RMAS DRAFT W15QKN26RA001 For Release.pdf
PDF 7 MB Posted
- Solicitation number
- Not on record
About this file
This is a draft Request for Proposal (RFP) for the Sixth Generation (GEN VI) Recruiting, Management, and Administrative Support (RMAS) Services Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) suite issued by the Army Contracting Command - New Jersey on behalf of the Human Resource Solutions Program Office. The procurement is a 100% small business set-aside for non-personal services to provide personnel management support encompassing recruitment, retention, data analytics, program execution, administrative support, and technology integration across the Department of War and other federal agencies. The Government intends to make multiple awards with a total estimated cumulative ceiling value of $1,522,318,030.19 and a minimum guarantee of $2,000 per IDIQ contract. The Period of Performance consists of one 5-year Base Period and one 5-year Option Period, with pricing to be determined at the individual task order level using Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), and Fixed Price Level of Effort (FFP LOE) contract types, plus cost reimbursement for Other Direct Costs, travel, and materials.
Contractor support services under this IDIQ cover the full personnel lifecycle including personnel structure and organization, distribution and manpower analysis, training and development, deployment, compensation and benefits, sustainment programs, and transition support. Special requirements include mandatory security clearances at the Secret level for key personnel, compliance with extensive training programs (antiterrorism, cyber awareness, OPSEC, SHARP, CTIP), and adherence to non-personal services provisions with Government oversight through Contracting Officers, Contracting Officers' Representatives (COR-RA and COR-HRS), and Government Technical Monitors. The solicitation is designated as Product Service Code R408 and NAICS code 541612. Key personnel requirements include a Contract Manager and Alternate Contract Manager with Master's degrees in business, management, or related fields. Offerors are evaluated primarily on Technical merit and Past Performance, with performance standards addressing proposal submission timeliness and quality, key personnel effectiveness, service quality ratings in CPARS, and business relations management. An Industry Day is scheduled for June 16, 2026, at Fort Knox, Kentucky, with question submission deadline of June 11, 2026, directed to the listed Contracting Officers and Contract Specialists.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFTSECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Created On:
05 Jun 2026, 13:45 PM Central Daylight Time
Section A - Solicitation/Contract Form
HRS GEN VI RMAS IDIQ RecompeteInstrument Name:
Product Service Code : R408
Executive Summary:
This executive summary highlights some of the important features of this solicitation. If conflicts exist between this summary and the provisions in the solicitation, the provisions of the solicitation take precedence.
General Information:
1. The Army Contracting Command - New Jersey (ACC-NJ) has a requirement from the Human Resource Solutions Project Office (HRSPO) to establish the next (Sixth) generation (herein referred to as GEN VI) of the Recruiting, Management, and Administrative Support (RMAS) Services Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award (MA) Task Order Contract (MATOC) suite. Contractor support services will provide personnel management support, from initial recruitment through career progression and transition-encompassing data analytics, program execution, administrative support, and technology integration. Specific support services may include but are not limited to: Contract support for data and records tracking, recruitment and retention programs, protocol activities including recognition ceremonies and public relations programs, technical writing and credentialing and qualification.
Requirements under this suite will be competed at the Task Order (TO) level.
2. The Government intends to make multiple awards in accordance with Federal Acquisition Regulation (FAR) 16.504-3. The IDIQ contract(s) will include Contract Line Item Numbers (CLINs) for Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), and Firm Fixed Price-Level of Effort (FFP LOE) RMAS Services. The contract(s) will also include a Cost Reimbursable/NoFee CLIN for Travel and Other Direct Costs (ODCs) and a CLIN for Contract Data Requirements Lists (CDRLs).
The individual contract types utilized for requirements will be determined at the task order level.
The Period of Performance will be for a 10-year period, consisting of one 5-year Base Period and one 5-year Option Period. As stated within Section M, the Government reserves the right to make staggered awards. All awarded contracts under the RMAS Suite will share the same IDIQ Base Period end date and the Option Period will remain consistent for all awardees within the RMAS Suite.
3. Government Furnished Equipment (GFE) issued will be specific to individual TO and listed therein. All GFE shall be accurately accounted for an safeguarded in accordance with the same guidelines and policies as applied to the Contractor's assets.
4. Disclosure of Labor Rates and Pricing Information (Task Order Level): Offerors are advised that pricing information, including fully burdened labor rates submitted at the task order level, may be
W15QKN26RA001
DRAFT
subject to requests for public release under the Freedom of Information Act (FOIA), 5 U.S.C. (S)
552. If an offeror considers its labor rates, pricing methodologies, or associated financial data to constitute protected trade secrets or confidential commercial information exempt from disclosure under FOIA Exemption 4 (5 U.S.C. (S) 552(b)(4)), the offeror must clearly mark the applicable portions of its proposal in accordance with the legend prescribed at FAR 52.215-1(e). In the event the Government receives a FOIA request for labor rates or pricing data that an offeror has marked as confidential, the Government will strictly comply with the submitter notification and objection procedures set forth in Executive Order 12600 prior to making any disclosure determination.
5. It is anticipated that there may be requirements at the TO level for access to Classified Information by Contractors under this MA IDIQ. The proposed RMAS and PLS IDIQ MATOCs will be classified at SECRET level or below. To receive an award, Offerors will be required to have Secret personnel clearances. The PWS for each mission area will require that prior to the start of performance under these contracts, all key Contractor personnel shall obtain, at a minimum, secret level clearance.
6. The ACC is in the process of deploying the Electronic Cost Reporting and Financial Tracking (eCRAFT) Enterprise tool (E2) to all ACC organizations. E2 is a tool designed to enhance cost reporting and financial tracking utilizing standardized labor categories, authoritative data, and automated reports. E2 is expected to be deployed in Fiscal Year 2026 and its utilization is required for service contracts/orders that contain Cost type Contract Line Item Numbers (CLINs). While pricing is not requested at the IDIQ level per Sections L and M of this solicitation, Offeror(s) are advised information listed within Section J, Attachment 0005 of this solicitation may be requested at the TO level for any requirements to which eCRAFT applies.
7. The total estimated cumulative ceiling value of the RMAS suite of contracts is $1,522,318,030.19. The minimum guarantee for each IDIQ contract is $2,000.
General Information to Offerors:
1. Responses must set forth full, accurate and complete information as required by this solicitation (including attachments). Fill-ins are provided on Standard Form 33 and other solicitation documents. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
2. Responses must be plainly marked with the Solicitation Number and the date and local time set forth for receipt of proposals in the solicitation document.
3. Information regarding the timeliness of response is addressed in the provision of the solicitation entitled Proposal Submittal Requirements.
4. Procurement Information:
W15QKN26RA001
This Procurement is a competitive acquisition and is a 100% Small Business Set-Aside. The Government intends to award to all Offerors submitting acceptable and qualifying proposals IAW FAR 15.104(b)(1)(ii)(A), with the Source Selection Authority (SSA) giving appropriate consideration to the evaluation factors: Technical and Past Performance.
PSC/NAICS codes are: R408/541612.
5. Issuing Office:
U.S. Army Contracting Command - New Jersey ATTN: Morgan F. Ziatyk Office Symbol: ACC-NJ Picatinny Arsenal, NJ 07806 Email: morgan.f.ziatyk.civ@army.mil
6. Additional Information: N/A
7. Point of Contact for Information:
Name: Morgan F. Ziatyk Title: Contracting Officer Email: morgan.f.ziatyk.civ@army.mil Phone: 520-669-8325
Name: Michele Walston Title: Contract Specialist Email: michele.l.walston.civ@army.mil Phone: 520-669-7958
Name: Jacqueline Smith Title: Contract Specialist Email: jacqueline.m.smith95.civ@army.mil Phone: 520-669-7872
*** END OF NARRATIVE ***
W15QKN26RA001
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 FIRM FIXED PRICE (FFP) SERVICES -
BASE PERIOD This CLIN is established to provide Firm Fixed Price services for the Base Period in accordance with the Performance Work Statement (PWS). Price /Cost will be determined at the TO level.
The Base Ordering Period consists of a total of five (5) years.
Pricing Arrangement: Firm Fixed Price
Lot
0002 FIRM FIXED PRICE LEVEL OF EFFORT
(FFP LOE) SERVICES - BASE PERIOD
This CLIN is established to provide Firm Fixed Price - Level of Effort services for the Base Period in accordance with the PWS. Price/cost will be determined at the TO level. The Base Ordering Period consists of a total of five (5) years.
Pricing Arrangement: Fixed Price Level of Effort
Lot
0003 COST PLUS FIXED FEE (CPFF)
SERVICES - BASE PERIOD This CLIN is established to provide Cost Plus Fixed Fee services for the Base Period in accordance with the PWS. Price/cost will be determined at the TO level. The Base Ordering Period consists of a total of five
(5) years.
Pricing Arrangement: Cost Plus Fixed Fee
Lot
0004 COST REIMBURSEMENT: ODCs
/MATERIAL/TRAVEL- BASE PERIOD
Lot
W15QKN26RA001
This CLIN is established to provide Cost Reimbursement - No Fee for Other Direct Costs (ODCs), Material and Travel for the Base Period in accordance with the PWS.
Price/cost will be determined at the TO level. The Base Ordering Period consists of a total of five (5) years.
Pricing Arrangement: Cost No Fee
0005 CONTRACT DATA REQUIREMENTS
LIST (CDRL) This CLIN is established to provide Not Separately Priced (NSP) Contract Data Requirements Lists (CDRLs) in accordance with the PWS.
CLIN 0005 is applicable across all Periods. The following ELINS are associated with the Data Item Numbers on the Contract Data Requirements List (CDRL), DD Form 1423, in Section J:
CDRL A001 Post Award/In-process Review (IPR) Meeting Minutes CDRL B001 Operations Security (OPSEC) Standard Operating Plan (SOP) CDRL C001 Quality Control Plan CDRL D001 Contract/TO Status Report CDRL D002 Key Personnel Listing CDRL D003 Transition Management Process Plan CDRL E001 Commander's Critical Incident Report (CCIR).
Lot
0006 SERVICE CONTRACTING REPORTING
(SCR) The contractor shall provide timely SCR submissions in accordance with FAR 52.204-14; the contractor is required to fill in all required data fields using the following address: http://www.sam.gov/.
The Contractor shall report annually by October 31, for services performed under this contract during the preceding
Lot
W15QKN26RA001
Government fiscal year (FY) (October 1 - September 30). Contractors may direct any questions to the Help Desk at the website. CLIN 0006 is applicable across all periods.
0007 MINIMUM GUARANTEE This CLIN is established to provide the minimum guarantee in accordance with the Performance Work Statement (PWS).
Claimant Program Code: S1 Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
FIRM FIXED PRICE (FFP) SERVICES -
OPTION PERIOD 1 (OP1) This CLIN is established to provide Firm Fixed Price services for OP1 in accordance with the PWS. Price/cost will be determined at the TO level. The OP1 Ordering Period consists of a total of five (5) years.
Pricing Arrangement: Firm Fixed Price
Lot
Option Line Item
FIRM FIXED PRICE LEVEL OF EFFORT
(FFP LOE) SERVICES - OPTION
PERIOD 1 (OP1) This CLIN is established to provide Firm Fixed Price - Level of Effort services for OP1 in accordance with the PWS. Price/cost will be determined at the TO level. The OP1 Ordering Period consists of a total of five (5) years.
Pricing Arrangement: Fixed Price Level of Effort
Lot
Option Line Item
COST PLUS FIXED FEE (CPFF)
SERVICES - OPTION PERIOD 1 (OP1)
This CLIN is established to provide Cost Plus Fixed Fee services for the OP1 in
Lot
W15QKN26RA001
accordance with the PWS. Price/cost will be determined at the TO level. The OP1 Ordering Period consists of five (5) years.
Pricing Arrangement: Cost Plus Fixed Fee
Option Line Item
COST REIMBURSEMENT (CR): ODCs
/MATERIAL/TRAVEL- OPTION PERIOD 1
(OP1) This CLIN is established to provide Cost Reimbursement - No Fee for Other Direct Costs (ODCs), Material and Travel for Option Period One (OP1) in accordance with the PWS. Price/cost will be determined at the TO level. The OP1 Ordering Period consists of a total of five
(5) years.
Pricing Arrangement: Cost No Fee
Lot
W15QKN26RA001
Section C - Description/Specifications/Statement of Work
C.1 Vision Statement
To operate as the Army's Preferred Strategic Source providing the Army, the Department of War (DoW), and other Federal Agency customers assisted acquisition services to acquire cost efficient and effective Human Resource (HR) Services through enterprise-level performance-based contracts using streamlined acquisition processes that deliver quality services supporting our Soldiers, civilians, and their families.
C.1.1 Introduction
This is a non-personal services requirement to provide streamlined acquisition of HR services for PLS Services utilizing a competitive, efficient, standardized, and well-managed process. The Government shall not exercise any supervision or control over Contractor or Subcontractor personnel performing services herein or under any TO issued against this contract. Contractor employees shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
C.1.2 Background
HR Solutions is a chartered Army Project Office aligned under the Capability Program Executive Enterprise Software and Services (CPE ES2). HR Solutions provides a strategic source for centrally managed full life-cycle acquisition support for enterprise level HR services for the DoW and other Federal Agencies. The HR Solutions program office provides Contractor support services to the full life cycle of non-personal personnel services, in support of defense personnel communities, including Military Members (Active, Guard and Reserve), Military Families, Defense civilian Employees, Veterans, and Retirees worldwide. The HR Solutions program has been designated as a preferred source for acquiring and managing HR service contracts in the Army.
The HR Solutions program office focuses on the importance of developing and maintaining sound service acquisition strategies by centralizing policy and technical expertise in an office with senior leader visibility. This business model supports the Defense Procurement Acquisition Policy (DPAP) intent that "acquisitions for services support and enhance the war fighting capabilities of the DoD."
HR Solutions supports the Secretary of the Army's Optimization of Army Service Acquisitions Implementation Plan. The program office is staffed with Army acquisition professionals and provides DoW with centralized acquisition management and support for HR knowledge-based services. This program provides consistent, efficient, and streamlined acquisition support services which results in cost savings for requiring activities. This contract is part of a multiple award indefinite delivery indefinite quantity (IDIQ) suite of contracts managed by HR Solutions that support the personnel life cycle functional area.
C.1.3 Objectives
The objective of the resulting contract is to obtain qualified Contractors to provide support to DoW and other Federal Agency HR programs and systems with a focus on policies, programs, and
W15QKN26RA001
systems in the functional area of PLS Services. The following are specific objectives of this contract:
Acquire services based on clear, performance-based requirements.
Expect cost, schedule, and performance outcomes to be identifiable and measurable at the contract and task order (TO) level.
Acquire services using a strategic, enterprise-wide approach, which is applied to both the planning and the execution of the acquisition and will enable streamlined acquisition and cost savings for services contracts to achieve outcomes consistent with customer need(s).
Services are acquired by business arrangements which are in the best interest of the DoW and other Federal Agencies and are in compliance with applicable statutes, regulations, policies, and other requirements.
C.1.4 Mission Statement
As an Army Preferred Source, HR Solutions provides centralized acquisition management of enterprise-level, HR, knowledge-based services and training to DoD and other Federal Agency requiring activities. The Contractor's role is to support the HR Solutions project directorate in accomplishing this mission.
C.2.0 General Requirements
C.2.1 Scope
The Contractor shall provide PLS Services for Army, DoW, and other Federal Agency HR programs and activities. Services shall include ancillary support services needed to provide a total support solution for the HR program to include Information Technology (IT) support. Each specific HR service requirement that requires support for IT operations will be evaluated to ensure that the ancillary IT requirements comply with the certification requirements of 10 United States Code (USC) 2222. All requirements will be submitted to the program office for processing and the Contractor shall support these requirements through the issuance of TOs under this contract.
When the HR Solutions program office authorizes decentralized ordering, the Ordering Guide shall be followed.
C.2.1.1 If decentralized ordering is authorized by the HR Solutions program office, the Contractor shall follow the guidance in the HR Solutions Decentralized Ordering Guide to be published.
C.2.2 Description of Services
The following general task descriptions are provided to demonstrate the requirements that may require Contractor support to facilitate the execution of the HR Solutions program office's mission.
The definition for each of the functional elements is provided as a general scope of work that may be required. Support that will be required to be performed will be further defined in each individual
TO.
W15QKN26RA001
C.2.2.1 Personnel Life-Cycle Support
The Contractor shall provide support to all facets of the personnel management life cycle. The Contractor shall support the HR Support core competencies to 1) man the force; 2) provide HR services; 3) coordinate personnel support; and 4) conduct HR planning. This includes planning, analysis, and program assistance for:
C.2.2.1.1 Personnel Structure
This phase of the personnel life cycle includes activities needed to determine and distribute manpower requirements. Contractor tasks may include:
C.2.2.1.1.1 Organizing
Support for streamlining or transforming the overall organization such as providing management approaches aimed at improvements by means of elevating efficiency and effectiveness of processes that exist within and across organizations.
C.2.2.1.1.2 Life Cycle Research, Analysis, and Predictive Modeling
Development of life cycle models and methodologies or to develop models that predict the outcome of something, e.g., implementation of a new HR project or policy.
C.2.2.1.1.3 Proof of Concept Studies
Providing proofs of concept which are short and/or incomplete realization (or synopsis) of methods or ideas to demonstrate feasibility, or a demonstration in principle. The purpose is to verify that a concept or theory is probably capable of exploitation in a useful manner. The proof of concept is usually considered a milestone on the way of a fully functioning prototype.
C.2.2.1.1.4 Support for Policy Analysis and Policy Development
Study and assessment of projects, policies, and programs and determining their effectiveness and also to assist in the creation of a deliberate plan of action to guide decisions and achieve rational outcomes (policy).
C.2.2.1.1.5 Program Analysis and Process Reengineering
Identification, study, analysis, and/or improvement of new or existing programs/processes within an organization to 1) prediction of an outcome or impact, 2) determination of feasibility or functionality, or 3) to meet new goals and objectives. These actions often follow a specific methodology or strategy to create successful results. Tasks may include tracking to assess progress, location, and impacts of HR policies and action reference customers and programs.
C.2.2.1.1.6 Operational Business Application
Implementation of new or existing business processes or software programs.
W15QKN26RA001
C.2.2.1.1.7 Risk Management and Mitigation
Integration of recognition of risk, risk assessment, developing strategies to manage it, and mitigation of risk using managerial resources. Risk management is a philosophy that attempts to integrate the entire spectrum of exposures that can affect an organization, to include operational and financial risks. It examines the effects of risk on the organization, rather than from the source of the exposure and identifies solutions to minimize their effect.
C.2.2.1.2 Distribution
This phase of the personnel life cycle involves assigning Soldiers based on requirements and priorities and civilians at command discretion and based on resource availability. Contractor tasks may include:
C.2.2.1.2.1 Manpower, Requirements, and Trend Analysis
Collection of information and identify a pattern or trend in manpower or requirements.
C.2.2.1.2.2 Forecasting Manpower, Manpower and Personnel Integration (MANPRINT), Strength Requirement, Distribution, and Utilization
Projection of manpower needs.
C.2.2.1.3 Training and Development
This phase of the personnel life cycle involves Individual and institutional training, self and leader development, education and support programs. Contractor tasks may include actions to develop familiarization training as it relates to understanding and use of a developed product. It also includes training that focuses on developing, coordinating training programs and conducting the actual training aimed at benefiting the total workforce.
C.2.2.1.4 Deployment
This phase of the personnel life cycle involves mobilizing, demobilizing, reconfiguring, non-combatant evacuation, and repatriating Military members, civilian employees, and Contractors.
Contractor tasks may include:
C.2.2.1.4.1 Personnel System Support
Coordination of overall personnel support at the program level such as, but not limited to, Military Personnel Office (MILPO), and Defense Military Pay Office (DMPO), Mobilization and Demobilization support services, and casualty affairs services.
C.2.2.1.5 Compensation
W15QKN26RA001
This phase of the personnel life cycle involves managing pay, allowances, benefits, and financial entitlements of Soldiers and civilian retirees; and pay and incentives for civilian employees and Contractors. Contractor tasks may include:
C.2.2.1.5.1 Benefits and Entitlements
Providing information on and education of Soldiers, civilian personnel and their family members on available benefits and entitlements programs such as, but not limited to, retirement, education, and medical.
C.2.2.1.5.2 Boards
Providing support in scheduling, establishing, collecting data, implementing, and recording results of boards for promotion, medical, assignment, and other services in support of board activities.
C.2.2.1.5.3 Awards
Providing support to activities in the processing of awards and related documents recognizing Military and civilian service. Functions could include but are not limited to researching individual personnel records, award cases, and making recommendations for award.
C.2.2.1.5.4 Honors
Planning and preparation for Military honors and ceremonies.
C.2.2.1.6 Sustainment
This phase of the personnel life cycle involves managing programs to maintain and advance the well-being and work-life balance of Soldiers, civilians, family members, and veterans.
C.2.2.1.6.1 Well Being Programs
The Contractor shall provide support for program development, information preparation and delivery, assistance and referral services on well-being programs relating to, but is not limited to, health care and prevention, pay compensation, housing, fitness, workplace environment, religious programs, investments education, and family member employment, etc.
C.2.2.1.6.2 Family and Morale, Welfare and Recreation Support Services
Support for Family and Morale, Welfare and Recreation (FMWR) programs and activities.
C.2.2.1.6.3 Drug and Alcohol Programs
Coordination and implementation of drug and alcohol abuse prevention programs. This may include developing, distributing, and presenting training or seminars.
W15QKN26RA001
C.2.2.1.6.4 Counseling
Providing education and counseling resources for Soldiers, civilian personnel and their family member, e.g., substance abuse, stress, etc. and other job-related problems.
C.2.2.1.6.5 Wounded Warrior Programs
Providing a system of advocacy and follow-up to severely injured and ill Soldiers and their families with individual support during their rehabilitation and transition back to Military service or into the civilian community. This may include monitoring and tracking individual usage, follow-up of individuals utilizing the programs, and providing feedback regarding the overall effectiveness of the program.
C.2.2.1.6.6 Family Community Programs
Providing support as needed to ensure continued improvement and operation of the various "family welfare organizations, e.g., Community and Family Support Center, Army Community Services, Family Advocacy, Well-Being, and New Parent Support Program. This may involve maintaining day-to-day operations.
C.2.2.1.6.7 Personnel Safety
Recommending, designing and establishing various safety-focused programs, e.g., Risk Reduction, Child Advocacy, and Family Advocacy. Actions may also include review and analysis of incident reports.
C.2.2.1.6.8 Tracking and Monitoring
Quality control, quality assurance, and data collection and analysis, e.g., monitoring expenses, and adherence to schedules.
C.2.2.1.6.9 Call-in Programs
Recommending, designing and establishing various "call center operations through which Soldiers and family members and civilian personnel can call a toll-free phone number for assistance in a particular situation, e.g., suicide prevention, accident reporting, deployment support, relocation support, and Army Wounded Warrior (AW2) support.
C.2.2.1.6.10 Help Desk
The help desk may be the first point of entry for Soldiers, their family members, and civilian personnel who are requesting additional information or guidance on HR-related issues. Tasks will include operation of help desks, generally for 7 days per week, 24 hours per day.
C.2.2.1.6.11 Library
W15QKN26RA001
Operation and maintenance of a reference library at DoW or Federal locations that makes available printed materials and generic employment research/information and internet resources.
In addition, the library may include reference materials that cover such subjects as personal appraisal, career decision making, resumes, and application preparation.
C.2.2.1.6.12 Routing and Distribution of Correspondence
Processing incoming and outgoing mail and correspondence.
C.2.2.1.7 Transition
This phase of the personnel life cycle involves moving Military and civilian employees among Military components and to non-Military related civilian status. Contractor tasks may include:
C.2.2.1.7.1 Transition Support
Providing transitioning Soldiers, civilian personnel and their families with needs such as, but not limited to, identification cards, forms processing, individual counseling in the area of transition services and benefits etc.
C.2.2.1.7.2 Employment Assistance
Assisting individual(s) / Soldiers with job search and job placement agencies. Discussing the benefits of reenlistment to acquire additional experience, education, and certification. Providing resume development assistance and interviewing techniques.
C.2.2.1.7.3 Transition Processing
Coordinating Soldier/civilian personnel transition from one phase of their career or from one duty location to another such as, but not limited to classification processes, employee relation programs, entitlement programs such as retirement and benefits, development of position descriptions, and preparation of vacancy announcements.
C.2.2.2 Data Administration
Data administration tasks support information needs of all phases of the personnel life cycle.
Contractor task may include:
C.2.2.2.1 Content Management
Performing content management. Content management is a set of processes and technologies that support the evolutionary life cycle of digital information. This digital information is often referred to as digital content. Digital content may take the form of text, such as documents, multimedia files, such as audio or video files or any other file type which follows a content lifecycle which requires management.
W15QKN26RA001
C.2.2.2.2 Data Modeling and Management
Structuring and organizing data which is then typically implemented in a database management system. In addition to defining and organizing the data, data modeling will impose (implicitly or explicitly) constraints or limitations on the data placed within the structure.
C.2.2.2.3 Communication Systems Enhancement
Developing recommendations for upgrading, purchasing, and/or projecting enhancements to communications systems.
C.2.3 Location and Hours of Work
The place of performance shall be determined in each TO and may include both (1) Contractor-owned or leased facility and (2) Government owned or leased facility, supporting the requirements in both Continental United States (CONUS) and Outside the Continental United States (OCONUS).
Specific hours for support and core hours will be identified in individual TOs. Some TOs may require work outside normal duty hours including 24-hour operations and shift work.
C.2.3.1 Surge Support
Periodically, the Government may require that additional work be accomplished over and above the planned level of support. TOs that require surge support will specify surge procedures and any applicable overtime payment procedures. Contractor reimbursement for surge support will be in accordance with (IAW) the TO terms and conditions. The Contractor shall obtain advance approval from the KO prior to implementing surge support.
C.2.3.2 Telecommuting (Telework)
Regular, reoccurring telecommuting (telework) may be authorized at the TO level depending on the nature of the work to be performed. Additionally, if not otherwise specified in the TO PWS, in the event of an unexpected full or partial installation closure, telework and/or alternate work locations may be authorized at the TO level with written approval by the COR at the requiring activity (COR-RA). The Government may permit telework by Contractor employees when determined to be in the best interest of the Government in meeting TO requirements and mission needs. Specific details will be included in the TO PWS.
All performance requirements shall remain the same for work performed through telework unless otherwise authorized by the Contracting Officer (KO). Any adjustments to surveillance methods will be addressed through an update to the Quality Assurance Surveillance Plan (QASP).
The Contractor shall have an established telework program subject to review by the Government.
The Contractor's telework plan, to include the date(s), hours of operation, and description of tasks to be performed, shall be submitted to the COR-RA for review and approval NLT 30 days after TO award and prior to implementation for each TO. The Contractor shall coordinate what specific requirements can be performed via telework and/or at an alternate work location with the COR-RA
W15QKN26RA001
and are instructed to abide by their official company policies for telework and utilizing alternate work locations to perform the Government's requirements called for under the TOs. This plan shall include a component for short-term (two working days or less) as well as long-term (greater than two working days) per labor category. The Contractor shall obtain COR-RA approval prior to commencement of any telework, unless otherwise stated at the TO level.
In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure the Government's mission-critical operations stay operational during times of Local /National Emergency or incidents of Local/National Significance. Guidance from Army Senior and /or Installation leadership will be adhered to for those incident's mitigation strategies (e.g.
pandemic). Telework may be implemented on an installation-by-installation basis. The Government will identify at the TO level what services/tasks are required to ensure continuity of critical services and at what level those services must be performed. Further, the Contractor may be required to include a Mission Essential Contractor Services Plan IAW Defense Federal Acquisition Regulation Supplement (DFARS) 252.237-7023 at the TO level if any or all the TO support services are determined to meet the definition of mission essential services in that clause.
Regardless of the reason, use of alternate work locations and/or Telework shall be at no additional cost to the Government to include but not limited to equipment, facilities, Internet connectivity /access, etc. The Government is not authorizing the use of off-site rates to accomplish alternate work locations and will not be responsible for any associated costs.
Personal or company issued equipment may not be used to access the Government network infrastructure unless pre-approved at the TO level; examples include using Virtual Port Network (VPN) or a corporate network. If the KO approves telework or remote work, the Contractor shall use only Government furnished property (GFP), if provided under the contract/TO, to access the VPN. Per DA Pam 25-1-1, the only authorized access from DoW-owned computers, systems, and networks to the Internet is via the Non-classified Internet Protocol (IP) Router Network (NIPRNet).
The VPN allows remote DoW computers to meet this requirement by providing a secure tunnel to the NIPRNet. The VPN shall be used at all times with which the DoW-owned computer is accessing the Internet, when using commercial Internet Service Providers. Unauthorized split-tunneling of VPN connections by the Contractor is prohibited. Authorized split-tunneling configurations shall be accompanied by a signed Authorizing Official, General Officer / Senior Executive Service-level, risk assessment.
NO CLASSIFIED WORK shall be performed at an alternate work location not previously approved by a DD254. If a TO involves supporting CLASSIFIED work, the Contractor shall analyze the existing PWS in coordination with the Government and provide a response to the COR-RA, COR- HRS and KO with regard to:
a) which PWS paragraphs cannot be performed,
b) percentage of the TO impacted, and
c) can approximate total of funded (obligated) dollars on TO that are impacted.
C.2.4 Recognized Government Holidays
W15QKN26RA001
In general, Contractor employees are not required to perform services on legal United States (US) federal holidays, nor will Government facilities operate during these yearly approved days;
however, occasionally contract employees may be required to perform services during recognized US federal holidays and Government facilities be open on these days. Any of the US federal holidays falling on a Saturday will be observed on the preceding Friday, holidays falling on a Sunday will be observed on the following Monday. US federal holidays generally include, but are not limited to:
New Year's Day, 1st day in January Martin Luther King, Jr.'s Birthday, 3rd Monday of January President's Day, 3rd Monday of February Memorial Day, Last Monday of May Juneteenth National Independence Day , 19th day of June Independence Day, 4th day in July Labor Day, 1st Monday of September Columbus Day, 2nd Monday of October Veterans Day, 11th day of November Thanksgiving Day, 4th Thursday of November Christmas Day, 25th day of December
On occasion, additional recurring/non-recurring holidays may be implemented Government-wide or apply to a specific location/region. In these cases, the Contractor shall observe these holidays as applicable without TO PWS changes. Individual TOs that may require performance on these holidays will address deviations specifically in the TO PWS. OCONUS locations may require observance of different holidays than those annotated above. Individual TOs for OCONUS performance will specify deviations from the above stated holidays and delineate applicable holidays for that duty location. The Department of Labor (DOL) wage determinations applicable to individual TOs may require additional holidays than those stated above. The Contractor is responsible for complying with wage determination requirements and all other appropriate DOL laws and regulations, as applicable.
C.2.4.1 Training Holidays
The Military may designate a weekday as a training holiday and/or a mandatory training day if doing so would provide a three-day or four-day holiday weekend (e.g., Thanksgiving weekend, Friday is usually a Military training holiday). However, training holidays do not apply to Contractor employees.
C.2.5 Other Direct Costs
Other Direct Costs (ODCs), to include travel and other allowable expenses, may be required and will be specified in the individual TO PWS. When ODCs are required at the TO level, the Government will include an ODC contract line-item number (CLIN) to reimburse the Contractor for
W15QKN26RA001
actual costs of Government approved expenses. Indirect costs (such as general and administrative (G&A) costs and material handling fee) and profit/fee will not be allowed on ODCs.
C.2.5.1 Contractor Travel
The Government will not issue Government travel orders. Travel reimbursement will not be provided for travel within a 50-mile radius of the place of performance unless specifically authorized in the TO PWS (see PWS 2.5.1.1 Local Travel). The Government views travel in two categories, local travel and long-distance travel which are discussed in the subparagraphs below.
In instances where the Government is unable to define travel requirements in sufficient detail to include as part of the firm fixed price of a TO, the Government may allow travel on a cost reimbursement (no fee) basis. When travel is allowed on a cost reimbursement (no fee) basis at the TO level, all travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the Government.
Contractor travel is subject to the limitations of and costs for travel shall be billed IAW the regulatory implementation of Public Law 99-234 and Federal Acquisition Regulation (FAR) 31.205- 46, Travel Costs. The Contractor shall arrange individual Contractor and Subcontractor employee travel. Contractors are expected to utilize the most economical means available for all travel related expenses (e.g. economy cars, coach airfare, etc.). The Government will reimburse the Contractor for all COR-RA or COR-HRS approved travel. Travel that is not approved by the COR- RA or COR-HRS will not be reimbursed and will be at the Contractor's expense. The Government will not reimburse the Contractor for Contractor personnel relocation expenses. Contractor Quality Control Plan (QCP) travel will not be reimbursed unless otherwise directed by the KO.
Per Diem Rates: Per diem rates are determined according to FAR 31.205-46, (a)(2)(i)(ii)(iii), as summarized below:
The General Services Administration (GSA) prescribes rates for the Continental U.S.
The Defense Travel Management Office (DTMO) prescribes rates for Overseas Non-Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico etc.).
The Department of State (DoS) prescribes rates for foreign overseas locations.
C.2.5.1.1 Local Travel
Travel not normally requiring per diem and lodging, shall be considered local travel. If required, payment for local travel will be authorized in individual TOs. Specific procedures and guidance will be identified at the TO level however the general procedure will be followed for all local travel billed as ODCs for TOs centrally issued through the HR Solutions Program Office. These procedures may also be used for orders that are issued using decentralized ordering procedures through other contracting offices. Reimbursable mileage rates shall be determined by the GSA IAW FAR 31.205- 46, (a)(1).
If the Contractor is required to travel within a 50-mile radius of the assigned place of performance to perform duties and payment for local travel is specifically authorized in the TO, the Contractor
W15QKN26RA001
shall provide a report with all local travel in privately owned vehicles (POVs) when mileage reimbursement is sought. The report shall contain, at a minimum, where the travel was performed, actual mileage of the travel, and cost per traveler. The Contractor shall submit the report to the COR-RA and the authorized Government representative identified in the TO for approval IAW TO instructions. Invoices seeking local travel reimbursement shall include a copy of the approved local mileage report. The Contractor shall orchestrate travel arrangements; track the travel and travel budget and prepare travel invoices.
C.2.5.1.2 Long Distance Travel
If required, long distance travel will be specified in individual TOs. Travel is considered long distance when it requires per diem and/or lodging. Specific procedures and guidance will be identified at the individual TO level however the general procedure will be followed for all long-distance travel billed as ODCs for TOs centrally issued through the HR Solutions Program Office.
These procedures may also be used for orders that are issued using decentralized ordering procedures through other contracting offices.
Any long-distance travel required in the performance of TOs and billed as an ODC shall be approved in advance by the COR-RA or other authorized Government representative identified in the TO PWS. Travel requests shall be sent to the COR-RA and the authorized Government representative for approval not later than (NLT) two weeks prior to the required travel. Requests for long distance travel shall be submitted in the format identified in the TO and shall include all estimated travel costs to include per diem rate, lodging, air fare, rental car, and any other miscellaneous expenses. After travel is completed, the Contractor shall complete the appropriate Travel Claim Form as identified in the TO and submit it to the authorized Government representative for approval. The Contractor shall provide a copy of an approved Travel Claim Form and receipts as required by the TO procedures with the next invoice due after travel is completed.
Travel requests submitted inside of the two-week window will be reviewed on a case-by-case basis to determine if approval is warranted.
C.2.5.2 Other Allowable Expenses
Only allowable services or materials as specified in individual TOs will be billed against the TO ODC CLIN. Specific allowable items that may be billed against the ODC CLIN will be identified in each individual TO. The Contractor shall submit a written request to the COR-HRS or COR-RA and receive approval from the COR-HRS or COR-RA for any ODC charge unless specifically identified in the TO. The Contractor shall not exceed established ODC ceilings specified in each TO ODC CLINs.
C.2.5.3 Germany Temporary Duty (TDY) Travel Guidance
Contracted employees traveling to Germany, on official TDY travel are subject to the provisions of Army in Europe Regulation (AER) 715-9, Section VI, paragraphs 29 & 30 respectively entitled Analytical Support Status Accreditation (ASSA) or Technical Expert Status Accreditation (TESA) TDY and "BACO-90". The BACO-90 process requires that the Contractor employees receive approval from the German Federal Ministry of Labor prior to their arrival in Germany. The AER 715-
W15QKN26RA001
9 and the applicable BACO-90 request forms and guidelines can be accessed online on the U.S.
Army Europe and Africa - DoD Contractor Personnel Office (DOCPER) website at: https://www.
europeafrica.army.mil/Contractor/.
C.2.6 Emergency Services
C.2.6.1 Employee Emergency Care
When a Contractor employee working under any associated TO suffers a serious injury or illness on a Government installation, emergency treatment will be IAW the local installation emergency protocols. Where available, Government facilities and emergency treatment will be provided as the first point of medical care. Transfer to other than Government medical treatment facilities shall take place as soon as possible and as determined by attending medical authorities. Medical charges will be made to the Contractor employee.
C.2.6.2 Emergency/Incident Police Services
The Government will provide the services of the installation police for on-installation emergencies /incidents at place(s) of performance specified in individual TOs. If the incident is reportable, the Contractor shall follow emergency reporting procedures identified at the TO level.
C.2.7 Contract Administration and Management
The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to this requirement and associated TOs. The Contractor shall maintain continuous communication and workflow continuity between the HR Solutions Program Office and the Contractor's corporate offices, and/or Army Contracting Command - New Jersey (or other appropriate contract administrative office for any decentralized orders at TO level) for any contract related issues.
C.2.7.1 Contract Administration
The Contractor shall establish processes and assign appropriate resources to effectively administer this contract and associated TOs. The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or TOs (see PWS C.2.7.1.1). Notwithstanding any of the provisions of this requirement and associated TOs, the KO shall be the only individual with the authority to act on behalf of the Government to direct /redirect Contractor efforts, or in any way amend or change contract/TO terms or conditions. If the Contractor believes there have been changes made to this requirement or an associated TO by unauthorized personnel, the Contractor shall notify the contract/TO KO in writing immediately, but NLT two business days after the occurrence of any potential change. This notification shall include a brief description of the issue/change directed, who directed the change, and what work was done as a result of it. Any changes / work made that are not authorized by the KO will be at risk and at the contractor's expense.
C.2.7.1.1 Administrative Information
W15QKN26RA001
C.2.7.1.1.1 The Contractor shall create an electronic email distribution list or single corporate electronic inbox to be used by the Government when requesting information, distributing program information, requesting TO proposals, and distributing TO awards/modifications. The Contractor shall ensure this email distribution list or electronic inbox is current at all times to ensure proper and timely communication. The Contractor shall provide the single email distribution list or electronic inbox address to the KO, COR, and the HR Solutions Portal within five business days after contract award. Updates shall be submitted to the HR Solutions Portal and Administrative KO NLT three business days after changes are made.
C.2.7.1.1.2 The Contractor shall ensure their organizational chart, the Contractor's points of contact (POCs) for billing and invoicing, and the Contractor's POCs for the QASP and quality control are current at all times. Initial submission shall be submitted to the HR Solutions Portal and the Administrative KO NLT 10 days following contract award. Updates shall be submitted to the HR Solutions Portal and Administrative KO NLT three business days after changes are made.
C.2.7.1.1.3 OFF-RAMPING PROCEDURES: Within 30 days after the first 24 months of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .