This is a Cost Proposal template for State of Tennessee RFQ #32110-19125, a statewide contract for slope stabilization services administered through the Department of General Services Central Procurement Office. The solicitation seeks pricing for five service groups: Group 1 (Soil Nailing), Group 2 (Horizontal Drains), Group 3 (Railroad Rails and Cribbing), Group 4 (Rockfall Mitigation), and Group 5 (Compaction Grouting). Group 1 includes 43 line items covering self-drilling nails in various depths, permanently cased nails, wire mesh, shotcrete application, mobilization, and related materials, with estimated annual quantities ranging from 10 to 20,000 units. Group 2 contains six line items for horizontal drains of varying lengths and mobilization. Group 3 includes eleven line items for concrete, geogrid reinforcement, railroad rail installation, and cribbing. Group 4 lists eleven line items for rock scaling, blasting, drilling, concrete buttress, anchors, and related services. Group 5 addresses three line items for grout casing installation, compaction grout, and mobilization. All respondents must provide pricing for the mandatory "Emergency Site Visit 24 hrs." line item. Respondents are not required to bid all five groups but must provide complete pricing for all line items within any group for which they propose.
The cost proposal requires respondents to submit unit prices in U.S. currency limited to two decimal places, with pricing remaining valid for a minimum of 120 days after submission. The State estimates total contract purchases of $28 million across all groups: $20 million for Group 1, and $2 million each for Groups 2 through 5. The State intends to award to the three highest-evaluated respondents within the competitive range for each group, establishing an A, B, and C vendor for each service category. The estimated quantities provided are for informational purposes only and do not constitute volume guarantees or minimum purchase commitments. Respondents must be authorized signatories capable of binding their legal entity to the contract terms, with documentation of authority required if the signer is not the President or Chief Executive Officer. The contract term extends 36 months from the effective date of December 13, 2025, with two optional 12-month renewal periods available, potentially extending the contract to 60 months total.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Instructions
State of Tennessee RFQ #32110-19125 - Slope Stabilization Services
| The Cost Proposal, detailed below, shall indicate the proposed price for goods or services defined in the Scope of the Pro Forma Contract, Section A.3. The Cost Proposal shall remain valid for at least one hundred twenty (120) days subsequent to the date of the Cost Proposal opening and thereafter in accordance with any contract resulting from this RFQ. All monetary amounts shall be in U.S. currency and limited to two (2) places to the right of the decimal point. |
| The estimated total contract quantities associated with each cost item is for informational purposes only. The estimated total contract quantities do NOT and should NOT be construed as any type of volume guarantee or minimum purchase quantity. The estimated total contract quantities shall NOT create rights, interests, or claims of entitlement in the Respondent. |
| Notwithstanding the cost items herein, pursuant to the Pro Forma Contract section C.1., “The total purchases of any goods or services under the Contract are not known. The State estimates the purchases during the Term shall be: Group 1 Soil Nailing: twenty million dollars ($20,000,000). Group 2 Horizontal Drains: two million dollars ($2,000,000). Group 3 Railroad Rails and Cribbing: two million dollars ($2,000,000). Group 4 Rockfall Mitigation: two million dollars ($2,000,000). Group 5 Compaction Grouting: two million dollars ($2,000,000) (“Estimated Liability”). This Contract does not grant the Contractor any exclusive rights. This Contract does not grant the Contractor any exclusive rights. The State does not guarantee that it will buy any minimum quantity of goods or services under this Contract.” |
| The State intends to make an award to the three (3) highest evaluated respondent(s) within the competitive range for each group. The State intends for each group to have an A, B, and C vendor. |
| All Respondents MUST provide pricing for the mandatory line, "Emergency Site Visit 24 hrs." Respondents do not have to provide pricing for all five (5) groups but MUST provide pricing for all lines in any group Respondent chooses to respond to, in order to be considered for award. |
| TAB 2 - Signature |
| Signature is required with the Cost Proposal. Complete this page and return with all submitted Proposal documentation. |
| Tab 3 - Cost Proposal |
| This tab will be Respondent's Pricing for Slope Stabilization Services |
| Group 1 - Soil Nailing |
| Fill in orange cells with proposed rates for each line in this group. MUST fill in all lines within this group to be considered for award of Group 1 - Soil Nailing. |
| Group 2 - Horizontal Drains |
| Fill in blue cells with proposed rates for each line in this group. MUST fill in all lines within this group to be considered for award of Group 2 - Horizontal Drains. |
| Group 3 - Railroad Rails and Cribbing |
| Fill in green cells with proposed rates for each line in this group. MUST fill in all lines within this group to be considered for award of Group 3 - Railroad Rails and Cribbing. |
| Group 4 - Rockfall Mitigation |
| Fill in purple cells with proposed rates for each line in this group. MUST fill in all lines within this group to be considered for award of Group 4 - Rockfall Mitigation. |
| Group 5 - Compaction Grouting |
| Fill in yellow cells with proposed rates for each line in this group. MUST fill in all lines within this group to be considered for award of Group 5 - Compaction Grouting. |
| ** ALL respondents MUST provide a rate for Mandatory Line, "Emergency Site Visit 24 hrs." to be considered for award of any Group |
2. Signature
State of Tennessee
This Cost Proposal must be signed, in the space below, by an individual empowered to bind the Respondent to the provisions of this RFQ and any contract awarded pursuant to it. If said individual is not the President or Chief Executive Officer, this document must attach evidence showing the individual’s authority to legally bind the Respondent.
| RESPONDENT SIGNATURE: |
| PRINTED NAME & TITLE: |
| DATE: |
RESPONDENT LEGAL ENTITY NAME:
3. Cost Proposal
State of Tennessee
| Line Item Description | UOM | Total Estimated Annual Quantities | Unit Price |
| Group 1 - Soil Nailing | |||
| Nails, Self Drilling, up to 20 ft | EA | 900 | |
| Nails, Self Drilling, up to 30 ft | EA | 700 | |
| Nails, Self Drilling, up to 40 ft | EA | 300 | |
| Nails, Self Drilling, up to 50 ft | EA | 50 | |
| Nails, Self Drilling, up to 60 ft | EA | 10 | |
| Nails, Self Drilling, up to 70 ft | EA | 10 | |
| Nails, Self Drilling, up to 80 ft | EA | 15 | |
| Nails, Permanently Cased, up to 20 ft (std grouting) | EA | 100 | |
| Nails, Permanently Cased, up to 30 ft (std grouting) | EA | 10 | |
| Nails, Permanently Cased, up to 40 ft (std grouting) | EA | 10 | |
| Nails, Permanently Cased, up to 50 ft (std grouting) | EA | 10 | |
| Nails, Permanently Cased, up to 60 ft (std grouting) | EA | 10 | |
| Nails, Permanently Cased, up to 70 ft (std grouting) | EA | 10 | |
| Nails, Permanently Cased, up to 80 ft (std grouting) | EA | 10 | |
| Wire Mesh and steel plate surface treatment | SF | 3000 | |
| Shoulder Build-up, Road Service | LF | 3000 | |
| Primary Mobilization (mobilization to initial site) | EA | 20 | |
| Shotcrete, Nominal 6-in thickness (std weather) | SF | 10000 | |
| Shotcrete, Nominal 8-in thickness (std weather) | SF | 20000 | |
| Shotcrete, Nominal 12-in thickness (std weather) | SF | 5000 | |
| Shotcrete, Nominal 6-in thickness (cold weather - below 35°F) | SF | 5000 | |
| Shotcrete, Nominal 8-in thickness (cold weather - below 35°F) | SF | 5000 | |
| Shotcrete, Nominal 12-in thickness (cold weather - below 35°F) | SF | 5000 | |
| Nails, Permanently Cased Soil, up to 20 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 30 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 40 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 50 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 60 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 70 ft (pressure Grouting) | EA | 10 | |
| Nails, Permanently Cased Soil, up to 80 ft (pressure Grouting) | EA | 10 | |
| Vertical Reinforced Element | LF | 1000 | |
| Select Granular Backfill Material | TON | 5000 | |
| Geogrid Reinforcement Type 1 | SY | 600 | |
| Geogrid Reinforcement Type 2 | SY | 50 | |
| Geogrid Reinforcement Type 3 | SY | 50 | |
| Geogrid Reinforcement Type 4 | SY | 50 | |
| Retaining Wall Facing Elements | SF | 2500 | |
| Geosynthetic Reinforcement Fabric | SY | 5000 | |
| Cellular Grout | CY | 250 | |
| Soil Nail Proof and Verification Testing | EA | 100 | |
| Preconstruction Shotcrete Panel | EA | 20 | |
| Void Fill Grout Installation | CY | 100 | |
| Galvanized Wire Baskets or Welded Wire Form ***( All Incidental Items Included EXCEPT Backfill) | SF | 1800 | |
| Group 2 - Horizontal Drains | |||
| Horizontal Drains, 0 to 50 ft | FT | 3500 | |
| Horizontal Drains, 50 - 100 ft. | FT | 2500 | |
| Horizontal Drains, 100 -150 ft. | FT | 1000 | |
| Horizontal Drains, 150 - 200 ft. | FT | 25 | |
| Horizontal Drains, 200 + ft. | FT | 25 | |
| Primary Mobilization (mobilization to initial site) | EA | 10 | |
| Group 3 - Railroad Rails and Cribbing | |||
| Class A Concrete | CY | 1000 | |
| Geogrid Reinforcement Type 1 | SY | 2000 | |
| Geogrid Reinforcement Type 2 | SY | 2000 | |
| Geogrid Reinforcement Type 3 | SY | 2000 | |
| Geogrid Reinforcement Type 4 | SY | 2000 | |
| Geosynthetic Reinforcement Fabric | SY | 1000 | |
| Installation of State-Provided Railroad Rail | LF | 500 | |
| Installation of Vendor-Provided Railroad Rail | LF | 3800 | |
| Installation of State-Provided Cribbing | SF | 500 | |
| Installation of Vendor-Provided Cribbing | SF | 3800 | |
| Primary Mobilization (mobilization to initial site) | EA | 8 | |
| Select Granular Backfill Material | TON | 1000 | |
| Group 4 - Rockfall Mitigation | |||
| Rock Scaling | SY | 5000 | |
| Rock Blasting up to 100 CY | CY | 2000 | |
| Rock Blasting 101+ CY | CY | 3000 | |
| Drilling | LF | 1000 | |
| Temporary Rockfall Protection (cost + 15%) | EA | 30 | NO BID REQUIRED |
| Rock Sizing | CY | 3000 | |
| Concrete Buttress | CY | 1500 | |
| Anchors | LF | 200 | |
| Anchor Testing | EA | 200 | |
| Wire Mesh Fabric | SF | 2000 | |
| Horizontal Drain Pipes | LF | 3000 | |
| Limited Access Shotcrete/Gunite | SF | 2500 | |
| Rockfall Mobilization | EA | 15 | |
| Rock Drilling with Hammer | LF | 3000 | |
| Group 5 - Compaction Grouting | |||
| Grout Casing Installation | LF | 8000 | |
| Compaction Grout | CF | 10000 | |
| Mobilization for compaction grouting | EA | 20 | |
| Mandatory Line | |||
| Emergency Site Visit 24 Hrs. | EA | N/A | |
| Approved Parts, Materials, Supplies and Equipment with Markup | EA | N/A | NO BID REQUIRED |