S02 - 824IC3005 Bid Dwgs Woodlawn Bk11.pdf

PDF 8 MB Posted

Attached to
Z1QA--Facility Renovations at the Woodlawn and Bath National Cemeteries.
Solicitation number
36c78620b0009
Issued by

About this file

This document package includes construction drawings and specifications for facility renovations, improvements, and repairs at the Woodlawn National Cemetery. The project involves demolishing existing mechanical, plumbing, and HVAC systems in the administration building including radiators, boilers, ductwork, and flues. It also includes installing new fire alarms, telecommunications, security, data cabling, and electrical systems in the administration building and temporary office trailer. Mechanical plans show proposed locations for new HVAC equipment. Telecommunications drawings provide specifications for a new network video recorder, switches, and IP cameras. The opportunity is solicited by the Department of Veterans Affairs National Cemetery Administration for contract number 36c78620b0009.

View the file

Other files

File Type Posted
S06 - A0003 - Amendment.docx DOCX document
S06 - HazMat Information - WB.pdf PDF
S06 - Amendment 0002.docx DOCX document
A2 - Pre-Bid Walk-Thru Sign In Sheet.PDF PDF
A1 - 803IC3015 Bid Dwgs Bath Bk02A.pdf PDF
S05 - Amendment 0001.docx DOCX document
S02 - 824IC3005 Bid Dwgs Woodlawn Bk09.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk05.pdf PDF
S02 - 824IC3005 - Geotechnical Report - Woodlawn.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk02.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk12.pdf PDF
S02 - Scope of Work Final - Woodlawn-Bath.pdf PDF
S02 - 803IC3015 Bid Specs Bath Bk.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk03.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk01.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk13.pdf PDF
ATTACHMENT 05 - Cost Estimate Worksheet - WB.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk03.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk06.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk07.pdf PDF
P07 - WD - NY20200005 - Woodlawn NC.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk10.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk05.pdf PDF
S02 - 36C786-20-B-0009 - Solicitation.pdf PDF
P07 - WD - NY20200048 - Bath NC.pdf PDF
S02 - 803IC3015 - Geotechnical Report - Bath.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk01.pdf PDF
S02 - 824IC3005 Bid Specs Woodlawn Bk.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk04.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk02.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk07.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk06.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk08.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk04.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADMIN METER

PULL NEW 200 AMP FEEDER

THROUGH EXISTING 2" CONDUIT.

200N 200N

100N

60N

100N

100N 200N

H.F. LENZ COMPANY, P.C.

1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300

FAX: 814-269-9301

LEGEND

NOTES

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

Walker Federal Services, LLC

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

N C A

ATIONAL

EMETERY

DMINISTRATION

N C A

ATIONAL

EMETERY

DMINISTRATION

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

GGG BLP

May 22, 2020

1 DEMOLITION RISER DIAGRAM - ELECTRICAL

NOT TO SCALE

2 NEW WORK RISER DIAGRAM - ELECTRICAL

NOT TO SCALE

ELECTRICAL RISER DIAGRAMS

EP-204

ST

ST

ST

ST

ST ST

W W W

W

EEEE

E E E E E

E

A-28

A-29

FINAL CONNECTION TO FUEL PUMP

FED VIA EXISTING 1" CONDUIT

H.F. LENZ COMPANY, P.C.

1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300

FAX: 814-269-9301

LEGEND

NOTES

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

Walker Federal Services, LLC

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

N C A

ATIONAL

EMETERY

DMINISTRATION

N C A

ATIONAL

EMETERY

DMINISTRATION

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

GGG BLP

May 22, 2020

SITE ELECTRICAL PLAN

ES-101

0 5' 10' 20' 30'

3"

1-WAY DUCT LINE

NOTES:

1. CONCRETE SHALL BE 2500 P.S.I. @ 28 DAYS.

2. PROVIDE REINFORCING RODS ON TOP OF DUCTS WHEN CROSSING OR

PLACED IN ROADWAYS. REFER TO SPECIFICATIONS FOR MORE INFO.

3. MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 24" [610mm].

4. IMBED NON-FERROUS TIE WIRES IN DUCT BED CONCRETE.

[7 6m m

[7 6m m

(T

YP

[76mm]

TIE WIRE

3"

2-WAY DUCT LINE

NOTES:

1. CONCRETE SHALL BE 2500 P.S.I. @ 28 DAYS.

2. PROVIDE REINFORCING RODS ON TOP OF DUCTS WHEN CROSSING OR

PLACED IN ROADWAYS. REFER TO SPECIFICATIONS FOR MORE

INFORMATION.

3. MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 24" [610mm].

4. IMBED NON-FERROUS TIE WIRES IN DUCT BED CONCRETE.

5. PROVIDE MINIMUM 6" [152mm] SPACE BETWEEN POWER AND

TELECOMMUNICATION DUCTS.

6. INNERDUCT QUANTITY AND SIZE AS INDICATED ON PLANS.

[7 6m m

[7 6m m

(T

YP

[76mm]

TIE WIRE

3" [76mm]

DUCT [SIZE AS

INDICATED ON

DWGS.]

3" [76mm]

3" [76mm]

DUCT [SIZE AS

INDICATED ON

DWGS.]

H.F. LENZ COMPANY, P.C.

1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

Walker Federal Services, LLC

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

N C A

ATIONAL

EMETERY

DMINISTRATION

N C A

ATIONAL

EMETERY

DMINISTRATION

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

GGG BLP

May 22, 2020

SITE ELECTRICAL DETAILS

ES-201

1 DUCTBANK SECTION 1

NOT TO SCALE

2 DUCTBANK SECTION 2

NOT TO SCALE

SYMBOLS ABBREVIATIONS

TELEPHONE OUTLET - WALL MOUNTED, M.H. 48" AFF, UON.

DATA OUTLET - WALL MOUNTED, M.H. 48" AFF, UON.

FLOOR MOUNTED DATA OUTLET.

TELEPHONE/DATA OUTLET - WALL MOUNTED, M.H. 18" AFF, UON.

PROVIDE 1" EC FROM THE OUTLET TO 6" ABOVE FINISHED CEILING AND

TERMINATE WITH 90° BEND AND INSULATED BUSHING.

AFF

ANSI

ASME

ASTM

BICSI

EIA

FCC

ISSS

ISO

NEC

NEMA

NESC

NFPA

OSHA

POE

RUS

SMPTE

TIA

UL

UON

ABOVE FINISHED FLOOR

AMERICAN NATIONAL STANDARDS INSTITUTE

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AMERICAN SOCIETY FOR TESTING MATERIALS

BUILDING INDUSTRY CONSULTING SERVICES INTERNATIONAL

ELECTRONICS INDUSTRY ASSOCIATION

FEDERAL COMMUNICATIONS COMMISSION

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS

INTERNATIONAL STANDARDS ORGANIZATION

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION

NATIONAL ELECTRICAL SAFETY CODE

NATIONAL FIRE PROTECTION ASSOCIATION

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

POWER OVER ETHERNET

RURAL UTILITY SERVICE (FORMERLY AREA)

SOCIETY OF MOTION PICTURE AND TELEVISION ENGINEERS

TELECOM INDUSTRY ASSOCIATION

UNDERWRITER'S LABORATORIES, INC.

UNLESS OTHERWISE NOTED

TELECOM GENERAL NOTES

1. ALL CABLE PATHWAYS ARE DESIGNED WITH A MAXIMUM 40 PERCENT FILL RATIO UNLESS

OTHERWISE NOTED. FILL REQUIREMENTS MAY ALTER FROM INITIAL DESIGN DUE TO COR'S

REQUIREMENTS DURING INSTALLATION.

2. ALL CABLE PATHWAYS SHALL BE FREE FROM PROJECTIONS AND ROUGH OR SHARP EDGES

THROUGHOUT THE ENTIRE PATH. ALL POINTS OR EDGES THAT CABLING MUST PASS, AND

MAY BE SUBJECT TO INJURY OR WEAR, SHALL BE ROUNDED, PADDED, OR BUSHED.

3. THE TELECOM DRAWINGS INDICATE THE GENERAL LOCATION OF EQUIPMENT, CABLE

PATHWAYS, AND OUTLETS. ALTHOUGH THE DRAWINGS DO NOT NECESSARILY DICTATE THE

ACTUAL ROUTES OF CABLE TRAYS AND CONDUITS, LOCATION OF EQUIPMENT AND OUTLETS,

AND OTHER SUPPORTING ITEMS. FOLLOW THE DESIGN IN THIS DOCUMENTS AS CLOSELY AS

POSSIBLE. COORDINATE TO THE NEAREST INSTALLATION OF TELECOM ITEMS WITH THOSE OF

ALL OTHER TRADES.

4. ALL BLOCKS, PANELS AND CABLE SHALL BE ASSIGNED, LABELED AND RECORDED BY THE

INSTALLING CABLE CONTRACTOR, AND DELIVERED TO THE ENGINEER.

5. SEE NOTES ON INDIVIDUAL DRAWINGS FOR CROSS REFERENCE TO PERTINENT DETAILS,

SECTIONS, ETC. SHOWN ON OTHER DRAWINGS IN THIS DRAWING SET.

6. SCALES NOTED ON THE TELECOM DRAWING ARE FOR GENERAL INFORMATION AND USED

FOR REFERENCE ONLY.

7. ALL MOUNTING HEIGHTS SHOWN ARE MEASURED FROM FINISHED FLOOR TO BOTTOM OF

MOUNTED EQUIPMENT UNLESS OTHERWISE NOTED.

