This document provides details on a federal solicitation and related bid drawings. The solicitation number is 36c78620b0009 for facility renovations, improvements, and repairs at the Woodlawn and Bath National Cemeteries. The opportunity type is a solicitation issued by the Department of Veterans Affairs National Cemetery Administration. The bid drawings file S02 - 824IC3005 Bid Dwgs Woodlawn Bk02.pdf is related to this solicitation for renovating and improving facilities at the named national cemeteries. The description specifies repairs and renovations are needed at the Woodlawn-Bath National Cemetery.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAY 22, 2020
1. INSTALL CONSTRUCTION FENCING WHEN WORK
BEGINS AND UNTIL COMPLETE & ACCEPTED AT EACH
AREA. FOLLOW 010002 & COR'S DIRECTION.
2. WORKING & STORAGE ON OCCUPIED GRAVES IS
PROHIBITED. PROTECT GRAVES, HEADSTONES,
TEMPORARY MARKERS, AND MEMORIALS FROM
DAMAGE. INSTALL 34" PLYWOOD COVERS ON ALL
HEADSTONES & MEMORIALS W/IN 10' OF WORK & AS
DIRECTED. REMOVE AFTER WORK IS COMPLETE.
3. COORDINATE ACCESS SCHEDULES & TEMPORARY LANE
CLOSURES & BARRICADES W/ COR NOT LESS THAN 7
DAYS IN ADVANCE OF EACH PROPOSED ACCESS.
TEMPORARY CEMETERY OFFICE
TRAILER; REFER TO 1/LS-205
SIGN; (TYP.)
FLAG POLE; (TYP.)
LS-203LS 203
TEMPORARY CEMETERY OFFICE SIGN
LAYDOWN & STORAGE
GETTYSBURG TABLET
CONFEDERATE MEMORIAL
MEMORIAL
MEMORIAL W/IN LOW
ADMINISTRATION BUILDING
MAINTENANCE BUILDING
PUBLIC RESTROOM
COMMITTAL SERVICE SHELTER
AMERICAN FLAG POLE; REFINISH PER 099100
FLAG LIGHT; TYP. OF 4
HEADSTONE; (TYP.)
HEADSTONE RESET BY CEMETERY STAFF; REFER
TO DEMOLITION PLANS & COORDINATE W/ COR
S1
BORING LOCATION; REFER TO PROJECT
MANUAL, GEOTECHNICAL REPORTBx
USE EXTREME CAUTION EXCAVATING NEAR
GRAVES; PERFORM IN PRESENCE OF COR (TYP.)15
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
THE FOLLOWING IS INTENDED TO LIMIT DISRUPTION TO
CEMETERY OPERATIONS, NOT REPRESENT A FINAL LIST OF
DETAILED OPERATIONS. COR WILL CONSIDER DIFFERENT
SEQUENCES. REVIEW IN DETAIL W/ COR AND CEMETERY
DIRECTOR AND UPDATE AS REQUESTED.
1. MOBILIZATION: INSTALL CONSTRUCTION FENCING,
TREE PROTECTION MEASURES, EROSION & SEDIMENT
CONTROL DEVICES, CONSTRUCTION TRAILER, AND
CEMETERY OFFICE TRAILER & RELATED SIGN & WALK.
2. SITE WORK:
2.1. DEMOLISH PAVEMENTS & CURBING, EXCEPT AT
EXISTING FUEL TANK. DEMOLISH WATER LINE &
HYDRANTS. INSTALL NEW CONCRETE PAVING,
CURBS, WATER LINE, WATERING STATION.
2.2. INSTALL NEW FUEL TANK, SLAB, BOLLARDS,
FOOTINGS & APPURTENANCES. TRANSFER FUEL
FROM EX. TO NEW TANKS & DEMOLISH EXISTING
TANK & ADJACENT REMAINING PAVEMENTS,
BOLLARDS & APPURTENANCES.
2.3. CONDUCT ASPHALT MILLING & DEMOLITION.
INSTALL ASPHALT AGGREGATE & BINDER COURSES.
2.4. CONSTRUCT STORAGE BUILDING, PUNCH, TURN
OVER. RELOCATE EX. STORAGE BLDG CONTENTS &
THAT OF OTHERS PER COR TO NEW STORAGE BLDG.
COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.
2.5. DEMOLISH EXISTING STORAGE BUILDING, STORAGE
SHED & SCREEN FENCE, REMAINING AGGREGATE
PAVING. CONSTRUCT NEW SCREEN WALL & OPEN
PARKING GARAGE.
3. ADMINISTRATION & MAINTENANCE BUILDINGS
3.1. INSTALL TEMPORARY CEMETERY OFFICE TRAILER &
RELATED UTILITIES, SIGN, SIDEWALKS.
3.2. RELOCATE BUILDINGS' FURNISHINGS, EQUIPMENT,
MATERIALS TO OFFICE TRAILER & STORAGE.
COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.
3.3. BUILDING DEMOLITION & CONSTRUCTION.
3.4. PUNCH BUILDINGS & TURN OVER TO CEMETERY.
3.5. RELOCATE FURNISHINGS, EQUIPMENT, MATERIALS
FROM TRAILER & STORAGE. COORDINATE W/ COR
MIN. 10 DAYS IN ADVANCE.
3.6. REMOVE TEMPORARY CEMETERY OFFICE TRAILER &
RELATED TEMPORARY UTILITIES, PAVEMENTS &
SIGN. RESTORE FINISHED GRADE & INSTALL TOPSOIL
& TURF. INSTALL ASPHALT PAVING TOP COURSE,
PAVING MARKINGS & SCREEN FENCES.
4. CONDUCT METAL PICKET FENCE AND OTHER WORK AT
ANY POINT.
CONSTRUCTION SEQUENCE
STST
STSTSSSSSSSSSSSSSS
STSTSTSTSTSTSSSSTTSTSTSSSSTTSSTT
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTTSTSTSTST
STSTSTSTSTST
STSTTTTT
STSTSTST
STSTSSSSSSSSSSSSSSSSSS
STST
STST
STST STST STST STST STSTSTST STST STST STST STSTSTST
STST
TTTTTT
SSTSTSSSTSSSSSSST
WW WWWW WW WW WW WW WW WWWWWWWW WW WWWWWW WW WW WWWW WW WWWWWWWWWWWWWWWW
WWWW
WWWW
WWWWWW
WW
WW
WW
WW
WW
WW
WWWWWW
WW
WWWW
WWWW
WW
WW
WW
B4
0 10 20 40 60
MATCHLINE SHEET LS-102 MATCHLINE SHEET LS-102
CONSTRUCTION ACCESS PLAN
GC-101
LEGEND
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
G C C o n s tr u c ti o n a c c e s s .d w g
P M T D
S td D W G
T o
P D F .p c
1. INSTALL CONSTRUCTION FENCING WHEN WORK
BEGINS AND UNTIL COMPLETE & ACCEPTED AT EACH
AREA. FOLLOW 010002 & COR'S DIRECTION.
2. WORKING & STORAGE ON OCCUPIED GRAVES IS
PROHIBITED. PROTECT GRAVES, HEADSTONES,
TEMPORARY MARKERS, AND MEMORIALS FROM
DAMAGE. INSTALL 34" PLYWOOD COVERS ON ALL
HEADSTONES & MEMORIALS W/IN 10' OF WORK & AS
DIRECTED. REMOVE AFTER WORK IS COMPLETE.
3. COORDINATE ACCESS SCHEDULES & TEMPORARY LANE
CLOSURES & BARRICADES W/ COR NOT LESS THAN 7
DAYS IN ADVANCE OF EACH PROPOSED ACCESS.
TEMPORARY CEMETERY OFFICE
TRAILER; REFER TO 1/LS-205
SIGN; (TYP.)
FLAG POLE; (TYP.)
LS-203LS 203
TEMPORARY CEMETERY OFFICE SIGN
LAYDOWN & STORAGE
GETTYSBURG TABLET
CONFEDERATE MEMORIAL
MEMORIAL
MEMORIAL W/IN LOW
ADMINISTRATION BUILDING
MAINTENANCE BUILDING
PUBLIC RESTROOM
COMMITTAL SERVICE SHELTER
AMERICAN FLAG POLE; REFINISH PER 099100
FLAG LIGHT; TYP. OF 4
HEADSTONE; (TYP.)
HEADSTONE RESET BY CEMETERY STAFF; REFER
TO DEMOLITION PLANS & COORDINATE W/ COR
S1
BORING LOCATION; REFER TO PROJECT
MANUAL, GEOTECHNICAL REPORTBx
USE EXTREME CAUTION EXCAVATING NEAR
GRAVES; PERFORM IN PRESENCE OF COR (TYP.)15
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
THE FOLLOWING IS INTENDED TO LIMIT DISRUPTION TO
CEMETERY OPERATIONS, NOT REPRESENT A FINAL LIST OF
DETAILED OPERATIONS. COR WILL CONSIDER DIFFERENT
SEQUENCES. REVIEW IN DETAIL W/ COR AND CEMETERY
DIRECTOR AND UPDATE AS REQUESTED.
1. MOBILIZATION: INSTALL CONSTRUCTION FENCING,
TREE PROTECTION MEASURES, EROSION & SEDIMENT
CONTROL DEVICES, CONSTRUCTION TRAILER, AND
CEMETERY OFFICE TRAILER & RELATED SIGN & WALK.
2. SITE WORK:
2.1. DEMOLISH PAVEMENTS & CURBING, EXCEPT AT
EXISTING FUEL TANK. DEMOLISH WATER LINE &
HYDRANTS. INSTALL NEW CONCRETE PAVING,
CURBS, WATER LINE, WATERING STATION.
2.2. INSTALL NEW FUEL TANK, SLAB, BOLLARDS,
FOOTINGS & APPURTENANCES. TRANSFER FUEL
FROM EX. TO NEW TANKS & DEMOLISH EXISTING
TANK & ADJACENT REMAINING PAVEMENTS,
BOLLARDS & APPURTENANCES.
2.3. CONDUCT ASPHALT MILLING & DEMOLITION.
INSTALL ASPHALT AGGREGATE & BINDER COURSES.
2.4. CONSTRUCT STORAGE BUILDING, PUNCH, TURN
OVER. RELOCATE EX. STORAGE BLDG CONTENTS &
THAT OF OTHERS PER COR TO NEW STORAGE BLDG.
COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.
2.5. DEMOLISH EXISTING STORAGE BUILDING, STORAGE
SHED & SCREEN FENCE, REMAINING AGGREGATE
PAVING. CONSTRUCT NEW SCREEN WALL & OPEN
PARKING GARAGE.
3. ADMINISTRATION & MAINTENANCE BUILDINGS
3.1. INSTALL TEMPORARY CEMETERY OFFICE TRAILER &
RELATED UTILITIES, SIGN, SIDEWALKS.
3.2. RELOCATE BUILDINGS' FURNISHINGS, EQUIPMENT,
MATERIALS TO OFFICE TRAILER & STORAGE.
COORDINATE W/ COR MIN. 10 DAYS IN ADVANCE.
3.3. BUILDING DEMOLITION & CONSTRUCTION.
3.4. PUNCH BUILDINGS & TURN OVER TO CEMETERY.
3.5. RELOCATE FURNISHINGS, EQUIPMENT, MATERIALS
FROM TRAILER & STORAGE. COORDINATE W/ COR
MIN. 10 DAYS IN ADVANCE.
3.6. REMOVE TEMPORARY CEMETERY OFFICE TRAILER &
RELATED TEMPORARY UTILITIES, PAVEMENTS &
SIGN. RESTORE FINISHED GRADE & INSTALL TOPSOIL
& TURF. INSTALL ASPHALT PAVING TOP COURSE,
PAVING MARKINGS & SCREEN FENCES.
4. CONDUCT METAL PICKET FENCE AND OTHER WORK AT
ANY POINT.
CONSTRUCTION SEQUENCE
S1
G
AS
G
AS
G
AS
G
AS
GASGAS
GASGAS
GASGAS
G
AS
G
AS
WW
WW
WW
STSTSTSTSTSTTTSTSTTT
STSTTTTT
STSTTTTTTTT
STST
STST
STST
STST
STST
STST
STST
GAGA
STST STST STST STSTSTSTSTST STST STST STSTTT STST STST STST STST STST STST STST STST TTTTSTSTTSTT STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STST
STSTTTTTTT
STSTSSSTSTSTSTSTSTSSTSTSTSTSTT
STSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTTSTST
STSTSSSSSSSSSSSSSSSSSS
WW
WW
WW
TT
TT
WW
WW
WW
GASGASSS
SAN
SAN
SAN
SAN
SAN
SAN
SANSANGAGAGAGAGAGAGASS NNNSANSANSANSAN SANSAN NNSASAANN SANSAN SANSAN SANSANSSSAS SANSAN SANSAN SANSAN SANSAN SANSAN
SANSAN SANSAN SANSAN
SAN
SAN
SAN
SANNN
SAN
SAN
SASA
SAN
SAN
SAN
SAN
SAN
SANNNNNNNNN
SAN
SAN
SAN
SAN
SASAA
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
AA
| GASGAS GASGAS GASGAS GASGASGAGA GASGAS GASGASSSASAASASSSASASSSSSSGG
WWWWWW WWWWWWWW WW WW
STST STST STST
13 B3
NN
B1
NNNNNNNNNNNNN
B2
0 10 20 40 60
MATCHLINE SHEETCG-101 MATCHLINE SHEETCG-101
CONSTRUCTION ACCESS PLAN
GC-102
LEGEND
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
G C C o n s tr u c ti o n a c c e s s .d w g
P M T D
S td D W G
T o
P D F .p
CE-201
INLET PROTECTION
CE-201CE-201
SEDIMENT LOG
TREE PROTECTION MATTING;
REFER TO 01 56 39
STST
STSTSSSSSSSSSSSSSS
STSTTTSTSTSTSTTTTTTTSTSTSSSSSSSSSS
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
STSTSTSTSTSTSSSTSTSSSTSTSTS
STSTSTSTSTSTSTSTSTSTSSSTSTSSSTSTSTST
STSTTTTTTTTTTTTTTTTT
STSTSTST
STSTSSSSSSSSSSSSSSSSSS
STST
STST
STST STST STST STST STSTSTST STST STST STST STSTSTST
STST
TTTTTT
STSTSTSSSSSSSST
WW WWWW WW WW WW WW WW WWWWWWWW WW WWWWWW WW WW WWW WW WWWWWWWWWWWWWW
WWWW
WWWW
WWWWWW
WW
WW
WW
WW
WW
WW
WWWW
WWWW
WWWW
WW
WW
WW
LIMITS OF WORK, UNFENCED
REFER TO 010002 & COR'S DIRECTION
EXISTING TREE; PROTECT PER 015639
TREE AND PLANT PROTECTION
LIMITS OF WORK W/ CONSTRUCTION FENCE
REFER TO 010002 & COR'S DIRECTION
0 10 20 40 60
MATCHLINE SHEET CE-102 MATCHLINE SHEET CE-102
LEGEND
NOTES
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLCF
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
WOODLAWN NATIONAL CEMETERY
803IC3005
BJ; IL BJ; TJ
May 22, 2020
FINAL CONSTRUCTION DOCUMENTS
EROSION AND SEDIMENT
CONTROL PLAN
CE-101
1. REMOVE SEDIMENT LOGS, STAKES, AND COMPOST
MATERIAL FOLLOWING CONSTRUCTION AND LEGALLY
DISPOSE OF OFF GOVERNMENT'S PROPERTY.
G .0 .1
W o o d la w n
F a c
R e n
IC
C a d d o c s
C E E ro s io n c o n tr o l.
d w g
A M T D
S td D W G
T o
P D F .p
File details come from the government source that posted it. Updated .