This document provides details on a federal solicitation and related bid drawings. The solicitation number is 36c78620b0009 for facility renovations, improvements, and repairs at the Woodlawn and Bath National Cemeteries. The opportunity type is a solicitation issued by the Department of Veterans Affairs National Cemetery Administration. The bid drawings file S02 - 824IC3005 Bid Dwgs Woodlawn Bk02.pdf is related to this solicitation for renovating and improving facilities at the named national cemeteries. The description specifies repairs and renovations are needed at the Woodlawn-Bath National Cemetery.

View the file

Other files

File Type Posted
S06 - A0003 - Amendment.docx DOCX document
S06 - HazMat Information - WB.pdf PDF
S06 - Amendment 0002.docx DOCX document
A2 - Pre-Bid Walk-Thru Sign In Sheet.PDF PDF
A1 - 803IC3015 Bid Dwgs Bath Bk02A.pdf PDF
S05 - Amendment 0001.docx DOCX document
S02 - 824IC3005 Bid Dwgs Woodlawn Bk09.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk05.pdf PDF
S02 - 824IC3005 - Geotechnical Report - Woodlawn.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk02.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk12.pdf PDF
S02 - Scope of Work Final - Woodlawn-Bath.pdf PDF
S02 - 803IC3015 Bid Specs Bath Bk.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk03.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk01.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk13.pdf PDF
ATTACHMENT 05 - Cost Estimate Worksheet - WB.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk03.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk06.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk07.pdf PDF
P07 - WD - NY20200005 - Woodlawn NC.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk10.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk05.pdf PDF
S02 - 36C786-20-B-0009 - Solicitation.pdf PDF
P07 - WD - NY20200048 - Bath NC.pdf PDF
S02 - 803IC3015 - Geotechnical Report - Bath.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk01.pdf PDF
S02 - 824IC3005 Bid Specs Woodlawn Bk.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk04.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk07.pdf PDF
S02 - 803IC3015 Bid Dwgs Bath Bk06.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk08.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk11.pdf PDF
S02 - 824IC3005 Bid Dwgs Woodlawn Bk04.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAY 22, 2020

1. INSTALL CONSTRUCTION FENCING WHEN WORK

BEGINS AND UNTIL COMPLETE & ACCEPTED AT EACH

AREA. FOLLOW 010002 & COR'S DIRECTION.

2. WORKING & STORAGE ON OCCUPIED GRAVES IS

PROHIBITED. PROTECT GRAVES, HEADSTONES,

TEMPORARY MARKERS, AND MEMORIALS FROM

DAMAGE. INSTALL 34" PLYWOOD COVERS ON ALL

HEADSTONES & MEMORIALS W/IN 10' OF WORK & AS

DIRECTED. REMOVE AFTER WORK IS COMPLETE.

3. COORDINATE ACCESS SCHEDULES & TEMPORARY LANE

CLOSURES & BARRICADES W/ COR NOT LESS THAN 7

DAYS IN ADVANCE OF EACH PROPOSED ACCESS.

TEMPORARY CEMETERY OFFICE

TRAILER; REFER TO 1/LS-205

SIGN; (TYP.)

FLAG POLE; (TYP.)

LS-203LS 203

TEMPORARY CEMETERY OFFICE SIGN

LAYDOWN & STORAGE

GETTYSBURG TABLET

CONFEDERATE MEMORIAL

MEMORIAL

MEMORIAL W/IN LOW

ADMINISTRATION BUILDING

MAINTENANCE BUILDING

PUBLIC RESTROOM

COMMITTAL SERVICE SHELTER

AMERICAN FLAG POLE; REFINISH PER 099100

FLAG LIGHT; TYP. OF 4

HEADSTONE; (TYP.)

HEADSTONE RESET BY CEMETERY STAFF; REFER

TO DEMOLITION PLANS & COORDINATE W/ COR

S1

BORING LOCATION; REFER TO PROJECT

MANUAL, GEOTECHNICAL REPORTBx

USE EXTREME CAUTION EXCAVATING NEAR

GRAVES; PERFORM IN PRESENCE OF COR (TYP.)15

LIMITS OF WORK, UNFENCED

REFER TO 010002 & COR'S DIRECTION

EXISTING TREE; PROTECT PER 015639

TREE AND PLANT PROTECTION

LIMITS OF WORK W/ CONSTRUCTION FENCE

REFER TO 010002 & COR'S DIRECTION

THE FOLLOWING IS INTENDED TO LIMIT DISRUPTION TO

CEMETERY OPERATIONS, NOT REPRESENT A FINAL LIST OF

DETAILED OPERATIONS. COR WILL CONSIDER DIFFERENT

SEQUENCES. REVIEW IN DETAIL W/ COR AND CEMETERY

DIRECTOR AND UPDATE AS REQUESTED.

1. MOBILIZATION: INSTALL CONSTRUCTION FENCING,

TREE PROTECTION MEASURES, EROSION & SEDIMENT

CONTROL DEVICES, CONSTRUCTION TRAILER, AND

CEMETERY OFFICE TRAILER & RELATED SIGN & WALK.

2. SITE WORK:

2.1. DEMOLISH PAVEMENTS & CURBING, EXCEPT AT

EXISTING FUEL TANK. DEMOLISH WATER LINE &

HYDRANTS. INSTALL NEW CONCRETE PAVING,

CURBS, WATER LINE, WATERING STATION.

2.2. INSTALL NEW FUEL TANK, SLAB, BOLLARDS,

FOOTINGS & APPURTENANCES. TRANSFER FUEL

FROM EX. TO NEW TANKS & DEMOLISH EXISTING

TANK & ADJACENT REMAINING PAVEMENTS,

BOLLARDS & APPURTENANCES.

2.3. CONDUCT ASPHALT MILLING & DEMOLITION.

INSTALL ASPHALT AGGREGATE & BINDER COURSES.

2.4. CONSTRUCT STORAGE BUILDING, PUNCH, TURN

OVER. RELOCATE EX. STORAGE BLDG CONTENTS &

THAT OF OTHERS PER COR TO NEW STORAGE BLDG.

COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.

2.5. DEMOLISH EXISTING STORAGE BUILDING, STORAGE

SHED & SCREEN FENCE, REMAINING AGGREGATE

PAVING. CONSTRUCT NEW SCREEN WALL & OPEN

PARKING GARAGE.

3. ADMINISTRATION & MAINTENANCE BUILDINGS

3.1. INSTALL TEMPORARY CEMETERY OFFICE TRAILER &

RELATED UTILITIES, SIGN, SIDEWALKS.

3.2. RELOCATE BUILDINGS' FURNISHINGS, EQUIPMENT,

MATERIALS TO OFFICE TRAILER & STORAGE.

COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.

3.3. BUILDING DEMOLITION & CONSTRUCTION.

3.4. PUNCH BUILDINGS & TURN OVER TO CEMETERY.

3.5. RELOCATE FURNISHINGS, EQUIPMENT, MATERIALS

FROM TRAILER & STORAGE. COORDINATE W/ COR

MIN. 10 DAYS IN ADVANCE.

3.6. REMOVE TEMPORARY CEMETERY OFFICE TRAILER &

RELATED TEMPORARY UTILITIES, PAVEMENTS &

SIGN. RESTORE FINISHED GRADE & INSTALL TOPSOIL

& TURF. INSTALL ASPHALT PAVING TOP COURSE,

PAVING MARKINGS & SCREEN FENCES.

4. CONDUCT METAL PICKET FENCE AND OTHER WORK AT

ANY POINT.

CONSTRUCTION SEQUENCE

STST

STSTSSSSSSSSSSSSSS

STSTSTSTSTSTSSSSTTSTSTSSSSTTSSTT

STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST

STSTTSTSTSTST

STSTSTSTSTST

STSTTTTT

STSTSTST

STSTSSSSSSSSSSSSSSSSSS

STST

STST

STST STST STST STST STSTSTST STST STST STST STSTSTST

STST

TTTTTT

SSTSTSSSTSSSSSSST

WW WWWW WW WW WW WW WW WWWWWWWW WW WWWWWW WW WW WWWW WW WWWWWWWWWWWWWWWW

WWWW

WWWW

WWWWWW

WW

WW

WW

WW

WW

WW

WWWWWW

WW

WWWW

WWWW

WW

WW

WW

B4

0 10 20 40 60

MATCHLINE SHEET LS-102 MATCHLINE SHEET LS-102

CONSTRUCTION ACCESS PLAN

GC-101

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2020, Walker Federal Services, LLCF

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

BJ; IL BJ; TJ

May 22, 2020

FINAL CONSTRUCTION DOCUMENTS

G .0 .1

W o o d la w n

F a c

R e n

IC

C a d d o c s

G C C o n s tr u c ti o n a c c e s s .d w g

P M T D

S td D W G

T o

P D F .p c

1. INSTALL CONSTRUCTION FENCING WHEN WORK

BEGINS AND UNTIL COMPLETE & ACCEPTED AT EACH

AREA. FOLLOW 010002 & COR'S DIRECTION.

2. WORKING & STORAGE ON OCCUPIED GRAVES IS

PROHIBITED. PROTECT GRAVES, HEADSTONES,

TEMPORARY MARKERS, AND MEMORIALS FROM

DAMAGE. INSTALL 34" PLYWOOD COVERS ON ALL

HEADSTONES & MEMORIALS W/IN 10' OF WORK & AS

DIRECTED. REMOVE AFTER WORK IS COMPLETE.

3. COORDINATE ACCESS SCHEDULES & TEMPORARY LANE

CLOSURES & BARRICADES W/ COR NOT LESS THAN 7

DAYS IN ADVANCE OF EACH PROPOSED ACCESS.

TEMPORARY CEMETERY OFFICE

TRAILER; REFER TO 1/LS-205

SIGN; (TYP.)

FLAG POLE; (TYP.)

LS-203LS 203

TEMPORARY CEMETERY OFFICE SIGN

LAYDOWN & STORAGE

GETTYSBURG TABLET

CONFEDERATE MEMORIAL

MEMORIAL

MEMORIAL W/IN LOW

ADMINISTRATION BUILDING

MAINTENANCE BUILDING

PUBLIC RESTROOM

COMMITTAL SERVICE SHELTER

AMERICAN FLAG POLE; REFINISH PER 099100

FLAG LIGHT; TYP. OF 4

HEADSTONE; (TYP.)

HEADSTONE RESET BY CEMETERY STAFF; REFER

TO DEMOLITION PLANS & COORDINATE W/ COR

S1

BORING LOCATION; REFER TO PROJECT

MANUAL, GEOTECHNICAL REPORTBx

USE EXTREME CAUTION EXCAVATING NEAR

GRAVES; PERFORM IN PRESENCE OF COR (TYP.)15

LIMITS OF WORK, UNFENCED

REFER TO 010002 & COR'S DIRECTION

EXISTING TREE; PROTECT PER 015639

TREE AND PLANT PROTECTION

LIMITS OF WORK W/ CONSTRUCTION FENCE

REFER TO 010002 & COR'S DIRECTION

THE FOLLOWING IS INTENDED TO LIMIT DISRUPTION TO

CEMETERY OPERATIONS, NOT REPRESENT A FINAL LIST OF

DETAILED OPERATIONS. COR WILL CONSIDER DIFFERENT

SEQUENCES. REVIEW IN DETAIL W/ COR AND CEMETERY

DIRECTOR AND UPDATE AS REQUESTED.

1. MOBILIZATION: INSTALL CONSTRUCTION FENCING,

TREE PROTECTION MEASURES, EROSION & SEDIMENT

CONTROL DEVICES, CONSTRUCTION TRAILER, AND

CEMETERY OFFICE TRAILER & RELATED SIGN & WALK.

2. SITE WORK:

2.1. DEMOLISH PAVEMENTS & CURBING, EXCEPT AT

EXISTING FUEL TANK. DEMOLISH WATER LINE &

HYDRANTS. INSTALL NEW CONCRETE PAVING,

CURBS, WATER LINE, WATERING STATION.

2.2. INSTALL NEW FUEL TANK, SLAB, BOLLARDS,

FOOTINGS & APPURTENANCES. TRANSFER FUEL

FROM EX. TO NEW TANKS & DEMOLISH EXISTING

TANK & ADJACENT REMAINING PAVEMENTS,

BOLLARDS & APPURTENANCES.

2.3. CONDUCT ASPHALT MILLING & DEMOLITION.

INSTALL ASPHALT AGGREGATE & BINDER COURSES.

2.4. CONSTRUCT STORAGE BUILDING, PUNCH, TURN

OVER. RELOCATE EX. STORAGE BLDG CONTENTS &

THAT OF OTHERS PER COR TO NEW STORAGE BLDG.

COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.

2.5. DEMOLISH EXISTING STORAGE BUILDING, STORAGE

SHED & SCREEN FENCE, REMAINING AGGREGATE

PAVING. CONSTRUCT NEW SCREEN WALL & OPEN

PARKING GARAGE.

3. ADMINISTRATION & MAINTENANCE BUILDINGS

3.1. INSTALL TEMPORARY CEMETERY OFFICE TRAILER &

RELATED UTILITIES, SIGN, SIDEWALKS.

3.2. RELOCATE BUILDINGS' FURNISHINGS, EQUIPMENT,

MATERIALS TO OFFICE TRAILER & STORAGE.

COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.

3.3. BUILDING DEMOLITION & CONSTRUCTION.

3.4. PUNCH BUILDINGS & TURN OVER TO CEMETERY.

3.5. RELOCATE FURNISHINGS, EQUIPMENT, MATERIALS

FROM TRAILER & STORAGE. COORDINATE W/ COR

MIN. 10 DAYS IN ADVANCE.

3.6. REMOVE TEMPORARY CEMETERY OFFICE TRAILER &

RELATED TEMPORARY UTILITIES, PAVEMENTS &

SIGN. RESTORE FINISHED GRADE & INSTALL TOPSOIL

& TURF. INSTALL ASPHALT PAVING TOP COURSE,

PAVING MARKINGS & SCREEN FENCES.

4. CONDUCT METAL PICKET FENCE AND OTHER WORK AT

ANY POINT.

CONSTRUCTION SEQUENCE

S1

G

AS

G

AS

G

AS

G

AS

GASGAS

GASGAS

GASGAS

G

AS

G

AS

WW

WW

WW

STSTSTSTSTSTTTSTSTTT

STSTTTTT

STSTTTTTTTT

STST

STST

STST

STST

STST

STST

STST

GAGA

STST STST STST STSTSTSTSTST STST STST STSTTT STST STST STST STST STST STST STST STST TTTTSTSTTSTT STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STST

STSTTTTTTT

STSTSSSTSTSTSTSTSTSSTSTSTSTSTT

STSTSTSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTSTSTTSTST

STSTSSSSSSSSSSSSSSSSSS

WW

WW

WW

TT

TT

WW

WW

WW

GASGASSS

SAN

SAN

SAN

SAN

SAN

SAN

SANSANGAGAGAGAGAGAGASS NNNSANSANSANSAN SANSAN NNSASAANN SANSAN SANSAN SANSANSSSAS SANSAN SANSAN SANSAN SANSAN SANSAN

SANSAN SANSAN SANSAN

SAN

SAN

SAN

SANNN

SAN

SAN

SASA

SAN

SAN

SAN

SAN

SAN

SANNNNNNNNN

SAN

SAN

SAN

SAN

SASAA

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

AA

| GASGAS GASGAS GASGAS GASGASGAGA GASGAS GASGASSSASAASASSSASASSSSSSGG

WWWWWW WWWWWWWW WW WW

STST STST STST

13 B3

NN

B1

NNNNNNNNNNNNN

B2

0 10 20 40 60

MATCHLINE SHEETCG-101 MATCHLINE SHEETCG-101

CONSTRUCTION ACCESS PLAN

GC-102

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2020, Walker Federal Services, LLCF

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

BJ; IL BJ; TJ

May 22, 2020

FINAL CONSTRUCTION DOCUMENTS

G .0 .1

W o o d la w n

F a c

R e n

IC

C a d d o c s

G C C o n s tr u c ti o n a c c e s s .d w g

P M T D

S td D W G

T o

P D F .p

CE-201

INLET PROTECTION

CE-201CE-201

SEDIMENT LOG

TREE PROTECTION MATTING;

REFER TO 01 56 39

STST

STSTSSSSSSSSSSSSSS

STSTTTSTSTSTSTTTTTTTSTSTSSSSSSSSSS

STSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST

STSTSTSTSTSTSSSTSTSSSTSTSTS

STSTSTSTSTSTSTSTSTSTSSSTSTSSSTSTSTST

STSTTTTTTTTTTTTTTTTT

STSTSTST

STSTSSSSSSSSSSSSSSSSSS

STST

STST

STST STST STST STST STSTSTST STST STST STST STSTSTST

STST

TTTTTT

STSTSTSSSSSSSST

WW WWWW WW WW WW WW WW WWWWWWWW WW WWWWWW WW WW WWW WW WWWWWWWWWWWWWW

WWWW

WWWW

WWWWWW

WW

WW

WW

WW

WW

WW

WWWW

WWWW

WWWW

WW

WW

WW

LIMITS OF WORK, UNFENCED

REFER TO 010002 & COR'S DIRECTION

EXISTING TREE; PROTECT PER 015639

TREE AND PLANT PROTECTION

LIMITS OF WORK W/ CONSTRUCTION FENCE

REFER TO 010002 & COR'S DIRECTION

0 10 20 40 60

MATCHLINE SHEET CE-102 MATCHLINE SHEET CE-102

LEGEND

NOTES

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2020, Walker Federal Services, LLCF

Walker Federal Services, LLC

FACILITY RENOVATION,

IMPROVEMENTS, AND

REPAIRS

WOODLAWN NATIONAL CEMETERY

803IC3005

BJ; IL BJ; TJ

May 22, 2020

FINAL CONSTRUCTION DOCUMENTS

EROSION AND SEDIMENT

CONTROL PLAN

CE-101

1. REMOVE SEDIMENT LOGS, STAKES, AND COMPOST

MATERIAL FOLLOWING CONSTRUCTION AND LEGALLY

DISPOSE OF OFF GOVERNMENT'S PROPERTY.

G .0 .1

W o o d la w n

F a c

R e n

IC

C a d d o c s

C E E ro s io n c o n tr o l.

d w g

A M T D

S td D W G

T o

P D F .p

File details come from the government source that posted it. Updated .