
111,, matt.pak Note
SD
GENERAL NOTES:
REFER TO FLOOR PLANS FOR DEVICE LOCATIONS AND ADDITIONAL INFORMATION.
REFER TO SPECIFICATION SECTION 28 31 11 AND VA FIRE PROTECTION DESIGN MANUAL FOR DESCRIPTION OF FIRE ALARM SEQUENCE OF OPERATIONS. IF EXISTING SEQUENCE OF OPERATIONS DIFFERS FROM THE MATRIX SHOWN ON THE CONTRACT DRAWINGS, NEW DEVICES SHALL BE PROGRAMMED TO MATCH
THE EXISTING SEQUENCE OF OPERATIONS.
FACILITY PARTIALLY EVACUATES AND RELOCATES OCCUPANTS UPON FIRE ALARM INITIATION. REFER TO SPECIFICATIONS, VA FIRE PROTECTION DESIGN MANUAL AND EXISTING SEQUENCE OF OPERATIONS FOR SPECIFIC OPERATION SEQUENCE REQUIREMENTS.
S E
Q U
E N
C E
O F
O P
E R
A T
IO
N
A C
T
IV
A T
E A
LA
R
M
IN
D
IC
A T
IO
N
A C
T
IV
A T
E S
U P
E R
V
IS
O R
Y
IN
D
IC
A T
IO
N
A C
T
IV
A T
E T
R O
U B
LE
IN
D
IC
A T
IO
N
A C
T
IV
A T
E A
U D
IB
LE
A N
D V
IS
U
A L
A
LA
R M
S
SYSTEM INPUTPLAN MARK
FAILURE OR COMMUNICATION ERROR
SMOKE DETECTORIN
IT
IA
T
IN
G
D E
V
IC
E
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG
FIRE ALARM DETAILS
MP MP
FA-701
N.T.S.
FIRE ALARM MATRIX
1/16/2026
1 1 1 1 1 1 1 1 1
CC3
O
E
0.
Cx)
CO
/ V44 no
h. dC /A (10<7, —72/ E
C.
FIRE ALARM DEVICES MOUNTING HEIGHTS
Scale:
DETAIL TITLE: PRE ALARM DEVICES
VA U.S. Depurt rent of runs Affirs
SCALE: N.T.S,
DATE ISSUED: 03/01/23 CAD DETAIL NO/ S02831 00-01
V7/707
X'
0 Introba c □ M P A N Y
0,/.42170 10099111,,fllll
I I I I I I I I I
FIRE ALARM
CONTROL PANEL
MANUAL PULL STATION &
FIRE PHONE JACK
E
MAGNETIC DOOR
HOLDER
SPEAKER/VISUAL
& VISUAL-ONLY
LO
(770
A%% OE.MAA)’, SWRHWs4 0270
LT
E w
000, : C W.s
-o • 2.
| Bldg 1 |
| 1-FA001 - FIRE ALARM SYMBOLS, NOTES, AND ABBREVIATIONS |
| 1-FA105 - BLDG 1 OVERALL BASEMENT PLAN -FIRE ALARM |
| 1-FA190 - BLDG 1 OVERALL NINTH FLOOR PLAN -FIRE ALARM |
| 1-FA205 - BLDG 1 ENLARGED PLANS -TR-B022B, TR-A932, TR-A455A |
| Bldg 2 |
| 2-FA-100-R - BLDG 2 OVERALL SUBBASEMENT PLAN -FIRE ALARM |
| 2-FA-101 - BLDG 2 OVERALL GROUND FLOOR PLAN -FIRE ALARM |
| 2-FA-201-R - BLDG 2 ENLARGED SUB-BASEMENT PLAN -DATA CENTER B3A138 |
| 2-FA-202 - BLDG 2 ENLARGED SUB-BASEMENT PLANS -TR-B3116A |
| 2-FA-205 - BLDG 2 ENLARGED GROUND FLOOR PLANS -TR-2A119D |
| 21-FA210 - BLDG 21 ENLARGED FIRST FLOOR PLANS -TR A108 |
| FA-701 - FIRE ALARM DETAILS |
File details come from the government source that posted it. Updated .