This document provides details on a federal contract opportunity for facility renovations and improvements at two national cemeteries. The solicitation number is 36c78620b0009 and seeks bids for renovations at the Woodlawn and Bath National Cemeteries. The work includes facility improvements and repairs. The contracting agency is the Department of Veterans Affairs National Cemetery Administration. The solicitation describes the opportunity type as a bid for renovations and provides the name and location of the national cemeteries that will receive improvements. Relevant documentation is available in an attached file with drawings of the planned work at Woodlawn Cemetery.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 ASPHALT PAVING
1-1/2" = 1'-0"
TOP COURSE NYSDOT SECTION 402
FOR TYPE 12.5 F2 TOP COURSE HMA,
ITEM NO. 402.12720
1' -0
" COMPACTED AGGREGATE BASE
COURSE; NYSDOT SECTION 304 FOR
TYPE 2 SUBBASE COURSE, ITEM NO.
304.12
SEPARATION GEOTEXTILE; MIRAFI HP270
OR EQUAL AS APPROVED BY COR
NOTES:
1. REFER TO SPECIFICATIONS AND GEOTECHNICAL REPORT FOR SITE PREPARATION AND PAVEMENT DRAINAGE
REQUIREMENTS.
31 2" 11 2"
BINDER COURSE; NYSDOT SECTION
402 FOR TYPE 19 F9 BINDER COURSE
HMA, ITEM NO. 402.197902
COMPACTED SUITABLE SUBGRADE
3 WHEELSTOP
3/4" = 1'-0"
6'-0"
#5 x 3'-0" REBAR
(TYP.)
2"
61 2"
1" Ø HOLE
(TYP.)
8" TOOLED EDGE
(TYP.)
1'-0" 1'-6" 1'-0" 1'-6" 1'-0"
1"
2 #3 BARS
PRECAST CONCRETE PARKING
BUMPER; WET CAST
8" 4" 21 2"
2 ASPHALT OVERLAY
1-1/2" = 1'-0"
TACK COAT
COMPACTED AGGREGATE BASE COURSE;
NYSDOT SECTION 304 FOR TYPE 2
SUBBASE COURSE, ITEM NO. 304.12
NOTES:
1. MEET ADJACENT EXISTING PAVEMENT FLUSH.
2. MILL ADDITIONAL DEPTH AND/OR INSTALL TOP COURSE GREATER THAN 2" AS NECESSARY TO ENSURE A SMOOTH
PAVEMENT TIE-IN & PRECLUDE FORMATION OF FALSE GUTTERS
3. WHERE MILLING EXPOSES ISOLATED AREAS OF MEDIUM TO HIGH SEVERITY OF CRACKING OR OTHER DISTRESS, OR
DESTABILIZES EXISTING BINDER AND/OR BASE COURSE, SAWCUT TO FORM RECTANGULAR PERIMETERS & REPLACE
WITH FULL-DEPTH ASPHALT PAVING PER 1/CP-201.
4. CLEAN AND REMOVE ALL LOOSE MATERIAL AND DEBRIS FROM MILLED SURFACES & SAWCUT EDGES PRIOR TO
APPLYING TACK COAT.
2" M
IN
EXISTING BINDER COURSE
TOP COURSE ; MATCH 1/CP-201
SAWCUT MILLED EDGE TO PROVIDE
A NEAT, TRUE 90° EDGE
4 ACCESSIBLE PARKING ICON
3/4" = 1'-0"
NOTES:
1. PROVIDE PAINT PER 32 17 23 PAVEMENT MARKINGS.
3' -1
0"
3'-4"
3' -3
2'-7"
NYSDOT 39-INCH STENCILED
ACCESSIBLE PARKING ICON; WHITE
BACKGROUND; PMS 293C BLUE
5 CURB
1-1/2" = 1'-0"
#4 BAR, CONTINUOUS
(TYP.)
NOTES:
1. VERIFY MATCH TO EXISTING ADJACENT CURB. *ADJUST INDICATED DIMENSIONS AND BATTER AS NECESSARY.
2. PROVIDE 4000 PSI COMPRESSIVE STRENGTH.
3. PROVIDE 18" WIDE TOOLED CONTROL JOINTS UNIFORMLY SPACED NOT TO EXCEED 15'. ALIGN TO ADJACENT SIDEWALK
WHERE APPLICABLE.
4. PROVIDE 12" EXPANSION JOINTS UNIFORMLY SPACE NOT TO EXCEED 20' O.C. ALIGN TO ADJACENT SIDEWALK WHERE
APPLICABLE. PROVIDE 12" PREFORMED EXPANSION JOINT FILLER, RECESSED 14" FROM TOP & FACE OF CURB.
5. APPLY 3
16" RADIUS TO EXPOSED EDGES AND HAND-TOOLED JOINTS.
6. FINISH WITH A STEEL TROWEL OR FINE BRUSH ALONG LENGTH OF CURB. USE ONLY NEW, CLEAN FINISHING TOOLS.
7. SAWCUT AND REMOVE ADJACENT EXISTING PAVEMENT AS NECESSARY AND APPROVED BY COR. REPAIR IN
ACCORDANCE W/ 1/CP-201.
*R 2"
1' -4
*6
COMPACTED AGGREGATE BASE COURSE;
NYSDOT SECTION 304 FOR TYPE 2
SUBBASE COURSE, ITEM NO. 304.12
COMPACTED SUBGRADE
ADJACENT PAVING
6"
6"
CIP CONCRETE
4" (T
YP
CP-201CP-201
ASPHALT PAVING
(SIM.)
1'-0"
SEPARATION GEOTEXTILE; MIRAFI HP270
OR EQUAL AS APPROVED BY COR
*8"
*1 4"
6 CURB TRANSITION
1-1/2" = 1'-0"
TC
FG
3'-6" 6" 5
CP-201CP-201
CURB
(SIM.)
BC
ADJACENT
CURBTRANSITION
NOTES:
1. PROVIDE TRANSITION WHERE FLUSH CURB MEETS STANDARD CURB.
1' -0
LS-201LS 201
EXPANSION JOINT
(SIM.)
6"
CP-201CCCCCCCP-201CCCCCCCC
7 FLUSH CURB
1-1/2" = 1'-0"
*8"
1' -0
6"
R1 4"
CP-201CP-201
CURB
(SIM.)
CURB TRANSITION
(BEYOND)
NOTES:
1. FOR ADJACENT CONCRETE SIDEWALK & DETECTABLE WARNING, REFER TO LS-201.
3" (T
YP
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
PAVING DETAILS
CP-201
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
C P
P a v in g d e ts .d w g
P M T D
S td D W G
T o
P D F .p c
LS-201
CONCRETE PAVING
HEAVY DUTY
LS-202LS-202
FLOWER WATERING
STATION
LS-201LS-201
CONCRETE PAVING
TYPICAL
LS-201LS 201
CONCRETE JOINTING
CONTROL JOINT
REFER TO FENCE REPAIR TABLE, LS-212
LS-204LS-204
GATE 1
X
LS-201LS-201
AGGREGATE SURFACING
PLANTING; REFER TO LP- PLANS
STRUCTURAL SLAB; REFER TO Sx PLANS
LS-201LS-201
CONCRETE JOINTING
EXPANSION JOINT
LS-201LS-201
CONCRETE PAVING
TEMPORARY
LS-201LS-201
TEMPORARY AGGREGATE BASE
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
F
E2
B1
A
5'-0"
R3'-0"
(TYP.)
