S02 - 803IC3015 Bid Dwgs Bath Bk06.pdf
PDF 19 MB Posted
- Solicitation number
- 36c78620b0009
About this file
This file contains details of a federal contract opportunity for facility renovations and improvements. The solicitation number is 36c78620b0009 and seeks bids for renovations at the Woodlawn and Bath National Cemeteries. The work includes facility renovations, improvements and repairs. The contracting agency is the Department of Veterans Affairs National Cemetery Administration. The description indicates the opportunity is for renovating and updating facilities at the two national cemeteries to improve conditions. The attached file appears to contain bid drawings to assist contractors in preparing responses for the work outlined.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
MH-201
MECHANICAL SCHEDULES
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
MH-202
MECHANICAL SCHEDULES
A
A AMPERE
AC AIR CONDITIONING
ACV AUTOMATIC CONTROL VALVE
ACD AUTOMATIC CONTROL DAMPER
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
ALM ALARM
AP ACCESS PANEL
ARCH ARCHITECT
AS AIR SEPARATOR
B
BFP BACK FLOW PREVENT
BHP BREAK HORSE POWER
BOP BOTTOM ELEVATION OF PIPE
BWV BACK WATER VALVE
C
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN-OUT
CP CONDENSATE PUMP
D
D DRAIN
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DX DIRECT EXPANSION
E
(E) EXISTING
EX. EXISTING
EWC ELECTRIC WATER COOLER
EA EACH
EFF EFFICIENCY
ELEC ELECTRICAL
EMT ELECTRICAL METAL TUBE CONDUIT
ES END SWITCH
ET EXPANSION TANK
F
FA FREE AREA
FMT FLOW METER/TRANSMITTER
FPM FEET PER MINUTE
FT FEET
FZ FREEZE STAT
G
G GAS
H
H HEIGHT
HB HOSE BIBB CONNECTION WITH CHAINED CAP
HC HEATING COIL
HOA HAND-OFF-AUTOMATIC SWITCH
HP HORSE POWER
HW HOT WATER
HWR HOT WATER RETURN (DOMESTIC)
HWS HOT WATER SUPPLY (DOMESTIC)
HVAC HEATING VENTILATION AIR CONDITIONING
HX HEAT EXCHANGER
HZ HERTZ
I
IN INCHES
INWC INCHES OF WATER COLUMN
K
KW KILOWATTS
L
LAV LAVATORY
LF LINEAR FEET
LPR LOW PRESSURE CONDENSATE RETURN
LPS LOW PRESSURE STEAM SUPPLY
LSPS LOW STATIC PRESSURE SWITCH
M
MAV MANUAL AIR VENT
MIN MINIMUM
MPR MEDIUM PRESSURE CONDENSATE RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
N
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NUM NUMBER
NTS NOT TO SCALE
O
OCC OCCUPIED
P
P PUMP
PC PUMPED CONDENSATE
PD PRESSURE DROP
PLBG PLUMBING
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
R
RET RETURN
REQ REQUIRED
RI RUN INDICATOR
RPM REVOLUTIONS PER MINUTE
S
SA SOUND ATTENUATOR
SP STATIC PRESSURE SENSOR
SQFT SQUARE FEET
S/S START/STOP
SK SINK
T
TEMP TEMPERATURE
TOP TOP ELEVATION OF PIPE
TYP TYPICAL
U
UNOCC UNOCCUPIED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
V VENT
VTR VENT THRU ROOF
VIF VERIFY IN FIELD
VS VIBRATION SWITCH
W
W WIDTH
WMS WIRE MESH SCREEN
WC WATER CLOSET
GENERAL ABBREVIATIONS
VALVE
PIPE UNION
PLUMBING SYMBOLS LEGEND
END CAP
PIPE RISE
PIPE DROP
TOP TAKE-OFF
BOTTOM TAKE-OFF
PIPE BREAK
AAV
MANUAL VALVE WITH MEMORY STOP (BALANCING)
CAPPED VALVE WITH HOSE BIBB AND CHAIN
CHECK VALVE
Y-STRAINER
BASKET STRAINER
AUTOMATIC VALVE, 2-POSITION ACTUATOR
AUTOMATIC VALVE, MODULATING ACTUATOR
3-WAY VALVE, 2-POSITION ACTUATOR
3-WAY VALVE, MODULATING ACTUATOR
PRESSURE GAGE WITH GAGE CLOCK
TEMPERATURE SENSOR
PRESSURE / TEMPERATURE WELL
AUTOMATIC AIR VENT WITH ISOLATION VALVE
MANUAL AIR VENTMAV
FLEXIBLE CONNECTION
PIPE GUIDE
ANCHOR
UP
DN
DIRECTION OF FLOW IN PIPE
PITCH PIPE UP IN DIRECTION OF FLOW
PITCH PIPE DOWN IN DIRECTION OF FLOW
1. GENERAL PROVISIONS
A. THE GENERAL AND SPECIAL CONDITIONS GOVERN THIS
WORK TO THE EXTENT THAT THEY APPLY. THE
DRAWINGS AND THE SPECIFICATIONS ARE
COMPLEMENTARY TO EACH OTHER AND WHAT IS
CALLED FOR BY ONE SHALL BE BINDING AS IF CALLED FOR
BY BOTH.
B. THE CONTRACTOR MUST FULLY EXAMINE THE
DRAWINGS, SPECIFICATIONS AND JOB SITE AND FULLY
INFORM HIMSELF OF ALL EXISTING CONDITIONS AND
WORK REQUIRED BY THE DRAWINGS AND
SPECIFICATIONS BEFORE SUBMITTING HIS BID.
C. PROTECT WORK AT ALL TIMES FROM DAMAGE. RESTORE
ALL DAMAGED WORK TO A NEW CONDITION BEFORE
FINAL ACCEPTANCE.
D. ENTIRE INSTALLATION MUST CONFORM TO ALL CITY
CODES THAT GOVERN AND TO ALL APPLICABLE
REQUIREMENTS OF THE NATIONAL FIRE PROTECTION
ASSOCIATION.
E. THIS CONTRACT INCLUDES ALL EXCAVATION, BACKFILL,
LABOR, PIPING, MATERIALS, FIXTURES AND EQUIPMENT
NECESSARY FOR THE WORK.
F. ORDER AND OBTAIN ALL NECESSARY TESTS, PERMITS
AND CERTIFICATES OF APPROVAL, AND PAY ANY
REQUIRED FEES FOR SAME.
G. ALL LOCATIONS AND ELEVATIONS OF SEWER AND WATER
SERVICE NEEDS VERIFY ON THE JOB SITE PRIOR TO
ACTUAL CONSTRUCTION. IF UTILITIES CANNOT BE
CONNECTED AS SHOWN, NOTIFY THE COR IMMEDIATELY.
H. EQUIPMENT CAPACITIES AND MANUFACTURER MODEL
NUMBERS ARE SPECIFIED ON THE DRAWINGS.
I. MATCH ALL EQUIPMENT REQUIRING ELECTRIC POWER
WITH THE POWER TO BE SUPPLIED. SEE ELECTRICAL
DRAWINGS. ELECTRICAL CONNECTIONS BY ELECTRICAL
CONTRACTOR. ALL ELECTRIC REQUIREMENTS MUST BE
COORDINATED WITH THE ELECTRICAL CONTRACTOR.
J. ALL PIPING SHALL BE TESTED IN ACCORDANCE WITH THE
LOCAL CODE REQUIREMENTS AND PROVED TIGHT.
LEAKING JOINTS SHALL BE REMADE, NOT CAULKED, AND
TESTED.
K. INSTRUCT THE GOVERNMENT IN THE OPERATION AND
MAINTENANCE OF ALL COMPONENTS OF THE
INSTALLATION.
L. START-UP AND TEST ALL SYSTEMS.
M. PROVIDE LISTED FIRE CAULKING AND/OR SEALANT
SYSTEMS WHEN PENETRATING FLOORS (2 HR) OR CHASE
(2 HR).
N. PERFORM ALL WORK ABOVE, BELOW, IMMEDIATELY
ADJACENT TO THEN-OCCUPIED SPACES OUTSIDE OF
NORMAL BUSINESS HOURS UNLESS OTHERWISE
AUTHORIZED BY COR.
O. MAINTAIN EXISTING OR PROVIDE NEW UTILITIES,
SYSTEMS, AND SERVICES TO OCCUPIED SPACES AT ALL
TIMES. NO OUTAGES ARE PERMITTED DURING NORMAL
BUSINESS HOURS. COORDINATE ALL OUTAGES DURING
CHANGE-OVERS BETWEEN PHASES WITH CEMETERY
DIRECTOR NOT LESS THAN 7 DAYS IN ADVANCE.
4. BASIC MATERIALS AND METHODS
A. EXCAVATION AND BACKFILL MUST CONFORM TO ALL
MINIMUM REQUIREMENTS ESTABLISHED BY THE
ARCHITECT.
B. MAKE ALL PIPING CONNECTIONS TO EQUIPMENT WITH
GROUND JOINT UNIONS OR EQUIVALENT.
C. PIPE HANGERS AND SUPPORTS: CLEVIS OR SPLIT RING
TYPES; SPACING AND ROD SIZE AS RECOMMENDED IN
ASHRAE HANDBOOK AND IN ACCORDANCE WITH
INDUSTRY PRACTICE. BAND IRON HANGERS SHALL NOT
BE USED. HANGERS AND ACCESSORIES SHALL BE
CARPENTER & PATERSON, OR APPROVED EQUAL.
D. PROVIDE ESCUTCHEON PLATES WHEREVER PIPES PASS
THROUGH WALLS OR FLOORS; CHROME PLATED IN
EXPOSED AREAS.
E. VALVES: ALL 125 LB. STEAM CLASS. ALL BRONZE.
(1) GATE VALVES: SOLID DISC TYPE, UNION BONNET.
STOCKHAM, OR APPROVED EQUAL.
(2) DRAIN VALVE: 3/4" BRONZE GLOBE VALVE WITH
HOSE THREAD ADAPTER.
(3) PROVIDE GATE VALVE OR STOP IN WATER LINES
TO EACH PLUMBING FIXTURE.
(4) APPROVED BALL VALVES MAY BE USED IN LIEU OF
GATE VALVES, 2" MAX SIZE.
F. PIPING SHOULD NOT BE IN DIRECT CONTACT WITH
STRUCTURAL MEMBERS. SLEEVE ALL OPENINGS IN
MASONRY WALLS & SLABS.
3. INSULATION AND SOUNDLINING
A. ALL OWENS - CORNING FIBERGLASS PRODUCTS
INDICATED, OR APPROVED EQUAL. INSTALL MATERIALS
AND ACCESSORIES IN ACCORD WITH MANUFACTURER'S
RECOMMENDATIONS.
B. ALL INSULATION PRODUCTS MUST MEET UL RATINGS OF
FLAME SPREAD 25 AND SMOKE DEVELOPED 50.
C. PIPING - ONE PIECE 25 ASJ/SSL FITTINGS AND VALVES
INSULATED WITH SAME THICKNESS OF MITERED PIPE
INSULATION, GLASS CLOTH REINFORCED, DOUBLE MATIC
COATING.
(1) DOMESTIC HOT WATER: R 3.6.
(2) DOMESTIC COLD WATER IN NON-CONDITIONED
SPACE AND WHERE SUBJECT TO CONDITION.
(3) EXPOSED PIPING AT FIXTURE CONNECTIONS
SHALL NOT BE INSULATED.
D. VAPOR BARRIER ON COLD PIPING SHALL BE
CONTINUOUS.
4. PLUMBING
A. PIPING.
(1) ABOVE GROUND SOIL, WASTE AND VENT PIPING:
CAST IRON PIPE AND FITTINGS.
(2) ABOVE GROUND DOMESTIC WATER PIPING:
COPPER PIPE AND FITTINGS.
B. CLEANOUT: JOSAM NO. 56040 OR APPROVED EQUAL, AS
REQUIRED BY CODE.
PLUMBING NOTES
SANITARY PIPE NEW
SANITARY PIPE EXISTING
VENT PIPE NEW
VENT PIPE EXISTING
PLUMBING EQUIPMENT NEW
PLUMBING EQUIPMENT EXISTING
COLD WATER PIPE NEW
COLD WATER PIPE EXISTING
HOT WATER PIPE NEW
HOT WATER PIPE EXISTING
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
KEY NOTE SYMBOL
SANITARY PIPE DEMO
VENT PIPE DEMO
PLUMBING EQUIPMENT DEMO
COLD WATER PIPE DEMO
HOT WATER PIPE DEMO
X X X
X X X
X X X
X X X
X X X
STORM WATER PIPE NEW
STORM WATER PIPE EXISTING
STORM WATER PIPE DEMOX X
ST
ST
ST
(AS APPLICABLE) (AS APPLICABLE)(AS APPLICABLE)
DATA
TAG
DATA
TAG
EQUIPMENT TAGS
EQUIPMENT TAG REQUIRING
AN ELECTRICAL CONNECTION
EQUIPMENT TAG NOT REQUIRING
AN ELECTRICAL CONNECTION,
DATA CAN BE EQUIPMENT NUMBER
AND/OR FLOW SETPOINT
PT
BACK WATER VALVE
BWV
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
P-001
PLUMBING SYMBOLS,
ABBREVIATIONS AND
GENERAL NOTES
NOTES
1. ALL EXISTING SANITARY PIPING WITH THE EXISTING BUILDING (PHASE III AREA) IS
BURIED BELOW A SLAB ON GRADE.
2. FOR EQUIPMENT SHOWN TO BE REMOVED, PATCH AND SEAL REMAINING WALLS,
FLOORS AND/OR ROOF WORK TO MAINTAIN THAT ELEMENT'S PREVIOUS INTEGRITY.
REFER TO AD-101 BUILDING DEMOLITION PLAN FOR FURTHER REQUIREMENTS.
3. NO SERVICE OUTAGES ARE PERMITTED DURING NORMAL BUSINESS HOURS.
COORDINATE ALL OUTAGES WITH COR NOT LESS THAN 7 DAYS IN ADVANCE.
SIMILARLY, COORDINATE ALL WORK THAT OCCURS WITHIN THE OCCUPIED BUILDING
(EVEN IF IT DOES NOT INVOLVE AN OUTAGE) WITH THE COR NOT LESS THAN 7 DAYS
IN ADVANCE.
LEGEND
EX. FD
GARAGE
WORKSHOP
CLOSET
BREAK RM
BREAK RM
MECH
HALL
WOMEN
MEN
OFFICE
LOBBY
VEST
STORAGE
EX. FD
EX. CO
4"
4"
3"
1.5"
4"
X X
X
X X
X
XX
X
CAPPED FORMER CONNECTION TO SINK.
DN
DN
DN
UP
PHASE IIPHASE III
PHASE IIPHASE III
X
X X
PHASE I
THE EXISTING CLEAN-OUT WILL BE
DEMOLISHED IN PHASE I TO MAKE ROOM
FOR THE INCOMING SIDEWALK. SEE
PP-101 FOR ADDITIONAL PHASE-I WORK.
COORDINATE SERVICE OUTAGE PER
NOTES ON THIS SHEET.
EX. CO
PLUMBING DEMOLITION
SANITARY PLANS
PD-101
0 2 4 8 12
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
1. FOR EQUIPMENT SHOWN TO BE REMOVED, PATCH AND SEAL REMAINING WALLS,
FLOORS AND/OR ROOF WORK TO MAINTAIN THAT ELEMENT'S PREVIOUS INTEGRITY.
REFER TO AD-101 BUILDING DEMOLITION PLAN FOR FURTHER REQUIREMENTS.
LEGEND
01 EXISTING SIAMESE HOSE BIBB.
DN
DN
UP
02 DEMOLISH EXISTING COLD WATER PIPING FROM MAIN TO EXISTING EYEWASH.
03 EXISTING HOSE BIBB WITH HOSE ON ROLL TO REMAIN.119
GARAGE
WORKSHOP
CLOSET
BREAK RM
BREAK RM
MECH
HALL
WOMEN
MEN
OFFICE
LOBBY
VEST
STORAGE
EX. WALL
HYDRANT
3/4"
EX. 2"
WATER
SERVICE
2"
3/4" 1/2"
2" 1.5
3/4"
2" 3/ 4"
X X
X X
X
X
X X
EX.
BFP
PHASE IIPHASE III
PHASE IIPHASE III
0 2 4 8 12
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
PLUMBING DEMOLITION
WATER PLANS
PD-102
LEGEND
1. ALL EXISTING SANITARY PIPING WITH THE EXISTING BUILDING (PHASE III
AREA) IS BURIED BELOW A SLAB ON GRADE.
2. NO SERVICE OUTAGES ARE PERMITTED DURING NORMAL BUSINESS HOURS.
COORDINATE ALL OUTAGES WITH COR NOT LESS THAN 7 DAYS IN ADVANCE.
SIMILARLY, COORDINATE ALL WORK THAT OCCURS WITHIN THE OCCUPIED
BUILDING (EVEN IF IT DOES NOT INVOLVE AN OUTAGE) WITH THE COR NOT
LESS THAN 7 DAYS IN ADVANCE.
3. ALL NEW SANITARY WORK WITHIN THE EXISTING BUILDING (PHASE III)
INCLUDES A REQUIREMENT TO CUT THE EXISTING SLAB ON GRADE FOR THE
NEW SANITARY LINES. (FOR PHASE II WORK, THE SLAB IS NEW - INSTALL PHASE
II SANITARY PIPE BEFORE SLAB-POUR).
DN
DN
DN
UP
GARAGE
WORKSHOP
121a
CLOSET
BREAK RM
MECHNICAL
HALL
WOMEN
MEN
LOCKERS
DIRECTOR
OFFICE
IT CLOSET
OPEN OFFICE
RESTROOM
RESTROOM
VESTIBULE
STORAGE
MULTI-USE
FILES
LOBBY
FOREMAN
117a
CLOSET
OFFICE GALLEY
MAINT. GALLEY
CAPPED FORMER CONNECTION TO SINK.
EXISTING 2" VTR TO REMAIN.
NEW 2" VTR.
04 PROVIDE TRAP GUARD WITH FLOOR DRAIN.
1 NEW WORK FLOOR PLAN - ADMINISTRATIVE BUILDING
SCALE: 1/4" = 1'-0"
2 SANITARY RISER DIAGRAMS - ADMINISTRATIVE BUILDING
NO SCALE
1ST FLOOR
ROOF
1ST FLOOR
ROOF
EX. FD
EX. CO
3" 4"
SK-1
3"
SK-1
EX. SK
(116)
EX. UR
(116)
EX. 2" VTR EX. 2" VTR
WC-1
(102)
3"
1.
5"
EX. FD
(118)
LV-1
(102)
EX. SK
(115)
SK-1
(113)
EX. 4"
EX. SK
(119)
03 EX. WC
(115)
EX. WC
(116)
EX. 4"
2" 1.
5"
FD-1
(103)
FD-1
(102)
1.
5"
2"
LV-1
(103)
1.
5"
2"
SK-1
(107)
1.
5"
2"
WC-1
(103)
3" 2"
2" VTR EX. 2" VTR
EX. FD
(122)
EX. FD
4"
4"
1.5"
2"
(119)EX. CO
EX. 4"
3"
2" 2"
3"
2"
EX
. 1
.5
EX
. 1
.5
EX. 2"
EX
. 2
EX. 2"
EX
. 1
.5
EX
. 1
.5
EX
. 1
.5
EX. 3"
EX. 2"
EX
. 2
EX. 2"
WC-1
FD-1
WC-1
LV-1
FD-1
LV-1
SK-2
1.5"
2"
PHASE IIPHASE III
05 PERFORM CONNECTION TO EXISTING SANITARY OUTSIDE NORMAL BUSINESS HOURS
UNLESS SPECIFICALLY APPROVED OTHERWISE BY THE COR.
(SLAB ON GRADE)(SLAB ON GRADE)
CEILINGROOF
CO
COCO
CO
CO
CO
PHASE III
PHASE II
PH
AS
E I
PH
AS
E I
PHASE I
PHASE III
PHASE I
PHASE II
INSTALL THIS WORK IN PHASE I TO MAKE ROOM FOR THE INCOMING SIDEWALK. SEE
PD-101 FOR ADDITIONAL PHASE-I DEMO WORK. COORDINATE SERVICE OUTAGE PER
NOTES ON THIS SHEET.
PHASING
PA
PROVIDE SEALED CAP AT THIS LOCATION AT THE END OF PHASE I. UNSEAL AND
CONTINUE PIPING WHEN PHASE II COMMENCES.
PB
PA
PA
PA PA
PB
0 2 4 8 12
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
PLUMBING
SANITARY PLANS
PP-101
PHASING
LEGEND
DN
DN
DN
UP
GARAGE
WORKSHOP
121a
CLOSET
BREAK RM
MECHNICAL
HALL
WOMEN
MEN
LOCKERS
DIRECTOR
OFFICE
IT CLOSET
OPEN OFFICE
RESTROOM
RESTROOM
VESTIBULE
STORAGE
MULTI-USE
FILES
LOBBY
FOREMAN
117a
CLOSET
OFFICE GALLEY
MAINT. GALLEY
EXISTING ELECTRIC WATER HEATER. NEW P/T VALVE AND EXPANSION TANK TO BE ADDED.
2 DOMESTIC WATER RISER DIAGRAMS - ADMINISTRATIVE BLDG
NO SCALE
1 NEW WORK FLOOR PLAN - ADMINISTRATIVE BUILDING
SCALE: 1/4" = 1'-0"
1ST FLOOR
ROOF
1ST FLOOR
ROOF
EX. WALL
HYDRANT
3/4"
EX. 2"
WATER
SERVICE
2"
3/4" 1/2"
1.5
2" 3/ 4"
EX.
BFP
02 EXISTING SIAMESE HOSE BIBB TO REMAIN.
03 PROVIDE NEW ANSI Z358.1 (OR APPROVED EQUAL) COMPLIANT TEPID WATER
MIXING VALVE, MOUNTED AT 42" AFF. CONNECT 1/2" CW AND 1/2" HW TO VALVE,
WITH A 1/2" TEPID WATER OUTPUT PIPE FOR THE EXISTING EMERGENCY EYEWASH.
3/4"
1/ 2"
1/ 2"
WC-1
WC-1
LV-1
LV-11.2
5"
1.25"
1/2"
SK-1
3/4"1.5"
1/2"
SK-1
HWR
1/2"
3/4"
3/4"
EX. 2" CW
FROM STREET
1/2"1"1/2"
EX. UR LV-1
EX.
BFP EX.
WH (103)
1/2"
LV-1
(102)
1/2" 1.25"
WC-1(107)
(102)
1/2"
(113)
SK-1 SK-1EX. SK
3/4"
EX. LVEX. LV
(119) (116) (115) (116)
1.5"
EX. WC
(115)
EX. WC
(116) 02EX. WALL
HYDRANT
(120)
EX. HOSE
BIBB
(122)
EX.
FRIDGE
(121)
EX. EYE
WASH
(122)
EX. ICE
MAKER
(121)
1/2"
HWR
EX. 3/4" EX. 3/4" EX. 3/4"
EX. 2" EX. 2" EX. 3/4"
1/2"3/8"1/2"1/2"
3/4"
3/4" 1.5"
3/4"
1.25"
WC-1
(103)
PHASE IIPHASE III
PHASE IIPHASE III
PA PIPES THAT ARE DESIGNATED AS NEW WORK (THICK LINEWEIGHT) IN THIS ZONE MUST
BE DONE DURING PHASE II. PERFORM THIS PORTION OF THE WORK OUTSIDE NORMAL
BUSINESS HOURS UNLESS SPECIFICALLY APPROVED OTHERWISE BY THE COR. THE
EXISTING PIPES (THINNER LINEWEIGHT) WILL BE EXISTING TO REMAIN.
PB THIS SINK (SK-1) WILL BE INSTALLED DURING PHASE III. THEREFORE, THE
HOT AND COLD WATER CONNECTING PIPES WILL ALSO BE INSTALLED DURING
PHASE III.
PA
PB
3/4"
SK-2
(118)
1/2"
REFR.
(119)
04 PIPING GOING THROUGH 2-HR RATED FIRE WALL. PROVIDE FIRE SLEEVE/FIRE CAULK
TO MATCH RATING.
(SLAB ON GRADE)(SLAB ON GRADE)
CEILINGCEILING
NOTES
1. NO SERVICE OUTAGES ARE PERMITTED DURING NORMAL BUSINESS HOURS.
COORDINATE ALL OUTAGES WITH COR NOT LESS THAN 7 DAYS IN ADVANCE.
SIMILARLY, COORDINATE ALL WORK THAT OCCURS WITHIN THE OCCUPIED BUILDING
(EVEN IF IT DOES NOT INVOLVE AN OUTAGE) WITH THE COR NOT LESS THAN 7 DAYS
IN ADVANCE.
2. INSTALL ALL DOMESTIC WATER PIPING SUCH THAT THE PIPING IS LAID ON TOP OF
THE ATTIC JOIST, SUCH THAT THE ATTIC BATT INSULATION IS SEVERAL INCHES ABOVE
THE PIPING, IN ORDER TO PREVENT A POSSIBILITY OF EXPOSURE TO FREEZING
CONDITIONS. SIMILARLY, INSTALL ALL DOMESTIC WATER PIPING THAT IS IN
EXTERNAL WALLS (RESTROOMS 102, 103) SUCH THAT THE PIPING IS ON THE
INNERMOST PORTION OF THE WALL. REPORT ANY DEVIATIONS FROM THESE
REQUIREMENT TO THE COR.
PHASE I
NO NEW DOMESTIC
PLUMBING WORK IS
REQUIRED FOR
PHASE I.
0 2 4 8 12
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
PLUMBING
WATER PLANS
PP-102
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
TDF MLP
JUNE 5, 2020
FINAL CONSTRUCTION DOCUMENTS
PP-201
PLUMBING SCHEDULES
STRUCTURAL GENERAL
S-001 93Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLC
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
DAB CAD
JUNE 5, 2020
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300
FAX: 814-269-9301
© COPYRIGHT 2019, H.F. LENZ COMPANY, P.C.
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
STRUCTURAL GENERAL
NOTES AND LOADING
S-002 94Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2020, Walker Federal Services, LLC
Walker Federal Services, LLC
FACILITY RENOVATION,
IMPROVEMENTS, AND
REPAIRS
BATH NATIONAL CEMETERY
803IC3015
DAB CAD
JUNE 5, 2020
H.F. LENZ COMPANY, P.C.
1407 Scalp Avenue, Johnstown, PA 15904 Phone: 814-269-9300
FAX: 814-269-9301
© COPYRIGHT 2019, H.F. LENZ COMPANY, P.C.
N C A
ATIONAL
EMETERY
DMINISTRATION
N C A
ATIONAL
EMETERY
DMINISTRATION
File details come from the government source that posted it. Updated .