This document is a set of plumbing construction drawings for the EHRM Infrastructure Upgrades project at the Veterans Affairs Medical Center in Philadelphia, Pennsylvania. The drawings are 100% bid documents dated January 16, 2026, prepared by Introba consulting engineers and HFS Company for the U.S. Department of Veterans Affairs.
The project encompasses plumbing system design and installation across multiple buildings (Buildings 1, 2, 3, 21, and 30) at the facility. Key specifications include the installation of 24-gauge galvanized steel drip pans with soldered seams under piping to protect against leaks, with water sensors ("Water Bug" leak detection devices) placed in pan centers. Drip pans must be minimum 6 inches wider on each side than the pipe(s) being protected, secured with 24-gauge galvanized steel straps spaced every 2 feet, and adhered to floors using heavy-duty construction adhesive with waterproof silicone sealant at location edges. PVC ball valves with locking handles and threaded hose connections must be installed at low points for drainage access. The plumbing work includes coordination across cold water, hot water, hot water return, sanitary, storm, vent, and medical laboratory gas piping systems. All work must comply with the International Plumbing Code and Virginia Plumbing Design Manual. The drawings indicate extensive coordination requirements with mechanical, electrical, and fire protection trades, verification of existing utilities prior to work commencement, and notification procedures for hazardous materials encountered during demolition. Temporary isolation valves and service interruption protocols are required, with 10 days' notice necessary before system interruptions, and work scheduling subject to owner approval to minimize operational disruption.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24 GAUGE GALVANIZED STEEL WITH
SOLDERED SEAMS WATER TIGHT. USE LIQUID
FLUX WITH A ZINC CHLORIDE BASE SIMILAR
TO JOHNSON GALVANIZED STEEL FLUX
PIPE/PIPES
24 GAUGE GALVANIZED STEEL STRAPS
MINIMUM 1" WIDE SPACED EVERY 2'-0"
MINIMUM 6", WIDER EACH SIDE, THAN THE
PIPE OR PIPES THE DRIP PAN IS PROTECTING
STAINLESS STEEL MACHINE
SCREWS SELF TAPPING (TYP.)
PLACE "WATER BUG" LEAK
DETECTION OR EQUAL WATER
SENSOR IN CENTER OF DRIP
PAN BOTH DIRECTIONS.
NOTE:
IF DUE TO EXISTING CONDITIONS AND DRIP PAN CANNOT BE INSTALLED AS DETAILED SUBMIT POSSIBLE CHANGES TO THE
ENGINEER FOR APPROVAL.
PROVIDE PVC BALL VALVE WITH LOCKING
HANDLE AND THREADED HOSE END DRAIN
CONNECTION. INSTALL BALL VALVE AT LOW
POINT OF DRIP PAN IN AN ACCESSIBLE
LOCATION FOR STAFF TO ATTACH A HOSE
AND PROVIDE DRAIN DOWN. DO NOT
INSTALL OVER TELECOM RACKS.
PVC FLANGE KIT, BOLTED THROUGH DRIP PAN.
PVC PIPE AND FITTINGS, THREADED
OR SOCKET CONNECTION FITINGS
WITH LOW VOC CEMENT.
COMMON PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
DIRECTION OF FLOW
BRANCH CONNECTION, BOTTOM
BRANCH CONNECTION, TOP
ELBOW, TURNED DOWN
ELBOW TURNED UP
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE
UNION
PIPING CAP
RISER DESIGNATION
ABOVE FINISH FLOOR
AUTHORITIES HAVING JURISDICTION
ACCESS PANEL
BOTTOM OF PIPE
DIAMETER
DOWN
EXISTING
FINISHED FLOOR ELEVATION
GALLONS PER HOUR
GALLONS PER MINUTE
HORSEPOWER
INVERT ELEVATION
NORMALLY CLOSED
NOT TO SCALE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
ROUGH-IN
SHUTOFF VALVE
TOTAL DYNAMIC HEAD
VERIFY IN FIELD
POINT OF DISCONNECT
POINT OF CONNECTION
AFF
AHJ
AP
BOP
DIA
DN
EX OR EXIST
FFE
GPH
GPM
HP
IE OR INV. ELEV
NC
NTS
PSI
RPM
RI
SOV
TDH
VIF
X
PLUMBING SYMBOLS & ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
TRAPPED CONNECTION
STRAINER
BALANCING VALVE
CLEANOUT (CO)
OS & Y GATE VALVE
TEMPERATURE GAUGE
THERMOSTATIC MIXING VALVE
REDUCED PRESSURE BACKFLOW PREVENTER
HOSE BIBB/WALL HYDRANT
ACID VENT PIPING
ACID WASTE PIPING
DOMESTIC COLD WATER PIPING (CW)
DOMESTIC HOT WATER PIPING (HW)
DOMESTIC HOT WATER RETURN PIPING (HWR)
DRAIN PIPING
DEIONIZED WATER PIPING
GREASE VENT PIPING
GREASE WASTE PIPING
NATURAL GAS PIPING
NON-POTABLE WATER PIPING
OVERFLOW STORM PIPING
OIL WASTE PIPING
PUMP DISCHARGE PIPING
REVERSE OSMOSIS PIPING (RO)
SANITARY PIPING
SOFTENED COLD WATER PIPING
SOFTENED HOT WATER PIPING
SUBSOIL DRAINAGE PIPING
STORM PIPING
TEMPERED WATER PIPING
VENT PIPING
WASTE PIPING
FLEXIBLE CONNECTION
FLOOR DRAIN/FLOOR SINK (FD/FS)
CIRCULATION PUMP
AV
AW
D
DI
RO
NP
PD
SSD
ST
OST
TW
S
GW
GV
OW
W
SCW
SHW
G
PROCESS PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ARGON PIPING
CARBON DIOXIDE PIPING
COMPRESSED AIR PIPING (NON-MEDICAL)
COMPRESSED AIR INTAKE PIPING (NON-MEDICAL)
AR
CA
CAI
CO2
GENERAL NOTES
1. DUE TO THE LIMITED SPACE AVAILABLE FOR THE INSTALLATION OF
ALL THE PLUMBING WORK, COORDINATION BETWEEN ALL OTHER
TRADES IS OF UTMOST IMPORTANCE.
2. THIS CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY
LOCATIONS, ELEVATIONS AND SIZES OF ALL UTILITIES AT SITE PRIOR
TO PROCEEDING WITH WORK. EXISTING SYSTEMS AND STRUCTURE
SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF COLD
WATER, HOT WATER, SANITARY WASTE AND VENT, STORM AND
MEDICAL LABORATORY GAS PIPING.
3. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY
AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING
PLANS, SPECIFICATIONS, AND FIELD SURVEYS. THE EXACT
LOCATION OF PIPING, FIXTURES AND EQUIPMENT MAY DEVIATE
FROM THE LOCATION INDICATED ON THESE DRAWINGS. EXTREME
ACCURACY IS NOT GUARANTEED. THIS CONTRACTOR SHALL BE
PREPARED TO MAKE ALTERATIONS TO NEW AND/OR EXISTING
SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL
FURNISH A COMPLETE CODE COMPLYING SYSTEM. THIS
CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES
WHICH PREVENT THE INSTALLATION OF WORK AS SHOWN.
4. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE
PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS
CONTRACTOR SHOULD OBTAIN THE ENGINEER'S WRITTEN
EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING
BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE
INTERPRETATION OF THE ENGINEER.
5. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR THE
EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN
COMPLETED. REPAIR SHALL INCLUDE, BUT NOT LIMITED TO, ANY
EXISTING WALL, CEILING OR FLOOR THAT IS SCHEDULED TO REMAIN.
REPAIR, PAINTING, AND PATCHING SHALL BE COMPLETED BY AN
APPROPRIATE CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.
6. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING
DEMOLITION OPERATIONS, THE CONTRACTOR WILL NOTIFY
BUILDING OWNER OF THE HAZARDOUS MATERIAL.
7. TEMPORARY CONNECTION SHALL BE PROVIDED BY RESPECTIVE
PLUMBING AND FIRE PROTECTION CONTRACTORS WHEN EXTENDED
INTERRUPTIONS OF SERVICES AND UTILITIES SUCH AS WATER,
WASTE AND FIRE PROTECTION WHICH SERVE OTHER AREAS ARE
NECESSARY.
8. COORDINATE WITH MAINTENANCE PERSONNEL AS TO SOURCE OF
UTILITIES AND TEMPORARILY DISCONNECT OR SHUT OFF SERVICES
OR UTILITIES AT NEAREST MAIN. TEMPORARY AND ACCESSIBLE
ISOLATION VALVES SHALL BE INSTALLED CLOSE TO THIS POINT OF
WORK.
9. IT IS ESSENTIAL THAT BUILDING OPERATIONS CONTINUE WITH
MINIMAL INTERRUPTIONS. IT IS NECESSARY THAT OPERATION OF
EXISTING SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS
POSSIBLE EXCEPT IN AREAS VACATED FOR CONSTRUCTION WORK.
WORK WHICH WILL INTERFERE WITH OPERATION OF EXISTING FIRE
SUPPRESSION AND PLUMBING SYSTEMS OR WHICH REQUIRE
DOWNTIME WILL BE SCHEDULED ONLY AFTER CONSULTATION WITH
AND PERMISSION GIVEN BY THE OWNER. ALLOW 10 DAYS PRIOR TO
ANTICIPATED INTERRUPTION OF SYSTEMS. WORK MAY BE REQUIRED
TO BE PERFORMED OUTSIDE NORMAL WORKING HOURS.
10. ARCHITECTURAL, TECHNOLOGY, MECHANICAL, AND ELECTRICAL
DEMOLITION, AND NEW WORK DRAWINGS AND SPECIFICATIONS
SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.
11. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG
WITH PIPING BEING REMOVED.
12. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH
PROJECT'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF ANY
WORK.
13. USE CAUTION WHEN SAW-CUTTING THROUGH EXISTING CONCRETE
FLOOR OR WALL CONSTRUCTION FOR THE INSTALLATION OF
PLUMBING SYSTEMS TO AVOID CUTTING REBAR AT EDGE OF
OPENING.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS,
TRANSITIONS, OFFSETS, ETC., TO AVOID DUCTWORK, PIPING,
EQUIPMENT OR STRUCTURE NEW OR EXISTING AND TO MAKE A
COMPLETE AND FUNCTIONING SYSTEM.
15. REMOVE ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS,
SPRINKLER HEADS, SPRINKLER HEAD ESCUTCHEON, ETC.) AS
REQUIRED TO COMPLETE THE SCOPE INDICATED IN THE
CONSTRUCTION DOCUMENTS (SEE ARCHITECTURAL, TECHNOLOGY,
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION DRAWINGS).
