Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
WPH1A
Bonnie Echoles, Contracting Officer
RFP- EQWPC-23-0001CISAHQ, Construction Services for CISA Headquarters Bldg, St Elizabeths W Campus, SE WASH DC Amendment 0011
THE FOLLOWING CHANGES, CORRECTIONS, AND ADDITIONS AS NOTED HEREIN ARE HEREBY INCORPORATED
INTO THE SOLICITATION.
WP1AA
GSA, OFC OF ACQUISITIONS
1800 F STREET, NW
WASHINGTON, DC 20405
TO ALL PROSPECTIVE OFFERORS
GSA, OFC OF DESIGN AND CONSTRUCTION
1800 F STREET, NW
WASHINGTON, DC 20405
RFP- EQWPC-23-0001CISAHQ
10/27/2023
04/05/2023
BONNIE ECHOLES Digitally signed by BONNIE ECHOLES
Date: 2023.10.27 12:57:31 -04'00'
10/27/2023
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
AMENDMENT 0011
IRA RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC
Note: The Inflation Reduction Act of 2022 (IRA), Pub. L. No. 117-169, enacted in
August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements.
Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the
Specifications, and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.
ITEM 1: Proposal receipt date and time is EXTENDED as follows.
NOVEMBER 14, 2023, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov
ITEM 2: DELETE the Pricing Sheet as issued previously and INSERT the attached REVISED PRICING SHEET in lieu thereof. This REVISED PRICING SHEET is to be used in proposal submission. (Clarification of Options)
ITEM 3: Offeror must acknowledge receipt of this amendment by signature in block 15 and by inclusion of page 1 of the SF30 as an attachment to the proposal submission.
END OF AMENDMENT 0011
ATTACHMENTS
Revised AMEND 0011 Pricing Sheet
ISSUED UNDER AMENDMENT 0011
ATTACHMENT TO SF 1442: PRICING SHEET
(To be submitted as an ATTACHMENT TO SF 1442)
CLIN & SubCLIN Price
CLIN 0001 Non IRA Project Expenditures $
CLIN 0002 IRA Acquisition and installation of low embodied carbon materials
SubCLIN 0002AA Acquisition and installation of low embodied carbon steel and associated expenses
SubCLIN 0002AB Acquisition and installation of low embodied carbon asphalt and associated expenses
SubCLIN 0002AC Acquisition and installation of low embodied carbon glass and associated expenses
SubCLIN 0002AD Acquisition and installation of low embodied carbon concrete and associated expenses
CLIN 0003 IRA emerging and sustainable Technologies
CLIN 0004 IRA high-performance green building measures
OPTION 1. MASONRY REPOINTING at Bldgs. 56/57 and Smokestacks:
Option 1A: Repointing only at LIMITED areas indicated for repointing (at exterior and interior) by Structural drawings and specifications at these historic buildings and smokestacks. $
Option 1B: Repointing at ALL exposed surfaces (at exterior and interior) of these historic buildings and (exterior only) of smokestacks. $
OPTION 2. PROTECTION BOARD INSTALLATION at EXISTING EXTERIOR OPENINGS at Bldgs. 56/57:
Option 2A: Install Painted Marine-Grade Plywood sheathing at existing openings on new framing and per architectural details for these historic buildings. $
Option 2B: Install Painted Plastic (PVC, "AZEK" or approved equal) sheathing at existing openings on new framing and per architectural details for these historic buildings. $
ISSUED UNDER AMENDMENT 0011
OPTION 3. MASONRY SURFACE FINISHES at Smokestacks (only) at Bldgs. 56/57:
Option 3A: Remove All Existing paint at brick surface(s) and restore to match (original) un-painted adjacent areas. $
Option 3B: Repaint existing painted areas if restoration of original brick surface is not possible (as determined by Preservation Team & Owner via close inspection of test areas during masonry repair). $
OPTION 4. SLAB ON GRADE (SOG) WORK at INTERIORS of Bldgs. 56/57:
Option 4A: Retain and repair existing basement floor slabs (assuming 10% of area requires repair). $
Option 4B: Replace all existing basement floor areas with new SOG, at one (nominal) elevation, similar to level of the majority of existing slab. $
Option 4C: Remove all existing basement floor areas (allowing for future new SOG installation by others) and provide temporary bracing of exterior / bearing walls and columns / footings. $
ALTERNATE
Alternate 01: CISA Temporary Parking Lot
OPTION - WARRANTY
FIVE-YEAR Maintenance Agreement (Spec Section 142100 Part 1.07.C)
OPTIONAL BID RATES
Contractor’s Overhead Rate for Adjustments
Contractor’s Profit Rate for Adjustments
Contractor’s Daily Rate for Compensable Project Delay (Work Day)