LS-111LS-111
LAYOUT ENLARGEMENT 2
STST
STST
STSTSTST
STST
STST
STST
STST
STST
STST
STST
STSTSTST
STST
STST
STST
STSTSS STST STST STST STSTSTST STST STST STST STSTSTST
STST
TT
STST
WW WWWW WW WW WW WW WW WW WW WWWWWW WW WW WWWW WW WW
WWWW
WWWWWW
WWWW
WWWW
WW
WWWW
WW
WW
WW
WWWWWW
(T(T
WW
WW
WWWW
WWWW
WWWWWWWWWWW
WW
WW
WW
WW
WW
WWWW
WW
WW
WW
WW
WWWWWWWW
WWW
WW
WWW
WWWWW
WWWWWWWWWWWWWWWWW
WWWWWW
WWW|
WWWW
WW
WW
WWWWWW
SSSSSSSSSSSSSS
TTTTTTTTTTTTTTTTTT
STSTSTSTSSSTSTSSSTSTSTST
STSTTTSTSTSTSTTSSSTSTSSSTSTSTSTT
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTST
TTSSSTSSTSTSSSSTTSSSTSTSTSSSSTTSSSSTTTTSSST
SSSSSSSSSSSSSS
WWWWWWWW
WWWWWWWW
WW
WWW
WWWW
WWWWW
WWWWWWWWWWWWWWW
8748748888778888888888877777777777777448748748888788888 44444
73733333333878788777887777
1" PEX WATER TUBE
PROVIDE 48" MIN. DEPTH OF COVER
MAINTAIN NOT LESS THAN 12" CLEARANCE BTW WALK & HEADSTONES;
DEMONSTRATE PROPOSED EDGES OF ENTIRE SIDEWALK W/ STRING LINE FOR
COR'S REVIEW AND APPROVAL PRIOR TO INSTALLING FORMS; PERFORM ALL
WORK RELATED TO THIS SIDEWALK IN PRESENCE OF CEMETERY DIRECTOR &
COR; PROVIDE NOT LESS THAN SEVEN DAYS NOTICE.
WARNING: SIDEWALK MAY BE ABOVE EXISTING GRAVES. DO NOTOTT
OVER-EXCAVATE. ENCOUNTERING A CASKET OR OTHER REMAINS MAYIN
NECESSITATE IMMEDIATE PAUSE AND REASSESSMENT OF SIDEWALK WORK.KKWE
FOLLOW CEMETERY DIRECTOR'S DIRECTION.
6'-6" ||
0 10 20 40 60
MATCHLINE SHEET LS-102
SITE DEVELOPMENT PLAN
LS-101
MATCHLINE SHEET LS-102
LEGEND
NOTES
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
L S S it e d e v p la n .d w g
P M T D
S td D W G
T o
P D F .p
LS-201
CONCRETE PAVING
HEAVY DUTY
LS-202LS-202
FLOWER WATERING
STATION
LS-201LS-201
CONCRETE PAVING
TYPICAL
LS-201LS 201
CONCRETE JOINTING
CONTROL JOINT
REFER TO FENCE REPAIR TABLE, LS-212
LS-204LS-204
GATE 1
X
LS-201LS-201
AGGREGATE SURFACING
PLANTING; REFER TO LP- PLANS
STRUCTURAL SLAB; REFER TO Sx PLANS
LS-201LS-201
CONCRETE JOINTING
EXPANSION JOINT
LS-201LS-201
CONCRETE PAVING
TEMPORARY
LS-201LS-201
TEMPORARY AGGREGATE BASE
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTIONE1
D
C
B2
6'-6"
LS-111LS-111
LAYOUT ENLARGEMENT 2
LS-111LS-111
LAYOUT ENLARGEMENT 1
T T
E E E
E E E
E
E EEEE
G
AS
G
AS
G
AS
G
AS
GASGAS
GASGAS
GASGAS
G
AS
G
AS
WW
WW
WW
STST
STST
STST
STSTT
STST
STST
STST
STST
STST
STST
STST STST STST STSTSTSTSTST STST STST STSTTT STST STST STST STST STST STST STST STST TTTTSTSTTSTT STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STSTSTST
STST
STST
WW
WW
WWW
WWW
TT
TT
WW
WWW
WWWW
GASGASSS
NN
SASANN
SAN
SAN
SAN
SAN
SANSANGAGAGAGAGAGAGASS SANSANSANSAN SANSAN NNSASANNANN SANSAN SANSAN SSSANSANSAS SANSAN SANSAN SANSAN SANSAN SANSAN