8. FIRE STOP ALL STRUCTURE PENETRATIONS WITH FIRE STOPPING MATERIAL EQUAL TO OR

GREATER THAN THAT OF PENETRATED STRUCTURE. INSTALL FIRE STOPPING MATERIAL AFTER

COMPLETE INSTALLATION OF CABLING. USE ONLY LISTED FIRE STOPPING MATERIAL IN

ACCORDANCE WITH UL, AND OTHER AUTHORITIES HAVING JURISDICTION.

9. TELECOM ROOMS SHALL NOT BE USED AS STORAGE SPACE BY ANY CONTRACTOR EXCLUDING

THE INSTALLING CONTRACTOR FOR THE TELECOM SYSTEMS. WHEN THE INSTALLATIONS OF

A TELECOM SPACE IS COMPLETE, ALL ITEMS AND EQUIPMENT NOT SUPPORTING THE

FUNCTIONS OF THAT SPACE SHALL BE REMOVED FROM THE SPACE.

10. ALL NEW TELECOM AND SECURITY ROOMS/CLOSETS WILL HAVE 1-HOUR FIRE RATED WALLS.

SEE ARCHITECTURAL DRAWINGS FOR DETAILS.

11. THE TELECOM DRAWINGS INDICATE THE GENERAL LOCATION OF THE BACKBONE CONDUIT

FOR THE TELECOM ROOMS. VERIFY THE EXACT LOCATION OF THE CONDUIT (S). POSITION

CONDUITS SO THEY ENTER AND EXIT TELECOM ROOMS IN THE CORNERS AS SHOWN ON THE

TELECOM ROOM DRAWINGS.

12. NOT ALL HARDWARE FOR INSTALLATION IS IDENTIFIED/SHOWN. PROVIDE ALL MOUNTING

HARDWARE REQUIRED FOR A COMPLETE AND PROPERLY OPERATING INSTALLATION.

13. NOT ALL ITEMS, COMPONENTS AND SYSTEMS SPECIFIED IN THIS DRAWING SET OR THE

SPECIFICATIONS ARE DETAILED. PROVIDE MANUFACTURER'S SPECIFICATIONS AND DETAIL

SHEETS IN THE PRECONSTRUCTION SUBMITTALS FOR SELECTION PER THE SPECIFICATIONS.

14. INSTALL COMPONENTS OR SYSTEMS PER THE MANUFACTURE'S INSTALLATION

INSTRUCTIONS OR SPECIFICATIONS.

15. ALL CABLE SHALL COMPLY WITH THE SPECIFICATIONS AND SHALL BE SUITABLE AND LISTED

FOR THE ENVIRONMENT IN WHICH IT IS INSTALLED.

16. ALL CONDUIT RUNS SHALL FOLLOW BICSI STANDARDS FOR BENDS, FILL AND JUNCTION BOX

PLACEMENT. NO CONDUIT RUNS SHALL HAVE GREATER THAN 180 DEGREES OF BEND

WITHOUT A PROPERLY SIZED AND PLACED BOX.

17. ALL CONDUIT RUNS AND CABLE TRAY SHOWN ARE DIAGRAMMATICAL. REPORT ANY MAJOR

DEVIATION TO CONSTRUCTION MANAGER FOR APPROVAL..

18. ALL CONDUITS FROM BELOW SHALL STUB UP 4" A.F.F.

19. COORDINATE FINAL SYSTEMS, EQUIPMENT LAYOUT AND CONDUIT ROUTING AS SHOWN ON

DRAWING WITH SITE CONDITIONS.

20. ENSURE PROPER SEPARATION OF CLASS 1, CLASS 2, AND CLASS 3 CIRCUITS PER NEC 725-54.

21. VERIFY THE SIZE OF ALL CONDUCTORS, CONDUIT,L AND JUNCTION BOXES (40% MAXIMUM

FILL). INSTALLATION SHALL BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE (NEC)

AND ALL LOCAL CODES HAVING JURISDICTION.

22. DO NOT INSTALL LOW VOLTAGE VOICE AND DATA CABLING IN THE SAME CONDUITS AS 120

VAC POWER CABLES.

23. PROMPTLY NOTIFY COR PRIOR TO INSTALLATION OF WORK IF ANY MOUNTING LOCATIONS

NOTED ON THE DRAWINGS ARE OBSTRUCTED AND/OR IF ANY CONFLICTS OR PROBLEMS ARE

DISCOVERED.

24. PROVIDE AND INSTALL EQUIPMENT AND HARDWARE IN ORDER TO MEET THE INTENT OF THE

DESIGN AND TO PROVIDE GOVERNMENT WITH A COMPLETE AND FULLY OPERATIONAL

CABLING SYSTEM AS SPECIFIED. PROMPTLY ADDRESS ANY QUESTIONS REGARDING THE

INTENT OF THE DESIGN TO THE COR.

25. PROVIDE A SINGLE GANG BOX WITH A CONDUIT TO THE NEAREST ACCESSIBLE CEILING FOR

ANY DEVICE SHOWN ON THESE DRAWINGS THAT IS LOCATED IN AN OPEN OR HARD CEILING

SPACE.

1. COORDINATE EXACT REQUIREMENTS FOR INCOMING SERVICE OF LOCAL UTILITIES FOR POWER AND

TELEPHONE, PAY ALL FEES, AND INSTALL A COMPLETE AND FUNCTIONAL SYSTEM.

2. COORDINATE INSTALLATION OF TELEPHONE SYSTEM INCLUDING TELEPHONE WIRING AND TELEPHONE

OUTLETS WITH THE GOVERNMENT/ENGINEER.

3. REFER TO BASE BUILDING DRAWINGS FOR LOCATION OF UTILITY SERVICE JUNCTION BOX.

COORDINATION WITH TELEPHONE COMPANIES

CONSTRUCTION SEQUENCE

1. ALL OUTAGES MUST BE PERFORMED OUTSIDE THE NORMAL BUSINESS HOURS

UNLESS OTHERWISE AUTHORIZED BY COR.

2. SCHEDULE A SHORT OUTAGE. COORDINATE WITH DATA/TELECOM SERVICE

PROVIDER FOR THEM TO SPLICE EXISTING SERVICE CABLES TO EXTEND AT

TEMPORARY TRAILER.

3. SETUP NEW MODEM AND DATA/TELECOM DISTRIBUTION NETWORK AT

TEMPORARY TRAILER.

4. REPLACE EXISTING DATA/TELECOM EQUIPMENT AS SHOWN ON DRAWING ET-201

AT ADMINISTRATION BUILDING. ALL SERVICES TO TRAILER MUST NOT BE

DISTURBED DURING WORK AT ADMINISTRATION BUILDING.

5. MAINTAIN EXISTING OR PROVIDE NEW UTILITIES, SYSTEMS, AND SERVICES TO

OCCUPIED SPACES AT ALL TIMES. NO OUTAGES ARE PERMITTED DURING

NORMAL BUSINESS HOURS. COORDINATE ALL OUTAGES DURING CHANGE-OVERS

BETWEEN EXISTING BUILDING AND TEMPORARY FACILITIES WITH CEMETERY

DIRECTOR NOT LESS THAN 7 DAYS IN ADVANCE.

6. AFTER ALL UPGRADES OF ADMINISTRATION BUILDING EQUIPMENT, REMOVE

TEMPORARY SPLICE FOR TRAILER AND TURN OVER TO NCA ALL THE IT/TELECOM

EQUIPMENT INSTALLED IN THE TRAILER BY CONTRACTOR WHEN TRAILER IS

REMOVED FROM SERVICE.

7. FOR DATA/TELECOM SYSTEM DIAGRAM, SEE DRAWING ET-301.

TELECOM SYMBOLS,

ABBREVIATIONS AND

GENERAL NOTES

ET-001

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

DS

DS

DS

DS

RA

M

P

DN

DN

KITCHEN

UTILITY RM

RESTROOM

LOBBY

OFFICE

RESTROOM

OFFICE

OFFICE

HALL

CLOSET

108A

CLOSET

109A

CLOSET

110A

CLOSET

102A

ENT. PORCH

104B

PORCH

109B

DN

DN

CLOSET

107A

LOUNGE

1 ADMINISTRATION BUILDING FLOOR DEMO PLAN

1/4" = 1'-0"

ADMINISTRATION BUILDING

TELECOM DEMOLITION PLAN

ET-101

GENERAL NOTES

1. FOR TELECOMMUNICATION SYMBOLS, ABBREVIATIONS AND GENERAL NOTES, SEE

DRAWING ET-001.

2. FOR TELECOMMUNICATION NEW WORK PLANS, SEE DRAWING ET-201.

3. FOR TELECOMMUNICATION DETAILS, SEE DRAWING ET-301.

KEY NOTES

DISCONNECT AND REMOVE EXISTING TELEPHONE AND DATA OUTLETS AS

INDICATED. DEMOLITION SHALL BE COMPLETE INCLUDING GANG BOX, COVER

PLATE AND PULLING WIRING BACK TO SOURCE AND DISPOSAL THEREOF.

DISCONNECT AND RELOCATE EXISTING VERIZON TELECOM MODEM AS SHOWN

ON DRAWING E-201.

PROTECT EXISTING DATA SIGNAL MODEM AND T-1 CABLE FOR RE-USE.

DISCONNECT AND REMOVE EXISTING INTEGRATED SERVICE ROUTER, ETHERNET

NETWORK SWITCH, CONNECTOR PORT, UPS AND ALL WIRING/CONNECTIONS

LOCATED IN IT CLOSET (105A).

FOR CONSTRUCTION SEQUENCE, SEE DRAWING ET-001.

WARNING. EXISTING PIPE WRAP IN THE CRAWLSPACE MAY CONTAIN ASBESTOS.

