AMENDMENT 0005 072123 ROUND 2 CISA Headquarters RFIs and Responses.pdf

PDF 123 KB Posted

Attached to
Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC
Solicitation number
RFP-EQWPC-23-0001CISAHQ
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Issued under Amendment 0005

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

RFI RESPONSE LOG (07/21/2023)

ITEM Doc, Spec, or Detail/ Sheet COMMENT Response

1 Drawing S 001

General note 5 on S 001 indicates "All smokestacks stabilization work to precede all other site, demolition, and construction work for the larger CISA headquarters project." Please advise if this is applicable as it appears the "early" demolition of buildings 60 and 66 occurred before the stabilization. If the stabilization is required before any construction work (i.e. excavation, caissons, foundations) can begin please advise if the period of performance is still anticipated to be 807 days, as the 807 days appears to be rather aggressive considering the length of time the stabilization will require.

Historic Structures should be stabilized before extensive earth movement and excavation. Vibration of construction vehicles was not a concern during the "Early" site clearing as that didn't occur adjacent to Buildings 56/57 and the Smokestacks.

2 General

Please advise extent of "early" demolition package for buildings 60 and 66- i.e. were all foundations/basements/etc completely removed and backfilled or will additional demo/concrete removal be required.

Regarding both building's 60 & 66, all foundations/basements/etc. were completely removed and backfilled. Thus, no additional demo/cpmcrete removal will be required.

3 Section 011000 - Summary

Section 011000 – Summary – 1.6.G states “Hazardous material abatement and containment shall be performed where necessary by the Contractor to complete the Work. The Contractor shall conduct its own survey to support its construction requirements. The amount of and the extent of information contained in the Government’s survey is provided for information only.”

1) Please confirm that Contractor’s bid is not to include any abatement and containment of hazardous materials in Buildings 56/57 and Smokestacks;

2) Please confirm that the findings of the Contractor's survey of hazardous materials will be the basis for an equitable adjustment of time and cost to the Contract

Contractor to price their bid per Section 011000 - Summary -

1/6.G. Any findings of the contractor's survey of hazardous materials will be addressed/considered as part of the construction process. However, although the Governement will consider a request for equitable adjustment, there is no guarantee for an equitable adjustment of time and cost to the

Contract.

4 General

Is it the Government’s intent that the Contractor is to include in their bid price the cost of abatement and disposal of hazardous materials found in Buildings 56/57 and Smokestacks? If so, please provide a Hazmat Report with a list of estimated quantities upon which the Contractor’s bid shall be based.

Contractor to price their bid per Section 011000 - Summary -

1/6.G. Any findings of the contractor's survey of hazardous materials will be addressed/considered as part of the construction process. However, although the Governement will consider a request for equitable adjustment, there is no guarantee for an equitable adjustment of time and cost to the

Contract.

5 Volume 1 Narrative

Per Narrative Volume 1: Hazardous Materials (pg 47) “it is clear there is a significant amount of lead paint and likely asbestos at Buildings 56/57”, but no quantities are listed. Please confirm that

Contractor’s bid is not to include any abatement and containment of hazardous materials in

Buildings 56/57. If the Contractor’s bid price is to include any costs associated with remediation/disposal of hazardous materials, please provide a list of estimated quantities upon which the Contractor’s bid shall be based.

Contractor to price their bid per Section 011000 - Summary -

1/6.G. Any findings of the contractor's survey of hazardous materials will be addressed/considered as part of the construction process. However, although the Governement will consider a request for equitable adjustment, there is no guarantee for an equitable adjustment of time and cost to the

Contract.

6 Section 312000 Earth Moving

Section 312000 – Earth Moving – 1.3.B.3 refers to Division 01 Section “Hazardous Material

Abatement”. This Section is not included in the documents. Please confirm it is the Government’s intent that: no cost associated with the offsite removal/disposal of hazardous excavated material or removal/clean-up of Underground Storage Tanks is to be included in the Contractor's bid; the

Contractor is only to notify the Government when hazardous materials are encountered during excavation; it is the Government’s responsibility to evaluate the encountered material for contamination and to provide an equitable adjustment to the Contract for the additional cost and time to remove these materials..

Contractor to price their bid per Section 011000 - Summary -

1/6.G. Any findings of the contractor's survey of hazardous materials will be addressed/considered as part of the construction process. However, although the Governement will consider a request for equitable adjustment, there is no guarantee for an equitable adjustment of time and cost to the

Contract.

7 AI-802 - Exterior Door Schedule Numerous Doors on the Exterior Door Schedule are missing information regarding material type and door size. Please reissue Sheet AI-802 with complete information

No references to support this statement. Clarification on which doors appear missing is required to address the concern.

ROUND 2

8 Spec 012100 3.2.B

This specification section indicated that "RF Shielding is required at all exterior windows.”

However, drawings AE-201, 202, an 208 show limited RF-Shielding required on the North, West, and South Elevations. Please confirm the drawings are correct and that the specification 012100

3.2B will be revised to clarify that RF shielding is not required at all exterior windows

Spec 012100 covers SCIF related scope and 3,2.B implies all exterior windows that are part of SCIF. Drawings indicate extent of RF shielding for exterior windows associated with

SCIF program.

9 Spec 011000 1.2-A item #1 - confirm this is not applicable to this project. This project isn't Design/Build - ref.

Spec 011000 1.1.C Project is Design/Bid/Build as opposed to Ddesign/Build.

10 Spec 011000 1.2-A Items #2 - Confirm this is not applicable, or advise how much time to include in our bid for this requirement as well as provide the type, location, and nature of the Work

Cordination with "other contractors" is the same as would occur on similar projects. There will be two other large scale projects occuring during the time frame of the CISA HQ project. However, neither project will have construction within the LOD of the CISA HQ project.

11 Spec 011000 1.2-A Items #3 - Advise the number and duration of the unplanned Work suspension by the CO, or confirm that it is not applicable

An "unplanned suspension of the work by the CO" could be a possible future event where it is unreasonable that the

"number and duration" of these future events would be known at this time.

Spec 011000-1-D Existing Conditions or

As- Built Conditions

a) Confirm that the Government's intent of the term "adjustments" is as applies to minor adjustments for fitting the work to account for slight/minor deviations.

The Government's intent is as stated per spec. 011000 1.6.D.

Spec 011000-1-D Existing Conditions or

As- Built Conditions

b) Confirm that any significant adjustment(s), missing scope, etc. required to accomodate existing conditions that are not shown or designed on the contract documents will be the basis for an equitable adjustment of time and cost to the Contract.

The Government's intent is as stated per spec. 011000 1.6.D.

Any request for equitable adjustment will be considered by the

Government but not guranteed.

14 Spec 011000 3.1 A, B, C, D

As this Solicitation is for Construction services only, confirm that the "spaces" (SCIF, Collateral

Classified, etc) described in this section have been fully designed to comply with the applicable and referenced standards, and that the Contractor is not responsible for any design.

Contractor is required to comply with all SCIF construction standards as specified in Section 012100. "Design" is not required, compliance to these standards during construction is required and conflicts with these standards shall be alerted to the CO per 012100.3.1.

15 Spec 011000 1.2-A

Confirm that this paragraph is not applicable, or delete and remove any references to "Design" and replace with the same Option exercise terms as defined in Vol 1 Solicitation & Agreement section II.A.(4), and section III.M. (ii) which states "all options may be exercised within 90 days of

Contract award." If the Goverment intends for Option pricing to be held for longer that 90 days, then add Economic Price Adjustment clause for bid alternates so that price can be adjusted after

NTP.

Paragraph reference does not match the spec section reference for this RFI. Contractor to clarify.

16 Spec 012400 1.2-E Confirm that this paragraph is not applicable as it doesn't align with the project delivery method nor does it align with Option 1 listed in Spec 012400 3.1-A.1 Paragraph to be removed.

17 Spec 012900 1.1-B-1 Confirm that this paragraph is not applicable as it doesn't align with the project delivery method. This is not a Design/Build project

Spec section 011000 specifies that the project delivery method is Design, Bid, Build. The contractor is to follow the appropriate Cost-Loaded Network Analysis Schedule associated with this delivery method. The reference to

Design/Build will be revised to match Spec 011000.

18 Spec 012900 1.4-E-14 Confirm that this item is not applicable Contractor is not responsible to Design related expenses, but is required to submit expenses incurred during Construction.

19 Spec 013100 1.6-A-5 Confirm that "Design Quality Control Manager" is not a role applicable to this project and delete this item.

Contractor to supply personnel for all relevant positions.

Design Quality Control Manager does not apply to the

Construction Team.

20 Spec 013100 1.6-A-12 Confirm that "A/E Project Manager" is not a role applicable to this project and delete this item.

Contractor to supply personnel for all relevant positions. A/E

Project Manager does not apply to the Construction Team.

21 Spec 013100 1.6-F Confirm that "Design Quality Control Manager" is not a role applicable to this project and delete this item.

Contractor to supply personnel for all relevant positions.

Design Quality Control Manager does not apply to the

Construction Team.

22 Spec 013100 1.6-L Confirm that "A/E Project Manager" is not a role applicable to this project and delete this item.

Contractor to supply personnel for all relevant positions. A/E

Project Manager does not apply to the Construction Team.

23 Spec 013100 1.6-P

Confirm that all Design Phase LEED submissions have been performed by others during the design process and are the Contractor shall just be responsible for construction phase requirements that it's responsible for under the contract documents, or confirm if the project already has LEED Coordinator involved with the Design who will continue to manage the process in lieu of the Contractor.

Correct. Design Phase credits are the responsibility of the

Design Team.

24 Spec 013100 1.7-A Confirm that references to design are not applicable. "Design" of the project is not expected by the Contractor.

25 Spec 013600 1.3-A This section appears to relate to the design phase of the project. Confirm how this section is applicable to the Construction Contractor, or confirm it's not applicable.

Not all phases in this section are Design Phase activities.

Contractor to address items 1.3.3-6.

26 Spec 013600 1.4

Confirm that items and sub-items within this Section that pertain to Design Phase submittals are not applicable to the Construction Contract, or clarify what is expected of the Contractor since Design Phase has already been completed.

This spec covers the entire project duration for the Design and Construction phase requirements for COBie deliverables.

The contractor needs to concentrate on scope that relates to

Construction activities.

27 Spec 014200 1.1-C Confirm that this item is not applicable to the Work.

This spec section only provides References, Definitions and

Abbreviations of "terms" found in the contract. This RFI is frivolous as spec section 011000 calls out the project delivery method.

28 Spec 014200 1.1-DD Confirm that this item is not applicable to the Work, or in the event applicable provide clarification where this is required since this is not a design build delivery method.

This spec section only provides References, Definitions and

Abbreviations of "terms" found in the contract. This RFI is frivolous as spec section 011000 calls out the project delivery method.

29 Spec 014200 1.1-EE Confirm that this item is not applicable to the Work, or in the event applicable provide clarification where this is required since this is not a design build delivery method.

This spec section only provides References, Definitions and

Abbreviations of "terms" found in the contract. This RFI is frivolous as spec section 011000 calls out the project delivery method.

30 Spec 014200 1.1-UU Provide clarification where this is required / how this is applicable since this is not a design build delivery method.

This spec section only provides References, Definitions and

Abbreviations of "terms" found in the contract. This RFI is frivolous as spec section 011000 calls out the project delivery method.

31 General

Please confirm that this contract will authorize the CO to consider progress payments for material delivered to the Contractor at locations other than the site with satisfactory evidence per

FAR 52.232-5

Confirmed.

32 General as applies; also Spec 023000

Please confirm that for the purpose of this bid that bidders should only consider the information provided by the Government, their own visual inspection of the site, and general knowledge of local conditions that could impact the cost of the project to the extent that such information is reasonably accessible, when calculating their price for the proposal. If any additional studies, surveys, explorations, etc. conducted after contract award) including Construction activities reveals differing conditions or conditions that are not shown on the contract documents that such conditions may be the basis for an equitable adjustment of time and cost to the Contract.

Contractor should prepare bid per specification . Requests for equitable adjustment on work related to this section will be considered but not guranteed by the Goverment. Refer to

FAR 52.236-2 Differing Site Conditions.

33 Site Visit For the Site Visit on May 22, we request that the number of attendees from each

Offeror be increased from 2 to 3.

RFI is moot as of 07/12/23.

34 General Please provide the Revit architectural, site and structural design models.

The models would be highly beneficial in planning the construction logistics and schedule.”

Refer to Round 1 RFI response

35 Site Visit Please confirm that the site visit scheduled for May 22 will include access to the interiors of

Buildings 56/57 and Existing CUP2 Building

Site visit that was conducted on May 22nd included both access to the interiors of Buildings 56/57 and a visit to the

CUP2 Building.

36 RFP Drawings - Volume 2

Please confirm that Sheets SS-311, SS-211 and SS-201 are incorrectly inserted into Volume 2 of the Drawings between Sheets SE-603 and SE-631 and should be deleted. These Drawing Sheets are also inserted with the Structural Site Drawings at the end of Volume 2

Correct, 3 structural site drawings are inadvertantly inserted between SE-603 and SE-631.

Section 083473 Sound Control Security

Door Assembies

Paragraph 1.3.D in Section 083473 refers to Section 083475. This Specification is not included in the Bid Documents.

Section 083475 is not required. Cross-reference will be deleted.

38 Pricing Sheet - Alternate

CLIN 2 of the Pricing Sheet identifies Alternate 01: CISA Temporay Parking Lot. Please confirm the scope of this Alternate as we can find no description for this Alternate in the Bid

Documents

Temporart Parking Lot drawings were issued under

Amendment #4 and posted on sam.gov

39 AI-803

On Door Schedule Sheet AI-803, please confirm that Door No. LL5103 at the Security Booth should indicate Legend Note 9 Level 3 Ballistic Door under Comments

Correct. Note 9 will be added to the Comments Column for

Door LL5103. Refer also to Details 10 & 11/AI-814 and 8/AI-

816.

40 AE-360

General Note 5 on Sheet AE-360 states that Magnetometer, Turnstiles, card reader, panic button, X-Ray, Server Racks are by others. Please confirm that these are Government Furnished, Government Installed.

The devices are Government Furnished and installed. The rough-in, conduit to the device and back boxes to support the device are the responsibility of the contractor.

41 11/ AI-603

Enlarged Plan Detail 11/ AI-603 at the Director's WC - Level 5 indicates a Ballistic Rated

Wall Hatch. Please provide size and specification for wall hatch.

Refer to 2/AE-109AB for door number 5105B and to AI-809 for Door size and information

42 4/ AE-420

The Exterior Foundation Wall Access Hatch to MSE Cavity as indicated by detail 4/ AE- 420 calls for the access hatch to be Water and Air Tight. Please provide a specification for this product.

MSE cavity access hatch BOD product:

Acudor ADWT-SS - 30x30 stainless steel airtight/watertight access door with cylinder lock and key. 2" of XPS insulation to be laminated to exterior face of door to meet insulation requirements as exterior hatch into MSE cavity. Refer to architectural details.

43 4/ AE-420 SE-102A

The Exterior Foundation Wall Access Hatch to MSE Cavity as indicated by detail 4/ AE- 420 is shownto have Rough Opening of 756MM. The Structural Drawings SE-102A and B indicate a

1070x1070 Access Hatch. Please confirm size of access hatch.

Rough opening size to be 762mm x 762mm (30" x 30") as required by BOD product. MSE cavity access hatch product info in RFI response above.

44 AI-703

Elevator Lobby Elevations 10 and 13/ AI-703 call out MT-10 Doors, Transom, Jamb TYP @ all

Elevator Locations. There is no MT-10 defined on the Interior Finish Schedule on AI-

900. Please confirm that all MT-10 call outs should be MT-01.

MT-10 is a typo. Shall be called out MT-01

1/AE-201

1/AE-322

Elevation 1/AE-201 calls for Façade Type C on Levels LL3-LL1 centered at Gridline 10. Enlarged

Elevation 1/AE-322 calls for Façade Type A1 at this location. Please confirm that

Façade Type A1 is correct.

Correct. on AE-201, facade from levels L1-LL3 between column lines 10 and 9.6 is Facade Type A1 - precast panels supported by concrete structure. Note will be revised in architectural drawings.

46 L-101 A retaining wall is called out on Sheet L-101 to the west of Existing Building 52. Please provide construction details for this wall.

OLIN: Wall in this location to be CIP concrete similar to stair check walls. OLIN to provide details in IFC submission.

47 CU-239

Please confirm that the Government will pay Columbia Gas directly for the natural gas line relocation Work which is indicated on CU-239

GSA to provide response based on their experience/agreement with Columbia Gas.

48 I2/ AI-813

Detail I2/ AI-813 indicates an Epoxy Modified Repair Mortar as infill for the Walker Duct trenches.

Please provide a specification for the product to be used for this application

The infill product shall be " Polymer Modified Repair mortar".

Refer to specification 033000-2.9A. Note in 12/AI-813 will be revised.

Section 324007 - Active Roadway Barrier

Systems

Please confirm that the vehicle barriers adjacent to the Security Trailer are Portable Barriers as specified in Section 324007.

Yes, confirmed, per spec and drawing.

50 Details 5 - 7/ AI-608

Details 5 - 7/ AI-608 indicates what appears to be wood veneer display cases and laminated marker/tack boards attached to Knoll Connectivity poles as specified in Section 109500. There are no details showing the construction or anchorage of this assembly. Please provide details for pricing this Work.

Contractor to refer to manufacturer's standard and recommended instructions for installation.

https://www.knoll.com/document/1356467458260/Interpole_In stallation_Guide_V2.pdf.

51 AE-430

Details on Sheet AE-430 indicate cont. perforated drain tile with reference to the

Plumbing Drawings. Please clarify reference to the Plumbing Drawings as there are no drain tile details found in the Plumbing Drawings

Perforated drains information are in civil drawings and specification. Architectural drawings notes will be revised to reference civil drawings.

52 CU-111

Drain Tile notes on Sheet CU-111 refer to Structural Detail 1/ SS-301. This structural detail makes no reference to drain tile. Please clarify reference to 1/ SS-301.

The detail reference should be 1/SS-311.

53 1/ AI-702

The west elevation (1/ AI-702) in Visitor Lobby LL5102 appears to indicate a built-in bench similar to break room benches. There is a detail reference 2/ AI-824 to the right of the bench. Please confirm that this detail is intended to cut through the bench.

Detail 2/AI-824 is intended to cut thru the bench. Detail tag shall be on the built-in- bench.

54 General During the Site Visit it was noted that there is salvaged brick in the footprint of the site.

Please confirm this material is to be disposed of off site.

The saved bricks are to fill the Gabion Wall baskets where reference to the baskets are made on SS-301.

55 AI-817

The label for Detail 2/ AI-817 indicates Header - Operable Partition - LL2 MPR - L1

Conference Room. There is no Operable Partition in MPR LL2162. Please confirm.

Confirmed. MPR LL2162 does not have operable partition.

The title of detail 2/AI-817 will be revised to remove reference to LL2 MPR.

56 Stone Coursing 1 & 2/ L-730

Please confirm that stone coursing pattern at building stone veneer is to match stone coursing pattern of retaining wall stone veneer as indicated by Details 1 & 2/ L-730

OLIN: This is correct. The stone coursing across the building and retaining walls is to match and align.

57 321440

Specification Section 321440, Part 2.D refers to Material for GR-1A and GR-1B Stone Pavers and further indicates the location of GR-1A and GR-1B pavers as shown on the Drawings. The Paving

Legend on the Landscape Drawings (L-350) only indicate GR-1

Pavers. Please clarify

OLIN: GR1A and GR1B are the same meterial but are to be fabricated in different thicknesses for installation in different conditions. Refer to Material Plans, L-300 to L-304 for locations of paving types and details 01 & 02/L-830 for paver thicknesses.

58 321440

Specification Section 321440 indicates 3 different granite stone types for GR-1A and GR- 1B and

3 different granite stone types for GR-2. Please confirm that all listed stone types are acceptable.

OLIN; We were required to provide 3 options for each granite type. Option 1 of each type is the preferred granite.

59 321440 Ref. 321440. Part 2 -Products-E.(a.11). Material for GR-2 indicates finish for exposed surfaces as

Thermal with truncated domes. Is this correct? GR-2 paver is located at Courtyard area. L-354

OLIN: This is incorrect. The material for GR2 is to be Thermal finish only without truncated domes. The specification will be revised in the IFC submission.

60 Division 26AE-472

Drawing AE-472.9 has a note that states "Route Speaker Wire Through Sealant Joint at

Curtainwall sill at location of control box. Coordinate pathway for speaker wire with Curtainwall installation." This note refers to the control box for the Bird Control devices. Please provide the desired location for the control box.

Refer to spec 108113 for BOD of bird deterent system. See

EP-107C & EP-107A for desired location of control panel

61 Section 134920.0010 Section 134920.0010 specifies an Electromagnetic / RF Shielded STC 50 window. Please provide a basis of design manufacturer.

Bid spec does not contain section 134920 as refrenced in the description. RF shielded glazing are specified in 088000 with

BOD manufacturer and RF Shielded partition assemblies are specified in spec 092900

62 AE-200

In the notes section for item HPC-03 indicates that the paint system is to be shop applied and touched up in the field. Is that the intention of this paint or can it be applied in the field.

Shop applied and touch up at field as required.

63 AE-101B

The radiation detector is shown to be provided by the Government's security package. Is the bollard that the radiation detector on also provided by the government's security package, or should it be provided by the contractor?

Radiation detectors (equipment) to be provided in government security package. Rough ins and conduit to be provided as part of contractor scope of work. Typcial bollard BOD at entries is Wikk rectangular stainless steel entry bollard with as specified in spec section 05700-2.5D. Refer to 1/AE- 470 for design intent with BOD product.Radiation detectors to be coordinated and mounted at sides of interior bollards as noted in electrical drawings.

64 AE-101B

Are the entry bollards with ABA sensors that are shown at the entrance on AE-101B supplied by the government's security package, or are they contractor supplied?

[C. Amin - 06.26.23] Contractor supplied.

65 AI-802AI-803

The following doors are missing hardware on the door schedule and not listed in any spec set:

OCW-1273, OCW-5205, OCW-5293 and LL5114C. Please provide the hardware set for each of these doors.

Refer to Section 084400, 2.2.F for applicable Hardware at all

Casement Operable Windows tagged as OCW on Door

Schedules.

Note: Door LL5114C is a Swing Glass Gate part of the

Security Gate System and not a door, and will be remove from the schedule.

66 AI-803

Opening LL4392 missing frame material and has veneer for frame finish. Is this a wood frame? If yes, please provide the wood frame jamb detail.

Door LL4392 is a Frameless Flush, Metal-Clad Panel Door.

Refer to Details 12/AI-801 and 13/AI-801 for additional information.

67 AI-803 - AI-810

Most HM frames listed in the door schedule have 2440 for height but some have 2438. Is there a difference in the conditions?

2438 is the correct dimension, equivalent to 8'-0" per the

Imperial/Metric Conversion Schedule on AE-001

68 AI-803 - AI-810

Most aluminum frames have 2438 for height but some have 2440. Is there a difference in the conditions?

Refer to note for item 66 above

69 AI-803

Opening LL3345 is shown to be a HM door and frame, but also shows door type GF, which is glass door. The specified hardware is set 22, which is for a glass door. Please confirm which type of door this should be, and change either the type or the hardware to reflect the correct door type.

Per Response to BID RFI 51 - Round 1, Hardware Set will be revised to 59

70 AI-804

The following doors are single doors per both door schedule and floor plans, but have hardware set 51, which is for double doors: LL2150, LL1564, LL1565B. Please provide the correct hardware set for each door.

Doors LL2150, LL1564, LL1565B will be reassigned to

Hardware Set 53.0. Revised Door Schedule and Door

Hardware Specification will be included with IFC documents.

Door LL2157 is a single door per both door schedule and floor plans but has hardware set 51, which is for pairs. Please provide the correct hardware set for this door.

Assumed this inquiry is for LL2150 (Door LL2157 is not part of the project): Door LL2150 will be reassigned to Hardware Set

58.0. Revised Door Schedule and Door Hardware

Specification will be included with IFC documents.

72 AI-803

The following hollow metal frames have "clear" noted for the finish, not paint: LL2266, LL2278, LL2280 and LL2282. What finish is this?

The Frame Finish for the listed doors will be revised to read

PAINT.

73 AI-803 - AI-810

The following openings have the finish "STL" listed for door and frame material: LL1.C52A, LL1412A, LL1419A, LL1420, LL1430, LL1431 and LL1440B. The doors are type F or AA and frames are type 3F. Should this material be changed to HM? If not, what is STL?

The correct Panel and Frame material for the 7 listed doors is

HM. Sheet AI-804 will be revised accordingly.

74 Door LL1.C14B is pair but has set 30. Set 30 is for a single door. Please provide the correct set.

Door LL1.C14B will be reassigned to new Hardware Set 28.1.

Revised Door Schedule and Door Hardware Specification will be included with IFC documents.

75 Door LL1232 is pair but has set 53. Set 53 is for a single door. Please provide the correct set.

Door LL1232 will be reassigned to Hardware Set 51.0

Revised Door Schedule and Door Hardware Specification will be included with IFC documents.

Door types FL and DL state “louver as indicated” for size, but door schedule does not list size.

Please provide louver size.

[M. Mancuso - 6.26.23] Currently, Door Louvers are not required for HVAC.

ZGF: If appropriate, a revised version of Sheet AI-800 with FL

& DL Types removed will be included in IFC documents.

Doors 2278 and 5533 have HM for frame material but have type SF3-A which is aluminum.

Should material be changed to AL or type changed to 3F?

Doors 2278 & 5533 are SF3A type. Frame material will be revised to read AL on Sheets AI-806 and AI-809.

Door 2561 has HM for frame material but has type SF3-C which is aluminum. Should material be changed to AL or type changed to 3F?

Door 2561 is SF3C type. Frame material will be revised to read AL on Sheet AI-806

Door 5531 has HM for frame material but has type SF3-B which is aluminum. Should material be changed to AL or type changed to 3F?

Door 5531 is SF3B type. Frame material will be revised to read AL on Sheet AI-809

Doors 5136 & 5138 have HM for frame material but have type SF3-E which is aluminum. Should material be changed to AL or type changed to 3F?

Doors 5136 & 5138 are SF3E type. Frame material will be revised to read AL on Sheet AI-809.

Openings 5106A & 5106B are wood doors and frame type 3F which is 3-sided HM frame but have

NF for frame material which is no frame. Should material be changed to HM? If NF is correct hardware will not work.

Frame material for doors 5106A & 5106B will be revised to indicate HM

Opening 5134 is a STC50 HM door but has AL for frame material. Should material be changed to

HM?

The Frame Material for Door 5134 will be revised to read HM.

The updated Door Schedule will be included with IFC documents

83 Door LL1571 is a STC50 HM door but has set 57. Should hardware be changed to set 59?

Per Response to BID RFI 52 - Round 1, Hardware Set will be revised to 59

84 All doors with set 20 are 8’-0” but set 20 only has 6 hinges. Should these doors have 8 hinges?

Set 20.0 will be revised to receive 4 hinges per leaf. A revised

Door Hardware Specification will be included with IFC documents.

8 of the 9 doors with set 28 are 8’-0” but set 28 only has 6 hinges. Should these doors have 8 hinges?

Set 28.0 will be revised to receive 4 hinges per leaf. A revised

Door Hardware Specification will be included with IFC documents.

Doors LL4.C07 & 1400 are not fire rated but panic in set 28 is for fire rated doors. Please provide the correct set.

Doors LL4.C07 & 1400 will be reassigned to new Hardware

Set 28.2. Revised Door Schedule and Door Hardware

Specification will be included with IFC documents.

Doors 1.C52A, 1.C52B, 1.C53B & LL3.C19 are not fire rated but panic in set 30 is for fire rated doors. Please provide the correct set.

Doors 1.C52A, 1.C52B, 1.C53B & LL3.C19 will be reassigned to new Hardware Set 30.1. Revised Door Schedule and Door

Hardware Specification will be included with IFC documents.

Doors LL2152 & 4106 are single per both door schedule and floor plans but have set 48 which is for pairs. Please provide the correct hardware set.

Doors LL2152 & 4106 will be reassigned to new Hardware Set

53.0. Revised Door Schedule and Door Hardware

Specification will be included with IFC documents.

Door LL2301 has set 73 pr the door schedule but is listed in spec set 50. This door is a pair. Is set

50 correct?

Set 50.0 is correct for Door LL2301. A revised Door Schedule will be included with IFC documents.

3 of the 4 doors with set 50 are 8’-0” but set 50 only has 6 hinges. Should these doors have 8 hinges?

Set 50.0 will be revised to receive 4 hinges per leaf. A revised

Door Hardware Specification will be included with IFC documents.

All of the doors with set 57 are 8’-0” but set 57 only has 3 hinges. Should these doors have 4 hinges?

Set 57.0 will be revised to receive 4 hinges per leaf. A revised

Door Hardware Specification will be included with IFC documents.

All of the doors with set 61 are 8’-0” but set 61 only has 3 hinges. Should these doors have 4 hinges?

Set 61.0 will be revised to receive 4 hinges per leaf. A revised

Door Hardware Specification will be included with IFC documents.

Door 5105B door type is F but has set 64. Set 64 is for a bullet resistant door. Should door type be changed to BR-1 or should the hardware set be changed?

The Door Type for Door 5105B will be revised to BR-1.

The updated Door Schedule will be included with IFC documents.

94 GC-101A

Sheet GC-101A contains a note that says grayed-out erosion and sediment control measures are to be installed in an early start package and maintained under this contract. Please confirm that the sediment traps and other grayed E&S measures will be installed prior to our work commencing.

The Early Site Package work has been completed. Contractor shall confirm that the E&S measures are in place as shown on GC-101A and maintain as required.

95 L-031 Sheet L-301 shows trees to be removed outside of the projects limits of disturbance. Please confirm that only trees within the project LOD are to be removed under this contract.

OLIN: Yes, only trees within the project LOD are to be removed under this contract.

96 L-020

General note #1 under Tree Protection Plan Notes on L-020 states there may be additional trees marked for removal that are not shown on the plans. Please confirm that only trees marked for removal on sheet L-031 are to be removed.

OLIN: The note states that trees indicated for removal are based on the survey provided for the project. We can't be sure that every tree on site was surveyed so are asking that all trees within the LOD be removed whether indicated specifically or not.

97 AE-404

Please confirm if the interior caulk joint of curtain wall sills is meant to be a weathertight seal, or is it supposed to be aesthetic? What condition should the interior side sealant be caulked to? If it is meant to be any type of performance air seal, should the joint be sealed at the angle at the back of the precast?

Interior sealant joint is typically aesthetic. Double sealants

(primary and secondary weathering sealant joint) are always required for all exterior conditions. See Specification 079200-

2.3 for sealant types. Sealants at the interior location shall be type 2.3.D - High Movement Interior Joints in spec 079200.

98 2/AE-315

The access window shown detailed in 1 and 2/AE-315 is in conflict with the aluminum fin shown.

Please clarify the dimensions of the access window so it is not in conflict with the fin, or provide an alternative solution to avoid the conflict.

Width of the access window is +/-1053 mm. Swing of the door shown here as graphical representation. Door width shall be finally coordinated with Curtainwall system as well as with the adjacent fin. See detail 5/AE-417 as well for casement window at vertical fin.

99 AE-405

There is a vertical line shown on detail 2/AE-405. Is this intended to be a backpan? Would a backpan be needed for sound requirements? What type of cavity closure should be installed?

Red vertical dashed line is called out as RFB-01 and cavity filled is called out with INS-04.

100 AE-200AE-201

Multiple drawings including overall elevations AE-201 and AE-202 include references to “CW-02” implying a curtain wall system other than CW-01; however no CW-02 system is specified on AE-

200 or the within the specifications. Please confirm if there is a separate CW-02 system and if so, provide pertinent information.

CW-02 should be CW-01A as mentioned in AE-200 CW-02 mentioned in the elevations will be corrected, 101 Spec 08 44 00

Specification 08 44 00 1.8 "Maintenance Material Submittals" notes that all furnished products purchased for but not included in work are to be delivered to Owner. Please confirm if there is a limit to the amount or size of spare material to be delivered. Please also confirm if the delivered location is to be the project site; if not, please confirm location.

Per the spec. sec. 084400 1.8, no limit to the amount or size of spare material is directed, only to "furnish products purchased for but not included in work". Also, the delivery location is to be determined, but will most likely be on the St.

Elizabeths campus site.

102 Spec 08 44 00AE-401

Specification 08 44 00 2.6.B "Gaskets/Weather-Stripping" indicates the exterior weather seal to be a gasket, not silicone sealant. Please confirm if this is a requirement or if this is preference based on the basis of design manufacturer listed. Drawings (including AE-401, AE-415) also seem to indicate a silicone weatherseal.

Exterior weather seal, glazing in glass within curtain wall frame, will be gasket as specified. Drawings to be updated to better graphically represent this condition.

103 Spec 08 44 00AE-350

Specification section 08 44 00 1.11 “Laboratory Mock-ups and Testing” describes laboratory testing specific to façade work. Please confirm if the intent is for the entirety of the mock-up, including roof components, as shown on AE-350 assembled at the laboratory, tested, dismantled, and reassembled on-site. Please also confirm if any testing at the laboratory mock-up is required on the roof or paver assemblies; if so, please provide requirements.

See 277, 278 response below regarding the dismantling and reassembly. Mock-ups of roof components are addressed in the individual performance specifications for Flat Seam Metal

Roof Panels (076119), Hot Fluid Protected Membrane

Roofing (075556), and SBS Modified Bitumininous

Membrane Roofing (075216). The intent of the mock-up was to test the assembly of the mock-up to demonstrate the level of craft and quality of the construction by the contractor.

Water penetration and air infiltration testing is specified for all assemblies in the mock-up, wall and roof assemblies, refer to individual spec sections in the contract.

104 28/AI-607

There appears to be a mirror in the lactation room but it is not labeled as to which mirror on 28/AI-

607. Please clarify which mirror type this should be.

Mirror at lactation room is TA-14. Per Spec Section 102813, mirrors are specified as framed. The TA Schedule on AI-600 will be revised to match the Specifications

105 Factor 1

Factor 1 states, "The Firm must demonstrate successful experience as a General Contractor(GC) responsible for the construction of two (2) similar projects substantially completed within the past six (6) years as defined below. [...] Project involved work on a historic site and/or campus. The terms 'historic site' and 'historic campus' refer to sites or campuses that are listed in or eligible for the National Register of Historic Places, or properties that otherwise have historic significance and required protection of historic elements." Factor 1 also states, "The more experience performing projects meeting the above criteria, the higher the Offeror will be rated."

Please revise the requirements such that at least two (2) projects submitted under Factor 1 must meet all of the Factor 1 past experience requirements (including the historic site and/or campus past experience requirement) and any additional projects not on a historic site and/or campus, while still meeting the remaining Factor 1 requirements, will be considered relevant project experience for consideration during the scoring process.

Unanswered Round 2 RFIs' will have responses posted on next Amendment.

106 5/Ae-40508 44 00

Details such as 5/AE-405 show a 1/8" aluminum backpan panel. Specification 08 44 00 section

2.4 F and I refer to a "galvanized steel backpan." Please confirm that the "aluminum" material refers to the shadowbox panel rather than the actual backpan, and the backpan should be galvanized steel.

1/8" ( 3mm) aluminum backpan for shadow box as shown in the detail.

107 5/AE-40508 44 00

Details such as 5/AE-405 show the aluminum shadowbox/backpan to be 1/8" thick. Specification

08 44 00 section 2.4 J says that the insulated shadow box panel is required to be a minimum 0.09 inch thick, which is smaller than the 1/8" in the drawing. Please confirm what the thickness of the backpan should be, and also what the thickness of the shadowbox panel should be.

See response to item #103

108 08 44 00, 2.4, J

Spec 08 44 00 section 2.4, J. describes "non-insulated shadow box panel conditions," but none seem to be shown in the drawings. Please clarify if there are any non-insulated shadowbox conditions.

Non-insulated shadowbox condition does not apply to the project. ZGF will update/ strikethru that section

109 01 81 23 The Blast Performance Specification 01 81 23 does not mention any glass doors within the curtainwall. Are exterior glass doors required to meet blast loads?

The doors within the curtainwall are not required to comply with any blast performance criteria and may be designed for conventional (non blast) loads only.

110 AE-105AAI-805

Doors 1.R04A and 1.R04B are shown on plan view on AE-105A but are not listed in the door schedule. Are these doors rated for water penetration resistance?

Thes two doors are in exterior door schedule at AI-802.

Exterior glazed doors are specified in spec 084226.

111 08 44 00

The specification for glazed aluminum curtain walls clearly defines two mockups, a laboratory mockup and a visual mockup. Please confirm the visual mockup, after it is reconstructed on site, does not need to be re-tested.

Refer to item #5 of round 1, Per spec lab tested mock up will be dissassemble and reassemble on site for visual mock up.

GSA to take final decision.

112 2/AE-401

The continuous extruded aluminum sill shown in detail 2/AE-401 is to be adhered in a bed of high temp non-curring butyl. This will interface with the silicone sealant of precast joints. Please confirm compatibility of the silicone sealant and the butyl to confirm the butyl will adhere to silicone.

Contractor to verify compatibilty of joint sealants and substrates per spec section 072900

113 1/AE-402

Please clarify what type of blocking is recommended at the top of the coping. Should it be nailable blocking?

Blocking shall be fire retardant. Yes, they will be nailable blocking

114 3/AE-406

Please clarify what type of sealant joint is shown underneath the curtainwall mullion. (This is one of three joints under the sill, the one all the way to the left)

See Specification 079200-2.3 for sealant types. Sealants at the interior location shall be type 2.3.D - High Movement

Interior Joints in spec 079200.

115 1/AE-407

There is a blank block shown in this detail at the step down right on the "Roof North" dotted line. Is this a graphical error? Should this be blocking? If so, what type?

Per detail note in drawing, see detail 3/AE-402 for typical assembly information.

116 5, 9/AE-417

Details 5 and 9 show the details at the casement window. One detail shows 2 backer rod and sealant joints and the other shows 3. Should these be consistent?

Yes, conditions to be consistent. Typical curtain wall and casement window conditions include (2) primary and secondary weathering sealant joints at exterior and (1) aesthetic sealant joint at interior.

117 1/AE-34

Detail 1/AE-34 shows the curtainwall adjacent to the terracotta with 3 back rods and sealants in between. Should the terra cotta stop and the curtain wall be sealed directly to the precast?

Assuming reference to detail 1/AE-434. Design intent is for terracotta to continue past curtain wall mullion. Closure plate to be provided at jamb for CW mullion to seal against at intersection with terracotta tile

118 AE-111263300

263300 2.5A indicates the PV arrays shall be structurally attached to the roof, however the structure is delegated design. The roof detail drawings do not show a condition for the PV structure supports. The flashing system utilized to incorporate the PV mounting penetration to the roof membrane may have large cost impacts depending on the quantity of supports, and specified system. Please provide a quantity of roof membrane penetrations for PV Array support systems to assume for bidding purposes, as well as what flashing system will be utilized (WP02a for example).

PV panel arrays to be ballasted system. No mechanical attachment. Spec 263300 will be updated

119 1/AE-402

1/AE-402 shows cross hatching below the coping cap, however it is not labeled. The cross hatching appears to be insulation, however insulation is not typically required at this location.

Please confirm if the cross hatching is insulation.

Coping condition is also indicated at Detail 3/AE-402 describing FILL COPING WITH INS-04, TYP. ALL COPINGS

120 1/AE-403

1/AE-403 shows spray foam insulation behind the precast panel (typical throughout the project).

At the parapet condition shown here, installing the spray foam insulation between the concrete curb/parapet and precast panel will be very difficult. For this condition, could pre-applied mineral wool insulation be utilized in lieu of the spray foam insulation.

Design intent is to fill cavity between precast and curb with spray foam insulation for consistency, energy performance, and continuous vapor barrier. Means and methods to be determined by contractor.

121 1/AE-404

1/AE-404 shows two silicone sealant joints between the precast panel and the extruded aluminum trim. The profile of the terracotta faced precast leaves no access for installation of these joints.

Please provide a revised detail that allows for installation in order to maintain a continuous airbarrier system. (A potential solution could be to install a silicone boot from underside of precast to air barrier at CIP curb, and a finished sealant joint between precast and stone. Eliminate metal aluminum trim.)

Drawing error. Design intent is not for lip of terracotta tile to extend past precast base, but be co-planar. Refer to detail

2/AE-404 for typical base condition with allowable gap for double sealant lines.

122 2/AE-407

2/AE-407 shows FRT blocking under the metal roof. Does this blocking need to support any specific loading for building access / maintenance? If so, please show required structure.

Blocking shown in detail 2/AE407 at the edge of roof slab does not need to support loading for building access or maintenance. The roof is accessed via casement window from roof and the design does not contemplate dropping

Bosun’s chair or fall arrest lines over the edge of this roof where blocking is located for any maintenance activity.

123 6/AE-413

6/AE413 says to refer to spec for scupper metal type but it does not appear to be in the spec.

Please confirm the metal type.

Scupper metal shall be stainless Steel

124 2/AE-401

2/AE-401 shows a steel angle below the sealant, but this steel angle is not shown in the structural drawings. Please confirm if this angle is to support the curtain wall, and if so, please locate this angle on the structural drawings

The angle is connected to a precast element which is a delegated design item. The angle is a delegated design item as it is a part of the curtain wall system and will need to be coordinated with the precaster -TT

125 SJ-201; SJ-202

Key note 59 on SJ-201 & SJ-202 notes that we should assume 10% of the metal structure for the smokestack access is to be replaced. Without member sizes/types, it is impossible to price this work. Please provide more information for pricing purposes.

Silman Response: Per notes in the drawings, due to limited access, Silman has not been able to assess the internal structure to date. Silman provided a quantity estimate to be used for pricing to account for this unknown. Until access is provided, exact steel sizes/quantity cannot be identified.

126 SJ-203; SJ-503

Key note 23 on the various structural elevations (SJ-203 as an example) state that it should be assumed that 5% of the steel lintels are to be replaced. The steel lintels required will vary based on the thickness of the wall as indicated on SJ-001. The only location where I can find that a wall thickness is specifically indicated, is on SJ-503 in the “typical steel lintel @ openings in existing conc wall”. This detail states to assume a wall thickness of 457mm, should it be assumed that all walls are 457mm for the purposes of estimating?

Silman Response: The detail noted on SJ-503 is not relevant for angle steel lintels in existing masonry walls. This detail is for an existing concrete wall. For pricing purposes at the steel angle lintels in the existing masonry walls, assume that the brick masonry walls are typically 406 mm (16") thick. Please note that this dimension must be verified in field. No probes have been performed to date to verify the thickness of the walls.

127 9/AE-413

Detail 9/AE-413 shows the supper liner. Please specify the thickness and seaming for the scupper liner. Please confirm if this is consistent with any detail showing scupper liner.

The gauge thickness will be 26 gauge and all seams will be soldered.

128 1/AE-403

On detail 1/AE-403, please confirm if the cavity between precast and curb could be a pre applied mineral wool to back of precast in lieu of spray foam insulation ?

Design intent is to fill cavity between precast and curb with spray foam insulation for consistency, energy performance, and continuous vapor barrier. Means and methods to be determined by contractor.

129 1/AE-404

Detail 1/AE-404 shows WP-01 bellows joint with continuous backer rod at concrete and foundation wall. Please confirm if this detail can be removed, as the concern is it will be damaged during backfill .

Bellows joint to remain. Bellows joint protected with WP-01 and drainage board. Aggregate infill over top of joint will be wrapped in filter fabric.

130 1/AE-406

Detail 1/AE-406 shows a steel angle attached at the top of the curb for facade support.