SANSAN SANSAN SANSAN
SAN
SAN
SAN
SAN
ANAN
SS
SAN
SAN
SAN
SAN
SAN
SANNNNNNNNN
SAN
SAN
SAN
SAN
SSASAA
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
AA
GASGAS GASGAS GASGAS GAGAASASGAGA GASGAS SSGASGAGG
WWWWWW WWWWWWWWWW WW WW
STST STST STST
SASA
ASAS
GASS
STSTSTSTSSSSSSSSTTTTTTTTTTTTTTT
WWW ANAN
WWWW
WWW NN
TT
SSSSSSSSSSSSSSSSSS
STSTSTSTSTSTSTSTSTTSTST
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTT
TTTTTT
TTT
TTTTTTT
STSTSTSTTTTTSTST
SSASASSSSSSSSSASA
SS
NN
GG
ST
STSSTSTST
EEEEEEE
SSSSSSS
NN
EEE
SASA
EEEE
SSSAS
EEEEE
TTTTTTTTTTT TTTT
99779988777 99999778787877 9797979888888888
88888888888888
ST
ST
ASSSS
ANAN
SANSANSANNSSSAASSSS NNNN
W WWWW
SS
WWWW NNNN
WW
G A
G
A SS
G A
G
AA
GGGG
GG SASA
CCC CC
STSSSSS
87474
1" PEX WATER TUBEBE1 WX
PROVIDE 48" MIN. DEPTH OF COVERMINDE 48OR
WW CONNECT NEW WATER PIPE TO EXISTINGEE TO EEEPEE EXISEECECNNO CTCC NNECTNECON
SERVICE; PROVIDE VALVE BOX, SERVICE
VALVE & BACKFLOW PREVENTER
0 10 20 40 60
MATCHLINE SHEET LS-101
SITE DEVELOPMENT PLAN
LS-102
MATCHLINE SHEET LS-101 LEGEND
NOTES
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
L S S it e d e v p la n .d w g
P M T D
S td D W G
T o
P D F .p
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
5'-0"
'-6
16'-0" 30'-0" VIF
LS-112LS-112
LAYOUT ENLARGEMENT 3
LS-112LS-112
LAYOUT ENLARGEMENT 4
COORDINATE ALL WORK THIS AREA
W/ COR AND CEMETERY DIRECTOR
T T
E E E
E E E
E
E EEE
Y DIRECTO
G
AS
G
AS
G
AS
G
AS
GASGAS
GASGAS
GASGAS
G
AS
G
AS
WW
WW
WW
STST
STST
STSSTSTTTTT
STST
STST
STST
SS
WW
WW
TT
TT
WW
WWW
WW
GASGASSS
SAN
SAN
SAN
SAN
SAN
SAN
SANSANGAGAGAGAGAGAGASS SANSANSASASANSA SANSAN SANSAN SANSAN SANSAN SANSANSSSS SANSAN SANSAN SANSAN SANSAN SANSAN
SANSAN SANSAN SANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SASAA
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
AA
GASGAS GASGAS GASGAS GASASGAGAGAGA GASGAS SSGASGAG
WWWWWW WWWWWWWWWW WW WW
STST STST STST
SAA
ASAS
ASTTTTA
B BB
B
STSSTSTSSSSSTTTTTTTTT
BB
WWW
AA
B
WWWW
WWW NN
BB
*P1
BBB
TT BB
SSSSASASSSSSSSSSASA
B
B
B
B
SS
NN
GG
*P1111PP
ST
STSSTSTT
EEEEEE
SSSSS
NN
EEE
SSSS
EE
TTTTTTTTTT TTTT
ST
ST
B
SSBBB SS
ANN
SANSANANNSSAASSSS
W WWWW
SS
WW NN
*P2P2P2
WW
G A
G
A SS
G A
G
AAA
GG
GG SASA
BB
B
CCCC CC
1' -0
4' -0
"0"
'-4
1' -0
S
'-5-5
1 2" 1'
-0
(T
YP
.) 1'-0"
(TYP.)
12'-0"12' 0"'-2'-
±5 '-7
5' -0
4'-0"3'-3"
5' -0
6' -0
SSSTSTS0404
1' -6
9"
6' -4
NN
±8'-0"±8
±5 '-0
T
5'-6" 1'-6"""
5'-0"
2' -5
5""
3"
1'-0"
(TYP.)
R6"6"
EXISTING FUEL SHUT-OFF TO REMAIN;
CONNECT TO NEW FUEL PUMPLTO
CONTROL WIRES; REFER TO E-x PLANS
T 9""
9'-0"
5' -0
SAA
ALIGN
GG
ANAN
12(TYP.)
(TYP.)
BB
FLUSH CURB; REFER TO
CP-x PLANS
CURB; REFER TO CP-x
PLANS
CURB; REFER TO CP-xE
PLANS
R10'-5"
13'-6"
'-6
R5'-0"
PROTECT EXISTING MEMORIAL
AND SIGN AS APPROVED BY COR
±2 '-6
*P1P
"6
6' ±2
*P1 *P1
AAAAAAAAAA
LS-202LS-202
GETTYSBURG TABLET08
LS-201LS-201
CONCRETE PAVING
HEAVY DUTY
LS-201LS-201
CONCRETE PAVING
TYPICAL
LS-201LS-201
CONCRETE JOINTING
CONTROL JOINT
*P2P1 5
LS-201LS-201
DETECTABLE WARNING PLATE
LS-203LS-203
BOLLARDB
LS-201LS-201
AGGREGATE SURFACING
PLANTING; REFER TO LP- PLANS
STRUCTURAL SLAB; REFER TO Sx PLANS
LS-201LS-201
CONCRETE JOINTING
EXPANSION JOINT
LS-201LS-201
CONCRETE PAVING
TEMPORARY
AMERICAN FLAG POLE; REFINISH W/ X2 PAINT
PER PRODUCT SCHEDULE, 1/LS-211 & 099100
LS-202LS-202
FUEL TANK
LS-203LS-203
HAND RAIL
STAIR 1
LS-201LS-201
ACCESSIBLE RAMP
LS-204LS-204
SCREEN FENCE
LS-204LS-204
GATE 209
* DENOTES MULTIPLE ADJACENT UNITS
LS-201LS-201
TEMPORARY AGGREGATE BASE
LS-201LS-201
MOW STRIP03
LS-202LS-202
SPILL KIT07
LIMIT OF FOOTING OR TURNDOWN SLAB,
BELOW11
DIG TEST PIT TO DETERMINE POTENTIAL
UTILITY CROSSING CONDITION12
0 5 10 20 30
SITE DEVOLPMENT PLAN
ENLARGEMENTS
LS-111
2 LAYOUT ENLARGEMENT 2
1"=10' 1 LAYOUT ENLARGEMENT 1
1"=10'
NOTES:
1. COORDINATE THE SCHEDULE, EXTENT, AND MEANS & METHODS OF ALL WORK THIS DETAIL WITH CEMETERY
DIRECTOR AND COR NOT LESS THAN TEN DAYS PRIOR TO WORK. REVIEW SCHEDULE WITH CEMETERY DIRECTOR
AND COR 3 DAYS AND 1 DAY PRIOR TO WORK AND SHOULD ANY POTENTIAL CHANGE ARISE.
2. PROVIDE ADDITIONAL/ALTERNATE BARRICADES AND FLAGGERS AS REQUESTED BY COR.
3. PERFORM ALL WORK THIS DETAIL IN THE PRESENCE OF COR.
LEGEND
NOTES
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
L S S it e d e v e n la rg .d w g
P M T D
S td D W G
T o
P D F .p
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
3'-6" 3'-6"
8"
8"
6"
8' -0
31 2" 31 2"
2"
EQ
3' -6
EQ
1' -6
2'-7"
1' -6
3' -8
VI
F
31 2"
R3'-0"
R1'-6"
E E
STSTTTTT
STST
TTTT
CC
2'-7"7'-61 2"
7'-0"4'-0"
1' -4
VI
F
3' -0
1' -0
2' -0
6'
-0
6"
31 2"
2"
2"
STSTSSSS
6"6"
5' -0
33 44"
4" 3'-21
4" 3'-21 4" ±33
4"
1' -0
71 2"
TTT1'
-8TT
TTTT
2"
TTTTTTTTTTTTTTTTT
2' -4
1'
-1 11 2"
33 4"" 2'
-2 1 4"
2' -2
1 4" 33 4"
2' -8
2'
-8
2' -8
4"
2'-102 1 4" 2'-101
4" 2'-101 4" 2'-101
4"
4"
2"
2"
4"
R41 2"
R 3 4
R 3 4 "
LS-20333333333333333L
0 1.5 3 4.5
SITE DEVOLPMENT PLAN
ENLARGEMENTS
LS-112
2 LAYOUT ENLARGEMENT 4
3/4" = 1'-0" 1 LAYOUT ENLARGEMENT 3
3/4" = 1'-0"
LEGEND
NOTES
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
L S S it e d e v e n la rg .d w g
P M T D
S td D W G
T o
P D F .p
File details come from the government source that posted it. Updated .