S02 - Att11 - Drawings 8of11 - Mechanical.pdf

PDF 20 MB Posted

Attached to
Construct EHRM Infrastructure Upgrades - Philadelphia, PA Federal contract opportunity
Solicitation number
36C77626R0063_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a mechanical drawing set for the EHRM Infrastructure Upgrades project at the VA Medical Center in Philadelphia, Pennsylvania. The document serves as Sheet M6.02, which contains mechanical legend, abbreviations, general notes, schedules, and detailed floor plans across five hospital buildings (Buildings 1, 2, 3, 21, and 30). The project scope encompasses the creation of 45 telecommunication closets across these five buildings, requiring pre-construction verification, demolition of existing infrastructure, and installation of new split air conditioning unit systems sized according to a sliding scale from 5 kW for single-rack units to 10 kW for four-rack units. Condensers will be located on grade, roofs, or Building 2 interstitial floors, with refrigerant piping routed through congested ceilings alongside conduit and control wiring.

The mechanical work requires compliance with multiple standards including the VA HVAC Design Manual (May 1, 2023), VA OIT Infrastructure Standard for Telecommunications Spaces (Version 3.1), ASHRAE 62.1 and 90.1, 2018 International Building Code, International Mechanical Code, International Plumbing Code, and SMACNA HVAC Duct Construction Standards. Critical requirements include manual volume dampers on all duct branches, weatherproofing of external equipment, fire-stopping of penetrations, duct protection during construction with MERV 8 filters if HVAC is used during construction, commissioning and testing reports prior to permit finalization, and field verification of all utility locations. The contractor must conduct demolition back to mains for existing ductwork and piping, provide condensate drainage to janitor closets with 1/8-inch-per-foot pitch, install drip pans with leak sensors under existing hydronic piping above new telecom rooms, and ensure refrigerant line runout lengths do not exceed 150 feet. All work must be performed between 5 PM and 5 AM ET due to occupied building conditions, with materials and equipment removed daily before 5 AM.

View the file

Other files for this federal contract opportunity

Other files attached to Construct EHRM Infrastructure Upgrades - Philadelphia, PA, newest first.
File Type Posted
S06 - 0005 - 36C77626R0063_1 0005.pdf PDF
S06 - 0005 - Att2 - Wage Determination.txt TXT text file
S06 - 0005 - Att1 - Technical Responses v2.xlsx XLSX spreadsheet
S06 - 0004 - Att2 - Wage Determination.pdf PDF
S06 - 0004 - Att1 - Technical Responses.xlsx XLSX spreadsheet
S06 - 0004 - 36C77626R0063_1 0004.pdf PDF
S06 - 0003 - Att1 - Wage Determination.pdf PDF
S06 - 0003 - 36C77626R0063_1 0003.pdf PDF
S06 - 0002 - Att3 - Site Visit 4.23.26 Agenda.pdf PDF
S06 - 0002 - 36C77626R0063_1 0002.pdf PDF
S06 - 0002 - Att5 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.docx DOCX document
S06 - 0002 - Att4 - Wage Determination.txt TXT text file
S06 - 0002 - Att2 - Site Visit 4.23.26 Sign-in Sheet.pdf PDF
S06 - 0002 - Att1 - Campus Map - Meeting Location.png PNG image
P06 - 0001 - Att1 - Campus Map - Meeting Location.png PNG image
S06 - 0001 - 36C77626R0063 0001.pdf PDF
S02 - Att12 - Drawings 9of11 - Electrical.pdf PDF
S02 - Att9 - Drawings 6of11 - Fire Protection.pdf PDF
S02 - Att5 - Drawings 2of11 - Hazmat.pdf PDF
S02 - Att14 - Drawings 11of11 - Security.pdf PDF
S02 - Att7 - Drawings 4of11 - Architectural.pdf PDF
S02 - Att6 - Drawings 3of11 - Civil.pdf PDF
S02 - Att4 - Drawings 1of11 - General.pdf PDF
S02 - Att15 - Limitations on Subcontracting.docx DOCX document
S02 - Att13 - Drawings 10of11 - Technology.pdf PDF
S02 - Att8 - Drawings 5of11 - Fire Alarm.pdf PDF
S02 - Att3 - BD Room A001 Addendum.pdf PDF
S02 - Att2 - Specifications Vol 2.pdf PDF
S02 - Att1 - Specifications Vol 1.pdf PDF
S02 - 36C77626R0063_1.pdf PDF
S02 - Att16 - Wage Determination.txt TXT text file
S02 - Att10 - Drawings 7of11 - Plumbing.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

M

M

M

S

T

P

M

M

T

C

C

C

H

C

H/C

DPSL H

T

T

RAIN

COND

DEWpt

RH

DPT

TA TAOA OA

T

AVG

AFMSAFMSAFMS

T T

TA TAOA OA

LEAK

VFD

BACNET

BACNET

FS

MECHANICAL ABBREVIATIONS

ACU AIR CONDITIONING UNIT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AL ACOUSTIC LINING

ARCH ARCHITECT/ARCHITECTURAL

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING

AND AIR-CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AW ACID WASTE

BLDG BUILDING

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STEEL

BRD BAROMETRIC RELIEF DAMPER

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CDW CONDENSER WATER

CFM CUBIC FEET PER MINUTE

CHW CHILLED WATER

CLG CEILING

CBC CALIFORNIA BUILDING CODE

CH CHILLER

CI CAST IRON

CT COOLING TOWER

CU COPPER

CL CENTERLINE

COL COLUMN

CONC CONCRETE

CONT CONTINUATION

CW COLD WATER

(D) DEMOLISHED

DB DRY BULB

DH DEHUMIDIFIER

DIM DIMENSION

DIA DIAMETER

DN DOWN

DWG DRAWING

(E) EXISTING

(ER) EXISTING TO BE RELOCATED

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EL ELEVATION

ELEC ELECTRICAL

ET EXPANSION TANK

EW EMERGENCY EYEWASH

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

(F) FUTURE

FCU FAN COIL UNIT

FD FIRE DAMPER

FFE FINISHED FLOOR ELEVATION

FLR FLOOR

FM FLOW METER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FPM FEET PER MINUTE

FS FLOW SWITCH

FSD COMBINATION FIRE SMOKE DAMPER WITH ACCESS

FT FEET

GPM GALLONS PER MINUTE

GR GRADE

GV GRAVITY VENTILATOR

HC HEATING COIL

HHW HEATING HOT WATER

HORIZ HORIZONTAL

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HW HOT WATER

HX HEAT EXCHANGER

ID INSIDE DIAMETER

IN. INCHES

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

LB POUND WEIGHT

MAX MAXIMUM

MFR MANUFACTURER

MIN MINIMUM

(N) NEW

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NG NATURAL GAS

NO NORMALLY OPEN

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OPNG OPENING

P PUMP

POC POINT OF CONNECTION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA PSI - ABSOLUTE

PSIG PSI - GAUGE

PVC POLYVINYL CHLORIDE

QTY QUANTITY

(R) REMOVE

RA RETURN AIR

RAH RECIRC AIR HANDLER

RC REHEAT COIL

REF ROOF EXHAUST FAN

SA SUPPLY AIR / SOUND ATTENUATOR

SC SCRUBBER

SCFM STANDARD CUBIC FEET PER MINUTE

SCHD SCHEDULE

SD SMOKE DETECTOR

SF SUPPLY FAN

SIM SIMILAR

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SMEF SMOKE EXHAUST FAN

SPEC(S) SPECIFICATION(S)

SS STAINLESS STEEL

ST SOUND ATTENUATOR TRAP

STD(S) STANDARD(S)

TA TRANSFER AIR

TE TEMPERATURE ELEMENT

TEMP TEMPERATURE

TI TEMPERATURE INDICATOR

TOS TOP OF STEEL

TYP TYPICAL

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

V VOLTS

VAV VARIABLE AIR VOLUME

VB VACUUM BREAK

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

VVR VARIABLE VOLUME UNIT WITH REHEAT

W WIDTH

W/O WITHOUT

WB WET BULB

WH WATER HEATER

WLD WELDED

WT WEIGHT

M6.02

DETAIL DESIGNATION

SHEET NUMBER

CD-1 120

LD-1 120 NUMBER OF SLOTS

- SLOT SIZE

AIR TERMINAL TYPE

CFM

CH

EQUIPMENT TYPE

EQUIPMENT NUMBER

REVISION CLOUD AND DELTA

POINT OF DISCONNECTION

RH

RH

CO2

T

T VAV-xx

POINT OF CONNECTION

RH SENSOR

HUMIDISTAT

CO2 SENSOR

TEMPERATURE SENSOR

THERMOSTAT (WITH VAV BOX

REFERENCE)

SYMBOLS AND

ANNOTATION

OUTSIDE AIR (OA)

SUPPLY AIR (SA)

RETURN AIR (RA)

TRANSFER AIR (TA)

EXHAUST AIR (EA)

RELIEF AIR

DUCT ELBOW WITH VANES

RADIUS DUCT ELBOW

SUPPLY AIR TERMINAL

RETURN AIR

TERMINAL

EXHAUST AIR TERMINAL

24"x16" 16"ø

RECTANGULAR TO ROUND

TRANSITION

DUCT WITH LINING

(CLEAR INSIDE DUCT

LINING DIMENSIONS)

20"x12" EA (L)

MOTORIZED DAMPERS

(OPPOSED AND

PARALLEL BLADE)

BALANCING DAMPER

20"x12" EA (L)

DUCT FREE AREA DIMENSIONS

DUCT SYSTEM

LINING TYPE (IF APPLICABLE)

24"ø 16"ø

DUCT WITH INSULATION

(CLEAR INSIDE DUCT

DIMENSIONS)

20"x12" SA

24"x16" 16"x16"

RECTANGULAR TO

RECTANGULAR TRANSITION

ROUND TO ROUND

TRANSITION

FIRE SMOKE DAMPER

BELLMOUTH

LINEAR DIFFUSER

LOUVER

MITERED DUCT ELBOW

EQUIPMENT (PLAN)

PUMP

EXHAUST FAN

SOUND ATTENUATOR

VENTILATOR

FAN COIL UNIT

FAN POWERED AIR

TERMINAL

FAN POWERED AIR

TERMINAL WITH COIL

FAN POWERED AIR

TERMINAL WITH COIL

AND PLENUM BOX

FLEXIBLE DUCT

DUCT

VENTURI VALVE

SINGLE VALVE

DOUBLE VALVE

PRESSURE REDUCING VALVE

PRESSURE REDUCING VALVE GAS

PRESSURE REDUCING VALVE - LINE

FEED

2-WAY CONTROL VALVE, 2-POS

2-WAY CONTROL VALVE, MODULATING

3-WAY CONTROL VALVE, 2-POS

3-WAY CONTROL VALVE, MODULATING

BALL VALVE

BUTTERFLY VALVE

BUTTERFLY VALVE W/OPERATOR

CHECK VALVE

CIRCUIT SETTER

DRAIN VALVE

FLOAT VALVE

T&P RELIEF VALVE

THERMOSTATIC MIXING VALVE

VALVE

WYE STRAINER

WAY STRAINER WITH BLOW OFF

MANUAL AIR VALVE

PLUG VALVE

SOLENOID VALVE

VALVES AND HYDRONIC

ACCESSORIES

AIR

TERMINAL

TAG

AIRSIDE EQUIPMENT (DIAGRAMS)UNDERFLOOR FAN

POWERED AIR TERMINAL

HHWS HEATING WATER SUPPLY

HHWR HEATING WATER RETURN

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

RS REFRIGERANT SUCTION LINE

RL REFRIGERANT LIQUID LINE

REFRIGERANT PIPINGR

PIPE DROP

PIPE RISE

PIPE BRANCH RISE

PIPE BRANCH DROP

PIPE BRANCH TEE

PIPE TEE RISE

PIPE TEE DROP

CAPPED PIPE

TEMP GUAGE

PRESSURE GUAGE

UNION

FLEX CONNECTOR

PETES PLUG

VACUUM BREAKER

PIPE GUIDE

PIPE ANCHOR

PIPE LINE DESIGNATIONS

PIPE

CONTROL VALVES & ACTUATORS

SENSORS

ROOM SENSORS (PLAN)

MOTORIZED ACTUATOR, 2 POSITION

MOTORIZED ACTUATOR, MODULATING

THERMOSTATIC ACTUATOR

EXHAUST FAN

SP

T

SLAB

DP

CO

DEWPOINT SENSOR

TEMPERATURE SENSOR IN SLAB

STATIC PRESSURE SENSOR

CARBON MONOXIDE SENSOR

U/C DOOR UNDERCUT

RECTANGULAR FROM

RECTANGULAR DUCT

TAKE OFF

ROUND FROM ROUND

DUCT TAKE OFF

ROUND FROM

RECTANGULAR DUCT

TAKE OFF

OC OCCUPANCY SENSOR

AUTOMATIC AIR VENT

COILS

EXHAUST FAN

M

FILTER HEAT EXCHANGER

PLUG FAN FAN

GRAVITY VENTILATORUPBLAST FAN

BTU METERTEMPERATURE SENSOR

TEMPERATURE SENSOR WITH

THERMOWELL

TEMPERATURE SENSOR AVERAGING

AIR FLOW MEASUREMENT STATION

RAIN DETECTOR

HYDRONIC FLOW METER

CONDENSATION DETECTOR

DEW POINT DETECTOR

RELATIVE HUMIDITY DETECTOR

ZONE SENSOR

BATHROOM EXHAUST

RETURN AIR GRILLE

EXHAUST AIR TERMINAL

KITCHEN HOOD EXHAUST

SUPPLY AIR TERMINAL

SUPPLY AIR GRILLE

RETURN AIR GRILLE

RETURN AIR TERMINAL

CEILING FLOOR

OPPOSED BLADE DAMPER PARALLEL BLADE DAMPER

PRESSURE TRANSDUCER

HYDRONIC LEVEL SENSOR

HEAT WHEEL

CENTRIFUGAL FAN PLUG FAN

FLOW CROSS

DIFFERENTIAL PRESSURE SENSOR

AIR TERMINALS (DIFFUSERS, REGISTERS, GRILLES)

AIR SIDE EQUIPMENT

FAN (CENTRIFUGAL)

AIR TERMINAL UNITS

AIR SYSTEM AND DIRECTION

RECTANGULAR DUCT

ROUND DUCT

BUTTERFLY DAMPER

WATER LEAK DETECTOR

ELECTRICAL OR NETWORK EQUIPMENT

(DIAGRAMS)

THE NETWORK

VARIABLE FREQUENCY DRIVE

BACNET GATEWAY OR NETWORK

CONNECTION

FLOW SWITCH

MECHANICAL LEGEND

- BALL VALVE 2 1/2" AND BELOW

- BUTTERFLY VALVE 3" AND ABOVE

SHUT-OFF VALVE TYPE

CIRCUIT SETTER

CD CONDENSATE DRAIN

BTU METER

(2- 2")

HYDRONIC EQUIPMENT (DIAGRAMS)

PUMP

APPLICABLE CODES

PROJECT OVERVIEW

THIS IS THE EHRM IT INFRASTRUCTURE PROJECT FOR THE VA HOSPITAL IN PHILADELPHIA,

PENNSYLVANIA. THE PROJECT TAKES PLACE IN FIVE (5) BUILDINGS ON THE HOSPITAL

CAMPUS. BUILDINGS 1, 2, 3, 21, AND 30. THE SCOPE OF WORK IS TO CREATE TELECOM

CLOSETS ON EACH FLOOR IN EACH OF THE FIVE BUILDINGS. THERE ARE 45 TELECOM

ROOMS IN TOTAL.

THE PROJECT WILL START WITH THE PRE-CONSTRUCTION VERIFICATION AND DEMOLITION

OF EXISTING INFRASTRUCTURE IN THE EXISTING ROOMS. RELOCATIONS OF

INFRASTRUCTURE MAY ALSO BE REQUIRED FOR EQUIPMENT SERVING OTHER AREAS.

NEW SPLIT A/C UNIT SYSTEMS WILL BE INSTALLED IN EACH TELECOM CLOSET.

CONDENSERS WILL BE LOACTED ON GRADE, ROOFS, OR ON BUILDING 2 INTERSTITIAL

FLOORS. PIPING WILL BE ROUTED THROUGH CONGESTED CIELINGS ALONG SIDE CONDUIT

AND CONTROL WIRING. ANY EXISTING TO REMANING PIPING IN TELECOM ROOMS SHALL BE

PANNED.

RELOCATIONS OF OTHER HVAC INFRASTRUCTURE MAY BE REQUIRED TO FACILITATE CABLE

TRAY ROUTING THROUGH THE BUILDINGS.

EACH SPLIT SYSTEM TO BE SIZED PER THE SLIDING SCALE BELOW:

1. 1-RACK TR: 5 kW (17.0 MBH)

2. 2-RACK TR: 7 kW (24.0 MBH)

3. 3-RACK TR: 8.5 kW (29.0 MBH)

4. 4-RACK TR: 10 kW (34.1 MBH)

MECHANICAL GENERAL NOTES

1. MANUAL VOLUME DAMPERS SHALL BE PROVIDED IN ALL DUCT BRANCHES TO INDIVIDUAL

DIFFUSERS, GRILLES AND REGISTERS, WHETHER THEY ARE SHOWN ON THE DRAWINGS OR

NOT. PROVIDE REMOTE DAMPER OPERATORS SUCH AS YOUNG'S REGULATOR OR EQUAL

WHEN DAMPERS ARE LOCATED ABOVE INACCESSIBLE CEILINGS.

2. ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES AND MATERIALS INSTALLED OUTSIDE OF

THE BUILDING OR OTHERWISE EXPOSED TO THE WEATHER SHALL BE COMPLETELY

WEATHERPROOFED.

3. ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED AND TESTED IN ACCORDANCE WITH THE

LOCAL REGULATIONS AND PROCEDURES DETAILED IN THE APPLICABLE STANDARDS ADOPTED

BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION.

(SMACNA)

4. PENETRATIONS OF PIPES, CONDUITS, ETC. IN WALLS REQUIRING PROTECTED OPENINGS SHALL

BE FIRE STOPPED.

5. DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS ELBOWS OR

OTHER ELEMENTS WHICH MAY BE REQUIRED. CONTRACTOR SHALL PROVIDE ALL

ACCESSORIES AS NECESSARY FOR A COMPLETE INSTALLATION, WITH NO ADDITIONAL COST

TO THE OWNER.

6. DUCT SIZES INDICATED ON DRAWINGS REPRESENT NET INSIDE DIMENSIONS.

7. REFRIGERANT SERVICE PORTS LOCATED OUTDOORS SHALL BE FITTED WITH LOCKING TYPE

TAMPER RESISTANT CAPS OR SHALL BE PROTECTED FROM UNAUTHORIZED ACCESS BY AN

ACCEPTABLE MEANS.

8. AT THE TIME OF ROUGH INSTALLATION, OR DURING STORAGE ON THE CONSTRUCTION SITE

AND UNTIL FINAL STARTUP OF THE HEATING, COOLING, AND VENTILATING EQUIPMENT, ALL

DUCTS AND OF THE RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED

WITH TAPE, PLASTIC, SHEET METAL, OR OTHER ACCEPTABLE METHODS TO REDUCE THE

AMOUNT OF DUST, WATER, AND DEBRIS WHICH MAY ENTER THE SYSTEM.

9. AIR-MOVING SYSTEMS SUPPLYING AIR IN EXCESS OF 2,000 CFM SHALL BE EQUIPPED WITH AN

AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTOR LOCATED IN THE MAIN SUPPLY-AIR

DUCT. A SYSTEM MAY INCLUDE MORE THAN ONE PIECE OF AC UNIT WHICH SERVES A COMMON

SPACE WITH AGGREGATE SUPPLY AIR OF MORE THAN 2,000 CFM.

10. PRIOR TO PERMIT BEING FINALIZED, A COMPLETE REPORT OF THE TESTING AND ADJUSTING

SHALL BE PROVIDED TO THE OWNER OR OWNER’S REPRESENTATIVE AND FACILITIES

OPERATOR AND FORM TESTING AND ADJUSTING SHALL BE COMPLETED AND PROVIDED TO THE

INSPECTOR.

11. PRIOR TO PERMIT BEING FINALIZED, A COMPLETE REPORT OF THE COMMISSIONING PROCESS

SHALL BE PROVIDED TO THE OWNER OR OWNER'S REPRESENTATIVE AND FACILITIES

OPERATOR, AND FORM VERIFICATION SHALL BE COMPLETED AND PROVIDED TO THE

INSPECTOR.

12. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, PROVIDE RETURN AIR FILTERS WITH A

MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN

AVERAGE EFFICIENCY OF 30 PERCENT, BASED ON ASHRAE 52.1-1992. REPLACE ALL FILTERS

PRIOR TO OCCUPANCY OR AT THE CONCLUSION OF CONSTRUCTION.

13. THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY LOCATIONS, ELEVATIONS, AND SIZES OF ALL UTILITIES AT SITE PRIOR TO PROCEEDING WITH WORK. EXISTING SYSTEMS AND

STRUCTURE SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF NEW PIPING AND

DUCTWORK.

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICALE CODES, LOCAL

AMENDMENTS, AND STANDARDS INCLUDING BUT NOT LIMITED TO:

• VA HVAC DESIGN MANUAL, REV MAY 1, 2023

• VA OIT- INFRASTURCTURE STANDARD FOR TELECOMMUNICATIONS SPACES,

VERSION 3.1

• VA TELECOMMUNICATIONS ROOM (TR) DESIGN CHECKLIST, DATED MAY 12, 2022

• ASHRAE 62.1, 2016

• ASHRAE 90.1, 2013

• 2018 INTERNATIONAL BUILDING CODE

• 2018 INTERNATIONAL MECHANICAL CODE

• 2018 INTERNATIONAL PLUMBING CODE

• 2018 INTERNATIONAL ENERGY CONSERVATION CODE

• SMACNA HVAC DUCT CONSTRUCTION STANDARDS, 3RD EDITION

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

MECHANICAL LEGEND, ABBREVIATIONS, AND

GENERAL NOTES

PD BV

M0.00

MECHANICAL SHEET LIST

NUMBER NAME

M0.00 MECHANICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

M0.01 MECHANICAL SCHEDULES

M0.02 MECHANICAL SCHEDULES

M0.03 MECHANICAL CONTROLS

M0.04 TR LIST

1-M-105 BLDG. 1 - MECHANICAL FLOOR PLAN - BASEMENT

1-M-110 BLDG. 1 - MECHANICAL FLOOR PLAN - FIRST FLOOR

1-M-120 BLDG. 1 - MECHANICAL FLOOR PLAN - SECOND FLOOR

1-M-130 BLDG. 1 - MECHANICAL FLOOR PLAN - THIRD FLOOR

1-M-140 BLDG. 1 - MECHANICAL FLOOR PLAN - FOURTH FLOOR

1-M-150 BLDG. 1 - MECHANICAL FLOOR PLAN - FIFTH FLOOR

1-M-160 BLDG. 1 - MECHANICAL FLOOR PLAN - SIXTH FLOOR

1-M-170 BLDG. 1 - MECHANICAL FLOOR PLAN - SEVENTH FLOOR

1-M-180 BLDG. 1 - MECHANICAL FLOOR PLAN - EIGHTH FLOOR

1-M-190 BLDG. 1 - MECHANICAL FLOOR PLAN - NINTH FLOOR

1-M-200 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A001D

1-M-201 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR B022B

1-M-210 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR B112A

1-M-211 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A154A

1-M-220 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A207

1-M-221 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR B228A

1-M-230 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A361

1-M-231 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR B317A

1-M-240 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR B418

1-M-241 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A455A

1-M-250 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A502

1-M-260 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A601

1-M-270 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A741

1-M-280 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A843A

1-M-290 BLDG. 1 - MECHANICAL ENLARGED FLOOR PLAN - TR A932

2-M-100-R BLDG. 2 - MECHANICAL FLOOR PLAN - SUB-BASEMENT

2-M-105 BLDG. 2 - MECHANICAL FLOOR PLAN - GROUND FLOOR

2-M-110 BLDG. 2 - MECHANICAL FLOOR PLAN - BASEMENT

2-M-115 BLDG. 2 - MECHANICAL FLOOR PLAN - FIRST FLOOR

2-M-120 BLDG. 2 - MECHANICAL FLOOR PLAN - SECOND FLOOR

2-M-130 BLDG. 2 - MECHANICAL FLOOR PLAN - THIRD FLOOR

2-M-140-R BLDG. 2 - MECHANICAL FLOOR PLAN - FOURTH FLOOR

2-M-150 BLDG. 2 - MECHANICAL FLOOR PLAN - FIFTH FLOOR

2-M-160 BLDG. 2 - MECHANICAL FLOOR PLAN - SIXTH FLOOR

2-M-170 BLDG. 2 - MECHANICAL FLOOR PLAN - SEVENTH FLOOR

2-M-180 BLDG. 2 - MECHANICAL FLOOR PLAN - EIGHTH FLOOR

2-M-201-R BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - DATA CENTER B3A138

2-M-202 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - DATA CENTER B3A138

2-M-203 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR B3B116A

2-M-204 BLDG. 2 - MECHANICAL ENLARGED FL00R PLAN - TR B3A151A

2-M-205 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR B2B105D

2-M-206 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR B2A119A

2-M-210 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 1B198

2-M-211 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 1A183A

2-M-230 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 3B159A

2-M-231 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 3A208

2-M-250 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 5A119

2-M-270 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 7A138

2-M-280 BLDG. 2 - MECHANICAL ENLARGED FLOOR PLAN - TR 8B101

3-M-110 BLDG. 3 - MECHANICAL FLOOR PLAN - 1ST FLOOR

3-M-120 BLDG. 3 - MECHANICAL FLOOR PLAN - 2ND FLOOR

3-M-130 BLDG. 3 - MECHANICAL FLOOR PLAN - ROOF

3-M-210 BLDG. 3 - MECHANICAL ENLARGED FLOOR PLAN - 1ST FLOOR - TR 121

21-M-100 BLDG. 21 - MECHANICAL FLOOR PLAN - BASEMENT

21-M-110 BLDG. 21 - MECHANICAL FLOOR PLAN - 1ST FLOOR

21-M-120 BLDG. 21 - MECHANICAL FLOOR PLAN - 2ND FLOOR

21-M-130 BLDG. 21 - MECHANICAL FLOOR PLAN - 3RD FLOOR

21-M-140 BLDG. 21 - MECHANICAL FLOOR PLAN - 4TH FLOOR

21-M-150 BLDG. 21 - MECHANICAL FLOOR PLAN - 5TH FLOOR

21-M-200 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - BASEMENT - TR AB3

21-M-210 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - 1ST FLOOR - TR A108

21-M-220 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - 2ND FLOOR - TR A216

21-M-230 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - 3RD FLOOR - TR A318

21-M-240 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - 4TH FLOOR - TR A422

21-M-250 BLDG. 21 - MECHANICAL ENLARGED FLOOR PLAN - 5TH FLOOR - TR A516

30-M-100 BLDG. 30 - MECHANICAL FLOOR PLAN - BASEMENT

30-M-110 BLDG. 30 - MECHANICAL FLOOR PLAN - 1ST FLOOR

30-M-120 BLDG. 30 - MECHANICAL FLOOR PLAN - 2ND FLOOR

30-M-130 BLDG. 30 - MECHANICAL FLOOR PLAN - ROOF

30-M-200 BLDG. 30 - MECHANICAL ENLARGED FLOOR PLAN - BASEMENT - TR BC113

30-M-210 BLDG. 30 - MECHANICAL ENLARGED FLOOR PLAN - 1ST FLOOR - TR 1B133C

30-M-211 BLDG. 30 - MECHANICAL ENLARGED FLOOR PLAN - 1ST FLOOR - TR 1C122

30-M-220 BLDG. 30 - MECHANICAL ENLARGED FLOOR PLAN - 2ND FLOOR - TR 2B133C

30-M-221 BLDG. 30 - MECHANICAL ENLARGED FLOOR PLAN - 2ND FLOOR - TR 2C156A

M6.00 MECHANICAL PIPING DETAILS

M6.01 MECHANICAL EQUIPMENT DETAILS

M6.02 BUILDING 1 RISER DIAGRAM

M6.03 BUILDING 2 RISER DIAGRAM

M6.04 BUILDING 3, 21, & 30 RISER DIAGRAMS

M6.05 BUILDING 2 DATA CENTER FLOW DIAGRAM

Grand total: 85

01/16/2026

1 1 1 1 1 1 1 1 1 oo wll// r n

C ?r | EL ]

E

4 ?S3 xL JI T1

O

A 4 L2 ,t=P

II I

I

() I

I I D —

K ( O O O O o o o o oLET-

IOi ••— — A

T la

I<I ©

DH

oN

K

XI

)X

X

II

M

© Q vI Q v4

IXXX

<5 o o o o sy Introba REGISTEREDO PO PROFESSIONAL

KACIEf ELAMP1040 c □ M P A N Y / Y

I I I I I I I I I

Ol

ENGINEER

IPE097080 I

R

E

$—5

NoNWEA4, "WsYiVl

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

MECHANICAL SCHEDULES

PD BV

M0.01

(1) PROVIDE ELASTOMERIC PADS FOR VIBRATION ISOLATION

(2) PROVIDE FACTORY REMOTE THERMOSTAT

(3) PROVIDE DRAIN PAN WITH LEAK DETECTION AND CONDENSATE PUMP PER DETAIL 1 ON SHEET M6.01

NOTES:

SPLIT SYSTEM INDOOR UNIT (EVAPORATOR) SCHEDULE

TYPE

EQUIPMENT

NUMBER

MANUFACTU

RER

INDOOR

MODEL

OUTDOOR

MODEL

AREA SERVED

INDOOR

FAN MOTOR REFRIGERANT

COOLING (AT INDOOR UNIT) FILTER

ELECTRICAL

NOTES

CFM VFD

(Y/N) HP (W) TYPE QTY (oz)

LINE MAX

LENGTH

SENS

CAPACITY

(BTU/H)

TOTAL

CAPACITY

(BTU/H)

EAT DB

(°F)

EAT WB

(°F)

LAT DB

(°F)

LAT

WB (°F)

TYPE MERV

FLA

MOCP VOLTAGE PHASE

FREQUENCY

(HZ)

AC 1-A001D LIEBERT DME027E PFH027A-PHN B1 A001D 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 1-A154A LIEBERT DME020E PFH020A-PLN B1 A154A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A207 LIEBERT DME020E PFH020A-PLN B1 A207 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A361 LIEBERT DME020E PFH020A-PLN B1 A361 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A455A LIEBERT DME020E PFH020A-PLN B1 A455A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A502 LIEBERT DME020E PFH020A-PLN B1 A502 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A601 LIEBERT DME020E PFH020A-PLN B1 A601 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A741 LIEBERT DME020E PFH020A-PLN B1 A741 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-A843A LIEBERT DME027E PFH027A-PHN B1 A843A 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 55.5 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 1-A932 LIEBERT DME020E PFH020A-PLN B1 A932 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-B022B LIEBERT DME027E PFH027A-PHN B1 B022B 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 1-B112A LIEBERT DME020E PFH020A-PLN B1 B112A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-B228A LIEBERT DME020E PFH020A-PLN B1 B228A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.0 56.1 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-B317A LIEBERT DME020E PFH020A-PLN B1 B317A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.0 56.1 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 1-B418 LIEBERT DME020E PFH020A-PLN B1 B418 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 2-1A183A LIEBERT DME027E PFH027A-PHN B2 1A183A 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-1B198 LIEBERT DME027E PFH027A-PHN B2 1B198 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-3A208 LIEBERT DME027E PFH027A-PHN B2 3A208 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-3B159A LIEBERT DME027E PFH027A-PHN B2 3B159A 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-5A119 LIEBERT DME037E PFH037A-PHN B2 5A119 1,320 No 0.27 407C 213 150' - 0" 33,900 35,000 80 62.8 56.1 53.8 POLYPROPYLENE/ALUMINUM 4 2.8 15 208 1 60 1, 2, 3

AC 2-7A137 LIEBERT DME027E PFH027A-PHN B2 7A137 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-8B101 LIEBERT DME027E PFH027A-PHN B2 8B101 1,230 No 0.20 407C 134 150' - 0" 24,500 24,500 80 62.8 61.8 56.1 POLYPROPYLENE/ALUMINUM 4 1.9 15 208 1 60 1, 2, 3

AC 2-B2A119A LIEBERT DME020E PFH020A-PLN B2 B2A119A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 2-B2B105C LIEBERT DME020E PFH020A-PLN B2 B2B105C 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 2-B3A151A LIEBERT DME020E PFH020A-PLN B2 B3A151A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 2-B3B116A LIEBERT DME020E PFH020A-PLN B2 B3B116A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE/ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 3-121 LIEBERT DME020E PFH020A-PLN B3 121 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-A108 LIEBERT DME020E PFH020A-PLN B21 A108 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-A216 LIEBERT DME020E PFH020A-PLN B21 A216 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-A318 LIEBERT DME020E PFH020A-PLN B21 A318 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-A422 LIEBERT DME020E PFH020A-PLN B21 A422 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-A516 LIEBERT DME020E PFH020A-PLN B21 A516 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 21-AB3 LIEBERT DME020E PFH020A-PLN B21 AB3 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 30-1B133 LIEBERT DME020E PFH020A-PLN B30 1B133C 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 30-1C122 LIEBERT DME020E PFH020A-PLN B30 1C122 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 30-2B133 LIEBERT DME020E PFH020A-PLN B30 2B133C 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 30-2C156A LIEBERT DME020E PFH020A-PLN B30 2C156A 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

AC 30-BC113 LIEBERT DME020E PFH020A-PLN B30 BC113 870 No 0.16 407C 134 150' - 0" 18,800 18,800 80 62.8 60.3 55.5 POLYPROPYLENE / ALUMINUM 4 1.8 15 208 1 60 1, 2, 3

(1) PROVDE 18" STAND TO BE BOLTED DOWN TO ROOF.

(2) PROVDE EQUIPMENT PAD FOR MOUNTING ON GRADE.

(3) REFER TO DETAILS 3 & 5 ON SHEET M6.01 FOR INTERSTITAL MOUNTING.

(4) PROVIDE LOCAL MEANS OF DISCONNECT WITH ASSOCIATED CIRCUIT AND PANEL LABELED ON DISCONNECT.

(5) PROVIDE HAIL GUARDS FOR ROOF MOUNTED EQUIPMENT.

(6) PFH020A-PLN MODEL'S COOLING CAPACITIES HAVE BEEN DERATED FOR HIGH AMBIENT TEMPERATURES

NOTES:

SPLIT SYSTEM OUTDOOR UNIT (CONDENSER) SCHEDULE

TYPE EQUIP. NO. MFR. MODEL LOCATION

MIN HEAT

REJECTION

CAPACITY (BTU/HR)

AMBIENT

AIR TEMP

(ºF)

CODE

MINIMUM

SEER

REFRIGERANT

COMPRES

SOR

CONDENSER

FAN

ELECTRICAL

MAX PIPE

LENGTH (FT)

DIMENSIONS

NOTES

TYPE QTY. (oz) QTY. QTY.

SINGLE POINT

[Y/N]

FLA (A)

MOCP

(A)

VOLT PH HZ

EMERG. POWER

[Y/N] WIDTH (IN) LENGTH (IN) HEIGHT (IN)

ACCU 3-121 LIEBERT PFH020A-PLN BLDG 3, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A001D LIEBERT PFH027A-PLN BLDG 1, 1ST FLOOR NW ROOF 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 1, 4, 5

ACCU 1-A154A LIEBERT PFH020A-PLN BLDG 1, 1ST FLOOR NW ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A207 LIEBERT PFH020A-PLN BLDG 1, 1ST FLOOR SE ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A361 LIEBERT PFH020A-PLN BLDG 1, 1ST FLOOR NE ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A455A LIEBERT PFH020A-PLN BLDG 1, 3RD FLOOR N ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A502 LIEBERT PFH020A-PLN BLDG 1, 3RD FLOOR N ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A601 LIEBERT PFH020A-PLN BLDG 1, 8TH FLOOR SE ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A741 LIEBERT PFH020A-PLN BLDG 1, 8TH FLOOR NE ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-A843A LIEBERT PFH027A-PHN BLDG 1, 8TH FLOOR SE ROOF 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 1, 4, 5, 6

ACCU 1-A932 LIEBERT PFH020A-PLN BLDG 1, 8TH FLOOR SE ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 1-B022B LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 1-B112A LIEBERT PFH020A-PLN BLDG 2, 2ND FLOOR INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 1-B228A LIEBERT PFH020A-PLN BLDG 2, 2ND FLOOR INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 1-B317A LIEBERT PFH020A-PHN BLDG 2, 4TH FLOOR ROOF 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 1, 4, 5