REPLACE, REINSTALL, OR COORDINATE REINSTALLATION WITH
OTHER TRADES FOR ALL ITEMS REMOVED TO ACCOMMODATE THE
INSTALLATION/ REMOVALS OF ANY PLUMBING PIPE, FIXTURE,
EQUIPMENT, OR OTHER TRADES WORK, USING WORKERS QUALIFIED
IN THE APPROPRIATE TRADE. REPLACE CEILING TILES DAMAGED
WITH THIS WORK TO MATCH, REPAIR WALLS BACK TO THE ORIGINAL
FINISH.
PLUMBING ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ADA AMERICANS WITH DISABILITIES ACT
A.F.F. ABOVE FINISH FLOOR
AP ACCESS PANEL
BP BOOSTER PUMP
BT BATHTUB
BTC BRANCH TO CONNECTION
CBV CALIBRATED BALANCING VALVE
CI CAST IRON
CO CLEANOUT
CSS CLINICAL SERVICE SINK
CW COLD WATER
DCVA DOUBLE CHECK VALVE ASSEMBLY
DF DRINKING FOUNTAIN
DI DEINOIZED WATER
DS DOWNSPOUT
DW DISHWASHER
DWH DOMESTIC WATER HEATER
EEW EMERGENCY EYE WASH
ESEW EMERGENCY SHOWER & EYE WASH
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
F.F. FINISH FLOOR ELEVATION
FS FLOOR SINK
G NATURAL GAS
GCO GRADE CLEANOUT
GD GARBAGE DISPOSAL
HB HOSE BIBB
HW HOT WATER
HWR HOT WATER RETURN
HWRP HOT WATER RETURN PUMP
HWST HOT WATER STORAGE TANK
I.E. INVERT ELEVATION
IM ICE MAKER
IW INDIRECT WASTE
LA LAVATORY
MB MOP BASIN
NIC NOT IN CONTRACT
NP NON-POTABLE
OB OUTLET BOX
ORD OVERFLOW ROOF DRAIN
PG PRESSURE GAUGE
PRV PRESURE REDUCING VALVE
RD ROOF DRAIN
RH ROOF HYDRANT
RO REVERSE OSMOSIS
RPZ REDUCED PRESSURE BACKFLOW PREVENTER
S SANITARY
SCW SOFTENED COLD WATER
SH SHOWER
SHW SOFTENED HOT WATER
SK SINK
SOV SHUT OFF VALVE
SP SUMP PUMP
S/S STAINLESS STEEL
SS SANITARY STACK
SSD SUBSOIL DRAINAGE
SSK SHOP SINK
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TW TREATED WATER
UR URINAL
V VENT
VIV VALVE IN VERTICAL
VB VACUUM BREAKER
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WD WASHER DRAIN
WH WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WM WATER METER
WS WASTE STACK
WSV WASTE STACK VENT
YCO YARD CLEANOUT
YH YARD HYDRANT
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
AHU
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
MATCHLINE
1 REVISION TAG
CODES AND STANDARDS
1. INTERNATIONAL PLUMBING CODE (LATEST EDITION)
2. VA PLUMBING DESIGN MANUAL.
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
PLUMBING SYMBOLS AND ABBREVIATIONS
AJH LWP
PL-000
NTS
DRIP PAN DETAIL
PLUMBING SHEET LIST
Sheet Number Sheet Name
PL-000 PLUMBING SYMBOLS AND ABBREVIATIONS
1-PL-100 BLDG 1 OVERALL BASEMENT PLAN
1-PL-110 BLDG 1 OVERALL FIRST FLOOR PLAN
1-PL-120 BLDG 1 OVERALL SECOND FLOOR PLAN
1-PL-130 BLDG 1 OVERALL THIRD FLOOR PLAN
1-PL-140 BLDG 1 OVERALL FOURTH FLOOR PLAN
1-PL-150 BLDG 1 OVERALL FIFTH FLOOR PLAN
1-PL-160 BLDG 1 OVERALL SIXTH FLOOR PLAN
1-PL-170 BLDG 1 OVERALL SEVENTH FLOOR PLAN
1-PL-180 BLDG 1 OVERALL EIGHTH FLOOR PLAN
1-PL-190 BLDG 1 OVERALL NINTH FLOOR PLAN
1-PL-200 BLDG 1 ENLARGED DEMOLITION AND NEW WORK FLOOR PLANS - BASEMENT AND FIRST FLOOR
1-PL-201 BLDG 1 ENLARGED DEMOLITION AND NEW WORK FLOOR PLANS - SECOND AND THIRD FLOOR
1-PL-202 BLDG 1 ENLARGED DEMOLITION AND NEW WORK FLOOR PLANS - FOURTH, SIXTH, AND SEVENTH FLOORS
2-PL-100 BLDG 2 OVERALL SUB-BASEMENT PLAN
2-PL-105 BLDG 2 OVERALL GROUND FLOOR PLAN
2-PL-110 BLDG 2 OVERALL FIRST FLOOR PLAN
2-PL-130 BLDG 2 OVERALL THIRD FLOOR PLAN
2-PL-150 BLDG 2 OVERALL FIFTH FLOOR PLAN
2-PL-170 BLDG 2 OVERALL SEVENTH FLOOR PLAN
2-PL-180 BLDG 2 OVERALL EIGHTH FLOOR PLAN
2-PL-200 BLDG 2 ENLARGED NEW WORK PLAN - O.I. & T. B3A138
2-PL-201 BLDG 2 ENLARGED DEMOLITION AND NEW WORK PLANS - FIRST AND SEVENTH FLOORS
3-PL-100 BLDG 3 OVERALL BASEMENT, FIRST, AND SECOND FLOOR PLANS
21-PL-100 BLDG 21 OVERALL BASEMENT FLOOR PLAN
21-PL-110 BLDG 21 OVERALL FIRST FLOOR PLAN
21-PL-120 BLDG 21 OVERALL SECOND FLOOR PLAN
21-PL-130 BLDG 21 OVERALL THIRD FLOOR PLAN
21-PL-140 BLDG 21 OVERALL FOURTH FLOOR PLAN
21-PL-150 BLDG 21 OVERALL FIFTH FLOOR PLAN
21-PL-200 BLDG 21 ENLARGED DEMOLITION AND NEW WORK PLANS - BASEMENT AND FOURTH FLOOR
30-PL-100 BLDG 30 OVERALL BASEMENT PLAN
30-PL-110 BLDG 30 OVERALL FIRST FLOOR PLAN
30-PL-120 BLDG 30 OVERALL SECOND FLOOR PLAN
30-PL-200 BLDG 30 ENLARGED DEMOLITION AND NEW WORK PLAN - FIRST FLOOR
01/16/2026
1 1 1 1 1 1 1 1 1
■so
I
O
O O£&
De
TH
IH
EXISTING FLOOR
NOTE:
FLOOR DRIP PAN DETAIL2
NOT TO SCALE
sy Introba O pS
KACIEz MELAMPLeel-Len
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N Y
I I I I I I I I I
A REGISTERED D
PROFESSIONAL
SEAL LOCATION WATER TIGHT WITH
WATERPROOF SILICON SEALANT
A
O
IF DUE TO EXISTING CONDITIONS AND DRIP PAN CANNOT BE INSTALLED AS DETAILED SUBMIT POSSIBLE CHANGES TO THE
ENGINEER FOR APPROVAL.
WIDTH TO BE PROVIDED TO ALLOW
SETTING OF WATER BUG DEVICE
WITHIN CHANNEL, OR WIDE ENOUGH
FOR ANY PIPE OR OTHER VERTICAL
OBSTRUCTION AND ALLOW WATER TO
FLOW AROUND OBSTRUCTION.
PLACE WATER SENSOR IN
CENTER OF DRIP PAN
BOTH DIRECTIONS
24 GAUGE GALVANIZED STEEL WITH
SOLDERED SEAMS WATER TIGHT.
USE LIQUID FLUX WITH A ZINC
CHLORIDE BASE SIMILAR TO
JOHNSON GALVANIZED STEEL FLUX
ADHERE DRIP PAN TO FLOOR USING HEAVY DUTY
CONSTRUCTION ADHESIVE.
th Q
NNWE40,
( 2 X
LU
STOR
A001B
TR
A001D
TR
B022B
ELECTRICAL
ROOM
B022A
ELECTRICAL
ROOM
A001E
FINANCE / FISCAL
MY HEALTHE VET
BIOMED
FACILITIES MANAGEMENT SHOPS
LIBRARY
MORGUE
Radiator
Radiator
Radiator RadiatorRadiator
STAIR #2
STAIR #3
STAIR #4
LOADING DOCK
STORAGE B002A
STORAGE
B035A
SYSTEMS
ENGINEER B033
ELECTRIC
SHOP
B026
M/R CHIEF
B032
ELECTRIC
SHOP A
B027 PLUMBING
SHOP
STORAGE
B031A
LOCK
SHOP
B038
OXYGEN
STOR.
B039
OXYGEN
STOR.
B040
PLUMBING
SHOP
B031
SOILED
LINEN
A027
A028
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
A001A
MECH.
ROOM
A001C
OLD
COMPUTER
ROOM
A001
FIRE
ALARM
ROOM
A004A
SOILED
LINEN A006
ELECTRIC
ROOM
A009
PHONE
EQUIP.
A008D
ENGINEERING
MECHANICAL
ROOM
A005
MEN'S TOILET
ROOM
GC113
ELEVATOR
MACHINE
ROOM
GC112
O.R.
PREP RM.
A028C
UNIFORM
STORAGE
A028D
H.A.C.
GC110
WOMEN'S
TOILET ROOM
GC111
STORAGE
GC115
PC
VIEWING
GC129
CLERK
GC123
BOOK
PROCESSING &
STORAGE
GC122
CLERK
AREA
GC121
LIBRARIAN'S
OFFICE
GC125
ELECTRICAL
ROOM
GC128
STAIRS
GCS1
TO TUNNEL & CHILLER
BUILDING (BLDG. #31)
SUB-BASEMENT
MECHANICAL ROOM
SB1
TO BUILDING 2
A/C MACH.
ROOM
B009
POLICE
TRAINING
ROOM
B007
ED
ELEVATOR
CANTEEN
OFFICE
B007A
JAN.
CLO.
B006
SOILED
LINEN
B005
CORRIDOR
CA-10
LOCKER
ROOM
B004
STORAGE
B003
STORAGE
B003A
CORRIDOR
CA-11
TO
RESEARCH
WING
STORAGE
B002
POLICE
SECURITY
STORAGE
A015A
POLICE
SECURITY
STORAGE
A015B
BIOMED
A015
MECHANICAL
A014
MECHANICAL
A014
FMS TLT &
LOCKER RM
A008E
IT/ MECHANICAL
A008C
IT/ MECHANICAL
A008B
MECHANICAL
A008A
PATIENT
CLOTHING
A007
CORRIDOR
CA-6
MECH
A004
ELEVATOR
LIBRARY
GC120 MY HEALTHE
VET
GC126
CORRIDOR
CA-5A
OFFICE
GC103
OFFICE
GC102
HR
OFFICE
GC101
HR
OFFICE
GC100
CORRIDOR
CA-3A
CORRIDOR
CA-4
SIGN ROOM
A019
CORRIDOR
CA-3
MEDICAL WASTE
ROOM
A018
EMS DIRTY
STORAGE
A017
EMS CLEAN
STORAGE
A017A
SERVICE
ELEVATOR
LOBBY
CA-2
CANTEEN STORAGE
A016B
ELEVATOR LOBBY
CA-1
IT CLO
A013C
IT CLO
A013B
CORRIDOR
CA-1A
POLICE
STOR
A016A
ELEC
CLO
A012
FMS CLO
A013A
STAIR #1
ELEC
CLO
A011
FAMILY
VIEWING
ROOM
B019
RADIATION
SAFETY
B020
SPS
STORAGE
B020
CORRIDOR
CA-12
CORRIDOR
CA-9
TO BUILDING 2
CARPENTER
SHOP
FOREMAN
B034
CORRIDOR
CA-13
PAINT
SHOP
B035
CORRIDOR
CA-15
TO BUILDING 2 CORRIDOR
CA-8
MASONRY
SHOP
B036
PAINT
SHOP
B037
CORRIDOR
CA-7
A016E
CORRIDOR
CA-14
EMS
STORAGE
A021
EMS
STORAGE
A020
TRASH ROOM
A022
MORGUE
ENTRANCE
A023
WASH RM
A023B
AUTOPSY AREA
A023C
MORGUE
BOX
A023D
EMS
OFFICE
A025
VAULT
A026A
VAULT
A026B
POLICE
LOCKER RM
A026
EMS LINEN ROOM
LINEN ROOM
A028B
ELEVATOR
CORRIDOR
CA-5
FINANCE
GC104
CANTEEN
A016H
CANTEEN
A016G
CANTEEN
A016E
ELEC CLO
A016J
CANTEEN
A016C
CANTEEN
A016D
MACH. RM.
A016K
EMS OFFICE
A024
A/C UNIT
A028A
OI&T
B022
TRANSFORMER
ROOM
A010
CARPENTER
SHOP
B035
MACHINE
SHOP
B030
A/C SHOP BO28
MECHANICAL
ROOM
BO29
1-PL-200
1-PL-200
1-PL-200
SUB-BASEMENT PLAN
1-PL-200
1-PL-200
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL BASEMENT PLAN
AJH LWP
1-PL-100
1/16" = 1'-0"
PLUMBING BASEMENT OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
— h +• if
4I □□ □S ]
IT
Al ri lr T l DD J □n ZS1 [ / 1 ritri
I 4 -lr FI If n
J II[
ri 4 1 ri — •• flL □ □ flri ri ri ri
1 n flri •• □L
A EI4 - □ □— Cf —I A
A 1 ]X iff□ □ □ □ — □□
L
5 J [ ]fl E □A - □LFF■ i11
0] [
- Jl' o J□3
- EII A•r
— JJ 1m I ■—H Ari • LF 1 fl□ I
_____ 0--I A -□— —
L E ri- ——□ j i □ □ ri□
0 □□
□ ri h Lh L ri riri — fl
1]&
TE
□ T
I
EL
If fl □ El ri □ □ ri ufl ] ri £1 fl
ONW EAl sy Introba pS PROFESSIONAL
KACIEz MELAMPLee K Len
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1 fl r i
Ja-7%
C% REGISTERED E.
L r
KAD
I
I I
V fl
Family Toilet Rm
B101
Women's Toilet Rm
B102
Lactation Room B103
EXAM
#1
B137
EXAM #2
B138
STORAGE
B139
STAIR
NO 4
CORRIDOR
C1-15C
LAB
B136
TOUCH
DOWN
B135
CORRIDOR
C1-15
ISO
EXAM #3
B140
ISO
EXAM #4
B141
ISO
EXAM #5
B142
EXAM #7
B144
EXAM #6
B143
EXAM #9
B147
SOCIAL/
EXAM #8
B146
ELEC
CLO
B145
SOILED
HOLDING
B134
PHARM
OFFICE
B133
MEDS
B132
CORRIDOR
C1-15A EXAM #10
B148
EXAM #11
B149
EXAM #12
B150
MECHANICAL
ROOM
B151
TOUCH
DOWN
B131
TRIAGE
B130 CORRIDOR
C1-14
MOD E
RECEPTION
B134
MOD E
WAITING
B132
HAC
B124
CORRIDOR
C1-13
MEN
TLT
HC
B122
STAIR
NO 3
ELEC
B122FEC
GALLERY
B121
ACCESS
FROM B2ACCESS
FROM B2
CORRIDOR
C1-12
CORRIDOR
TO ED
SUICIDE
PREVENTION
B118
HAS
B117
ED AO
B116
NUTRITION
FUTURE ED
BREAK
B115
ELEVATOR
ED
EXAM
ROOM
B112
UNISEX
TOILET
B111
ED
EXAM
ROOM
B110
ED
EXAM
ROOM
B109
ED
EXAM
ROOM
B108
ED
EXAM
ROOM
B107
ED
EXAM
ROOM
B106
ED
EXAM
ROOM
B105
ED
EXAM
ROOM
B104
CORRIDOR
C1-11
CORRIDOR
C1-10
FOOD
COURT
A142
FOOD LINE
A142B
FOOD LINE
A142C
FOOD LINE
A142A
CANTEEN
DINING
AREA
A140
DISHWASHER
A144A
COOLERS
A143
KITCHEN
A144
CAGE
STORAGE
A146
CAGE
STORAGE
A145A
CANTEEN
DINING
AREA
A145
A148 A149 A150
ELE CLO
A151
SERVICE
ELEVATOR
C1-2
MEN
TOILET HC
A153
PRIVACY
OFFICE
A154
CONGRESSIONAL
LIASON
A154B
STAIR
NO 5
WOMEN
TOILET HC
A155
VISN 4
CONFERENCE
ROOM
A157
VISN
OFFICE
A157A
CORRIDOR
C1-4
ELEC
CLO
A158
CONFERENCE
ROOM
A160
OFFICE
A161
OFFICE
A162
OFFICE
A162A
OFFICE
A163
PATIENT
ADVOCATE
FUTURE
PCS
A159
DECEDENT AFFAIRS
AFFAIRS
A164
OFFICE
1C101
OFFICE
1C111
WORK
ROOM
1C110
OFFICE
1C109
OFFICE
1C108
OFFICE
1C107
OFFICE
1C106
OFFICE
1C105
OFFICE
1C104
OFFICE
1C103
PCS
1C100
WAITING
1C102
FUTURE
QUALITY
MANAGEMENT
1C122
1C127
OFFICE
1C126
PRIVACY
OFFICE
1C125
OFFICE
(FRONT OFFICE)
1C124
OCC
OFFICE
1C123
CONFERENCE
ROOM
1C138
CHIEF OF
STAFF
1C137
1C136
1C135
1C134
1C133
STAIR
NO 1
1C-S1
1C132
1C129A1C131
CHIEF OF
STAFF OFFICE
1C129
CORRIDOR
C1-5
STORAGE
1C121
ELEVATOR
P.
ELEC
CLO
1C118
TELE
CLO
1C120
A174F
A174E
A174DA174CA174B
ASSISTANT
DIRECTOR
A175
BOARD ROOM
VESTIBULE
A177A
DIRECTOR'S
SUITE
A174
WOMEN
STAFF
ONLY HC
1C117
MEN STAFF
ONLY HC
1C115
HAC
1C114
CLOSET
1C113
COMPLIANCE
OFFICER
A156
A174G
A174I
A174H
CORRIDOR
C1-3A
CORRIDOR
C1-3
BOARD ROOM
A177
CORRIDOR
C1-1A
VA POLICE
OPERATIONS
A101
STAFF
A101A
TELEPHONE
OPERATOR
A102
CORRIDOR
C1-6
TLT
A103
HAC
A104
COPY/ EQUIPMENT
ROOM
A105A
OFFICE
A105B
OFFICE
A105C
OFFICE
A105F
OFFICE
A105G
OFFICE
A105H
STUDIO
A105E
MEDICAL
MEDIA
PERSONNEL
A105D
CORRIDOR
C1-7
MEDICAL
MEDIA
A105
HOLDING
ROOM
A106A
HOLDING
ROOM
A106B
VA POLICE
HOLDING
ROOM
A106
STAFF
OFFICE
A107C
UNISEX
TLT RM
A107B
CONFERENCE
ROOM
A107D
STAFF
AREA
A107E
PRINTER
AREA
A107A
OFFICE
A107I
STORAGE
A107H
TELE
CLOSET
A107F
OFFICE
A107G
QM
OFFICE
A108B
QM
OFFICE
A108C
QM/ FUTURE
PATIENT ADVOCATE
A108
QM
OFFICE
A108A
QM
A107
QM
A108D
QM/ FUTURE
DECEEDENT
AFFAIRS
A109
ELEC
CLO
A119
CARD
SAFE
A111A
PIV
A111
VA POLICE
SERVICE
A112
CORRIDOR
C1-8
STAIR
NO 2
VA CRIMINAL
INVESTIGATOR
A113
ASSISTANT
CHIEF OF POLICE
A114
CHIEF
OF
POLICE
A115
VA POLICE
ADMINISTRATION
A116
STAIR
NO 1
ELEC
CLO
A135
ELEC
CLO
A136
TELE
CLO
A136A
FEC
STORAGE
A39B
ELEVATOR LOBBY
C1-1
MECHANICAL
ROOM
1D102
OFFICE
A139C
RETAIL STORE
A139A
CORRIDOR
C1-9
CORRIDOR
C1-15B
B113
B113A
LAUNDRY
CHUTE
B113D
TR
A154A
TR
B112A
CLOSET
A154B
F E
C
GATE
GATE
CONSTRUCTIONCONSTRUCTION
TO SOUTH BUILDING
(BUILDING 2)
TO SOUTH BUILDING
1-PL-200
1-PL-200
NO PLUMBING WORK
ABOVE CEILING
DRIP PAN, SEE DETAIL 2, SHEET PL-000
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL FIRST FLOOR PLAN
AJH LWP
1-PL-110
1/16" = 1'-0"
PLUMBING FIRST FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
J n n AF n 1t R L/UD r
H
—L □
□ □□ □B 5 5□
V u 14O 171 5
Pii 51F—J 55 V/2 1i a
D —
IO T
o I[ 14] 5 DEL u
O 8 [ □V LP 7IE X
-D ][L—I —I] I] I I
M 8 0H|l LE□ n □i2 L[
B
MMo p E B EEP ]H I H
Y
—--------- i .—, JI—r rl A d LIT : 1I u L•RTDLDr lol Bo
I
[LE JTL TEHI-
-E [vLW VFL Lal J l
3m r999fl— 1 ]EE g- □ EL••• DI! — Xhra 9 zl0
[ □ □l fl W Q □
I
15C— fl
I..
1 flX[I I 7[ L1 1
I n E7 a □ fl □
I fl flJ n L 7 sy Introba pS PROFESSIONAL
KACIEz MELAMPLee K Leln
. ENGINEER JJ
AOPE097080/ gsyisC □ M P A N i i i i i i i i i
•al
B r
I r
IT
IL
I
H fl
I
I f o
I
□fl
B
I
I
LE
Bl
I fl
V
4 P
•a
\[E flflflfl
C% REGISTERED E.
TR
A207
TR
B228A
WALL PASS THRU N.I.C.
TO BUILDING 2
ACCESS PANEL
21" HIGH
TO
RESEARCH
WING
INPATIENT PHARMACY
REHABILITATION
IMPACT, BH, PCS & HAS
REHABILITATION
Printer
PASS-THRU REFRIG.
PASS-THRU FREEZER
LF
HOOD
N.I.C.
LF
HOOD
N.I.C.
LF
HOOD
N.I.C.
RESEARCH
B228D
RESEARCH
B228E RESEARCH
B228F
STAIR #4
CORRIDOR
C2-15
B228GRESEARCH
B228C
RESEARCH
B228B
CL
B228H
CL.
B228J
OFFICE
POOL
B228
INTERVIEW
B227
INTERVIEW
B226
OFFICE
B225A
OFFICE
B225B
WAITING
B225
CORRIDOR
C2-14
CORRIDOR
C2-13
MEN'S
TOILET
B224
STAIR #3
ELEC
B223FEC
B222
BOARD RM/
CONFERENCE
B221
ELEC
CLO
B221A
CORRIDOR
C2-122
CONFERENCE
VESTIBULE
B220H.A.C.
B219
STORAGE
B220A
BEHAVIORAL
HEALTH
OFFICE
B218
BEHAVIORAL
HEALTH
OFFICE
B217
BEHAVIORAL
HEALTH
OFFICE
B216
BEHAVIORAL
HEALTH
OFFICE
B215
BEHAVIORAL
HEALTH
OFFICE
B214
BEHAVIORAL
HEALTH
OFFICE
B213
BEHAVIORAL
HEALTH
OFFICE
B212
ED
ELEVATOR
BEHAVIORAL
HEALTH
OFFICE
B210
BEHAVIORAL
HEALTH
OFFICE
B209
BEHAVIORAL
HEALTH
OFFICE
B208
ELEC
CLO
B207
CESATE
B206
BEHAVIORAL
HEALTH
B205B
BEHAVIORAL
HEALTH
B203
BEHAVIORAL
HEALTH
B202C
BEHAVIORAL
HEALTH
B202B
BEHAVIORAL
HEALTH
B202A
BEHAVIORAL
HEALTH
B201
EEO
B205A
EEO
B204
CORRIDOR
C2-10A
CORRIDOR
C2-10
BULK
STORAGE
A237
CORRIDOR
C2-9
STAGING
AREA
RECEIVING
AREA
FILL
AREA
A236I
SUPERVISOR
INPATIENT
PHARMACY
A236H
ANTE
ROOM
A236F
IV
SOLUTION
ROOM
A236G
RESEARCH
A236E
COMPOUNDING
ROOM
A236D
CONTROLLED
SUBSTANCE
VAULT
A236C
PROCUREMENT
TECH
A236B
WORK
ROOM
A236J
INPATIENT
PHARMACY
A236
DUMB
WAITER
HAC
A236A
STAIR
NO 1
FEC
A235E ELEC
CLO
A235D
ELEC
A235C
CORRIDOR
C2-1A
ELEVATOR
LOBBY
C2-1
ELEC
CLO
A253F
REHAB
WAITING
A202
OFFICE
A203
OFFICE
A204
OFFICE
A231
OFFICE
A230
BEHAVIORAL
HEALTH
TOUCHDOWN
A229
ELEC
A228 CL
A229A
IMPACT
EXAM
ROOM
A227
STAIR #2
IMPACT
PHYSICIAN
A226B
IMPACT
NURSING
A226A
IMPACT
NURSING
A225
IMPACT
TOUCH
DOWN
A224
ASST. NURSE
MANAGERS
A223
NURSE
RESEARCHERS
A222
NURSING
A221
NURSING
A220
SAFE PATIENT
HANDLING
A219
HAS
SUPERVISORS
A218
IMPACT
TOUCHDOWN
A217
CORRIDOR
C2-8
IMPACT
EXAM ROOM
A216
TOILET
A215
TOILET
A214
VACANT
A213
VACANT
A212
ISO
A211
BEHAVIORAL HEALTH
TOUCHDOWN
A210
HAS
A209
GI
STOR
A208
IMPACT
RECEPTION
A206
CORRIDOR
C2-7
CORRIDOR
C2-6A
IMPACT
WAITING
A205
CORRIDOR
C2-6
RECEPTION
A201
OFFICE
A200
REHAB
OFFICE
A262
6 PERSON
TOUCHDOWN
A260
ELEC
A261
LOW
VISION
A259A
LOW
VISION
A259
LOW
VISION
A258
CHIEF OF
REHAB-
ILITATION
A257
SCI
CLINIC
A256 REHAB
A255
REHAB
A255A
RESIDENT'S
OFFICE
A254
OFFICE
A253
OFFICE
A252
OFFICE
A251
CORRIDOR
C2-5
WOMEN
STAFF
TLT HC
A250
MEN
STAFF
TLT HC
A249
CORRIDOR
C2-3A
HAC
A248
EXAM
A247
EXAM
A246
EXAM
A245
EXAM
A244
OT
A243A
OCCUPATIONAL
THERAPY
A243
ELEC
CLO
A242
ADL
BATH
A243B
ADL
KITCHEN
A243C CORRIDOR
C2-4
STORAGE
A241
STAIR
NO 5
EXAM
A240D
EVALUATION
ROOM
A240C
STAFF
AREA
A240B
STORAGE
A240A
CORRIDOR
C2-3
PHYSICAL
THERAPY
A239
MEN
TLT HC
A237
WOMEN
TLT HC
A238
CLEAN
LINEN
A239A
SERVICE
ELEVATOR
LOBBY
C2-2
CLO
A239B
ELEC CLO
A239C
SERVICE
ELEVATORS
SIGNAL
A235B
DATA
A235A
PASSENGER
ELEVATORS
CHANGING
ROOM
A239E
CHANGING
ROOM
A239F
STORAGE
A239D
UTILITY
SUPPLY
A239G
PROSTHETICS
REPRESENTATIVES
B238G
PROSTHETICS
RECEPTION
B238
PROSTHETICS
REPRESENTATIVES
B238F
ORTHOTIST
EXAM
B238E
ORTHOTIST
SHOP
B238D
PROSTHETICS
CHIEF
B238C
PROSTHETICS
REPRESENTATIVES
B238B
PROSTHETICS
REPRESENTATIVES
B238A
FILES
B233A
RECEPTION/
WORK
B233
WOMEN'S
TOILET
B232
EXAM/
INTERVIEW
B231
SPECIMEN
B230
EXAM/
INTERVIEW
B229
CORRIDOR
C2-11
ROOF
ROOF
1-PL-201
1-PL-201
1-PL-201
1-PL-201
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL SECOND FLOOR PLAN
AJH LWP
1-PL-120
1/16" = 1'-0"
PLUMBING SECOND FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1 p —•___ J J
BT5 I nrQ [4 e
••0 I —T n
RLEL. — L 4
V
_DL •l E 411— — — ■O' a LEL□ □ Ml1P /L / ifABA [
- ■ b 6—[
Ei •D□
I2
[ I [/
/ H□d L
I□p 2 ru5JEL H
/ _/ • l••
AA Cr. 111111111 1L R PM Ml•r u I lP J1□ En X i□ [ Jo
Me4 D LI inI a7 2 ! :R/LAmmj/l [I
IM M IIIH
€ I II C B ©I /
01.
HH II
1Fl 1 I ra
11£ aC ?
I H i l M 222Al IHiHL 7 sy Introba PS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
I
I
H H
II
I
I
H
H
IF
II
I
I
H
H
H
H
H g a
H s
P
IT
Z
E
L I I I
T I fl
P T 5
11—
H
LP
r
[ j
ANWE40,
C% REGISTERED E.
IB
re
E
J [ d
HAS
B317
TR
B317A
TR
A361
TO BUILDING 2 CHAPLAIN SERVICES
TO RESEARCH
WING
EYE CLINIC
SURGERY CLINICS
DF
Hood
ELEVATORS
SERVICE
STAIR #1
DumbwaiterISO
OFFICE
B323
CHAPLAIN
OFFICE
B322
CHAPLAIN
OFFICE
B321
CHAPLAIN
RECEPTION/
SECRETARY
B320 CHAPLAIN
SERVICE
B319
ELEVATOR
CORRIDOR
C3-12
WOMEN'S
TOILET
B324
MEN'S
TOILET
B324A
EUCHARISTIC
ROOM
3B168
LAB
B316C CLOSET
B316D
B316
LAB
B316B
OFFICE
B315A
OFFICE
B315
OFFICE
B312
OFFICE
B311
CONFERENCE
ROOM
B310
OFFICE
B309
OFFICE
B308
CORRIDOR
C3-11
DENTAL
RECEPTION
B307
DENTAL
WAITING
B306
HAC
B313
STOR
B314
DENTAL
CORRIDOR
C3-10A
CORRIDOR
C3-10
STO
3B169A STO
3B168A
CHAPEL
VEST.
3B171
HAC
B325
CHAPEL
3B169B
CHANCEL
3B169B
STORAGE
3B168C
SACRISTY/
STORAGE
3B169D
INTERVIEW
3B170
STAIR #3
TOILET
B326
OR
B327
CLO
B328
STAFF
B329
CLOSET
B330
CLO
B331
EXAM
B332
DENTAL
EXAM
B333
CORRIDOR
C3-13
CLO
B334
EXAM
B335
EXAM
B336
CLO
B337
DENTAL
LAB
B338
PORCELAIN
ROOM
B339
STAFF
LOUNGE
B339A
LOCKER
AREA
B339C
TOILET
ROOM
B339B
STAIR #4
CLO
B340
EXAM
B341
EXAM
B343
EXAM
B344
EXAM
B346
EXAM
B348
EXAM
B349
CLO
B342
CLO
B345
CLO
B347
STAFF
B350
STAFF
B351
OR
B352
STORAGE
B354
CLO
B353
MEN'S
ROOM
B355
WOMEN'S
ROOM
B356
CORRIDOR
C3-9C
B383
EXAM
ROOM
B382
PHOTO-
GRAPHY
ROOM
B380
CORRIDOR
C3-9D
PROCEDURE/
LASER ROOM
B379
OFFICE
B378
OFFICE
B378A OFFICE
B376
OFFICE
B374
CORRIDOR
C3-9E
EXAM
ROOM
B372
EXAM
ROOM
B370
EXAM
ROOM
B369
EXAM
ROOM
B381
EXAM
ROOM
B377
EXAM
ROOM
B375
EXAM
ROOM
B373
EXAM
ROOM
B3759
EXAM
ROOM
B361
EXAM
ROOM
B363
EXAM
ROOM
B364 EXAM
ROOM
B365
VISUAL
FIELDS
B371
VISUAL
FIELDS
B368
VISUAL
FIELDS
B366
CORRIDOR
C3-9F
CORRIDOR
C3-9B
EXAM
ROOM
B357
EXAM
ROOM
B358
EXAM
ROOM
B360
EXAM
ROOM
B362
CORRIDOR
C3-9A
CORRIDOR
C3-9
CORRIDOR
C3-9G
PASSENGER
ELEVATORS
ELEVATOR
LOBBY
C3-1
ELECTRICAL
ROOM
B367
B367A
SERVICE
ELEVATOR
LOBBY
C3-2
UNISEX
TLT RM
A342
STAFF
TLT RM
A341
CORRIDOR
C3-3
3 WEST
WAITING ROOM
A343
3 WEST
RECEPTIONIST
A345
STAIR
#5 FEC
MECHANICAL
A346
MECHANICAL
A346A
CORRIDOR
C3-4 CLOSET
A346B
CORRIDOR
C3-3A
CLO
A346C SOILED
UTILITY
A347
MEDICINE
ROOM
A348
EXAM
ROOM
A349
EXAM
ROOM
A350
EXAM
ROOM
A351
EXAM
ROOM
A352
EXAM
ROOM
A353
EXAM
ROOM
A354
CORRIDOR
C3-5
EXAM
ROOM
A355
EXAM
ROOM
A356
EXAM
ROOM
A357
EXAM
ROOM
A358
EXAM
ROOM
A359
EXAM
ROOM
A360
CAST
ROOM
A362
IMPACT
EXAM ROOM
A363
IMPACT
EXAM ROOM
A364
IMPACT
EXAM ROOM
A365
RESIDENT'S
ROOM
A300
WOMENS
ROOM
A301B
MENS
ROOM
A301A
CORRIDOR
C3-1A
TELE
A336D
TELE
A336E
CLO
A336B
CLO
A336C
FEC
ELEC
A336A
OFFICE
B300OFFICE
B301
HAC
B302
CLOSET
B303
VESTIBULE
C3-1B
RECEPTIONIST
B304
EYE
CLINIC
WAITING
B305
3 EAST
WAITING
ROOM
A301
CORRIDOR
C3-6
COMMUNICATIONS
CENTER
COUNTER
A335
CLEAN
SUPPLY
ROOM
A334
CENTRAL
EXAM
A333
CORRIDOR
C3-6A
HAC
A302
UTIL/
ELEC
A303
PROCEDURE
ROOM
A304
PODIATRY
EXAM #1
A305
PODIATRY
EXAM #2
A306
PODIATRY
EXAM #3
A307
GRINDING
ORTHODICS
A308
PODIATRY
ATTENDINGS
A309
PODIATRY
RESIDENTS
A310
PODIATRY
CHIEF
A311
PODIATRY
EXAM #4
A312
PODIATRY
EXAM #5
A313
PODIATRY
EXAM #6
A314
NURSES
WORK
ROOM
A315
SOILED
LINEN
A317
ENT STAFF
A318
ENT EXAM
ROOM #1
A319
ENT EXAM
ROOM #2
A320
ENT EXAM
ROOM #5
A321
SHARED EXAM
ROOM
A322
VASCULAR
REC/ SUPP
A323
VASCULAR
EXAM
ROOM
A324
VASCULAR
EXAM
ROOM
A325
VASCULAR
TECH OFFICE
A326
EXAM
ROOM
A327
CORRIDOR
C3-8
STERILIZ
ROOM
A328
ENT EXAM
ROOM #3
A329
ENT EXAM
ROOM #4
A330
STAFF
RESTROOM
A332 ENT
SUPPLY
A331
CORRIDOR
C3-6B
STAIR
#2
EXIST
FEC
PENTHOUSE
3D100C
CORRIDOR
C3-7
CLOSET
A363A
R a d ia to r
R a d ia to r
R a d ia to r
R a d ia to r
R a d ia to r
R a d ia to r
1-PL-201
31-PL-201
1-PL-201
1-PL-201
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL THIRD FLOOR PLAN
AJH LWP
1-PL-130
1/16" = 1'-0"
PLUMBING THIRD FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
••mi
J0O
] rL
I rm I-----1 i—hl —I—IPR —Et 1□
I IPI EEEEEl ? enste—n, । F
Ul । r 5 — L Jr lE __ 11 — lh—1 1
T EfU FM6Et 1 PTP=Et [1 L
LE
L EfE. mo (lI __ T I
1 H MMp OlI ।—HI . I1—1 ROM । IT
EN IED D •rue O flL
LNE 1/ / / MM 1aL • o o aC f]fl M4I G3
5s fl □ flIL fl CEl El El ( // 5 o o V45
] nCEAUE flET fl tnt =M □LL Tit fl r fl
FAE| □□ DHIA □
—u l [DP L T T
UM TH6 IL fl
LK C IJ LI LI ~ .□
DB PND1/Efl E□ □
• 0M fl EBBpfl —
D0
— — 2 1□
La— JI l ] I I U I
C M L
I 1
-—L EJ
Elt 1 7 222J1A 7 sy Introba pS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER //
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
ETE
a. □
(h s
B l I
]S 0
2 BP
H
ANWE40,
C% REGISTERED E.
=LE ell l
EW
I = II M 1.
I or
G H
CAN
Dr
L L
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
MECHANICAL
ROOM
B446A
CORRIDOR
C4-13B
SOILED
UTILITY
B446
STAFF
TOILET
B445
ENDO
B444
SCOPE CLEAN/
STORAGE
B443
ENDO
B442
CLEAN
STORAGE
B441
TECH
WORKROOM
B440
EXAM
ROOM 5
B438
STOR
B439
EXAM
ROOM 4
B437
EXAM/
OFFICE
B435
HAC
B436
EXAM/
OFFICE
B434
TRIAGE
B433
STAIR #3
ELEC
B432
ELEC
B431
SHARED GI
PROVIDER
OFFICE
B4303 PERSON
OFFICE
B429
3 PERSON
OFFICE
B428
ELEC
B427
OFFICE
B426
OFFICE
B425
OFFICE
B424
OFFICE
B423
CORRIDOR
C4-12
GI
PROVIDER
OFFICE
B422
OFFICE
B421
OFFICE
B420
OFFICE
B419
ELEVATOR
GI NURSE
STAFF
B416
SOILED
UTILITY
B415
STAFF
B414
EXAM
ROOM
B413
EXAM
ROOM
B412
EXAM
ROOM
B411
EXAM
ROOM
B410
UNISEX
TOILET
B409
H.A.C.
B408
UROLOGY
RAMP UP
TLT/ DRESSING
ROOM
B407A
CYSTOSCOPY
ROOM
B407
EQUIPMENT
CLEANING
B406
MEDICATION
ROOM
B405
EXAM
ROOM
B404
EXAM
ROOM
B403
EXAM
ROOM
B402
GI/ UROLOGY
RECEPTION
B401
CORRIDOR
C4-10A
GI/ PULMONARY
WAITING AREA
B457
TLT
B456
EXAM/
OFFICE
B455
EXAM
ROOM 3
B454
EXAM
ROOM 2
B452
CORRIDOR
C4-13
STOR
B453
GI
EXAM
ROOM 1
B451
CODE
CART
B450
PREP/
RECOVERY
B448
CORRIDOR
C4-13A
TLT
B448B
DRESS
B448A
ERCP
B447
PULMONARY
RECEPTION
B457
TELEHEALTH
B458
NEUROLOGY
OFFICE
B459
NEUROLOGY
OFFICE
B432
CORRIDOR
C4-10
UROLOGY/ GI
WAITING AREA
B400
UNISEX
TLT
B400A
UNISEX
TLT
B400B
PFT
A431
CORRIDOR
C4-9
PFT
A430 SLEEP LAB
A429
CLINICAL
RESEARCH
A433
TOUCH
DOWN
A433A
TOUCH
DOWN
A433B
EXAM/
BLOOD
DRAW
A433C
INTERVIEW
A433D
INTERVIEW
A433I
MECH
A433E
TLT
A433F
ELEVATOR
LOBBY
C4-1
ELEC
A433H
STOR
A433G
SERVICE
ELEVATOR
LOBBY
C4-2
H.C.
TLT
A435
NEUROLOGY/
PADRECC
WAITING
A472
CORRIDOR
C4-3
NEUROLOGY/
PADRECC
WAITING
A436
OFFICE
A437
ADMIN
OFFICER
A438
STOR
A439
OFFICE
A440
H.C.
TLT
A441
CORRIDOR
C4-3A
CHARTS
A442
STAIR #5
CORR.
C4-4
STOR
A443B
WORK
ROOM
A443
ELEC CLO
A443A
LAB
A445A
H.C.
TLT
A444
LAB
A445
CORRIDOR
C4-4A
OFFICE
A446
OFFICE
A447
OFFICE
A448
CHIEF
NEUROLOGY
A449
OFFICE
A451
OFFICE
A452
ADMIN
ASSIST
A450
OFFICE
A453
OFFICE
A454
SOILED
LINEN
A456
HAC
A457
EXAM
A458
EXAM
A459 EXAM
A460
EXAM
A461
EXAM
A462
STORAGE
A463
INTERVIEW
A464
EXAM
ROOM
A465
EXAM
A466EXAM
A467
EMG
EXAM
A468
EEG
EXAM
A469
CLEAN
LINEN
A470
NEUROLOGY/
PADRECC
RECEPTION
A471
OFFICE
A473
HOPTEL
ROOM #1
A400
TELE
A427B
TELE
A427C
CORRIDOR
C4-1A
DUMB
WAITER
CREDIT
UNION
A428 STAIR #1
FEC
ELEC
A427A
ELEC
A426
ELEC
CLO
A425
TOILET
A400A
TOILET
A401A
ON CALL
ROOM #2
A401
WAITING
SLEEP
LAB
A402
TLT
A424
TLT
A423A
ON CALL
ROOM #1
A423
CORRIDOR
C4-2
HOPTEL
ROOM #2
A422
TLT
A422A
CLO
A422B
TLT
A421A CLO
A421B
HOPTEL
ROOM #3
A41
STAIR
#2
FEC
H.A.C A420
CORRIDOR
C4-8
MECHANICAL
ROOM
A419
MECHANICAL
ROOM
A419A
CLEAN
LINEN
A418
D/
UTILITY
A415
CLO
A417
S/
LINEN
A416
S.C.
NURSE
A414
OFFICE/
EXAM
A413
CPAP.
SET
UP
A412
SLEEP LAB
A411
SLEEP
LAB
A409
TLT
A410
CLO
SLEEP
LAB
A408
TLT
A407
SLEEP
LAB
A406
MONITOR
RM
A405
CLO
CORRIDOR
C4-7
STO/
LINEN
A404
CORRIDOR
C4-6A
COPY
ROOM
A403
ADMIN
A403A
CORRIDOR
C4-5
CLO
TR
B418
CONFERENCE
ROOM
A455
TR
A455A
FEC
SLEEP LAB
PADRECC
O N
C A
L L
H O
P T
E L
H O
P T
E L O
N C
A L L
TO BUILDING 2
TO ROOF
TO RESEARCH WING
PULMONARY
CLINICAL RESEARCH
Radiator
R a d ia to r
Radiator Radiator Radiator
HS
H S
HS
HS
UP
DNUP
1-PL-202
1-PL-202
NO PLUMBING WORK
ABOVE CEILING
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL FOURTH FLOOR PLAN
AJH LWP
1-PL-140
1/16" = 1'-0"
PLUMBING FOURTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1 r ol i i2 & HH H It []EOH [
— HE
- a [H] L
MJ
in H
O0 [ ]
V 5] od 2A Unj5E
El HHr
3€ (27 nwa —L1•] 0 T
I □L i•]
1] D / [ ]E]D4Eooo—r □I gU11 —Eo
E Eloaf B
L 1
// /L]5 maTl
V
C” T W LW V PI I
7 —E [ ]Z" I 1od wri □T
9G—=f 3
—aB6— DBE —e □ □ □I
M □ C □a US □
[3‘o MUTRD0 □t □ ©u /IT QL aon 1 □ □ □
F& I
I I uD □
□ n□ sy Introba pS PROFESSIONAL
KACIEz MELAMPLeel-Len
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
H
H
E C n i
IN
EJ
EL
l
E E
•l==
E—
E
I r i
ANWE40, C% REGISTERED E.
EF 2
R A
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
RAD RAD
H e a d w a ll
H e a d w a ll
H e a d w a ll
Headwall
Headwall Headwall
Headwall Headwall
Headwall
H e a d w a ll
H e a d w a ll
H e a d w a ll
H e a d w a ll
H e a d w a ll
H e a d w a ll
RAD RADRAD RAD
RADRAD
TR
A502
STOR
A502A
ROOF
5 SOUTH SWING WARD
TO BUILDING 2
SURGERY TOUCHDOWN
To Research Building
EWC
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
1BED
B530
1 BED
B529
1BED
B527
TLT
RM
B528
TLT
RM
B531
TOUCH
DOWN
B526
1 BED
B524
NEW
TLT RM
B524A
CLEAN
LINEN
B523
TOILET
ROOM
B518A
SOILED
LINEN
B521
HAC
B520
CLO
B522
1 BED
B516
2 BEDS
B515
TOILET ROOM
B514
2 BEDS
B513
2 BEDS
B512
TOILET ROOM
B511
2 BEDS
B510
MEDICATION
ROOM
B508
TLT
B508A
STORAGE
B507
STORAGE
B506
TOILET
ROOM
B503A
NORISH-
MENT
KITCHEN
B505
2 BEDS
B503
TOUCH
DOWN
B502
QUALITY
MANAGEMENT
B501
CASE
MANAGERS
A534
SOCIAL
WORK
A533
PHARMACY
OFFICE
A532
DUMB
WAITER
STAIR # 1
A528
2 BEDS
CLO
A527
TLT
A528A
CL
A526
CL
A525
TLT
A524A
A524
SINGLE
BED
CLO
A523
STORAGE
A522A
STORAGE
A522B
CLO
A521
CL
A520
STORAGE
A522C TLT
A519A
2BED
A519
DAY
ROOM
A518
STAFF
LOCKER
ROOM
A517
A BED
ISOLATION
A516
ANTE
A516A
TLT
A516B
1 BED
ISOLATION
A515
TLT
A515B
ANTE
A515A
TLT
A514B
ANTE
A514A
1 BED
ISOLATION
A514
STOR
A513
SOILED
A512
CLEAN
A511
MED.
A510 2 BEDS
A509 TLT
A508A
TLT
A509A
2 BEDS
A508
STORAGE
A507
2BED
A506
TLT
A506A
TLT
A505A
2 BEDS
A505A504B5 EAST
NURSE STATION
A504
A504A
ANTE
ROOM
A503A
1 BED
ISOLATION
A503
TLT
A503B
HEAD NURSE
OFFICE
A571
NURSE'S
WORKROOM
A570
STAFF
ROOM
A569
REHAB
WORKROOM
A568
CHARTING
ROOM
A567
5 WEST
NURSE
STATION
A566
A566A SEMI- PRIVATE
A565
TLT
A565A
STORAGE
A564
TLT
A563A
RADIATION
TREATMENT
ROOM
A563
VESTIBULE
C5-9
RADIATION
TREATMENT
ROOM
A562
TLT
A562A
TLT
A560A
STORAGE
A561
SEMI-PRIVATE
A560
CORRIDOR
C5-8
CORRIDOR
C5-7
MED.
RM.
A559
NOURISH-
MENT
A558
DIRTY
UTILITY
A557LAUNDRY
CHUTE
ELEC.
A556
JAN.
A555
SEMI- PRIVATE
A554
TLT
A553A
TLT
A554A
SEMI-
PRIVATE
A553
TLT
A551
STOR
A552
SEMI-PRIVATE
A551STORAGE
A550
DAY
ROOM
A549
SEMI-
PRIVATE
A548
STOR
A545A
TLT
A548A
ELEC
A547
CORRIDOR
C5-10
STORAGE
A546
CONGREGATE
BATH
A545
STAIR
S5
PRIVATE
A544
TLT
A544A
CLEAN
LINEN
A543
CLEAN
LINEN
A542TLT
A541A
CORRIDOR
C5-6
SEMI-PRIVATE
A541
STAFF
TLT
A540
PATIENT
STORAGE
A539
TELEHEALTH
A538H
TLT RM
A538G
CLO
A538I
FMS
CLO
A538J
TELPHONE
A537C
TELEPHONE
A537BELEVATOR LOBBY
C5-1
TOUCH
DOWN
A538F
TOUCH
DOWN
A538E
MECH
A538DTOUCH
DOWN
A538C
MOD F
STORAGE
A538B
SURGERY
TOUCH
DOWN
A538
TOUCH
DOWN
A538A
SPS TEMP
CLEANING
B546
TLT RM
B546ASTAFF
ROOM
B545
CLEAN
STORAGE
B540B
PATIENT TLT
B544
5 SOUTH
NURSE STATION
B540A
STORAGE
B539
ELEC
B538
STAIR #3
ANTE-
ROOM
B535
OLD
TLT
B535B
CHEMO
CONTINGENCY
B535A
CONGREGATE
BATH
B534
ELE
B533
1 BED
B532
FAN ROOM
ELEC
A537
ELEC
A536
ELEC
A535
FEC
A537A
FLOOR DRIP PAN, SEE DETAIL 2, SHEET PL-000.
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL FIFTH FLOOR PLAN
AJH LWP
1-PL-150
1/16" = 1'-0"
PLUMBING FIFTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
T
I 4 □ rJ E
AlV -n T. □—mP □I jk SUoT valI□ □ ML2
JD
□ I]□ □
£ V0□ [ flA
2L £] [
60 □ 0
] LD
fl] fl / r□ □ □ lEJ “EE u = = -0□ N nee[ I flu□ DIT MaA 4i] 5—E5 /]P
L
N_A_D/UY D_fln
D u M \ pTALLE Jn [ ] r1 — r flflfl □ —
I s [ I) £ —
C dr □ □A
C □
R AAe] •El ••C
V\uC H
L 0 HT
C □ 1 La fl /A
3Qn_B□
7i 0a] —A□
I
Ito 1df
I r 222□ 7 sy Introba pS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
Pm DUE fl □
B fl
N ll
— I
5P “ue,''
I
L s
E
— 9 y •
I
ANWE40,
R
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
R A
D R
A D
RAD RAD
H e a d w a ll
H e a d w a ll
H e a d w a ll
FEC
EWC
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
RENAL
EXAM
B624
B623A
RENAL
EXAM
B623
RENAL
LAB
B622
RENAL EXAM
NURSING
B621
HAC
B620
CLO
B619
SOILED
LINEN
B618
CORRIDOR
C6-10A
TLT RM
B617A
STORAGE
B617
SUPPLIES
B616
TLT
B616A
WORK
AREA
B615 TLT
B615A
CORRIDOR
C6-11
NURSE
STATION
B611A
HEMODIALYSIS
B611
ISOLATION
B610
TOUCH
DOWN
B609
TLT
B609A
OFFICE
B608
TLT
B608A
STORAGE
B607
TLT
B603A
NOURISH-
MENT
B606
CLEAN
LINEN
B605
RESPIRATORY
CARE
EQUIP.
B604
EPO
B603 CASE
MANAGERS
B602
PHARMACY
OFFICE
B601
CLINICAL
DIETITIONS
A635
DIALYSIS
OFFICE
A634
TLT
A634A
NURSING
OFFICE
A632
DUMB
WAITER
STAIR
#1 ELEC
A629
FEC
A631A
ELECTRIC
A631
CLO
A630
2 BEDROOM
PATIENT
ROOM
A628
TLT
A628A
TLT
A624A
STAFF
TLT
A627
CLEAN
LINEN
A626
CLEAN
UTILITY
A625
1 BEDROOM
PATIENT
ROOM
A624
STAIR
#2
FEC
TELE
CLO
A623
CONGREGATE
BATH
A622
STOR
CLO
A622
TLT
A619A
ELEC
A621
ELEC
A620
2 BEDROOM
PATIENT
ROOM
A619
HOSPITALISTS
A618
NEW DAY ROOM
A617
1 BEDROOM
ISOLATION
ROOM
A616
ANTE-
ROOM
A616A
TLT
A616A
1 BEDROOM
ISOLATION
ROOM
A615
TLT
A615B
ANTE-
ROOM
A615A
TLT
A614B
ANTE-
ROOM
A614A
1 BEDROOM
ISOLATION ROOM
A614
HAC
A613
SOILED
UTILITY
A612
NOURISH-
MENT
ROOM
A611
MEDICATION
ROOM
A610
2 BEDROOM
PATIENT ROOM
A609 TLT
A608A
TLT
A609A 2 BEDROOM
PATIENT ROOM
A608
STORAGE
ROOM
A607
2 BEDROOM
PATIENT ROOM
A606
TLT
A606A
TLT
A605A
2 BEDROOM
PATIENT ROOM
A605
A604B
NURSE
STATION
A604
NURSE
STATION
A604A
ANTE-
ROOM
A603A
CORRIDOR
C6-6
1 BEDROOM
ISOLATION ROOM
A603
TLT
A603B
NURSING
OFFICE
A602
HEAD NURSE
OFFICE
A669
NURSE
WORKROOM
A668
RESIDENT'S
ROUNDING ROOM
A667
NURSE
STATION
A666
A666A
2 BEDROOM
PATIENT ROOM
A665
TLT
A663A
TLT
A665A
2 BEDROOM
PATIENT ROOM
A663
ASST.
NURSE
MGR
A662
2 BEDROOM
PATIENT ROOM
A661
TLT
A661A
TLT
A660A
2 BEDROOM
PATIENT ROOM
A660
MEDICATION
ROOM
A659
NOURISH-
MENT
ROOM
A658
DIRTY
UTILITY
A657LAUNDRY
CHUTE
ELEC
A656
HAC
A655
2 BEDROOM
PATIENT ROOM
A654
TLT
A653A
TLT
A654A
2 BEDROOM
PATIENT ROOM
A653
STOR
ROOM
A652
TLT
A651A
2 BEDROOM
PATIENT ROOM
A651
STOR
ROOM
A650
DAY
ROOM
A649
2 BEDROOM
PATIENT ROOM
A648
STOR
ROOM
A645A
TLT
A648A ELEC
A647
STORAGE
ROOM
A646CONGREGATE
BATH
A645
STAIR
#5
1 BEDROOM
PATIENT ROOM
A644
TLT
A644A
CLEAN
LINEN
A643
TLT
A641A
TELE
ROOM
A642
2 BEDROOM
PATIENT ROOM
A641
STOR
A639
STAFF
TLT
A640
SERVICE
ELEVATORS
C6-2CLO
A638A
ELEC
A638B
RESIDENT'S
WORKROOM
A639B
OFFICE
A637B
VOLUNTARY
A637
OFFICE
A637A
ELEVATOR LOBBY
C6-1
TELEPHONE
A631C
TELEPHONE
A631B
CORRIDOR
C6-9
VOLUNTARY
STORAGE
A636
ESCORT
SERVICE
B639
TLT
B639ARENAL
NURSE
B638
CORRIDOR
C6-10
STAFF
TLT
B637
OFFICE
B636
DIALYSIS/
RENAL
RECEPTION
B634
DIALYSIS
STORAGE
B634A
MECHANICAL
ROOM
B633
ELEC
B632FEC
B631
STAIR #3
ANTE
B629
RENAL
EXAM ROOM
B629A
TLT
B629B
MEDICAL
STAFF
OFFICE
STORAGE
B628
CLO
B627
CORRIDOR
C6-12
RENAL
EXAM
B626B625A
RENAL
EXAM
B625
CORRIDOR
C6-1A
TR
A601
LIFT
TO BUILDING 2
ROOF
BUILT UP ROOF
Printer
H e a d w a ll
U n it
RadiatorRadiatorRadiatorRadiator
Radiator Radiator Radiator Capped Steam Pipes
1-PL-202
1-PL-202
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL SIXTH FLOOR PLAN
AJH LWP
1-PL-160
1/16" = 1'-0"
PLUMBING SIXTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1 r 1
I r□ mAl5 l I
—URP □
J
I
1 1 E]□ a efl
/ E□ DE
IT6 1D 0
HQ Q O
5 ] L I
)I A fl11 an3 □
I D
II fl3 □
9□ ] 5fl fll /TP_[ID/ n r□ rj
DR HkJ IU 1 — n yrk2 L [□□ L O
NI□fl ICT
E I a—— ■r □
J I fl ■
[.€ 4 □ X1□ Ze”flp
3 ] B
>rL □ IU1 aL □
XrI I
/II
fl •l_□
D (
] 3
I•b a —B
I u 222□ □ 7 sy Introba pS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
L n
Q
FE
J l
B
) 8 8
H
' p ]D ll l I
H l •
L
CT 1
E
ANWE40,
G
A741
C .G
7 WEST WARD
TO BUILDING 2
7 EAST WARD
PASSENGER ELEVATOR
CORRIDOR
C7-1A
ELEVATOR
LOBBY
C7-1
CORRIDOR
C7-3
SERVICE
ELEVATOR
CORRIDOR
C7-6
CORRIDOR
C7-8
CORRIDOR
C7-8a
CORRIDOR
C7-5 CORRIDOR C7-5a
CORRIDOR
C7-4
EXAM
ROOM #7
B727
EXAM
ROOM #5
B726
EXAM
ROOM #3
B725
TELE
HEALTH
EXAM
ROOM
B724
TOUCH
DOWN
B723A
ELEVATOR
TOUCHDOWN
B723
STOR
B722
TLT
B718A
EXAM
ROOM
B718
TLT
B717A
EXAM
ROOM
B717
EXAM
ROOM
B716
EXAM
ROOM
B715A
EXAM
ROOM
B715B
EXAM
ROOM
B714
EXAM
ROOM
B713
EXAM
ROOM
B712
EXAM
ROOM
B711
EXAM
ROOM
B710
EXAM
ROOM
B709
TLT
B709A
EXAM
ROOM
B708
HAC
B707 TLT
B708A
LAB
B706
LACTATION
ROOM
B705
BEHAVIORAL
HEALTH
C&P
SUPERVISOR
B704
REC.
THERAPY
B703
BEHAVIORAL
HEALTH
B702
BEHAVIORAL
HEALTH
B704
OFFICE
A737
OFFICE
A736
OFFICE
A735
DUMB
WAITER
OFFICE
A733
FEC
ELEC
A732
STAIR
#1 ELEC
A731
CORRIDOR
C7-6A
DINING
ROOM
A730
WORK
ROOM
A729C
MEDICATION
A729A
EXAM
ROOM
A728
STAIR
#2
2 BED
ROOM
A726
H.C.
TLT
A725A
H.C.
TLT
A726A
2 BED
ROOM
A725
1 BED
ROOM
A724
TLT
A724A
ELEC
A723
EXAM
OFFICE
A722
EXAM
OFFICE
A721
2 BED
ROOM
A720
HAC
A719
TLT
A720A
TLT
A717A
STAFF
TLT
A718
1 BED
ROOM
A717
2 BED
ROOM
A716
TLT
A716A
TLT
A715A
2 BED
ROOM
A715
DUCT
NOURISH-
MENT
A714
ELEC
A727
SOILED
LINEN
A714
SHOWER
A712
CLOSET
A712A
TLT
A710A
MEDS
STOR
A711 1 BED
ROOM
A710
1 BED
ROOM
A709 TLT
A709A
LAUNDRY
A708
TLT
A707A
PATIENT
STOR
A708A
2 BED
ROOM
A707
2 BED
ROOM
A706
CLEAN
LINEN
A705
TLT
A704A
TLT
A706A
1 BED
ROOM
A704
1 BED
ROOM
A703
H.C.
TLT
A703A
ANTE
ROOM
A702A
STAFF
A702
CORRIDOR
C7-7ACORRIDOR
C7-7
NURSE
STATION
A729
DAY
ROOM
A701
ACTIVITY
ROOM
A700
CORRIDOR
C7-3A
7 WEST
PHASE 6
DRY ROOM
A781
EXAM
ROOM
A780
STAFF
TLT
A780A
TLT
A779A
1 BEDROOM
A779
1 BEDROOM
A778
TLT
A778A
STOR
A777
TLT
A776A
STOR
A777A 2 BEDROOM
A776
2 BEDROOM
A775
TLT
A775A
HAC
A774A
TLT
A773A
CLEAN
LINEN
A774
1 BEDROOM
A773
1 BEDROOM
A772
TLT
A772A
SHOWER
A771
SPD STOR
A771A
TLT
A768A
SOILED
LINEN
A770
ELEC
A769
1 BEDROOM
A768
1 BEDROOM
A767
TLT
A766A
TLT
A767A
1 BEDROOM
A766
1 BEDROOM
A765
H.C. TLT
A765A
TLT
A762A
CLEAN
LINEN
A764
ELEC
CLO
A763
2 BEDROOM
A762
EXAM/
OFFICE
A761
EXAM/
OFFICE
A760
H.C.
TLT
A758A
LAUNDRY
A759
BEDROOM
A758
2 BEDROOM
A757
CORRIDOR
C7-4A
TLT
A756A
TLT
A757A
2 BEDROOM
A756
STAIR
#5
1 BEDROOM
A755
TLT
A755A
MED
ROOM
A754A
NURSE
STATION
A754
WORK
ROOM
A757B
EXAM
ROOM
A752
NOURISH-
MENT
A752A
7 WEST
PHASE 4
DINING ROOM
A750
STAFF LOUNGE
A749
STAFF
TLT
A749A
CLO
A741A
SERVICE
ELEVATOR LOBBY
C7-2
CLO
A747
ELEC
A746
CORRIDOR
C7-2ACART
STORAGE
A748
STORAGE
A742
OFFICE
A740
CORRIDOR
C7-1B
ON-
CALL
ROOM
A739
CLO
A738
TLT
A739A
CLO
A743
TEL/
DATA
A744
TLT
A745
BEHAVIORAL
HEALTH
INPT. NURSE
MGR.
B741
BEHAVIORAL
HEALTH
OFFICE
B740
BEHAVIORAL
HEALTH
C&P B739
BH C&P
BEHAVIORAL
HEALTH
OFFICE
B738
C & P
RO RVSR
B737A
TLT RM
B737B
COMP & PENSION
WAITING AREA
B737
ELEC
B721
SOILED
UTILITY
B720
STOR
B719
ELEC
B736FEC
STAIR
#3
BH
COPY
ROOM
B735
BH TOUCH
DOWN
B734
BH TOUCH
DOWN
B733
ELEC
B732
EXAM
ROOM #2
B731
EXAM
ROOM #4
A730
EXAM
ROOM #6
A729
EXAM
ROOM #8
A728
EWC
1-PL-202
1-PL-202
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL SEVENTH FLOOR PLAN
AJH LWP
1-PL-170
1/16" = 1'-0"
PLUMBING SEVENTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
A ID Alo Q4O
(0
AVU
-ri □ [
IRsI fl
I
J XJ / 42 - ka/n 1 O X[ ■
BEI 0Us L/t
| IE= 5 t___ 9L
0 I a 7 — 4 J
6 a2DE Tia□ -OPi flv L B
— AUNA//XXDu/OTu/INNELUY □
■KETTXX 5LDD e —G £□ —H
L iJn
5 ’ll —L
1 fl—g-—
]I
■II []
0© ©
I (CL
I •I L R &Uriri JI- Q
]1 4 IJ
1) IIXXLE fl 6seI 1I
Y|□
I 00
I ri □ j l
5 0QQ
sy Introba pS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
I fl
Q
E ____ n 7
I E
•a p I ll
■ I l
DRR
In
ANWE40,
C% REGISTERED E.
I n
O(
S
STORAGE
A843B
TR
A843A
ROOF
ROOF
ROOF
HEALTH ADMINISTRATION SERVICE
SOCIAL WORKTO BUILDING 2
MEDICINE
EXISTING
STAIR #3
MHICM
B818
STAIR #3
SOCIAL
WORK
B814
SOCIAL
WORK
WAITING
ROOM
B815
CORRIDOR
C8-10a
SW SUICIDE
PREVENTION
B817
CORRIDOR
C8-11
SOCIAL
WORK
OFFICE
B816
CORRIDOR
C8-10
SOCIAL
WORK
OFFICE
B819
SOCIAL
WORK
INTERVIEW
B820
CL.
A846
CORRIDOR
C8-9
CORRIDOR
C8-9a
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
A815
SOCIAL WORK
TOUCHDOWN
A848
ELECTRICAL
ROOM
A857
CONNECTING CORRIDOR
C8-15A-2
SOCIAL
WORK
B810
ELEVATOR
SOCIAL
WORK
B808
SOCIAL
WORK
B807
CORRIDOR
C8-12
CLOSET
B806
WOMEN
B805
SW OFFICE
B804D
OFFICE
B804C
SOCIAL
WORK
CHIEF
B804B
WORK
AREA
B804A
SOCIAL
WORK
RECEPTION
B804
HOMELESS
OUTREACH
B803 FAMILY CONSULT/
CONFERENCE
B802
MHICM
B800
UNION
CONFERENCE
A845
UNION
PRESIDENT
A844 UNION
SUITE
A843
DUMB
WAITER
STAIR
#1
FEC
A829A
ELECTRIC
A829
CONFERENCE
A830
OFFICE
A829
OFFICE
A828
WORK
ROOM
A827
STAIR #2
OFFICE
A826
OFFICE
A824
OFFICE
A823
ROOF
OFFICE
A822
OFFICE
A821
OFFICE
A819
OFFICE
A818
WOMEN'S
ROOM
A817
OFFICE
A816
OFFICE
A815
OFFICE
A814
OFFICE
A813
OFFICE
A812
OFFICE
A811
OFFICE
A810OFFICE
A809
OFFICE
A808
OFFICE
A807
OFFICE
A806
OFFICE
A805
MEN'S
ROOM
A804
ELEC
A806
CORRIDOR
C8-7
CORRIDOR
C8-6
ELEC
A802
PROGRAM
SUPPORT
A801A
RECEPTION
A801
SOCIAL
WORK
A866
OFFICE
A865B
STAFF
A865
OFFICE
A865A
FAX/
COPY
A864
HAS
A863 HAS
SCANNERS
A862
HAS
STAFF
A861
CHEIF,
HIMS
A861B
HAS
TOUCH
DOWN
A861A
BREAK
ROOM
A860
STORAGE
A860AMEN'S
ROOM
A859
WOMEN'S
ROOM
A858
HAC
A855
OFFICE
A854
OFFICE
A853D
OFFICE
A853C
OFFICE
A853
OFFICE
A853A
STORAGE
A853B
STAIR #5
OFFICE
A852
OFFICE
A851B
OFFICE
A851A
OFFICE
A851
SOCIAL
WORK
A850
SOCIAL
WORK
STORAGE
A850A
SERVICE LOBBY
EMS
SCRUBBER
STORAGE
A838
EMS
STOR
A840
TELE
A839
CLO
A839APASSENGER
ELEVATOR LOBBY
C8-1A
MEN'S
TLT
A847
VSO
B812E
VSO
B812D
VSO
B812C
VSO
B812B
VSO
B812A
VSOS
B812
VSO
B812F
ELEC
B811
ELEC
B813
ELEC. CL.
A831
OFFICE
A825
OFFCIE
A820
NO PLUMBING WORK
ABOVE CEILING
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL EIGHTH FLOOR PLAN
AJH LWP
1-PL-180
1/16" = 1'-0"
PLUMBING EIGHTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
=” "EH HL
I F I[fl 3 B
I I H H
/|11 0aru A I]II
II
LB —D []e JIH
I 1 ap ear L ccP 5 D T
OfLd 1— I H□17J mt
EL/|PCO
e /EJRe \R \ q uIDT to 2 __ d I[ ]L 1— LJon
-a 0
I
J R
I lib r-B —
5 G 4•oom/ /PoD
5 tEp F
L□
I q q7 a sy Introba pS PROFESSIONAL
KACIEz MELAMPLeel-Len
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
I I I I I I I I I
L
1 H
B X r -an
L
1□
H a a
A932
ROOF
ROOF
PCS / WOMEN'S HEALTH / MISC OFFICES
E D
U C
A T
IO
N
W O
M E
N 'S
H E
A L T
H
STAIR #3
STAIR #2
PASSENGER
ELEVATORS
SERVICE
ELEVATORS
COATS
A901C
ELEC
B907
CONFERENCE
ROOM
B906
WORK
ROOM
B905
OFFICE
B904
OFFICE
B903
OFFICE
B902
OFFICE
B901
RECEPTION
B900
OFFICE
B908A
B908
OFFICE
B908B
CORRIDOR
C9-6
OFFICE
B909
COPY/
PRINTER
FAX
AREA
B910
OFFICE
B911
UNISEX
TLT RM
A934
PALLIATIVE CARE
A933
WOMEN'S
HEALTH
TOUCH
DOWN
A931
STAIR #1
PASSENGER
ELEVATOR LOBBY
C9-1
ELEC
A928
TELE
A927
FACILITIES
CLO
A926
ELEC
A901B
DIRECTOR
A901A
MULTI
PURPOSE
A917
EXAM
(NURSE)
TYPE B
A916
EXAM
(NURSE)
TYPE B
A914
MULTI-PUR
EXAM TYPE B
A913
PATIENT
TLT
A911A
PROCEDURE
ROOM/
EXAM
A911
GYN EXAM
TYPE A
A910
ALCOVE
A909
ALCOVE
A911B
CORRIDOR
C9-5A
PATIENT
TLT
A908
GYN
EXAM
TYPE A
A907
MULTI- PURP
EXAM TYPE A
A906
STORAGE
A911C
STAFF
STATION
A905
LAB/
MICROSCOPE
A905B
CLEAN/
HOLDING/
MEDS
A905A
CORRIDOR
C9-5
SOILED
HOLDING
A904
PROGRAM
MANAGER
A902
PATIENT
TLT
A903
CORRIDOR
C9-4A
CORRIDOR
C9-4CONSULT
A901D
CONSULT/
INTERVIEW
CHILD PLAY
A900A
WAITING
A900
RECEPTION
A901
CORRIDOR
C9-1A
WOMEN'S
TLT RM
A958
MEN'S
TLT RM
A957
ELEC
A956
WORK ROOM
A955
STAFF
A954
SIM LAB
A953A
CLASS
ROOM
A953
CLASSROOM
A952
OFFICE
A951
STAIR #5
OFFICE
A949
OFFICE
A948
OFFICE
A947
COPY
AREA
A946A
EDUCATION
RECEPTION
A946
OFFICE
A945
OFFICE
A945A
ADP
CLASSROOM
A936A
ADP
CLASSROOM
A936
ELEC
A937
ELEC
A938
SERVICE
ELEVATOR
LOBBY
C9-2
MECH
A939
DATA
A940
CORRIDOR
C9-1B
CORRIDOR
C9-3
FEC
A929
HAC
A941
HAC
A935
HAC
A915
FAC
A912
U P
D N
ROOF
ROOF
NO PLUMBING WORK
ABOVE CEILING
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved:
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
FULLY SPRINKLERED
100% BID
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
01/16/2026
642-22-700EHRM Infrastructure Upgrades -
CMCVAMC
3900 Woodland Avenue Philadelphia, PA 19104
KEYPLAN
BLDG
BLDG
BLDG
BLDG 1 OVERALL NINTH FLOOR PLAN
AJH LWP
1-PL-190
1/16" = 1'-0"
PLUMBING NINTH FLOOR OVERALL PLAN
01/16/2026
1 1 1 1 1 1 1 1 1
I1
5J I
II
rC 4
V I
4 [H □I —I
2T56
X 3E—=E== a v —L1 J L j6
@00 Q
4 rid vy I[m—D AnJ L DJ
74 _/L [BNVEDE "nr□ □ □ 1
[ ] f
Q
I l j/ 161
/C
B sy Introba pS PROFESSIONAL
KACIEz MELAMPLee I Leln
. ENGINEER JJ
AOPE097080/ gsyisc □ M P A N
1 1 1 1 1 1 1 1 1
OOP
B o
I T
EEE
3ii
1I1
GC
EX COMPRESSER AIR
EX NATURAL GAS
TO REMAIN
EX COLD WATER
EX HOT WATER
EX WASTE
TO REMAIN
PROVIDE DRIP
PAN AND
WATER SENSOR
TR
A001D
STOR
A001B
EXISTING PIPING IN THIS
AREA, IDENTIFY SYSTEMS
AND PROVIDE DRIP PANS AND
WATER SENSORS AS
REQUIRED.
W
EX 1 1/2"W
TO REMAIN
EX DIVISION 23
CRAC UNIT
1 1
OI&T
B022A
EX COLD WATER
EX HOT WATER
EX WASTE
TO REMAIN
GC
A
EX COMPRESSER AIR
EX NATURAL GAS
TO REMAIN
EMS
STORAGE
A001B
W
EX 1 1/2"W
TO REMAIN
EX 2"W
TO REMAIN
EX SINK 2
C&P ADMIN
B112A W
EX 1 1/2"W
TO REMAIN
EX 2"W
TO REMAIN
DRIP PAN, SEE
DETAIL 1, SHEET
PL-000.
TR
B112A
ED EXAM
ROOM
B112A
DRIP PAN, SEE DETAIL
2, SHEET PL-000.
W
EX 1 1/2"
PROVIDE DRIP PAN AND
WATER SENSOR.
TR
B022B
ELECTRICAL
ROOM
B022A
OLD
COMPUTER
ROOM
A001
INSULATED PIPE, VERIFY SERVICE IS ACTIVE, SERVICE TYPE AND FULL ROUTING.
ELECTRICAL
ROOM
A001E
INSULATED PIPE, PROVIDE DRIP PAN AND SENSOR AS REQUIRED.
St. Louis
6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com
8718 Botts…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .