ATTACHMENT 05 - Cost Estimate Worksheet - WB.pdf
PDF 136 KB Posted
- Solicitation number
- 36c78620b0009
About this file
This document contains a cost estimate worksheet and details of a related federal contract opportunity for facility renovations. The cost estimate worksheet is for a project to renovate facilities at the Woodlawn and Bath National Cemeteries. It lists the construction specification divisions that will be used for the project and includes blanks to input lump sum costs for each division. The total cost should be provided at the end.
The related federal contract opportunity is solicitation number 36c78620b0009 for renovations, improvements, and repairs at the Woodlawn and Bath National Cemeteries. The opportunity is being issued by the Department of Veterans Affairs National Cemetery Administration to make facility renovations, improvements, and repairs at the two national cemeteries. Interested parties should review the solicitation for details on response dates and contract terms.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB Number
Project Name
Division WOODLAWN BATH Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS
(https://www.cfm.va.gov/til/ncaSpec.asp)
36C78620B0009
Renovations, Improvements, and Repairs, at the Woodlawn & Bath National Cemeteries
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
HVAC
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds
Overhead
Profit
GRAND TOTALS $ $ $
File details come from the government source that posted it. Updated .