ACCU 1-B418 LIEBERT PFH020A-PLN BLDG 2, 4TH FLOOR ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 2-B3A151A LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 2-B3B116A LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 2-B2A119A LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 2-B2BXXX LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 2-1A183A LIEBERT PFH027A-PHN BLDG 2, 2ND FLOOR INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 2-1B198 LIEBERT PFH027A-PHN BLDG 2, 2ND FLOOR INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 2-3A208 LIEBERT PFH027A-PHN BLDG 2, 4TH FLOOR INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 2-3B159A LIEBERT PFH027A-PHN BLDG 2, 4TH FLOOR INTERSTITIAL 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 2-5A119 LIEBERT PFH037A-PHN BLDG 2, 6TH FLOOR INTERSTITIAL 43,750 105.0 13 407C 213 1 1 Yes 24.8 40 208 1 60 Yes 150' - 0" 48 18 31 3, 4

ACCU 2-7A137 LIEBERT PFH027A-PHN BLDG 2, 6TH FLOOR ROOF 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 1, 4, 5

ACCU 2-8B101 LIEBERT PFH027A-PHN BLDG 2, 6TH FLOOR ROOF 30,625 105.0 13 407C 134 1 1 Yes 18.4 30 208 1 60 Yes 150' - 0" 48 18 31 1, 4, 5

ACCU 21-A108 LIEBERT PFH020A-PLN BLDG 2, 2ND FLOOR INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 21-A216 LIEBERT PFH020A-PLN BLDG 2, 2ND FLOOR INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 21-A318 LIEBERT PFH020A-PLN BLDG 2, 3RD FLOOR ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 21-A423 LIEBERT PFH020A-PLN BLDG 2, 3RD FLOOR ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 21-A516 LIEBERT PFH020A-PLN BLDG 2, 3RD FLOOR ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 21-AB3 LIEBERT PFH020A-PLN BLDG 2, BASEMENT INTERSTITIAL 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 3, 4, 6

ACCU 30-1B133 LIEBERT PFH020A-PLN BLDG 30, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 30-1C122 LIEBERT PFH020A-PLN BLDG 30, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 30-2B133 LIEBERT PFH020A-PLN BLDG 30, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 30-2C156A LIEBERT PFH020A-PLN BLDG 30, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

ACCU 30-BC113 LIEBERT PFH020A-PLN BLDG 30, ROOF 23,500 105.0 13 407C 134 1 1 Yes 14.8 25 208 1 60 Yes 150' - 0" 40 18 24 1, 4, 5, 6

01/16/2026

1 1 1 1 1 1 1 1 1 sy Introba REGISTEREDO PO PROFESSIONAL

KACIEIE .MCLAMBL Leul c □ M P A N

I I I I I I I I I

NoNWEA4, St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

MECHANICAL SCHEDULES

PD BV

M0.02

NOTES:

MECHANICAL - EXISTING COMPUTER ROOM AIR CONDITIONER SCHEDULE

TYPE

EQUIP.

NO.

MFR MODEL SERVICE

AIR FLOW

(CFM)

PRIMARY COOLING (DX) SECONDARY COOLING (CW) SUPPLY FAN HEATING FILTER ELECTRICAL

NOTESNOMINAL

CAPACITY (MBH)

REFRIGERANT

TYPE

NOMINAL

CAPACITY

(MBH)

GLYCOL HP

NO OF

MOTORS

ESP (IN-WG)

HEATING

INPUT (KW)

TYPE SIZE

VOLT

(V)

PH (HZ)

(D)CRAC AC-A1 LIEBERT DS077KSA0EI950S 2-B3A138 10,600 263 R-407C 235 Yes 15 1 0.6 25 MERV 8 4" 460 3

(D)CRAC AC-A2 LIEBERT DS077KSA0EI950S 2-B3A138 10,600 263 R-407C 235 Yes 15 1 0.6 25 MERV 8 4" 460 3

(D)CRAC AC-B1 LIEBERT DS077KSA0EI950S 2-B3A138 10,600 263 R-407C 235 Yes 15 1 0.6 25 MERV 8 4" 460 3

(D)CRAC AC-B2 LIEBERT DS077KSA0EI950S 2-B3A138 10,600 263 R-407C 235 Yes 15 1 0.6 25 MERV 8 4" 460 3

NOTES

MECHANICAL - EXISTING CLOSED CIRCUIT DRY COOLER

TYPE

EQUIPMENT

NUMBER

MANUFACTURER MODEL SERVICE

FANS COIL ELECTRICAL DIMENSIONS DRY

WEIGHT

(LB)

NOTESNOMINAL FLOW -

EACH (CFM)

QTY

NOMINAL

FLOW (GPM)

AIR PRESSURE

DROP (IN WC)

PHASE VOLTAGE

LENGTH

(IN)

WIDTH

(IN)

HEIGHT

(IN)

(D)DC A LIEBERT DDNT700A (E)AC-A1, (E)AC-A2 5800 6 160.0 14.6 3 480 142" 94" 36" 1880

(D)DC B LIEBERT DDNT700A (E)AC-B1, (E)AC-B2 5800 6 160.0 14.6 3 480 142" 94" 36" 1880

(1) PERFORMANCE DATA IS SHOWN WITH UNIT UTILIZING R-407C REFRIGERANT. SCHEDULE WILL BE UPDATED TO REFLECT THE USE R-454B REFRIGERANT AS MANUFACTURER DATA BECOMES AVAILABLE

NOTES:

MECHANICAL - COMPUTER ROOM AIR CONDITIONER SCHEDULE

TYPE

EQUIP.

NO.

MFR MODEL SERVICE

AIR FLOW

(CFM)

FILTER PRIMARY COOLING (DX) HYDRONIC ELECTRICAL

OPERATING

WEIGHT (LB)

NOTES

MERV SIZE (IN)

SENSIBLE

CAPACITY (MBH)

TOTAL

CAPACITY (MBH)

EAT DB

(°F)

EAT WB

(°F)

LAT DB (°F)

LAT WB

(°F)

REFRIGERANT

TYPE

EWT (°F) LWT (°F) FLOW (GPM) PG % KW FLA MCA MOCP

VOLT

(V)

PH

(HZ)

Hz

(N)CRAC AC-A1 LIEBERT DS077KU 2-B3A138 9,095 8 4 197 230 75.0 61.0 55.5 52 R-454B 104 114 71.3 40 29.5 74 88 100 460 3 60 Hz 2930 ALL

(N)CRAC AC-A2 LIEBERT DS077KU 2-B3A138 9,095 8 4 197 230 75.0 61.0 55.5 52 R-454B 104 114 71.3 40 29.5 74 88 100 460 3 60 Hz 2930 ALL

(N)CRAC AC-B1 LIEBERT DS077KU 2-B3A138 9,095 8 4 197 230 75.0 61.0 55.5 52 R-454B 104 114 71.3 40 29.5 74 88 100 460 3 60 Hz 2930 ALL

(N)CRAC AC-B2 LIEBERT DS077KU 2-B3A138 9,095 8 4 197 230 75.0 61.0 55.5 52 R-454B 104 114 71.3 40 29.5 74 88 100 460 3 60 Hz 2930 ALL

(1) EACH PUMP SIZED FOR 100% OF PEAK LOAD.

(2) MOUNTED TO CONCRETE INERTIA BASE.

(3) REFER TO SPECIFICATION SECTION 230524 FOR VIBRATION ISOLATION REQUIREMENTS

(4) SYSTEM INCLUDES 40% PROPYLENE GLYCOL BY VOLUME

NOTES:

MECHANICAL - PUMP SCHEDULE

TYPE

EQUIPMENT

NUMBER

MANUFACTURER MODEL SERVICE PUMP TYPE

PUMP ELECTRICAL OPERATING

WEIGHT

(LB)

NOTESFLOW

(GPM)

HEAD

(FT.WC)

SPEED (RPM)

MIN. IMP. DIA.

(IN)

MIN. STATIC

EFF. (%)

BHP HP

VOLT

(V)

PHAS

E

FREQUE

NCY (HZ)

(N)P A BELL & GOSSETT E-1532 AC-A1, AC-A2 CLOSE-COUPLED HORIZONTAL END-SUCTION 143.0 142.0 3600 6 68 7.88 10 460 3 60 308 ALL

(N)P B BELL & GOSSETT E-1532 AC-B1, AC-B2 CLOSE-COUPLED HORIZONTAL END-SUCTION 143.0 142.0 3600 6 68 7.88 10 460 3 60 308 ALL

(1) REFER TO SPECIFICATION SECTION 230542 FOR VIBRATION ISOLATION

NOTES

MECHANICAL - CLOSED CIRCUIT DRY COOLER

TYPE

EQUIPMENT

NUMBER

MANUFACTURER MODEL LOCATION SERVICE

EWT

(°F)

LWT

(°F)

CAPACITY

(MBH)

AMBIENT AIR

(°F)

FAN COIL FAN ELECTRICAL DATA DIMENSIONS

OPERATING

WEIGHT

(LB)

NOTESFLOW

(CFM)

QUANTITY FLOW (GPM)

PRESSURE

DROP (IN

WC)

PG % FLA PHASE

FREQUENCY

(HZ)

VOLTAGE HP

LENGTH

(IN)

WIDTH

(IN)

HEIGHT

(IN)

(N)DC A LIEBERT DNT 700A LEVEL 4 ROOF AC-A1, AC-A2 120.0 109.4 662 95 5800 6 143 18.40 40 10 3 60 460 0.75 142" 94" 36" 1880 ALL

(N)DC B LIEBERT DNT 700A LEVEL 4 ROOF AC-B1, AC-B2 120.0 109.4 662 95 5800 6 143 18.40 40 10 3 60 460 0.75 142" 94" 36" 1880 ALL

(1) PRE-CHARGE PRESSURE SHALL BE EQUAL TO SYSTEM FILL PRESSURE AT TANK LOCATION.

(2) CONTRACTOR TO SET PRE-CHARGE PRESSURE DIAPHRAGM.

(3) PROVIDE FLOOR SUPPORT SKIRT WITH INTEGRAL ANCHOR POINTS.

NOTES:

MECHANICAL - EXPANSION TANK SCHEDULE

TYPE

EQUIPMENT

NUMBER

MANUFACTURER MODEL SERVICE

TANK

VOLUME

(GAL)

ACCEPTANCE

VOLUME (GAL)

MAX

TEMP

(°F)

MIN

TEMP

(°F)

WORKING

PRESSURE

(PSI)

INITIAL FILL

PRESSURE

(PSI)

TANK SIZE (IN) DRY

WEIGHT

(LB)

NOTES

DIAMETER HEIGHT

(N)ET A WESSELS NTA-120 AC-A1, AC-A2 70.0 57.0 115.0 10.0 10.0 5.0 24" 46" 260 ALL

(N)ET B WESSELS NTA-120 AC-B1, AC-B2 70.0 57.0 115.0 10.0 10.0 5.0 24" 46" 260 ALL

01/16/2026

1 1 1 1 1 1 1 1 1 sy Introba REGISTEREDO PO PROFESSIONAL

KACIEf ELAMP1040 c □ M P A N / Y

1 1 1 1 1 1 1 1 1

ENGINEER

iPE097080 I

V DIAICTrDrn ...

"WsYiVl

DX

C

RA SA

MFR CONTROLLER

BACNET

M

BACNET

INDOOR UNIT

R L

R S

(REFER TO 259000 SPEC FOR

FULL LIST OF NETWORK

POINTS TO BE MAPPED )

UNIT ENABLE/DISABLE BO

ACCU

x

RL

RS

SEE MECHANICAL PLANS FOR

SENSOR QUANTITIES AND

LOCATIONS

TELECOM A/C UNIT CONTROL SEQUENCE OF OPERATIONS

A/C UNIT NORMAL OPERATION:

1. A/C UNIT SHALL BE CONTROLED BY FACTORY PROVIDED CONTROLLER. SEQUENCE SHALL BE AS FOLLOWS:

a. ON A CALL FOR COOLING, AC UNIT CONDENSER AND EVAPORATOR SHALL ENERGIZE.

b. UPON MEETING SETPOINT TEMPERATURE, 80F (ADJ.), A/C UNIT SYSTEM SHALL SHUT DOWN.

VIEWABLE ON BMS

1. FAN STATUS.

2. SPACE TEMP AND HUMIDITY.

ALARMS AND SAFETIES:

1. LEAK DETECTION: ASSOCIATED EQUIPMENT SHALL BE DE-ENERGIZED AND ALARM SHALL BE SENT TO BMS.

2. HIGH TEMP ALARM: ALARM SHALL BE SENT TO BMS.

HIGH TEMP ALARMAI

CONTROL WIRING

BMS

T-STATT-STAT

CONDENSATE PUMP

MOUNT 48" ABOVE FINISHED FLOOR

NEXT TO LIGHT SWITCH OR PER

ARCHTECTURAL ELEVATION (TYP).

LEAK DETECTION BI

SECONDARY DRAIN PAN

DATA CENTRE SEQUENCE OF OPERATION

THE DATA CENTRE HAS TWO INDEPENDENT CIRCUITS, EACH CONTAINING TWO CRAC UNITS, A PUMPSET AND A DRY AIR COOLER. CIRCUIT 1 CONTAINS DRY COOLER DC A, PUMPSET DC A P01 AND CRAC UNITS A1 & B1. CIRCUIT 2 CONTINS DRY COOLER DC B, PUMPSET DC B P02 AND CRAC UNITS A2 & B2.

TEAMWORK MODE 2

THE CIRCUITS SHALL OPERATE IN ‘TEAMWORK MODE 2’. IN THIS MODE THE DEMANDS OF CIRCUIT 1 DICTATE THE OPERATION OF BOTH CIRCUITS. CRAC UNIT A1 MONITORS ALL AVILABLE SENSOR READINGS AND DETERMINES THE DEMAND FOR COOLING, HEATING, HUMIDIFICATION AND DEHUMIDIFICATION, THEN SENDS OPERATING INSTRUCTIONS TO ADDRESS THE GREATEST DEMAND. THE SETPOINTS FOR ALL UNITS IN THE MODE MUST BE IDENTICAL. THE PROPORTIONAL BAND, DEADBAND, AND RELATED SETTINGS MAY DIFFER BY UNIT. FAN SPEED IS MODULATED PER UNIT.

ROTATION AND CASCADING IS NOT AVAILABLE, SO EXPECT UNEVEN DISTRIBUTION OF WORK HOURS.

GLYCOL (ECON-O-CYCLE) COOLING

UNDER CERTAIN CONDITIONS, THE REFRIGERATION CIRCUIT IN THE CRAC UNITS CAN BE BYPASSED AND THE GLYCOL LOOP AND COIL CAN BE USED TO

COOL THE SPACE DIRECTLY. THE SEQUENCE IS AS DESCRIBED BELOW.

THE GLYCOL COOLING PROGRAM ESTABLISHES TWO DISTINCT CONTROL BANDS FOR COOLING CONTROL OPERATION. THE FIRST BAND CONTROLS THE OPERATION OF THE CHILLED GLYCOL VALVE AND THE SECOND CONTROLS THE OPERATION OF THE COMPRESSORS, 2 STAGES, 4 STAGES OR DIGITAL

SCROLL.

GLYCOL COOLING BECOMES AVAILABLE WHEN THE ENTERING GLYCOL TEMPERATURE IS AT LEAST 8F BELOW THE RETURN AIR TEMPERATURE OR 3F LOWER THAN THE RETURN AIR TEMPERATURE FOR TWO (2) CONSECUTIVE HOURS. THE MICROPROCESSOR CHECKS THE RETURN AIR TEMPERATURE

AND THE ENTERING GLYCOL FLUID TEMPERATURE TO DETERMINE A COOLING CAPACITY.

WHEN THE MICROPROCESSOR DECIDES THAT THE RETURN GLYCOL FLUID TEMPERATURE IS COLD ENOUGH, THE FIRST COOLING BAND IS THE MODULATING VALVE CONTROL. A SECOND BAND IS ADDED TO THE FIRST BAND FOR THE COMPRESSORS TO OPERATE IN THE NORMAL 2 STAGE, 4 STAGE OR DIGITAL SCROLL CONTROL METHOD. IF THE CHILLED GLYCOL FLUID TEMPERATURE IS NOT COLD ENOUGH THE VALVE CONTROL BAND IS REPLACED BY THE COMPRESSOR BAND. IF THE CHILLED GLYCOL COOLING CAPACITY IS REDUCED BY A RISE IN THE GLYCOL FLUID TEMPERATURE, THE CONTROL BAND SHRINKS PROPORTIONALLY. THIS ALLOWS THE COMPRESSOR BAND TO MOVE DOWN AS WELL.

NOTE:

THE ABOVE CONTROL SEQUENCES ARE FOR REFERENCE ONLY. EXISTING CONTROLS INFRASTRUCTURE FOR CIRCUITS ARE TO BE UTILIZED AND NEW EQUIPMENT SEQUENCES SHOULD BE PROVIDED BY LIEBERT AND

COORDINATED WITH THE VA CONTROLS INTEGRATOR.

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

MECHANICAL CONTROLS

PD BV

M0.03

NTS

TELECOM ROOM A/C UNIT CONTROL

POINTS TABLE SPLIT SYSTEM DX

POINT DESCRIPTION

POINT TYPE

HARDWIRED (H) OR

NETWORKED (N)? EXPECTED RANGE

UNIT ENABLE/DISABLE BO H 80-110°F

HIGH TEMP ALARM AI H 82-110°F

LEAK DETECTION BI H YES/NO

NTS

DATA CENTRE CRAC UNIT CONTROL

01/16/2026

1 1 1 1 1 1 1 1 1

8 nR O 0

El jr

G C sy Introba REGISTEREDO OO PROFESSIONAL

KACIEf ELAMP1040 c □ M P A N / Y

1 1 1 1 1 1 1 1 1

ENGINEER

iPE097080 I

St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

TR LIST

PD BV

M0.04

01/16/2026

1 1 1 1 1 1 1 1 1

EVAPORATOR CONDENSER

TOTAL COOLING (KW)BUILDING FLOOR ROOM NO. OF RACKS MODEL MODEL CONDENSER LOCATION

1 BASEMENT A001D 2 7 DME027E PFH027A-PHN 1ST FLOOR NE ROOF

1 BASEMENT BO22B 2 7 24000 DME027E PFH027A-PHN BUILDING 2 BASEMENT INTERSTITIAL

1 1 A154A 1 5 17040 DME020E PFH020A-PLN 1ST FLOOR NE ROOF

1 1 B112A 1 5 17040 DME020E PFH020A-PLN BUILDING 2 2ND FLOOR INTERSTITIAL

1 2 A207 1 5 17040 DME020E PFH020A-PLN 1ST FLOOR SE ROOF

1 2 B228A 1 5 17040 DME020E PFH020A-PLN BUILDING 2 2ND FLOOR INTERSTITIAL

1 3 A361 1 5 17040 DME020E PFH020A-PLN 1ST FLOOR NE ROOF

1 3 B317A 1 5 17040 DME020E PFH020A-PLN BUILDING 2 4TH FLOOR ROOF

1 4 A455A 1 5 17040 DME020E PFH020A-PLN 3RD FLOOR N ROOF

1 4 B418 1 5 17040 DME020E PFH020A-PLN BUILDING 2 4TH FLOOR ROOF

1 5 A502 1 5 17040 DME020E PFH020A-PLN 3RD FLOOR N ROOF

1 6 A601 1 5 17040 DME020E PFH020A-PLN 8TH FLOOR SE ROOF

1 7 A741 1 5 17040 DME020E PFH020A-PLN 8TH FLOOR NE ROOF

1 8 A843A 2 7 24000 DME027E PFH027A-PHN 8TH FLOOR SE ROOF

1 9 A932 1 5 17040 DME020E PFH020A-PLN 8TH FLOOR SE ROOF

2 SUB-BASEMENT B3A151A 1 5 17040 DME020E PFH020A-PLN BASEMENT INTERSTITIAL

2 SUB-BASEMENT B3B116A 1 5 17040 DME020E PFH020A-PLN BASEMENT INTERSTITIAL

2 GROUND B2A119A 1 5 17040 DME020E PFH020A-PLN BASEMENT INTERSTITIAL

2 GROUND B2B105C 1 5 17040 DME020E PFH020A-PLN BASEMENT INTERSTITIAL

2 1 1A183A 2 7 24000 DME027E PFH027A-PHN 2ND FLOOR INTERSTITIAL

2 1 1B198 2 7 24000 DME027E PFH027A-PHN 2ND FLOOR INTERSTITIAL

2 3 3A208 2 7 24000 DME027E PFH027A-PHN 4TH FLOOR INTERSTITIAL

2 3 3B155 2 7 24000 DME027E PFH027A-PHN 4TH FLOOR INTERSTITIAL

2 5 5A119 3 8.5 29040 DME037E PFH037A-PHN 6TH FLOOR INTERSTITIAL

2 7 7A138 2 7 24000 DME027E PFH027A-PHN 6TH FLOOR ROOF

2 8 8B101 2 7 24000 DME027E PFH027A-PHN

3 1 121 1 5 17040 DME020E PFH020A-PLN

21 BASEMENT AB3 1 5 17040 DME020E PFH020A-PLN

21 1 A107 1 5 17040 DME020E PFH020A-PLN BUILDING 2 2ND FLOOR INTERSTITIAL

21 2 A216 1 5 17040 DME020E PFH020A-PLN BUILDING 2 2ND FLOOR INTERSTITIAL

21 3 A318 1 5 17040 DME020E PFH020A-PLN BUILDING 2 3RD FLOOR ROOF

21 4 A422 1 5 17040 DME020E PFH020A-PLN BUILDING 2 3RD FLOOR ROOF

21 5 A516 1 5 17040 DME020E PFH020A-PLN BUILDING 2 3RD FLOOR ROOF

30 BASEMENT BC113 1 5 17040 DME020E PFH020A-PLN 1ST FLOOR ROOF

30 1 1B133C 1 5 17040 DME020E PFH020A-PLN 2ND FLOOR ROOF

30 1 1C122 1 5 17040 DME020E PFH020A-PLN 2ND FLOOR ROOF

30 2 2B133C 1 5 17040 DME020E PFH020A-PLN 2ND FLOOR ROOF

30 2 2C156A 1 5 17040 DME020E PFH020A-PLN 2ND FLOOR ROOF

sy Introba O pO

KACIEIE ,MCLAMBL Leul c □ M P A N Y

I I I I I I I I I

A REGISTERED D

PROFESSIONAL

TOTAL COOLING LOAD

(BTU/H)

24000

NoNWEAA, 6TH FLOOR ROOF

2ND FLOOR ROOF / GROUND

BUILDING 2 BASEMENT INTERSTITIAL

ROOM FUNCTION / SERVICE

IT COMPUTER ROOM / OI&T

IT COMPUTER ROOM / OI&T

OFFICE/DIRECTOR

ADMIN OFFICE / COMP & PENSION

PRINTER ROOM / BH & IMPACT - EAST

IT CLOSET/OI&T

CAST ROOM OFFICE / SURGERY

INPATIENT OPS SUP OFFICE / HAS

OLD AV CLOSET & PARTIAL CONF ROOM

CHIEF OFFICE / MEDICINE - GI

ADMIN - STAFF OFFICE / INPATIENT WARD

INPATIENT WARD BREAK ROOM / INPATIENT WARD

OFFICE / INPATIENT WARD

OFFICE & STORAGE ROOM / CARE COORDINATION

STORAGE ROOM / EDUCATION

CDI SUP OFFICE/HAS

CAC'S STAFF OFFICE / CACS

CONFERENCE - BREAK ROOM / LOGISTICS

PHARMACY CACHE

STAFF ROOM / POLICE

EXAM ROOM / PRIMARY CARE

SUPPLY ROOM / RADIOLOGY

OFFICE/LOGISTICS

TOUCHDOWN OFFICE/SURGERY

GROUP ROOM / BEHAVIORAL HEALTH

NON HD MIXING

EXAM ROOM / BEHAVIORAL HEALTH

OFFICE/RESEARCH

OFFICE/RESEARCH

OFFICE/RESEARCH

OFFICE/RESEARCH

OFFICE/RESEARCH

OFFICE/RESEARCH

OFFICE /CLC

CONGREGATE BATH

CONSULTATION / MEDITIATION ROOM

CONGREGATE BATH

OFFICE/SOCIAL WORK

STOR

A001B

TR

A001D

TR

B022B

ELECTRICAL

ROOM

B022A

ELECTRICAL

ROOM

A001E

FINANCE / FISCAL

MY HEALTHE VET

BIOMED

FACILITIES MANAGEMENT SHOPS

LIBRARY

MORGUE

Radiator

Radiator

Radiator RadiatorRadiator

STAIR #2

STAIR #3

STAIR #4

LOADING DOCK

STORAGE B002A

STORAGE

B035A

SYSTEMS

ENGINEER B033

ELECTRIC

SHOP

B026

M/R CHIEF

B032

ELECTRIC

SHOP A

B027 PLUMBING

SHOP

STORAGE

B031A

LOCK

SHOP

B038

OXYGEN

STOR.

B039

OXYGEN

STOR.

B040

PLUMBING

SHOP

B031

SOILED

LINEN

A027

A028

PASSENGER

ELEVATORS

SERVICE

ELEVATORS

A001A

MECH.

ROOM

A001C

OLD

COMPUTER

ROOM

A001

FIRE

ALARM

ROOM

A004A

SOILED

LINEN A006

ELECTRIC

ROOM

A009

PHONE

EQUIP.

A008D

ENGINEERING

MECHANICAL

ROOM

A005

MEN'S TOILET

ROOM

GC113

ELEVATOR

MACHINE

ROOM

GC112

O.R.

PREP RM.

A028C

UNIFORM

STORAGE

A028D

H.A.C.

GC110

WOMEN'S

TOILET ROOM

GC111

STORAGE

GC115

PC

VIEWING

GC129

CLERK

GC123

BOOK

PROCESSING &

STORAGE

GC122

CLERK

AREA

GC121

LIBRARIAN'S

OFFICE

GC125

ELECTRICAL

ROOM

GC128

STAIRS

GCS1

TO BUILDING 2

A/C MACH.

ROOM

B009

POLICE

TRAINING

ROOM

B007

ED

ELEVATOR

CANTEEN

OFFICE

B007A

JAN.

CLO.

B006

SOILED

LINEN

B005

CORRIDOR

CA-10

LOCKER

ROOM

B004

STORAGE

B003

STORAGE

B003A

CORRIDOR

CA-11

TO

RESEARCH

WING

STORAGE

B002

POLICE

SECURITY

STORAGE

A015A

POLICE

SECURITY

STORAGE

A015B

BIOMED

A015

MECHANICAL

A014

MECHANICAL

A014

FMS TLT &

LOCKER RM

A008E

IT/ MECHANICAL

A008C

IT/ MECHANICAL

A008B

MECHANICAL

A008A

PATIENT

CLOTHING

A007

CORRIDOR

CA-6

MECH

A004

ELEVATOR

LIBRARY

GC120 MY HEALTHE

VET

GC126

CORRIDOR

CA-5A

OFFICE

GC103

OFFICE

GC102

HR

OFFICE

GC101

HR

OFFICE

GC100

CORRIDOR

CA-3A

CORRIDOR

CA-4

SIGN ROOM

A019

CORRIDOR

CA-3

MEDICAL WASTE

ROOM

A018

EMS DIRTY

STORAGE

A017

EMS CLEAN

STORAGE

A017A

SERVICE

ELEVATOR

LOBBY

CA-2

CANTEEN STORAGE

A016B

ELEVATOR LOBBY

CA-1

IT CLO

A013C

IT CLO

A013B

CORRIDOR

CA-1A

POLICE

STOR

A016A

ELEC

CLO

A012

FMS CLO

A013A

STAIR #1

ELEC

CLO

A011

FAMILY

VIEWING

ROOM

B019

RADIATION

SAFETY

B020

SPS

STORAGE

B020

CORRIDOR

CA-12

CORRIDOR

CA-9

TO BUILDING 2

CARPENTER

SHOP

FOREMAN

B034

CORRIDOR

CA-13

PAINT

SHOP

B035

CORRIDOR

CA-15

TO BUILDING 2 CORRIDOR

CA-8

MASONRY

SHOP

B036

PAINT

SHOP

B037

CORRIDOR

CA-7

A016E

CORRIDOR

CA-14

EMS

STORAGE

A021

EMS

STORAGE

A020

TRASH ROOM

A022

MORGUE

ENTRANCE

A023

WASH RM

A023B

AUTOPSY AREA

A023C

MORGUE

BOX

A023D

EMS

OFFICE

A025

VAULT

A026A

VAULT

A026B

POLICE

LOCKER RM

A026

EMS LINEN ROOM

LINEN ROOM

A028B

ELEVATOR

CORRIDOR

CA-5

FINANCE

GC104

CANTEEN

A016H

CANTEEN

A016G

CANTEEN

A016E

ELEC CLO

A016J

CANTEEN

A016C

CANTEEN

A016D

MACH. RM.

A016K

EMS OFFICE

A024

A/C UNIT

A028A

OI&T

B022

TRANSFORMER

ROOM

A010

CARPENTER

SHOP

B035

MACHINE

SHOP

B030

A/C SHOP BO28

MECHANICAL

ROOM

BO29

T

T -

1-M-200

AC

1-A001D

AC

1-B022B

REFRIGERANT PIPING

FROM BUILDING 2

BASEMENT INTERSTITIAL

(ACCU 1-B022B). SEE

SHEET 2-M-110 FOR

CONTINUATION.

REFRIGERANT PIPING

UP. SEE SHEET 1-M-110

FOR CONTINUATION.

CONDENSATE DRAIN PIPING

DOWN FROM AC-B112A. SEE

SHEET 1-M-110 FOR

CONTINUATION.

1-M-201

St. Louis

6 South Old Orchard t: +1 800.404.7677 St. Louis, MO 63119 e: hello@introba.com www.introba.com

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved:

ARCHITECT OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

FULLY SPRINKLERED

100% BID

DOCUMENTS

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

01/16/2026

642-22-700EHRM Infrastructure Upgrades -

CMCVAMC

3900 Woodland Avenue Philadelphia, PA 19104

KEYPLAN

BLDG

BLDG

BLDG

BLDG. 1 - MECHANICAL FLOOR PLAN - BASEMENT

PD BV

1-M-105

1/16" = 1'-0"

MECHANICAL BASEMENT OVERALL PLAN

01/16/2026

1 1 1 1 1 1 1 1 1

— h +• if

4I □□ □S ]

IT

Al ri lr T l DD J □n Z1 / 1[ □tri

I I 4 -lr FI If i

J II[

ri 4 1 ri ••— flL □ □flri ri ri ri

1 n flri •• □L

A EI4 - □ □— Cf —

0.

]x r P L

5 J] [ ]fl E □A - □LFF0 i

■ 0] [ 1 J o 1 Jri □

C EI A•r

L [ ]

JJ 1m —H flri • LF 1□ I I

II A — —

Ari E J — fl—□

J I □ □ fl 0 □□

□ ri h Lh L -ri ri ri

1]tr

TE

I ri if

A □ ri u 2 sy Introba REGISTEREDO OO

PROFESSIONAL

KACIEIE .MCLAMBL Leul c □ M P A N

1 1 1 1 1 1 1 1 1

L fl

V

NoNWEA4, V

Family Toilet Rm

B101

Women's Toilet Rm

B102

Lactation Room B103

EXAM

#1

B137

EXAM #2

B138

STORAGE

B139

STAIR

NO 4

CORRIDOR

C1-15C

LAB

B136

TOUCH

DOWN

B135

CORRIDOR

C1-15

ISO

EXAM #3

B140

ISO

EXAM #4

B141

ISO

EXAM #5

B142

EXAM #7

B144

EXAM #6

B143

EXAM #9

B147

SOCIAL/

EXAM #8

B146

ELEC

CLO

B145

SOILED

HOLDING

B134

PHARM

OFFICE

B133

MEDS

B132

CORRIDOR

C1-15A EXAM #10

B148

EXAM #11

B149

EXAM #12

B150

MECHANICAL

ROOM

B151

TOUCH

DOWN

B131

TRIAGE

B130 CORRIDOR

C1-14

MOD E

RECEPTION

B134

MOD E

WAITING

B132

HAC

B124

CORRIDOR

C1-13

MEN

TLT

HC

B122

STAIR

NO 3

ELEC

B122FEC

GALLERY

B121

ACCESS

FROM B2ACCESS

FROM B2

CORRIDOR

C1-12

CORRIDOR

TO ED

SUICIDE

PREVENTION

B118

HAS

B117

ED AO

B116

NUTRITION

FUTURE ED

BREAK

B115

ELEVATOR

ED

EXAM

ROOM

B112

UNISEX

TOILET

B111

ED

EXAM

ROOM

B110

ED

EXAM

ROOM

B109

ED

EXAM

ROOM

B108

ED

EXAM

ROOM

B107

ED

EXAM

ROOM

B106

ED

EXAM

ROOM

B105

ED

EXAM

ROOM

B104

CORRIDOR

C1-11

CORRIDOR

C1-10

FOOD

COURT

A142

FOOD LINE

A142B

FOOD LINE

A142C

FOOD LINE

A142A

CANTEEN

DINING

AREA

A140

DISHWASHER

A144A

COOLERS

A143

KITCHEN

A144

CAGE

STORAGE

A146

CAGE

STORAGE

A145A

CANTEEN

DINING

AREA

A145

A148 A149 A150

ELE CLO

A151

SERVICE

ELEVATOR

C1-2

MEN

TOILET HC

A153

PRIVACY

OFFICE

A154

CONGRESSIONAL

LIASON

A154B

STAIR

NO 5

WOMEN

TOILET HC

A155

VISN 4

CONFERENCE

ROOM

A157

VISN

OFFICE

A157A

CORRIDOR

C1-4

ELEC

CLO

A158

CONFERENCE

ROOM

A160

OFFICE

A161

OFFICE

A162

OFFICE

A162A

OFFICE

A163

PATIENT

ADVOCATE

FUTURE

PCS

A159

DECEDENT AFFAIRS

AFFAIRS

A164

OFFICE

1C101

OFFICE

1C111

WORK

ROOM

1C110

OFFICE

1C109

OFFICE

1C108

OFFICE

1C107

OFFICE

1C106

OFFICE

1C105

OFFICE

1C104

OFFICE

1C103

PCS

1C100

WAITING

1C102

FUTURE

QUALITY

MANAGEMENT

1C122

1C127

OFFICE

1C126

PRIVACY

OFFICE

1C125

OFFICE

(FRONT OFFICE)

1C124

OCC

OFFICE

1C123

CONFERENCE

ROOM

1C138

CHIEF OF

STAFF

1C137

1C136

1C135

1C134

1C133

STAIR

NO 1

1C-S1

1C132

1C129A1C131

CHIEF OF

STAFF OFFICE

1C129

CORRIDOR

C1-5

STORAGE

1C121

ELEVATOR

P.

ELEC

CLO

1C118

TELE

CLO

1C120

A174F

A174E

A174DA174CA174B

ASSISTANT

DIRECTOR

A175

BOARD ROOM

VESTIBULE

A177A

DIRECTOR'S

SUITE

A174

WOMEN

STAFF

ONLY HC

1C117

MEN STAFF

ONLY HC

1C115

HAC

1C114

CLOSET

1C113

COMPLIANCE

OFFICER

A156

A174G

A174I

A174H

CORRIDOR

C1-3A

CORRIDOR

C1-3

BOARD ROOM

A177

CORRIDOR

C1-1A

VA POLICE

OPERATIONS

A101

STAFF

A101A

TELEPHONE

OPERATOR

A102

CORRIDOR

C1-6

TLT

A103

HAC

A104

COPY/ EQUIPMENT

ROOM

A105A

OFFICE

A105B

OFFICE

A105C

OFFICE

A105F

OFFICE

A105G

OFFICE

A105H

STUDIO

A105E

MEDICAL

MEDIA

PERSONNEL

A105D

CORRIDOR

C1-7

MEDICAL

MEDIA

A105

HOLDING

ROOM

A106A

HOLDING

ROOM

A106B

VA POLICE

HOLDING

ROOM

A106

STAFF

OFFICE

A107C

UNISEX

TLT RM

A107B

CONFERENCE

ROOM

A107D

STAFF

AREA

A107E

PRINTER

AREA

A107A

OFFICE

A107I

STORAGE

A107H

TELE

CLOSET

A107F

OFFICE

A107G

QM

OFFICE

A108B

QM

OFFICE

A108C

QM/ FUTURE

PATIENT ADVOCATE

A108

QM

OFFICE

A108A

QM

A107

QM

A108D

QM/ FUTURE

DECEEDENT

AFFAIRS

A109

ELEC

CLO

A119

CARD

SAFE

A111A

PIV

A111

VA POLICE

SERVICE

A112

CORRIDOR

C1-8

STAIR

NO 2

VA CRIMINAL

INVESTIGATOR

A113

ASSISTANT

CHIEF OF POLICE

A114

CHIEF

OF

POLICE

A115

VA POLICE

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .