S02 - 803IC3015 Bid Dwgs Bath Bk05.pdf
PDF 6 MB Posted
- Solicitation number
- 36c78620b0009
About this file
This package includes construction drawings and specifications for facility renovations, improvements and repairs at the Bath National Cemetery. The work includes demolishing existing HVAC systems, ductwork, registers and equipment; installing new HVAC equipment including air handlers, heat pumps, exhaust fans and associated ductwork; and modifying mechanical, plumbing and electrical systems. Precise phasing plans are provided to allow work in occupied areas with minimal disruptions. The project is part of Solicitation 36c78620b0009 issued by the Department of Veterans Affairs National Cemetery Administration for facility renovations at Woodlawn and Bath National Cemeteries.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S a
Sb
OSS
S
O S
S O
S
OS
S OSS OS
S
OS
OS
S O
S
S OS
S O
S
OS
S
OS
S OS
OS
SOS OS
OS
OS
S
S 3
S3
S a S b
S a
S S a
S b S c
S
S
S
S
S
S
S
S
S S
S
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
ADMINISTRATION BUILDING
LIGHTING PLAN
EP-202
0 2' 4' 8' 16'
2 KEY PLAN
SCALE: 1/8" = 1'-0"
1 FLOOR PLAN
SCALE: 1/4" = 1'-0"
M
SM
AB
GFI
M
F S
SM
F
F
FACP
F
ANN
NA
C
AN
N
F
F
F
FF
F S
F S
F S F S
F S
F S F S
F S
F S
F
WAP
WAP
WAP
(15cd)
(15cd)
(15cd)
AB
GFI
AB
GFI
NEW PANEL
'PP-3'
WP
GFI
WP
GFI
WP
GFI
EWH-1
M
SM
EF-1
M
SMEF-1
AHU-2
AB
AB
M
SM
PP-3-1
PP-3-2
PP-3-4
PP-3-5
PP-3-6
PP-3-9
PP-3-10
PP-3-11
PP-3-12
EF-2
PP-3-14
PP-3-14
PP-3-17,19
PP-3-15
PP-3-15
PP-3-16PP-3-21
FACP
M
M
SM
F F M
MS W
WAP
F S
F S F S
S
S3
WP
W
M
F S
F S
F S
F S
F S
F S F S
F S
F
F
F
FF
F
WAP
WAP
F
(15cd)
(15cd)(15cd) (15cd)
AB
GFI
AB
GFI
AB
GFI
AB
GFI
WP
GFI
M
SM
EF-1M
SM
EF-1M
SMEF-1
AHU-1
M
HWR-1
REFRIGERATOR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETRETRETR
ETR
ETR
ETR
ETR
ETR
ETRETR
ETR
ETR
ETR
ETR ETR
ETR
EX. AIR COMP
TO REMAIN
EX. PANEL 'PP-1' TO REMAIN
EX. PANEL 'PP-2' TO REMAIN
EX. WATT/HOUR
METER TO REMAIN
EX. UNIT HEATER
TO REMAIN EX. SERVER
TO REMAIN
EX. FAN TO REMAIN
AB
GFI
ETR ETR
ETR
PP-1-21
PP-1-23
PP-1-25
PP-1-27
PP-2-33,35
PP-2-34,36
PP-2-38
PP-2-37
PP-3-14
PP-3-22
HP-2
HP-1
WP
GFI
AB
ABAB AB
PP-3-24
AB
MTD 42"
A.F.F.
MTD 42"
A.F.F.F (15cd)
PP-3-3
AB
GFI
U/C
REFRIGERATOR
AB
PP-3-7
PP-3-8
PHASE III PHASE II
PHASE III PHASE II
PHASE III
PHASE III
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
PHASE III
ADMINISTRATION BUILDING
POWER PLAN
EP-301
0 2' 4' 8' 16'
2 KEY PLAN
SCALE: 1/8" = 1'-0"
S
Sa
Sb
S3
OS
OSS
S
P
S O
S S
O S
OS
S OSS OS
S
OS
OS
S O
S
S OS
S O
S
OS
S
OS
S OS
OS
SOS OS
OS
OS
S
H
P
S 3
S3
S a S b
S a
S S a
S b S c
75.2W 75.2W
111.6W
40W
40W
308.1W
56.4W
20W
75.2W
73.8W45.7W
145.1W
S
SS
S
S S
PHASE III PHASE II
PHASE III PHASE II
PHASE III
PHASE III
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
PHASE III
ADMINISTRATION BUILDING
LIGHTING PLAN
EP-302
0 2' 4' 8' 16'
2 KEY PLAN
SCALE: 1/8" = 1'-0"
MECHANICAL/PLUMBING/ETC. EQUIPMENT CONNECTION SCHEDULE
NOTES:
LIGHTING FIXTURE SCHEDULE
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
ELECTRICAL SCHEDULES
EP-401
REFRIGERATOR
MICROWAVE
RECEPTACLES
RECEPTACLES
EX. PANEL PP-1 NEW WORK
AHU-1
EF-1's AND RECEPTACLES
EX. PANEL
60/2
20/1
PP-2 NEW WORK
30/2
20/1 100/2
HP-1
HWR-1
NEW PANEL 'PP-3'
NEW PANEL PP-3
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
ELECTRICAL SCHEDULES
EP-402
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300 FAX: 814-269-9301Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
ELECTRICAL DETAILS
EP-403
1 TYPICAL FIRE ALARM DEVICE MOUNTING DETAIL
NOT TO SCALE
2 INSTALLATION OF COMMUNICATIONS OUTLETS
NOT TO SCALE
GARAGE
STORAGE 106
100N
FEEDER SCHEDULE
FEEDER
NUMBER
100N
QTY
of SETS
PHASE CONDUCTORS (PER SET)
QTY
SIZE
NEUTRAL CONDUCTORS (PER SET)
QTY
SIZE
GROUND CONDUCTORS (PER SET)
QTY
SIZE
CONDUIT
SIZE (PER SET)
1 1/2"
NOTES
ADMINISTRATION BUILDING
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300
FAX: 814-269-9301
LEGEND
KEY
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
Walker Federal Services, LLC
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
GGG BLP
JUNE 5, 2020
NOTES
ELECTRICAL DIAGRAMS
EP-404
1 RISER DIAGRAM - ELECTRICAL
NOT TO SCALE
GENERAL ABBREVIATIONS
MANUAL VALVE
PIPE UNION
MECHANICAL SYMBOLS LEGEND
END CAP
PIPE RISE
PIPE DROP
TOP TAKE-OFF
BOTTOM TAKE-OFF
PIPE BREAK
AAV
PT
MANUAL VALVE WITH MEMORY STOP (BALANCING)
CAPPED VALVE WITH HOSE BIBB AND CHAIN
CHECK VALVE
Y-STRAINER
BASKET STRAINER
AUTOMATIC VALVE, 2-POSITION ACTUATOR
AUTOMATIC VALVE, MODULATING ACTUATOR
3-WAY VALVE, 2-POSITION ACTUATOR
3-WAY VALVE, MODULATING ACTUATOR
PRESSURE GAGE WITH GAGE CLOCK
TEMPERATURE SENSOR
PRESSURE / TEMPERATURE WELL
AUTOMATIC AIR VENT WITH ISOLATION VALVE
MANUAL AIR VENTMAV
FLEXIBLE CONNECTION
PIPE GUIDE
ANCHOR
UP
DN
DIRECTION OF FLOW IN PIPE
PITCH PIPE UP IN DIRECTION OF FLOW
PITCH PIPE DOWN IN DIRECTION OF FLOW
REFRIGERANT PIPING LINE SET
MECHANCIAL EQUIPMENT - NEW
A
A AMPERE
AC AIR CONDITIONING
ACV AUTOMATIC CONTROL VALVE
ACD AUTOMATIC CONTROL DAMPER
AD ACCESS DOOR
AF AIR FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALM ALARM
AP ACCESS PANEL
ARCH ARCHITECT
AS AIR SEPARATOR
ATC AUTOMATIC TEMPERATURE CONTROLS
ATV ATMOSPHERIC VENT
AAV AUTOMATIC AIR VENT
AVS AIR VOLUME STATION
B
BHP BREAK HORSE POWER
BOD BOTTOM ELEVATION OF DUCT
BOP BOTTOM ELEVATION OF PIPE
BRD BAROMETRIC DAMPER
BWV BACK WATER VALVE
C
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN-OUT
CD CONDENSATE DRAIN
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CV CONSTANT VOLUME
D
D DRAIN
DC DUST COLLECTION DUCTWORK
DAT DISCHARGE AIR TEMPERATURE
DBT DRY BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DP DIFFERENTIAL PRESSURE
DX DIRECT EXPANSION
E
(E) EXISTING
EA EACH
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EFF EFFICIENCY
ELEC ELECTRICAL
ER EXHAUST REGISTER
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
F
F FAN
FA FREE AREA
FCU FAN COIL UNIT
FD FIRE DAMPER
FMT FLOW METER/TRANSMITTER
FPB FAN POWERED BOX (TERMINAL UNIT)
FPM FEET PER MINUTE
FSD FIRE/SMOKE DAMPER
FT FEET
FZ FREEZE STAT
G
G GAS
GR GLYCOL RETURN
GS GLYCOL SUPPLY
H
H HEIGHT
HB HOSE BIBB CONNECTION WITH CHAINED CAP
HC HEATING COIL
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND-OFF-AUTOMATIC SWITCH
HP HORSE POWER
HP HEAT PUMP
HV HEATING & VENTILATING UNIT
HW HOT WATER
HWR HOT WATER RETURN (DOMESTIC)
HWS HOT WATER SUPPLY (DOMESTIC)
HVAC HEATING VENTILATION AIR CONDITIONING
HX HEAT EXCHANGER
HZ HERTZ
I
IN INCHES
INWC INCHES OF WATER COLUMN
K
KW KILOWATTS
L
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
LF LINEAR FEET
LPR LOW PRESSURE CONDENSATE RETURN
LPS LOW PRESSURE STEAM SUPPLY
LSPS LOW STATIC PRESSURE SWITCH
LWT LEAVING WATER TEMPERATURE
M
MAV MANUAL AIR VENT
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MIN MINIMUM
MPR MEDIUM PRESSURE CONDENSATE RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
N
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NUM NUMBER
NTS NOT TO SCALE
O
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
OAT OUTSIDE AIR TEMPERATURE
OCC OCCUPIED
OED OPEN END DUCT
P
P PUMP
PC PUMPED CONDENSATE
PD PRESSURE DROP
PLBG PLUMBING
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
R
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RD RETURN DIFFUSER
RET RETURN
REQ REQUIRED
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RI RUN INDICATOR
RL REFRIGERANT LIQUID
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
S
SA SUPPLY AIR
SA SOUND ATTENUATOR
SAD SUPPLY AIR DAMPER
SD SUPPLY DIFFUSER
SDET SMOKE DETECTOR
SF SUPPLY FAN
SP STATIC PRESSURE SENSOR
SQFT SQUARE FEET
SR SUPPLY REGISTER
S/S START/STOP
SUP SUPPLY
T
T TEMPERATURE SENSOR
TEMP TEMPERATURE
TF TRANSFER FAN
TG TRANSFER GRILLE
TOD TOP ELEVATION OF DUCT
TOP TOP ELEVATION OF PIPE
TYP TYPICAL
U
UH UNIT HEATER
UNOCC UNOCCUPIED
UNO UNLESS NOTE OTHERWISE
V
V VENT
VAV VARIABLE AIR VOLUME TERMINAL UNIT
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VIBRATION SWITCH
W
W WIDTH
WBT WET BULB TEMPERATURE
WMS WIRE MESH SCREEN
WIC WALK-IN COOLER
GENERAL ABBREVIATIONS (CONT.)
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
KEY NOTE SYMBOL
CONDENSATE PIPE
FS
D
CD
R
DATA
TAG
DATA
TAG
1. SYSTEM UTILIZES THE REDUCED LIGHTING POWER DENSITY
OPTION TO COMPLY WITH THE ADDITIONAL EFFICIENCY
REQUIREMENTS OF IECC C406.
FS
D OR
1. GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE APPLICABLE
TO ALL DRAWINGS WITHIN THIS SECTION.
2. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER
SECTIONS.
3. THIS SCOPE OF CONSTRUCTION WORK INCLUDES FURNISHING
LABOR, MATERIALS, EQUIPMENT AND PERFORMANCE OF ALL
OPERATIONS REQUIRED TO PROVIDE A COMPLETE,
FUNCTIONAL AND OPERATIONAL SYSTEM.
4. PERFORM ALL WORK ABOVE, BELOW, IMMEDIATELY
ADJACENT TO THEN-OCCUPIED SPACES OUTSIDE OF NORMAL
BUSINESS HOURS UNLESS OTHERWISE AUTHORIZED BY COR.
5. MAINTAIN EXISTING OR PROVIDE NEW UTILITIES, SYSTEMS,
AND SERVICES TO OCCUPIED SPACES AT ALL TIMES. NO
OUTAGES ARE PERMITTED DURING NORMAL BUSINESS HOURS.
COORDINATE ALL OUTAGES DURING CHANGE-OVERS BETWEEN
PHASES WITH CEMETERY DIRECTOR NOT LESS THAN 7 DAYS IN
ADVANCE.
6. COORDINATE ROOF PENETRATIONS WITH WORK OF OTHER
SECTIONS AND WITH FLASHING REQUIREMENTS. PROVIDE
INFORMATION, HARDWARE, AND LABOR AS NECESSARY TO
COORDINATE ROOF CURBS REQUIRED FOR ROOF TOP
EQUIPMENT.
7. SUPPORT ALL EQUIPMENT, PIPING AND DUCTWORK FROM
BUILDING STRUCTURE TO PROVIDE A VIBRATION FREE
INSTALLATION. NOTIFY STRUCTURAL ENGINEER OF ALL
WEIGHTS AND METHODS OF SUPPORT.
8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH
NATIONAL ELECTRIC CODE.
9. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, UNLESS
NOTED OTHERWISE.
10. THE CONTRACTOR SHALL MAKE CONNECTIONS TO EQUIPMENT
AND FIXTURES INSTALLED BY HIS WORKMEN AS WELL AS
EQUIPMENT AND FIXTURES FURNISHED BY OTHERS, PROVIDED
BY THE GOVERNMENT, OR OTHERWISE SPECIFIED ON THE
DESIGN DOCUMENTS.
11. THOUGH SOME OFFSETS & TRANSITIONS ARE SHOWN IN
PIPING & SHEET METAL TO HELP INDICATE THE PHYSICAL
RELATIONSHIP BETWEEN THEM, IT IS NOT THE INTENT OF THE
DRAWINGS TO SHOW ALL PIPING & SHEET METAL OFFSETS &
TRANSITIONS REQUIRED. THE CONTRACTOR SHALL FULLY
COORDINATE THE WORK WITHIN ITSELF & WITH THE WORK OF
ALL TRADES TO PROVIDE COMPLETE & OPERABLE SYSTEMS
WITHOUT INTERFERENCES.
12. THE DOCUMENTS CONTAIN INFORMATION RELATIVE TO
SYSTEM SETPOINTS (PRESSURE, FLOW, TEMPERATURE, ETC...)
THAT ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY.
THE TESTING ADJUSTING AND BALANCING CONTRACTOR IN
CONJUNCTION WITH THE AUTOMATIC TEMPERATURE
CONTROLS CONTRACTOR SHALL SET ACTUAL SETPOINTS.
13. MANUFACTURERS' MODEL NUMBERS ARE SPECIFIED ON
EQUIPMENT SCHEDULES SOLELY TO ESTABLISH STANDARDS OF
QUALITY FOR PERFORMANCE AND MATERIALS.
14. EQUIPMENT AND MATERIAL INSTALLATION SHALL ADHERE TO
MANUFACTURES' REQUIREMENTS AND RECOMMENDATIONS.
15. PROVIDE ACCESS PANELS TO SYSTEM COMPONENTS THAT ARE
CONCEALED AND REQUIRE PERIODIC SERVICE.
16. ALL EQUIPMENT, PIPING, INSULATION, ETC., INSTALLED IN
HVAC PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR
FLAME AND SMOKE PER UNDERWRITERS'S LABORATORY (UL).
17. PROVIDE WEATHERPROOF EXTERNAL JACKETING FOR ALL
DUCT AND PIPE INSULATION THAT IS EXPOSED TO THE
OUTDOORS.
18. PROVIDE VAPOR RETARDANT FOR ALL INSULATED PIPES AND
EQUIPMENT THAT ARE PART OF THE COOLING SYSTEM, OR
ARE INSTALLED OUTSIDE THE CONDITIONED SPACE.
1. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE
CURRENT INTERNATIONAL MECHANICAL CODE INCLUDING
LOCAL JURISDICTION SUPPLEMENTS AND AMENDMENTS. ALL
WORK SHALL BE EQUAL OR SUPERIOR TO THAT REQUIRED BY
RULES, CODES, ORDERS, REGULATIONS AND LAWS IMPOSED BY
AUTHORITY HAVING JURISDICTION. THE MORE STRINGENT OF
THE CODES SHALL GOVERN.
2. ALL RETURN AIR OPENINGS ABOVE CEILING SHALL BE PROVIDED
WITH A 1/4" MESH ALUMINUM SCREEN.
3. ALL DIMENSIONS SHOWN FOR DUCTWORK ARE NET INSIDE
DIMENSIONS.
4. ALL WALL MOUNTED DEVICES SUCH AS THERMOSTATS SHALL BE
MOUNTED AT 48" ABOVE FINISHED FLOOR U.N.O. BY
ARCHITECT.
5. ALL ROUND RUN OUTS TO DIFFUSERS SHALL BE THE SAME
NOMINAL SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
6. THOUGH SOME MANUAL VOLUME DAMPERS ARE SHOWN ON
THE DRAWINGS, IT IS NOT THE INTENT OF THE DRAWINGS TO
SHOW ALL MANUAL VOLUME DAMPERS IN SUPPLY, RETURN
AND EXHAUST DUCTWORK. PROVIDE MANUAL VOLUME
DAMPERS AT THE FOLLOWING LOCATIONS AS REQUIRED TO
REGULATE THE FLOW OF AIR FOR OF AIR FOR PROPER BALANCE
AND OPERATION OF THE DUCT SYSTEMS.
- BRANCH TAKEOFFS
- DUCT SPLITS (DUCT “Y’S” OR SIMILAR SPLIT FABRICATIONS).
7. PROVIDE ALL NECESSARY DUCT TRANSITIONS TO CONNECT
DUCTWORK SYSTEMS TO EQUIPMENT AND DIFFUSERS.
8. ALL JOINTS AND SEAMS OF AIR DUCTS, AIR-HANDLERS, AND
FILTER BOXES SHALL BE SEALED TO SMACNA SEAL CLASS A. ALL
DUCTWORK FOR THIS PROJECT IS LOW PRESSURE DUCT, 2" W.G.
PROVIDE DUCT SEALANT TO COMPLY WITH UL723 CLASS 1
TESTED, AND ASTM 572 AND C732, WITH VOC NOT MORE THAN
250 G/L.
9. ALL NEW DUCTWORK SHALL BE GALVANIZED SHEET METAL,
2" PRESSURE CLASS, WITH METAL GAUGE (THICKNESS)
AND SUPPORTS DETERMINED BY COMPLIANCE WITH
SMACNA GUIDELINES FOR 2" PRESSURE CLASS. DUCT MAY
BE SLIP/DRIVE OR FLANGED.
10. FLEXIBLE DUCTWORK MAY BE USED AS FOLLOWS: LOW
PRESSURE APPLICATION ONLY, UL LISTED CLASS 1,
DOUBLE LAMINATED POLYESTER OR COATED FIBERGLASS
CLOTH WITH HELICAL WIRE REINFORCEMENT; FACTORY
INSULATED. MAXIMUM FLEX DUCT LENGTH IS 5'-0". DO NOT
INSTALL WITH ACUTE KINKS OR UNSUPPORTED SAGS.
11. ALL ELECTRICAL MOTORS SHALL MEET EPAct 1992 MINIMUM
EFFICIENCY REQUIREMENTS.
12. DAMPER LEAKAGE RATES SHALL NOT EXCEED 10 CFM/SF.
13. ALL NEW SUPPLY, RETURN, AND OUTSIDE AIR DUCTS SHALL
BE INSULATED TO A MINIMUM R-6.
14. SUPPLY AND RETURN EXTERIOR DUCTWORK &
DUCTWORK LOCATED IN THE ATTIC SHALL BE INSULATED
TO A MINIMUM OF R-8.
15. HVAC PIPING CARRYING FUILDS OF 105F OR BELOW 55F
SHALL HAVE R-3.6 INSULATION. THIS INCLUDES ALL
REFRIGERANT PIPING AND CONDENSATE DRAINS.
16. PROVIDE SECONDARY DRAIN PANS & FLOAT SWITCH (TO
CUT OFF COMPRESSOR) FOR ALL AHU'S.
17. ALL INTAKE OR EXHAUST LOUVERS SHALL INCLUDE
INTEGRAL GRAVITY DAMPERS (UNLESS AN MOTORIZED
DAMPER IS SPECIFIED).
18. PROTECT DUCT AND PIPING INSULATION THAT MAY
EXPOSED TO TEARING OR PENETRATION.
19. FOR ALL MECHANICAL SYSTEMS, PROVIDE HVAC TEST &
BALANCE (TAB) AFTER BUILD-OUT (BUT BEFORE
OCCUPANCY). TAB SHALL BE PERFORMED BY A NEBB OR
AABC CERTIFIED TAB CONTRACTOR. SUBMIT REPORT TO
GOVERNMENT FOR APPROVAL.
20. CONDUCT COMMISSIONING OF NEW EQUIPMENT: HEATER,
FAN, HVAC SPLIT SYSTEMS.
SAMPLE TAKE-OFF, INDICATING HARD-ROUND TAKE OFF,
THEN FLEX DUCT:
FLEX
FLEX COLLAR
HARD ROUND TAKE-OFF FROM MAIN
DIFFUSER
SU
PP
LY
D
UC
T
NEW DUCT
MOTORIZED
DAMPER FIRE SMOKE DAMPER
BAROMETRIC
DAMPER
BRD
THERMOSTAT
CO2 SENSOR
WALL SWITCH (FOR FAN CONTROL)
VOLUME DAMPER
MECHANCIAL EQUIPMENT - EXISTING OR RELOCATED
MECHANICAL NOTES GENERAL NOTES(AS APPLICABLE) (AS APPLICABLE)
EQUIPMENT TAGS
ENERGY CODE NOTE
MECHANCIAL EQUIPMENT - DEMOLISHEDX X X
EXAMPLE:
320 CFM (UNLESS USING DIFFUSER TAG)
DIFFUSER TYPE CD-1
CFM
EQUIPMENT TAG REQUIRING
AN ELECTRICAL CONNECTION
EQUIPMENT TAG NOT REQUIRING
AN ELECTRICAL CONNECTION,
DATA CAN BE EQUIPMENT NUMBER
AND/OR AIRFLOW SETPOINT
CD-1
BACK WATER VALVEBWV
W
C
T
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
M-001
MECHANICAL SYMBOLS,
ABBREVIATIONS AND
GENERAL NOTES
NOTES
LEGEND
01 REMOVE EXISTING BASEBOARD HEATER.
1. IN GENERAL, DEMOLISH ALL EXISTING HVAC SYSTEMS, INCLUDING SPACE
HEATERS, FANS, AND AIR HANDLING SYSTEMS, UNO.
2. NO SERVICE OUTAGES ARE PERMITTED DURING NORMAL BUSINESS HOURS.
COORDINATE ALL OUTAGES WITH COR NOT LESS THAN 7 DAYS IN ADVANCE.
SIMILARLY, COORDINATE ALL WORK THAT OCCURS WITHIN THE OCCUPIED
BUILDING (EVEN IF IT DOES NOT INVOLVE AN OUTAGE) WITH THE COR NOT
LESS THAN 7 DAYS IN ADVANCE.
GARAGE
WORKSHOP
CLOSET
BREAK RM
BREAK RM
MECH
HALL
WOMEN
MEN
OFFICE
LOBBY
VEST
STORAGE
EX
. 1
4x
RA
EX
. A
HU
EX
. 1
0x 6 S
A
EX. 10x8 SA EX. 10x8 SA
EX. 12x10 SA
EX
. 8 x6
SA
EX. 8x8 SA EX. 8x4 SA
T
T
TT
T
EX. SA
EX. 10x8 EA
EX
. 1
0x 6 E
A
EX. UH
TO REMAIN
T
01X X
X X
X X
X
XX
X
X
X
X
X X X X
X X
X
X
X X
X X
X X
X X
X
X X
X
X X X X X X X
X
X X
X X
X X
X X
X X X X
X X
X X
X X
X X X X X X
X X X X X X
XX
X X X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X
X
X
X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X X
X X X
X X
X
X
X
X
X X
X
X
X
X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X
X
X
02 EXISTING LOUVER TO REMAIN.
W EX. FAN TO REMAIN
X X
X
XX
X
03 REMOVE EXISTING HEAT PUMP. REUSE CURB. (SEE NEW WORK PLANS.)
04 REMOVE EXISTING REGISTER, PATCH AND RESEAL WALL.
PHASE IIPHASE III
PHASE IIPHASE III
05 DEMOLISH BOLLARDS AND HOUSEKEEPING PAD. FILL IN DEMOLISHED PAD AND
BOLLARDS WITH ASPHALT (SEE CP-101).
06 EXISTING 10x6 GOOSENECK EXHAUST ROOF VENT, TO REMAIN.
PHASE I PA
PHASING
FOR PHASE 1, DEMOLISH THE REGISTER LOCATED IN THIS WALL. ALSO DEMOLISH THE
ASSOCIATED DUCTWORK, UP TO 18" FROM THE WALL. PROVIDE TEMPORARY SHEET
METAL CAP. THE REST OF THE DUCT RUN WILL BE DEMOLISHED IN PHASE III OF THE
WORK.
PA
0 2 4 8 12
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
MECHANICAL
DEMOLITION PLANS
MD-101
DN
DN
DN
UP
PHASING
LEGEND
GARAGE
WORKSHOP
121a
CLOSET
BREAK RM
MECHANICAL
HALL
WOMEN
MEN
LOCKERS
DIRECTOR
OFFICE
IT CLOSET
OPEN OFFICE
RESTROOM
RESTROOM
VESTIBULE
STORAGE
MULTI-USE
FILES
LOBBY
FOREMAN
117a
CLOSET
OFFICE GALLEYMAINT. GALLEY
01 PROVIDE CONSTANT AIRFLOW REGULATOR; SET IN FIELD TO MATCH SCHEDULED
OUTSIDE AIR AIRFLOW. ALDES CAR-II OR APPEOVED EQUAL.
x1
0 S A
8x6 SA
SR-1
CD-1
CD-1
CD-1
CD-1
RAG-1
RAG-1
RR-1
RR-1
RR-1
CD-1
AHU
CD-1
x1
2 R A
RR-1
SR-1
SR-1
SR-1
SR-1
SR-1
SR-1
RR-1
RR-1
SR-1
CD-1
70 SR-1
SR-1
CD-1
SR-1
CD-2
SR-2
SR-2
170 SR-1
EF
EF
HP
SR-1
EF
EF
SR-1
SR-1
SR-1
EWH
8" Ø
RA
6x4 SA x1
2 S A x6
RA
12x6 RA
14x10 RA6" Ø
SA
x6
RA
12x6 RA 12x8 RA
18x6 RA 10x8 SA
6x 4 S
A
10x6 SA
6x6 SA
8x 6 S
A
6x4 SA
6x4 SA 6x4 SA
HP
6x 4 S
A
10x8 TD
W EX. FAN TO REMAIN
EX. UH
TO REMAIN
T
02 PROVIDE NEW HEAT PUMP PAD FOR NEW HEAT PUMPS. SEE CONCRETE PAVING
DETAIL 1-LS-201.W
W
W
W W
W
AHU
12x10 SA
6x4 SA
8x 6 S
A
6x6 SA
8"Ø SA
x1
0 R A
12x6 RA
12x6 RA
10x8 SA
6x4 SA x8
SA
12x4 RA
6x 4 S
A
PULLDOWN STAIRS. SEE ARCHITECTURAL DRAWINGS FOR LOCATION.
12x10 SA
8x6 SA
18x8 RA
RR-1
12x4 RA 03
6x 4 S
A
SR-1
PHASE IIPHASE III
PHASE IIPHASE III
PA DEMOLISH EXISTING HOUSEKEEPING PAD (SEE MD-101). DO NOT DEMOLISH PAD AND
EXISTING HEAT PUMP UNTIL PHASE III.
PB BUILD THE 10x8 TRANSFER DUCT DURING PHASE II, EXCEPT FOR THE FINAL FOUR (4) INCHES TO THE SOUTH (JUST BEFORE ROOM 114). FINAL FOUR (4) INCHES AND 10x8 TRANSFER
GRILLE TO BE CONSTRUCTED IN PHASE III.
PB
PA 5'
5'
2'-6"
7"
CONNECT TO EXISTING 10x6 EXHAUST GOOSENECK EXHAUST VENT ON ROOF04
FD 2
EF
6" Ø
SA
FD
16x4 SOFFIT OUTSIDE AIR INTAKE.05
16x4 SOFFIT VENT.06
6x 4 S
A
6"Ø SA
6"Ø SA 6"Ø SA6"Ø SA
8" Ø
RA
6x 4 S
A
6x 4 S
A 8x6 EA
8x6 EA
SR-1
6x6 SA
SR-1
6x 6 S
A
6" Ø
SA
T T
PHASE I
NO NEW
MECHANICAL
WORK IS REQUIRED
FOR PHASE I.
12x4 RA
SR-1
SR-1
0 2 4 8 12
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
MECHANICAL PLANS
MH-101
File details come from the government source that posted it. Updated .