DO NOT DISTURB. PIPE WRAP WILL BE REMOVED DURING SUBSEQUENT

PLUMBING DEMOLITION UNLESS OTHERWISE INDICATED.

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

0 2' 4' 8' 12'

DEMOLITION - TELEPHONE OUTLET

DEMOLITION - DATA OUTLET

DEMOLITION - TELEPHONE AND DATA OUTLET

LEGEND

(TYP.)

(TYP.)

TELECOM

EQUIPMENT

DATA/COMMUNICATION

EQUIPMENT 03

DS

DS

DS

RA

M

P

DN

DN

REF

CLOSET

104A

KITCHEN

UTILITY RM

RESTROOM

LOBBY

OFFICE

RESTROOM

OFFICE

OFFICE

HALL

CLOSET

108A

CLOSET

109A

CLOSET

110A

IT CLOSET

105A

CLOSET

102A

ENT. PORCH

104B

PORCH

109B

DN

DN

CLOSET

107A

LOUNGE

T

DS DS DS DS DS

T T

T T

T

T

1 ADMINISTRATION BUILDING - FLOOR PLAN

1/4" = 1'-0"

TELECOM PLANS

ET-201

0 2' 4' 8' 12'

GENERAL NOTES

1. FOR TELECOMMUNICATION SYMBOLS, ABBREVIATIONS AND GENERAL

NOTES, SEE DRAWING ET-001.

2. FOR TELECOMMUNICATION DEMOLITION PLAN, SEE DRAWING ET-101.

3. FOR TELECOMMUNICATION DETAILS, SEE DRAWING ET-301.

4. ALL CABLING IN TRAILER SHALL BE DONE ABOVE CEILING AND WIREMOLD

FROM CEILING TO NEW BOXES.

KEY NOTES

INSTALL NEW TELEPHONE AND DATA OUTLETS AS SHOWN. INSTALL CATEGORY 6

CABLES FOR DATA AND RJ12 FOR VOICE. AT THE DEVICE LOCATION, TERMINATE

CABLES WITH CATEGORY 6 JACKS INSTALLED IN A SINGLE-GANG FACEPLATE

MOUNTED AT 18" AFF, UON.

RELOCATE EXISTING VERIZON TELECOM MODEM ON NEW WALL MOUNTED RACK IN

IT CLOSET(105A). FOR MORE DETAILS, SEE TELECOMMUNICATION SYSTEM

DIAGRAM ON DWG ET-301. FOR RACK DETAILS, SEE DWG EY-201.

PROVIDE NEW INTEGRATED SERVICE ROUTER , ETHERNET NETWORK SWITCH AND

UPS. CONTRACTOR SHALL MAKE CONNECTION BETWEEN ALL EQUIPMENT LOCATED

IN IT CLOSET (105A). FOR MORE DETAILS, SEE DATA SYSTEM DIAGRAM ON DWG

ET-301.

COORDINATE FINAL INSTALLATION WITH TELEPHONE, NETWORK AND SECURITY

CONTRACTORS. INSTALL TELEPHONE, DATA EQUIPMENT, FLOOR MOUNTED IT

RACK, WALL MOUNTED RACK, SERVER AND UPS IN IT CLOSET (105A).

PROVIDE NEW LOCKABLE, WALL MOUNTED RACK LOCATED AT DIRECTOR'S OFFICE,

SIZE AS REQUIRED TO ACCOMMODATE ALL IT AND TELECOMMUNICATION

EQUIPMENT. TRAILER SUPPLIER TO PROVIDE SERVICE ENTRANCE JUNCTION BOX

FOR DATA AND COMMUNICATION CABLES AT LOCATION INDICATED. CONTRACTOR

TO EXTEND CABLES FROM JUNCTION BOX TO WALL MOUNTED RACK.

PROVIDE NEW DATA AND TELECOM MODEM INSIDE THE WALL MOUNTED RACK.

CONTRACTOR SHALL PROVIDE NEW 12 PORT ETHERNET SWITCH, PATCH PANEL

AND TELECOM DISTRIBUTION MODULES INSIDE THE RACK. CONTRACTOR SHALL

PROVIDE ALL DATA AND TELECOM SERVICE WIRING AND CONDUIT FROM

ADMINISTRATION BUILDING TO WALL MOUNTED RACK IN TRAILER. PROVIDE ANY

OTHER REQUIRED INTERNAL WIRING INSIDE THE RACK.

TRAILER SUPPLIER SHALL PROVIDE ALL DATA AND TELECOM OUTLETS, LOCATION AS

SHOWN AND WIRING AND CONDUIT TO OUTLETS AND ANY OTHER EQUIPMENT TO

PROVIDE COMPLETE DATA AND TELECOMMUNICATION SYSTEM AT TRAILER.

FOR CONSTRUCTION SEQUENCE, SEE DRAWING ET-001.

FOR DATA/TELECOM SYSTEM DIAGRAM, SEE DRAWING ET-301.

FOR ROUTE OF CABLES, SEE ELECTRICAL SITE PLAN.

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

TELEPHONE OUTLET - WALL MOUNTED

DATA OUTLET - WALL MOUNTED

TELEPHONE AND DATA OUTLET - WALL MOUNTED

LEGEND

(TYP.)

(TYP.)

(TYP.)

2 TEMPORARY OFFICE TRAILER - FLOOR PLAN

3" = 1'-0"

DATA/COMMUNICATION

EQUIPMENT

03 04

TELECOM

MODEM 02 04

SERVICE ENTRANCE

JUNCTION BOX

TELECOM

DISTRIBUTION MODULE

ETHERNET SWITCH

DATA SIGNAL MODEM

TELECOM MODEM

08 (TYP.)

WALL MOUNTED

RACK 05

DATA AND TELECOM

CABLES FROM ADMINISTRATION BUILDING

DATA AND TELECOM

CABLES TO TEMPORARY OFFICE TRAILER

09 10

EXISTING DATA SIGNAL

MODEM

(VISUAL UPTIME SELECT

FLUKE T-1 CSU/DSU)

IT/DATA SERVICE

PROVIDER

EXISTING T-1 CABLE

FROM SMARTJACK OR

TELEPHONE BISCUIT

ON WALL

NEW INTEGRATED SERVICE

ROUTER

(CISCO 4351)

NEW ETHERNET NETWORK

SWITCH

(CISCO 3850 24 PORT OR

EQUAL)

V.35 CISCO CABLE

CAT 6 ETHERNET CABLE

TO DATA OUTLETS

CAT 6E CABLE

120V AC

FROM UPS

RELOCATED EXISTING

TELECOM

MODEM

TELECOM SERVICE

PROVIDER

EXISTING T-1 CABLE

FROM SMARTJACK

OR TELEPHONE

BISCUIT ON WALL

TO TELEPHONE OUTLETS

RJ12 CABLE

120V AC

FROM UPS NEW

DATA SIGNAL MODEM

NEW ETHERNET NETWORK

SWITCH AND PATCH PANEL

(CISCO 3850 12 PORT OR

EQUAL)

TO DATA OUTLETS

BY TRAILER SUPPLIER

CAT 6E CABLE

BY TRAILER

SUPPLIER

120V AC

FROM UPS

ADMINISTRATION BUILDING TRAILER

JBFLOOR MOUNTED IT RACK

BY CONTRACTOR WALL MOUNTED RACK

BY CONTRACTOR

WALL MOUNTED RACK

BY CONTRACTOR

NEW

TELECOM MODEM

NEW TELECOM

DISTRIBUTION MODULE

JB

WALL MOUNTED RACK

BY CONTRACTOR

ADMINISTRATION BUILDING TRAILER

NEW TELEPHONE

CONNECTION BOX

RJ12 CABLE

BY TRAILER

SUPPLIER

TO TELEPHONE OUTLETS

BY TRAILER SUPPLIER

SPLICE BY

SERVICE PROVIDER

SPLICE BY

SERVICE PROVIDERSERVICE ENTRANCE

JUNCTION BOX

BY TRAILER SUPPLIER

SERVICE ENTR

JUNCTION BO

BY TRAILER SU

BY CONTRACTOR BY CONTRACTOR

BY CONTRACTOR

BY CONTRACTOR

BY CONTRACTOR

BY CONTRACTOR

BY CONTRACTOR BY CONTRACTOR

BY CONTRACTOR BY CONTRACTOR

TELECOM DETAILS

ET-301

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

1 BOX AND CONDUIT INSTALLTION DETAIL

NONE

ACCESSIBLE

CEILING

FACE PLATE

FISHABLE WALL

SINGLE-GANG

REDUCER RING

DOUBLE-GANG BOX

MINIMUM 1" CONDUIT STUBBED TO ACCESSIBLE

CEILING (USE 1-1/4" CONDUIT FOR

MORE THAN 7 CABLES)

3 DATA SYSTEM DIAGRAM

NONE

RJ45 TELEPHONE JACK (IVORY),

WITH RJ12 CABLES (YELLOW)

TELECOMMUNICATION PIN ASSIGNMENT

STANDARD : T568A

DATA JACK (BLUE),

WITH CAT 6E (WHITE)

SERIES: MINI COM,

CABLE TYPE: CATEGORY 6,

HUBBELL MODEL # HXJ6B OR EQUAL

RJ45 TELEPHONE JACK (IVORY),

WITH RJ12 CABLES (YELLOW)

TELECOMMUNICATION PIN

ASSIGNMENT STANDARD : T568A

RJ45 TELEPHONE JACK (IVORY),

WITH RJ12 CABLES (YELLOW)

TELECOMMUNICATION PIN

ASSIGNMENT STANDARD : T568A

DATA JACK (BLUE),

WITH CAT 6E (WHITE)

SERIES:MINI COM,

CABLE TYPE: CATEGORY 6,

HUBBELL MODEL # HXJ6B OR EQUAL

COMBINATION OF

TELEPHONE/DATA OUTLET

DUPLEX TELEPHONE

OUTLET

DUPLEX DATA

OUTLET

4 FACE PLATE DETAILS

NONE

2 TELECOMMUNICATION SYSTEM DIAGRAM

NONE

DATA JACK (BLUE),

WITH CAT 6E (WHITE)

SERIES:MINI COM,

CABLE TYPE: CATEGORY 6,

HUBBELL MODEL # HXJ6B OR EQUAL

GENERAL NOTES

1. FOR TELECOMMUNICATION SYMBOLS, ABBREVIATIONS AND GENERAL

NOTES, SEE DRAWING ET-001.

2. FOR TELECOMMUNICATION DEMOLITION PLAN, SEE DRAWING ET-101.

3. FOR TELECOMMUNICATION NEW PLAN, SEE DRAWING ET-201.

KEY NOTES

PROVIDE EQUIPMENT/DEVICE TO MEET THE SPECIFICATIONS OF NAMED

MANUFACTURER OR APPROVED EQUAL. ALL PRODUCTS, EQUIPMENT AND DEVICES

PROVIDED UNDER THIS PROJECT SHALL CONFORM TO "BUY AMERICAN ACT".

FOR CONSTRUCTION SEQUENCE, SEE DRAWING ET-001.

FACEPLATE (IVORY, PLASTIC)

MANUFACTURE: PANDUIT

FACEPLATE (IVORY, PLASTIC)

MANUFACTURE: PANDUIT

FACEPLATE (IVORY, PLASTIC)

MANUFACTURE: PANDUIT0101 01

NOTE:

THIS DETAIL IS APPLICABLE ONLY FOR ADMINISTRATION BUILDING.

02 02

BRICK CHIMNEY

AND VENTS

GABLE VENT

GABLE VENT

A

A

A

G

G

TW

GROUNDING

TEST WELL

G

G

G

A

VENT PIPE (TYP.)

"T" JOINT

CONNECTION (TYP.)

LIGHTNING CONDUCTOR

RUN ALONG ROOF,

FASTENED EVERY

3 FEET MAX.

AIR TERMINAL (TYP.)

BONDING

PLATE (TYP.)

GROUND ROD (TYP.)

RUN DOWN CONDUCTOR TO BUILDING

GROUND RING OR BUILDING'S MAIN

GROUNDING ELECTRICAL SERVICE AND BOND.

RUN IN RIGID CONDUIT 8' FROM GROUND UP

AND EXPOSED, MOUNTED ON WALL.

G

G

VENT PIPE

G

G

G

G

A A

TW

GROUNDING

TEST WELL

G

"T" JOINT

CONNECTION (TYP.)

GROUND ROD (TYP.)

AIR TERMINAL (TYP.)

LIGHTNING CONDUCTOR

RUN ALONG ROOF,

FASTENED EVERY

3 FEET MAX.

RUN DOWN CONDUCTOR TO BUILDING

GROUND RING OR BUILDING'S MAIN

GROUNDING ELECTRICAL SERVICE AND BOND.

RUN IN RIGID CONDUIT 8' FROM GROUND UP

AND EXPOSED, MOUNTED ON WALL.

ABONDING

PLATE (TYP.)

VENT PIPE (TYP.)

G

GENERAL NOTES

LIGHTNING PROTECTION PLAN

EJ-101

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

1. LOCATION OF VENT PIPES AND OTHER SUPER STRUCTURE ELEMENTS ARE

APPROXIMATELY SHOWN. COORDINATE ACTUAL LOCATIONS IN THE FIELD.

2. INTERCONNECT THE TELEPHONE AND ELECTRICAL SERVICE ENTRANCE GROUNDS TO

ONE LIGHTNING PROTECTION GROUND OR WATER PIPE.

3. GROUND ALL ELECTRICAL EQUIPMENT, ENCLOSURE, FRAMES AND STRUCTURES.

4. INTERCONNECT THE METAL BODIES OF INDUCTANCE LOCATED ABOUT THE ROOF

SUCH AS METAL FLASHING, GRAVEL STOPS, ROOF DRAINS, SOIL PIPE VENTS,

INSTALLATION VENTS, LOUVERS AND DOOR FRAMES SITUATED WITHIN 6'-0" OF A

LIGHTNING CONDUCTOR OR BONDED METAL BODY TO THE LIGHTNING CONDUCTOR

SYSTEM.

5. MAKE ALL UNDERGROUND OR EMBEDDED GROUNDING CONNECTIONS BY

EXOTHERMIC FUSION WELDING PROCESS, UON.

6. NO BENDS OF A CONDUCTOR SHALL FORM A FINAL INCLUDED ANGLE OF LESS THAN

90 DEGREES NOR SHALL HAVE A RADIUS OF BEND LESS THAN 8".

7. WHERE DOUBLE CONNECTIONS ARE REQUIRED, ATTACH AT DIAGONALLY OPPOSITE

POINTS OF THE EQUIPMENT, AND EXTEND EACH CONNECTION INDEPENDENTLY TO

DIFFERENT SEGMENTS OF THE GROUNDING SYSTEM.

8. INTERCONNECT ALL AIR TERMINALS AND SHALL FORM A TWO-WAY PATH FROM

EACH AIR TERMINAL HORIZONTALLY OR DOWNWARD TO CONNECTIONS WIT

GROUND TERMINALS.

9. FASTEN ALL LIGHTNING PROTECTION CONDUCTORS NOT MORE THAN 3'-0"

MAXIMUM SPACING.

10. DRIVE GROUND RODS SO THAT THE TOP OF THE GROUND RODS IS TO A MINIMUM

DEPTH OF 12" BELOW GRADE AND 2'-0" FROM FOUNDATION WALL.

11. MAKE CONNECTORS TO GROUND LOOP CONDUCTOR AT A POINT NOT LESS THAN

24" BELOW GRADE AND 2'-0" FROM FOUNDATION WALL.

12. PLACE THE AIR TERMINALS AT ALL UNPROTECTED OUTSIDE CORNERS AND 20'-0"

MAXIMUM SPACING AROUND THE ROOF PERIMETER OR RIDGE AND WITHIN 2'-0"

OF OUTSIDE EDGE.

13. PROVIDE ALL BURIED GROUND CABLES WITH A MINIMUM OF 18" OF EARTH COVER.

14. CLEAN BARE CABLE AT ALL CONNECTIONS TO A BRIGHT SURFACE, MAKE

CONNECTIONS ONLY WHEN THOROUGHLY DRY.

15. AFTER COMPLETION OF THE GROUND GRID, MEASURE AND RECORD THE

RESISTANCE TO EARTH. MEASUREMENTS SHALL BE MADE AS PER IEEE STD. 81. THE

RESISTANCE SHALL BE 5 OHMS OR LESS.

16. DO NOT INSTALL BARE COPPER LIGHTNING PROTECTION MATERIALS ON ALUMINUM

ROOF OR SIDING OR OTHER ALUMINUM SURFACES AND VISA VERSA, DO NOT

INSTALL ALUMINUM LIGHTNING PROTECTION MATERIALS ON COPPER ROOF OR

SIDING OR OTHER COPPER SURFACES.

17. INSTALL THE LIGHTNING PROTECTION SYSTEM IN A NEAT AND INCONSPICUOUS

MANNER SO THAT ALL COMPONENTS WILL BLEND IN WITH THE APPEARANCE OF

THE BUILDING.

18. ACTUAL JOB SITE CONDITIONS MAY NECESSITATE SLIGHT ALTERATIONS IN AIR

TERMINAL AND GROUND ROD LOCATIONS.

19. THE PLAN AND LAYOUT SHOWN FOR THESE SYSTEMS ARE SCHEMATIC AND ARE

INTENDED TO SHOW BASIC SYSTEM LAYOUT. VERIFY DIMENSIONS AND SITE

CONDITIONS AND PROVIDE SYSTEMS THAT COMPLY TO CODE REQUIREMENTS.

20. INSTALL DOWN CONDUCTORS FOR GROUNDING AND LIGHTNING PROTECTIONS IN

RIGID CONDUITS 8' FROM GROUND UP AND EXPOSED, MOUNTED ON WALL.

21. SUBMIT A SIGNED AND SEALED LIGHTNING PROTECTION SUBMITTAL DRAWING

THAT MEETS OR EXCEEDS THE REQUIREMENTS HEREIN, FOR OWNER'S APPROVAL

BEFORE CONSTRUCTION.

0 2' 4' 8' 12'

1 ADMINISTRATION BUILDING - ROOF PLAN

1/4" = 1'-0"2 MAINTENANCE BUILDING - ROOF PLAN

1/4" = 1'-0"

A

EJ-201

C

EJ-201

D

EJ-201

E

EJ-201

F

EJ-201

E

EJ-201

D

EJ-201

F

EJ-201

A

EJ-201

C

EJ-201

#4/0 B.C. STRANDED GROUND

GRID

24" MIN.

CONNECT GROUND ROD TO GROUND GRID

WITH EXOTHERMIC WELD

FINISHED GRADE

12" MIN.

GROUND

GAW910-TEST WELL

GROUND ROD CLAMP

CLASS II COPPER GROUNDING CONDUCTOR

GROUND ROD

3/4" DIA. x 10' LONG COPPER CLAD ROUND

GROUND ROD

EXOTHERMIC WELD

CONNECTION TO COUNTERPOISE

#4/0 AWG BARE CLASS II COPPER

CONDUCTOR 30" BELOW FINISHED GRADE

LIGHTNING PROTECTION

DETAILS

EJ-201

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

ADHESIVE BASE

CLASS II CONDUCTOR

STRUCTURE

COPING

CABLE FASTENER

GROUNDING SYSTEM

GROUND ROD

GROUND ROD CLAMP

BRONZE BONDING PLATE

CLASS II CONDUCTOR

SURFACE

WELDED BASE BRONZE

BONDING PLATE

CLASS II

AIR TERMINAL

CLASS II COPPER CONDUCTOR

A AIR TERMINAL BONDED TO STRUCTURE

NONE

GENERAL NOTES

1. INTERCONNECT THE TELEPHONE AND ELECTRICAL SERVICE ENTRANCE GROUNDS TO

ONE LIGHTNING PROTECTION GROUND OR WATER PIPE.

2. GROUND ALL ELECTRICAL EQUIPMENT, ENCLOSURE, FRAMES AND STRUCTURES.

3. INTERCONNECT THE METAL BODIES OF INDUCTANCE LOCATED ABOUT THE ROOF

SUCH AS METAL FLASHING, GRAVEL STOPS, ROOF DRAINS, SOIL PIPE VENTS,

INSTALLATION VENTS, LOUVERS AND DOOR FRAMES SITUATED WITHIN 6'-0" OF A

LIGHTNING CONDUCTOR OR BONDED METAL BODY TO THE LIGHTNING CONDUCTOR

SYSTEM.

4. MAKE ALL UNDERGROUND OR EMBEDDED GROUNDING CONNECTIONS BY

EXOTHERMIC FUSION WELDING PROCESS, UON.

5. NO BENDS OF A CONDUCTOR SHALL FORM A FINAL INCLUDED ANGLE OF LESS THAN

90 DEGREES NOR SHALL HAVE A RADIUS OF BEND LESS THAN 8".

6. WHERE DOUBLE CONNECTIONS ARE REQUIRED, ATTACH AT DIAGONALLY OPPOSITE

POINTS OF THE EQUIPMENT, AND EXTEND EACH CONNECTION INDEPENDENTLY TO

DIFFERENT SEGMENTS OF THE GROUNDING SYSTEM.

7. INTERCONNECT ALL AIR TERMINALS AND SHALL FORM A TWO-WAY PATH FROM

EACH AIR TERMINAL HORIZONTALLY OR DOWNWARD TO CONNECTIONS WIT

GROUND TERMINALS.

8. FASTEN ALL LIGHTNING PROTECTION CONDUCTORS NOT MORE THAN 3'-0"

MAXIMUM SPACING.

9. DRIVE GROUND RODS SO THAT THE TOP OF THE GROUND RODS IS TO A MINIMUM

DEPTH OF 12" BELOW GRADE AND 2'-0" FROM FOUNDATION WALL.

10. MAKE CONNECTORS TO GROUND LOOP CONDUCTOR AT A POINT NOT LESS THAN

24" BELOW GRADE AND 2'-0" FROM FOUNDATION WALL.

11. PLACE THE AIR TERMINALS AT ALL UNPROTECTED OUTSIDE CORNERS AND 20'-0"

MAXIMUM SPACING AROUND THE ROOF PERIMETER OR RIDGE AND WITHIN 2'-0"

OF OUTSIDE EDGE.

12. PROVIDE ALL BURIED GROUND CABLES WITH A MINIMUM OF 18" OF EARTH COVER.

13. CLEAN BARE CABLE AT ALL CONNECTIONS TO A BRIGHT SURFACE, MAKE

CONNECTIONS ONLY WHEN THOROUGHLY DRY.

14. AFTER COMPLETION OF THE GROUND GRID, MEASURE AND RECORD THE

RESISTANCE TO EARTH. MEASUREMENTS SHALL BE MADE AS PER IEEE STD. 81. THE

RESISTANCE SHALL BE 5 OHMS OR LESS.

15. DO NOT INSTALL BARE COPPER LIGHTNING PROTECTION MATERIALS ON ALUMINUM

ROOF OR SIDING OR OTHER ALUMINUM SURFACES AND VISA VERSA, DO NOT

INSTALL ALUMINUM LIGHTNING PROTECTION MATERIALS ON COPPER ROOF OR

SIDING OR OTHER COPPER SURFACES.

16. INSTALL THE LIGHTNING PROTECTION SYSTEM IN A NEAT AND INCONSPICUOUS

MANNER SO THAT ALL COMPONENTS WILL BLEND IN WITH THE APPEARANCE OF

THE BUILDING.

17. ACTUAL JOB SITE CONDITIONS MAY NECESSITATE SLIGHT ALTERATIONS IN AIR

TERMINAL AND GROUND ROD LOCATIONS.

18. THE PLAN AND LAYOUT SHOWN FOR THESE SYSTEMS ARE SCHEMATIC AND ARE

INTENDED TO SHOW BASIC SYSTEM LAYOUT. VERIFY DIMENSIONS AND SITE

CONDITIONS AND PROVIDE SYSTEMS THAT COMPLY TO CODE REQUIREMENTS.

19. INSTALL DOWN CONDUCTORS FOR GROUNDING AND LIGHTNING PROTECTIONS IN

RIGID CONDUITS 8' FROM GROUND UP AND EXPOSED, MOUNTED ON WALL.

20. SUBMIT A SIGNED AND SEALED LIGHTNING PROTECTION SUBMITTAL DRAWING

THAT MEETS OR EXCEEDS THE REQUIREMENTS HEREIN, FOR OWNER'S APPROVAL

BEFORE CONSTRUCTION.

C GROUDING ROD BONDED TO EQUIPMENT

NONEE GROUNDING TEST WELL

NONE

B GROUNDING ROD BONDED TO STRUCTURE

NONED GROUDING ROD DETAIL

NONEF GROUNDING "T" JOINT CONNECTION DETAIL

NONE

SYMBOLS ABBREVIATIONS

SECURITY ACCESS, VIDEO CAMERA

CCTV WARNING SIGNAGE

AFF

ANSI

ASME

ASTM

BICSI

EIA

FCC

ISSS

ISO

NEC

NEMA

NESC

NFPA

OSHA

POE

RUS

SMPTE

TIA

UL

UON

ABOVE FINISHED FLOOR

AMERICAN NATIONAL STANDARDS INSTITUTE

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AMERICAN SOCIETY FOR TESTING MATERIALS

BUILDING INDUSTRY CONSULTING SERVICES INTERNATIONAL

ELECTRONICS INDUSTRY ASSOCIATION

FEDERAL COMMUNICATIONS COMMISSION

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS

INTERNATIONAL STANDARDS ORGANIZATION

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION

NATIONAL ELECTRICAL SAFETY CODE

NATIONAL FIRE PROTECTION ASSOCIATION

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

POWER OVER ETHERNET

RURAL UTILITY SERVICE (FORMERLY AREA)

SOCIETY OF MOTION PICTURE AND TELEVISION ENGINEERS

TELECOMMUNICATIONS INDUSTRY ASSOCIATION

UNDERWRITER'S LABORATORIES, INC.

UNLESS OTHERWISE NOTED

SECURITY GENERAL NOTES

1. ALL CABLE PATHWAYS ARE DESIGNED WITH A MAXIMUM 40 PERCENT FILL RATIO UNLESS

OTHERWISE NOTED. FILL REQUIREMENTS MAY ALTER FROM INITIAL DESIGN DUE TO COR'S

REQUIREMENTS DURING INSTALLATION.

2. ALL CABLE PATHWAYS SHALL BE FREE FROM PROJECTIONS AND ROUGH OR SHARP EDGES

THROUGHOUT THE ENTIRE PATH. ALL POINTS OR EDGES THAT CABLING MUST PASS, AND

MAY BE SUBJECT TO INJURY OR WEAR, SHALL BE ROUNDED, PADDED, OR BUSHED.

3. THE SECURITY DRAWINGS INDICATE THE GENERAL LOCATION OF EQUIPMENT, CABLE

PATHWAYS, AND OUTLETS. ALTHOUGH THE DRAWINGS DO NOT NECESSARILY DICTATE THE

ACTUAL ROUTES OF CABLE TRAYS AND CONDUITS, LOCATION OF EQUIPMENT AND OUTLETS,

AND OTHER SUPPORTING ITEMS. FOLLOW THE DESIGN IN THIS DOCUMENTS AS CLOSELY AS

POSSIBLE. COORDINATE TO THE NEAREST INSTALLATION OF SECURITY ITEMS WITH THOSE OF

ALL OTHER TRADES.

4. ALL BLOCKS, PANELS AND CABLE SHALL BE ASSIGNED, LABELED AND RECORDED BY THE

INSTALLING CABLE CONTRACTOR, AND DELIVERED TO THE ENGINEER.

5. SEE NOTES ON INDIVIDUAL DRAWINGS FOR CROSS REFERENCE TO PERTINENT DETAILS,

SECTIONS, ETC. SHOWN ON OTHER DRAWINGS IN THIS DRAWING SET.

6. SCALES NOTED ON THE SECURITY DRAWING ARE FOR GENERAL INFORMATION AND USED

FOR REFERENCE ONLY.

7. ALL MOUNTING HEIGHTS SHOWN ARE MEASURED FROM FINISHED FLOOR TO BOTTOM OF

MOUNTED EQUIPMENT UNLESS OTHERWISE NOTED.

8. FIRE STOP ALL STRUCTURE PENETRATIONS WITH FIRE STOPPING MATERIAL EQUAL TO OR

GREATER THAN THAT OF PENETRATED STRUCTURE. INSTALL FIRE STOPPING MATERIAL AFTER

COMPLETE INSTALLATION OF CABLING. USE ONLY LISTED FIRE STOPPING MATERIAL IN

ACCORDANCE WITH UL, AND OTHER AUTHORITIES HAVING JURISDICTION.

9. SECURITY ROOMS SHALL NOT BE USED AS STORAGE SPACE BY ANY CONTRACTOR EXCLUDING

THE INSTALLING CONTRACTOR FOR THE SECURITY SYSTEMS.

10. ALL NEW SECURITY ROOMS/CLOSETS WILL HAVE 1-HOUR FIRE RATED WALLS. SEE

ARCHITECTURAL DRAWINGS FOR DETAILS.

11. NOT ALL HARDWARE FOR INSTALLATION IS IDENTIFIED/SHOWN. THE SECURITY CONTRACTOR

IS RESPONSIBLE FOR ALL MOUNTING HARDWARE REQUIRED FOR A COMPLETE AND

PROPERLY OPERATING INSTALLATION.

12. NOT ALL ITEMS, COMPONENTS AND SYSTEMS SPECIFIED IN THIS DRAWING SET OR THE

SPECIFICATIONS ARE DETAILED. PROVIDE MANUFACTURER'S SPECIFICATIONS AND DETAIL

SHEETS IN THE PRE-CONSTRUCTION SUBMITTALS FOR SELECTION PER THE SPECIFICATIONS.

13. INSTALL COMPONENTS OR SYSTEMS PER THE MANUFACTURE'S INSTALLATION

INSTRUCTIONS OR SPECIFICATIONS.

14. ALL CABLE SHALL COMPLY WITH THE SPECIFICATIONS AND SHALL BE SUITABLE AND LISTED

FOR THE ENVIRONMENT IN WHICH IT IS INSTALLED.

15. ALL CONDUIT RUNS SHALL FOLLOW BICSI STANDARDS FOR BENDS, FILL AND JUNCTION BOX

PLACEMENT. NO CONDUIT RUNS SHALL HAVE GREATER THAN 180 DEGREES OF BEND

WITHOUT A PROPERLY SIZED AND PLACED BOX.

16. ALL CONDUIT RUNS AND CABLE TRAY SHOWN ARE DIAGRAMMATICAL. REPORT ANY MAJOR

DEVIATION TO CONSTRUCTION MANAGER FOR APPROVAL.

17. ALL CONDUITS FROM BELOW SHALL STUB UP 4" AFF.

18. COORDINATE FINAL SYSTEMS, EQUIPMENT LAYOUT AND CONDUIT ROUTING AS SHOWN ON

DRAWING WITH SITE CONDITIONS.

19. ENSURE PROPER SEPARATION OF CLASS 1, CLASS 2, AND CLASS 3 CIRCUITS PER NEC 725-54.

20. VERIFY THE SIZE OF ALL CONDUCTORS, CONDUIT,L AND JUNCTION BOXES (40% MAXIMUM

FILL). INSTALLATION SHALL BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE (NEC)

AND ALL LOCAL CODES HAVING JURISDICTION.

21. DO NOT INSTALL LOW VOLTAGE VOICE AND DATA CABLING IN THE SAME CONDUITS AS 120

VAC POWER CABLES.

22. PROMPTLY NOTIFY COR PRIOR TO INSTALLATION OF WORK IF ANY MOUNTING LOCATIONS

NOTED ON THE DRAWINGS ARE OBSTRUCTED AND/OR IF ANY CONFLICTS OR PROBLEMS ARE

DISCOVERED.

23. PROVIDE AND INSTALL EQUIPMENT AND HARDWARE IN ORDER TO MEET THE INTENT OF THE

DESIGN AND TO PROVIDE GOVERNMENT WITH A COMPLETE AND FULLY OPERATIONAL

CABLING SYSTEM AS SPECIFIED. PROMPTLY ADDRESS ANY QUESTIONS REGARDING THE

INTENT OF THE DESIGN TO THE COR.

24. PROVIDE A SINGLE GANG BOX WITH A CONDUIT TO THE NEAREST ACCESSIBLE CEILING FOR

ANY DEVICE SHOWN ON THESE DRAWINGS THAT IS LOCATED IN AN OPEN OR HARD CEILING

SPACE.

25. ALL CABLES CEILING SHALL BE PLENUM RATED.

1. COORDINATE EXACT REQUIREMENTS FOR INCOMING SERVICE OF LOCAL UTILITIES FOR POWER AND

TELEPHONE, PAY ALL FEES, AND INSTALL A COMPLETE AND FUNCTIONAL SYSTEM.

2. COORDINATE INSTALLATION OF TELEPHONE SYSTEM INCLUDING TELEPHONE WIRING AND TELEPHONE

OUTLETS WITH THE GOVERNMENT/ENGINEER.

3. REFER TO BASE BUILDING DRAWINGS FOR LOCATION OF UTILITY SERVICE JUNCTION BOX.

COORDINATION WITH TELEPHONE COMPANIES

SECURITY SYMBOLS,

ABBREVIATIONS AND

GENERAL NOTES

EY-001

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

G

AS

G

AS

GAS

GAS

GAS

G

AS

W

W

W

ST

ST

ST

ST

ST

ST

ST

W

W

T T

W

W W

GAS

ST

ST

ST ST ST ST ST ST ST ST ST

ST ST ST

ST

ST

ST

ST

ST

ST

ST

GAS GAS GAS GAS GAS GAS

W W W W

ST ST ST

RE

F

SAN

ST

ST

T T

ST

ST

SAN

W W

C C

G

AS

G

AS

GAS

GAS

GAS

G

AS

W

W

W

ST

ST

ST

ST

ST

ST

ST

W

W

T T

W

W W

GAS

ST

ST

ST ST ST ST ST ST ST ST ST

ST ST ST

ST

ST

ST

ST

ST

ST

ST

GAS GAS GAS GAS GAS GAS

W W W W

ST ST ST

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

0 10 20 40 60

SITE SECURITY PLAN

EY-101

GENERAL NOTES

1. FOR SECURITY SYMBOLS, ABBREVIATIONS AND GENERAL NOTES, SEE

DRAWING EY-001.

2. FOR SECURITY DETAILS, SEE DRAWING EY-201.

3. COORDINATE WORK WITH THAT OF ELECTRICAL CONTRACTOR FOR

ELECTRICAL INSTALLATION SUPPORT.

4. CAMERA LOCATIONS ARE APPROXIMATE. MAKE MINOR ADJUSTMENTS

FOR INCREASED EFFECTIVENESS, AS APPROVED BY THE COR.

5. CCTV SIGNAGE IS SHOWN SCHEMATICALLY. FINAL LOCATIONS SHALL BE

APPROVED BY COR.

6. REFER TO SPECIFICATIONS FOR PROTECTION OF EXISTING TREES DURING

EXCAVATION AND OTHER ADJACENT WORK.

7. EXERCISE EXTREME CAUTION WHEN WORKING ADJACENT TO HEADSTONES.

CONDUCT ALL EXCAVATION ADJACENT TO HEADSTONES SOLELY IN THE

PRESENCE AND UNDER THE DIRECTION OF THE COR. SHOULD ANY

EVIDENCE OF INTERMENTS BE ENCOUNTERED AT ANY TIME, IMMEDIATELY

STOP WORK, NOTIFY COR AND CEMETERY DIRECTOR, AND AWAIT COR'S

DIRECTION.

KEY NOTES

PROVIDE NEW NETWORK VIDEO RECORDER (NVR) AND NETWORK SWITCH INSIDE

THE WALL MOUNTED RACK IN IT CLOSET (105A) - ADMINISTRATION BUILDING.

FOR ROUTE OF CABLES, SEE ELECTRICAL SITE PLAN.

SECURITY ACCESS, VIDEO CAMERA

CCTV WARNING SIGNAGE

LEGEND

CCTV #1

CCTV #3

CAMERA

MOUNTED ON

WALL (TYP.)

TEMPORARY

OFFICE

TRAILER

ADMINISTRATION

BUILDING

MAINTENANCE

BUILDING

STORAGE

BUILDING

CCTV #5CCTV #4

EXTERIOR

PULLBOX (TYP.)

CCTV #2

NETWORK VIDEO

RECORDER

CCTV

SIGNAGE

(TYP.)

UNDERGROUND

CABLES FOR

CAMERA

EXISTING

TELECOMMUNICATION

LINE

TYPICAL EXTERIOR CCTV CAMERAS

ROUTER

TV DISPLAY

PC WORK STATION

BY NCA

REMOTE LAPTOP

BY NCA

INTERNET

IT ROOM (105A)

16 PORT NETWORK

VIDEO RECORDER

(NVR) + POE SWITCH

SECURITY DETAILS

EY-201

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

C SECURITY SYSTEM BLOCK DIAGRAM

NONE

SYSTEM QUANTITY MODEL NUMBERMOUNTING MANUFACTURER REMARKS

A SECURITY SYSTEM SCHEDULE

NONE

WALL05CCTV #1 TO CCTV#5

OUTDOOR BULLET CAMERA.

PROVIDE WITH JUNCTION BOX (H4 - BO - JBOX1) AND

ALUMINUM CORNER MOUNTING BRACKET (H4 - MT - CRNR1)

AVIGILON 8.0C - H5A - BO1 - IR

IT RACK01

NETWORK VIDEO RECORDER

(NVR) VMA - AS3 - 16P12

IT RACK01UPS SMC1500 - 2UC

16 PORT 12 TB HD VIDEO APPLIANCE PRO FOR

VIDEO SURVEILLANCE SYSTEM

APC BY

SCHNEIDER ELECTRIC

AVIGILON

1500 VA, 120V POWER

23.62" 32.99"

.82

D IT RACK DETAILS

NONE

FRONT VIEW SIDE VIEW 3D VIEW

SYSTEM MODEL / SKU NUMBERMANUFACTURER

IT RACK_ADMINISTRATION BUILDING NAVEPOINT 00406143

TYPE

24U - MID DEPTH CABINETS

NOTE:

PROVIDE EQUIPMENT/DEVICE TO MEET THE SPECIFICATIONS OF NAMED MANUFACTURER OR APPROVED EQUAL.

ALL PRODUCTS, EQUIPMENT AND DEVICES PROVIDED UNDER THIS PROJECT SHALL CONFORM TO "BUY AMERICAN ACT".

NOTE:

PROVIDE EQUIPMENT/DEVICE TO MEET THE SPECIFICATIONS OF NAMED MANUFACTURER OR APPROVED EQUAL.

ALL PRODUCTS, EQUIPMENT AND DEVICES PROVIDED UNDER THIS PROJECT SHALL CONFORM TO "BUY AMERICAN ACT".

23.62" W X 32.99" D X 48.82" H

DIMENSIONS

IT CABINET MUST BE BOLTED TO THE FLOOR AND

USE TO MOUNT ONLY IT DEVICES.

REMARKS

B WALL MOUNTED RACK DETAILS

NONE

SYSTEM MODEL / SKU NUMBERMANUFACTURER

WALL MOUNTED RACK_ADMINISTRATION BUILDING NAVEPOINT 00406203

TYPE

9U-WALL MOUNT

NOTE:

PROVIDE EQUIPMENT/DEVICE TO MEET THE SPECIFICATIONS OF NAMED MANUFACTURER OR APPROVED EQUAL.

ALL PRODUCTS, EQUIPMENT AND DEVICES PROVIDED UNDER THIS PROJECT SHALL CONFORM TO "BUY AMERICAN ACT".

23.50" W X 18.00" D X 20.00" H

DIMENSIONS

USE TO MOUNT

TELECOM AND SECURITY DEVICES.

REMARKS

WALL MOUNTED RACK_TRAILER NAVEPOINT 004062039U-WALL MOUNT 23.50" W X 18.00" D X 20.00" H USE TO MOUNT

TELECOM AND IT DEVICES.

DS

DS

DS

RA

M

P

DN

DN

REF

CLOSET

104A

KITCHEN

UTILITY RM

RESTROOM

LOBBY

OFFICE

RESTROOM

OFFICE

OFFICE

HALL

CLOSET

108A

CLOSET

109A

CLOSET

110A

IT CLOSET

105A

CLOSET

102A

ENT. PORCH

104B

PORCH

109B

DN

DN

CLOSET

107A

LOUNGE

SD

SD SD

SD

SD

PNL B-26

SD

DS DS

DS DS

CLOSET

102A

RESTROOM

GARAGE

HAZMAT STOR

RESTROOM

102 CLOSET

101A

DS

SD SD

PNL A-22

DS

DS

SD

PNL C-5

DS DS DS DS DS

SD

SD

1 ADMINISTRATION BUILDING - FLOOR PLAN

1/4" = 1'-0"

FIRE ALARM PLANS

FA-101

0 2' 4' 8' 12'

GENERAL NOTES

1. WHERE CONDUIT AND CABLE PENETRATE FIRE RATED FLOORS AND WALLS,

PROVIDE U.L. LISTED FIRE STOPPING SYSTEM FOR EACH PENETRATION. GROUP

CABLES/CONDUITS TOGETHER TO REDUCE QUANTITY OF PENETRATIONS

WHEREVER POSSIBLE.

2. ALL EQUIPMENT SHALL BE NEW AND BEAR THE APPROPRIATE U.L. LISTING OR

CLASSIFICATION MARK. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

THE U.L. LISTING OR CLASSIFICATION.

3. COORDINATE WITH ARCHITECTURAL, STRUCTURAL AND MECHANICAL

DRAWINGS. SUCH COORDINATION SHALL OCCUR PRIOR TO ANY ROUGH-IN

AND PRIOR TO PROCUREMENT OF ANY MATERIAL(S).

KEY NOTES

CONTRACTOR SHALL PROVIDE NEW BATTERY BACKED - UP, INTERCONNECTED,

HARDWIRED AND TAMPER RESISTANT SMOKE ALARM, FIRST ALERT MODEL #SA520,

OR APPROVED EQUAL, AS SHOWN.

TRAILER SUPPLIER SHALL PROVIDE NEW BATTERY BACKED - UP, INTERCONNECTED,

HARDWIRED AND TAMPER RESISTANT SMOKE ALARM, FIRST ALERT MODEL #SA520,

OR APPROVED EQUAL, AS SHOWN.

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

FINAL CONSTRUCTION DOCUMENTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2019, Walker Federal Serivces, LLC

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

824IC3005

HU UB

May 22, 2020

05/22/2020

SMOKE ALARM

LEGEND

3 MAINTENANCE BUILDING - FLOOR PLAN

1/4" = 1'-0"

SD

1 (TYP.)

4 STORAGE BUILDING - FLOOR PLAN

1/4" = 1'-0" 2 TEMPORARY OFFICE TRAILER - FLOOR PLAN

3" = 1'-0"

(TYP.)

GENERAL ABBREVIATIONS

MANUAL VALVE

PIPE UNION

MECHANICAL SYMBOLS LEGEND

END CAP

PIPE RISE

PIPE DROP

TOP TAKE-OFF

BOTTOM TAKE-OFF

PIPE BREAK

AAV

PT

MANUAL VALVE WITH MEMORY STOP (BALANCING)

CAPPED VALVE WITH HOSE BIBB AND CHAIN

CHECK VALVE

Y-STRAINER

BASKET STRAINER

AUTOMATIC VALVE, 2-POSITION ACTUATOR

AUTOMATIC VALVE, MODULATING ACTUATOR

3-WAY VALVE, 2-POSITION ACTUATOR

3-WAY VALVE, MODULATING ACTUATOR

PRESSURE GAGE WITH GAGE CLOCK

TEMPERATURE SENSOR

PRESSURE / TEMPERATURE WELL

AUTOMATIC AIR VENT WITH ISOLATION VALVE

MANUAL AIR VENTMAV

FLEXIBLE CONNECTION

PIPE GUIDE

ANCHOR

UP

DN

DIRECTION OF FLOW IN PIPE

PITCH PIPE UP IN DIRECTION OF FLOW

PITCH PIPE DOWN IN DIRECTION OF FLOW

REFRIGERANT PIPING LINE SET

MECHANCIAL EQUIPMENT - NEW

A

A AMPERE

AC AIR CONDITIONING

ACV AUTOMATIC CONTROL VALVE

ACD AUTOMATIC CONTROL DAMPER

AD ACCESS DOOR

AF AIR FILTER

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALM ALARM

AP ACCESS PANEL

ARCH ARCHITECT

AS AIR SEPARATOR

ATC AUTOMATIC TEMPERATURE CONTROLS

ATV ATMOSPHERIC VENT

AAV AUTOMATIC AIR VENT

AVS AIR VOLUME STATION

B

BHP BREAK HORSE POWER

BOD BOTTOM ELEVATION OF DUCT

BOP BOTTOM ELEVATION OF PIPE

BRD BAROMETRIC DAMPER

BWV BACK WATER VALVE

C

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN-OUT

CD CONDENSATE DRAIN

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CV CONSTANT VOLUME

D

D DRAIN

DC DUST COLLECTION DUCTWORK

DAT DISCHARGE AIR TEMPERATURE

DBT DRY BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DP DIFFERENTIAL PRESSURE

DX DIRECT EXPANSION

E

(E) EXISTING

EA EACH

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EFF EFFICIENCY

ELEC ELECTRICAL

ER EXHAUST REGISTER

ES END SWITCH

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWT ENTERING WATER TEMPERATURE

F

F FAN

FA FREE AREA

FCU FAN COIL UNIT

FD FIRE DAMPER

FMT FLOW METER/TRANSMITTER

FPB FAN POWERED BOX (TERMINAL UNIT)

FPM FEET PER MINUTE

FSD FIRE/SMOKE DAMPER

FT FEET

FZ FREEZE STAT

G

G GAS

GR GLYCOL RETURN

GS GLYCOL SUPPLY

H

H HEIGHT

HB HOSE BIBB CONNECTION WITH CHAINED CAP

HC HEATING COIL

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND-OFF-AUTOMATIC SWITCH

HP HORSE POWER

HP HEAT PUMP

HV HEATING & VENTILATING UNIT

HW HOT WATER

HWR HOT WATER RETURN (DOMESTIC)

HWS HOT WATER SUPPLY (DOMESTIC)

HVAC HEATING VENTILATION AIR CONDITIONING

HX HEAT EXCHANGER

HZ HERTZ

I

IN INCHES

INWC INCHES OF WATER COLUMN

K

KW KILOWATTS

L

LAT LEAVING AIR TEMPERATURE

LD LINEAR DIFFUSER

LF LINEAR FEET

LPR LOW PRESSURE CONDENSATE RETURN

LPS LOW PRESSURE STEAM SUPPLY

LSPS LOW STATIC PRESSURE SWITCH

LWT LEAVING WATER TEMPERATURE

M

MAV MANUAL AIR VENT

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MIN MINIMUM

MPR MEDIUM PRESSURE CONDENSATE RETURN

MPS MEDIUM PRESSURE STEAM SUPPLY

N

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NUM NUMBER

NTS NOT TO SCALE

O

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

OAT OUTSIDE AIR TEMPERATURE

OCC OCCUPIED

OED OPEN END DUCT

P

P PUMP

PC PUMPED CONDENSATE

PD PRESSURE DROP

PLBG PLUMBING

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

R

RA RETURN AIR

RAD RETURN AIR DAMPER

RAT RETURN AIR TEMPERATURE

RD RETURN DIFFUSER

RET RETURN

REQ REQUIRED

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RI RUN INDICATOR

RL REFRIGERANT LIQUID

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

S

SA SUPPLY AIR

SA SOUND ATTENUATOR

SAD SUPPLY AIR DAMPER

SD SUPPLY DIFFUSER

SDET SMOKE DETECTOR

SF SUPPLY FAN

SP STATIC PRESSURE SENSOR

SQFT SQUARE FEET

SR SUPPLY REGISTER

S/S START/STOP

SUP SUPPLY

T

T TEMPERATURE SENSOR

TEMP TEMPERATURE

TF TRANSFER FAN

TG TRANSFER GRILLE

TOD TOP ELEVATION OF DUCT

TOP TOP ELEVATION OF PIPE

TYP TYPICAL

U

UH UNIT HEATER

UNOCC UNOCCUPIED

UNO UNLESS NOTE OTHERWISE

V

V VENT

VAV VARIABLE AIR VOLUME TERMINAL UNIT

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

VS VIBRATION SWITCH

W

W WIDTH

WBT WET BULB TEMPERATURE

WMS WIRE MESH SCREEN

WIC WALK-IN COOLER

GENERAL ABBREVIATIONS (CONT.)

CONNECT NEW TO EXISTING

LIMIT OF DEMOLITION

KEY NOTE SYMBOL

CONDENSATE PIPE

FS

D

CD

R

DATA

TAG

DATA

TAG

1. SYSTEM UTILIZES THE REDUCED LIGHTING POWER DENSITY

OPTION TO COMPLY WITH THE ADDITIONAL EFFICIENCY

REQUIREMENTS OF IECC C406.

FS

D OR

1. GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE APPLICABLE

TO ALL DRAWINGS WITHIN THIS SECTION.

2. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER

SECTIONS.

3. THIS SCOPE OF CONSTRUCTION WORK INCLUDES FURNISHING

LABOR, MATERIALS, EQUIPMENT AND PERFORMANCE OF ALL

OPERATIONS REQUIRED TO PROVIDE A COMPLETE,

FUNCTIONAL AND OPERATIONAL SYSTEM.

4. COORDINATE ROOF PENETRATIONS WITH WORK OF OTHER

SECTIONS AND WITH FLASHING REQUIREMENTS. PROVIDE

INFORMATION, HARDWARE, AND LABOR AS NECESSARY TO

COORDINATE ROOF CURBS REQUIRED FOR ROOF TOP

EQUIPMENT.

5. SUPPORT ALL EQUIPMENT, PIPING AND DUCTWORK FROM

BUILDING STRUCTURE TO PROVIDE A VIBRATION FREE

INSTALLATION. NOTIFY STRUCTURAL ENGINEER OF ALL

WEIGHTS AND METHODS OF SUPPORT.

6. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH

NATIONAL ELECTRIC CODE.

7. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, UNLESS

NOTED OTHERWISE.

8. THE CONTRACTOR SHALL MAKE CONNECTIONS TO EQUIPMENT

AND FIXTURES INSTALLED BY HIS WORKMEN AS WELL AS

EQUIPMENT AND FIXTURES FURNISHED BY OTHERS, PROVIDED

BY THE GOVERNMENT, OR OTHERWISE SPECIFIED ON THE

DESIGN DOCUMENTS.

9. THOUGH SOME OFFSETS & TRANSITIONS ARE SHOWN IN

PIPING & SHEET METAL TO HELP INDICATE THE PHYSICAL

RELATIONSHIP BETWEEN THEM, IT IS NOT THE INTENT OF THE

DRAWINGS TO SHOW ALL PIPING & SHEET METAL OFFSETS &

TRANSITIONS REQUIRED. THE CONTRACTOR SHALL FULLY

COORDINATE THE WORK WITHIN ITSELF & WITH THE WORK OF

ALL TRADES TO PROVIDE COMPLETE & OPERABLE SYSTEMS

WITHOUT INTERFERENCES.

10. THE DOCUMENTS CONTAIN INFORMATION RELATIVE TO

SYSTEM SETPOINTS (PRESSURE, FLOW, TEMPERATURE, ETC...)

THAT ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY.

THE TESTING ADJUSTING AND BALANCING CONTRACTOR IN

CONJUNCTION WITH THE AUTOMATIC TEMPERATURE

CONTROLS CONTRACTOR SHALL SET ACTUAL SETPOINTS.

11. MANUFACTURERS' MODEL NUMBERS ARE SPECIFIED ON

EQUIPMENT SCHEDULES SOLELY TO ESTABLISH STANDARDS OF

QUALITY FOR PERFORMANCE AND MATERIALS.

12. EQUIPMENT AND MATERIAL INSTALLATION SHALL ADHERE TO

MANUFACTURES' REQUIREMENTS AND RECOMMENDATIONS.

13. PROVIDE ACCESS PANELS TO SYSTEM COMPONENTS THAT ARE

CONCEALED AND REQUIRE PERIODIC SERVICE.

14. ALL EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN

HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR

FLAME AND SMOKE PER UNDERWRITERS'S LABORATORY (UL).

15. PROVIDE WEATHERPROOF EXTERNAL JACKETING FOR ALL

DUCT AND PIPE INSULATION THAT IS EXPOSED TO THE

OUTDOORS.

16. PROVIDE VAPOR RETARDANT FOR ALL INSULATED PIPES AND

EQUIPMENT THAT ARE PART OF THE COOLING SYSTEM, OR

ARE INSTALLED OUTSIDE THE CONDITIONED SPACE.

1. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE

CURRENT INTERNATIONAL MECHANICAL CODE INCLUDING

LOCAL JURISDICTION SUPPLEMENTS AND AMENDMENTS. ALL

WORK SHALL BE EQUAL OR SUPERIOR TO THAT REQUIRED BY

RULES, CODES, ORDERS, REGULATIONS AND LAWS IMPOSED BY

AUTHORITY HAVING JURISDICTION. THE MORE STRINGENT OF

THE CODES SHALL GOVERN.

2. ALL RETURN AIR OPENINGS ABOVE CEILING SHALL BE PROVIDED

WITH A 1/4" MESH ALUMINUM SCREEN.

3. ALL DIMENSIONS SHOWN FOR DUCTWORK ARE NET INSIDE

DIMENSIONS.

4. ALL WALL MOUNTED DEVICES SUCH AS THERMOSTATS SHALL BE

MOUNTED AT 48" ABOVE FINISHED FLOOR U.N.O. BY

ARCHITECT.

5. ALL ROUND RUN OUTS TO DIFFUSERS SHALL BE THE SAME

NOMINAL SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.

6. THOUGH SOME MANUAL VOLUME DAMPERS ARE SHOWN ON

THE DRAWINGS, IT IS NOT THE INTENT OF THE DRAWINGS TO

SHOW ALL MANUAL VOLUME DAMPERS IN SUPPLY, RETURN

AND EXHAUST DUCTWORK. PROVIDE MANUAL VOLUME

DAMPERS AT THE FOLLOWING LOCATIONS AS REQUIRED TO

REGULATE THE FLOW OF AIR FOR OF AIR FOR PROPER BALANCE

AND OPERATION OF THE DUCT SYSTEMS.

- BRANCH TAKEOFFS

- DUCT SPLITS (DUCT “Y’S” OR SIMILAR SPLIT FABRICATIONS).

7. PROVIDE ALL NECESSARY DUCT TRANSITIONS TO CONNECT

DUCTWORK SYSTEMS TO EQUIPMENT AND DIFFUSERS.

8. ALL JOINTS AND SEAMS OF AIR DUCTS, AIR-HANDLERS, AND

FILTER BOXES SHALL BE SEALED TO SMACNA SEAL CLASS A. ALL

DUCTWORK FOR THIS PROJECT IS LOW PRESSURE DUCT, 2" W.G.

PROVIDE DUCT SEALANT TO COMPLY WITH UL723 CLASS 1

TESTED, AND ASTM 572 AND C732, WITH VOC NOT MORE THAN

250 G/L.

9. ALL NEW DUCTWORK SHALL BE GALVANIZED SHEET METAL,

2" PRESSURE CLASS, WITH METAL GAUGE (THICKNESS)

AND SUPPORTS DETERMINED BY COMPLIANCE WITH

SMACNA GUIDELINES FOR 2" PRESSURE CLASS. DUCT MAY

BE SLIP/DRIVE OR FLANGED.

10. FLEXIBLE DUCTWORK MAY BE USED AS FOLLOWS: LOW

PRESSURE APPLICATION ONLY, UL LISTED CLASS 1,

DOUBLE LAMINATED POLYESTER OR COATED FIBERGLASS

CLOTH WITH HELICAL WIRE REINFORCEMENT; FACTORY

INSULATED.

11. ALL ELECTRICAL MOTORS SHALL MEET EPAct 1992 MINIMUM

EFFICIENCY REQUIREMENTS.

12. DAMPER LEAKAGE RATES SHALL NOT EXCEED 10 CFM/SF.

13. ALL NEW SUPPLY, RETURN, AND OUTSIDE AIR DUCTS SHALL

BE INSULATED TO A MINIMUM R-6.

14. SUPPLY AND RETURN EXTERIOR DUCTWORK &

DUCTWORK LOCATED IN THE ATTIC SHALL BE INSULATED

TO A MINIMUM OF R-8.

15. HVAC PIPING CARRYING FUILDS OF 105F OR BELOW 55F

SH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .