Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
WPH1A
RFP- EQWPC-23-0001CISAHQ, Construction Services for CISA Headquarters Bldg, St Elizabeths W Campus, SE WASH DC Amendment 0010
THE FOLLOWING CHANGES, CORRECTIONS, AND ADDITIONS AS NOTED HEREIN ARE HEREBY INCORPORATED
INTO THE SOLICITATION.
WP1AA
GSA, OFC OF ACQUISITIONS
1800 F STREET, NW
WASHINGTON, DC 20405
TO ALL PROSPECTIVE OFFERORS
GSA, OFC OF DESIGN AND CONSTRUCTION
1800 F STREET, NW
WASHINGTON, DC 20405
RFP- EQWPC-23-0001CISAHQ
10/24/2023
04/05/2023
10/24/2023
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
AMENDMENT 0010
IRA RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC
Note: The Inflation Reduction Act of 2022 (IRA), Pub. L. No. 117-169, enacted in
August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements.
Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the
Specifications, and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.
ITEM 1: Proposal receipt date and time is REMAINS UNCHANGED as follows.
OCOTBER 31, 2023, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov
ITEM 2: DELETE the Pricing Sheet as issued previously and INSERT the attached REVISED PRICING SHEET in lieu thereof. This REVISED PRICING SHEET is to be used in proposal submission.
ITEM 3: The SOLICITATION: EVALUATION FACTOR 3. Designated Key Personnel (Superintendent, Project Manager, Quality Assurance Manager, Scheduler). DELETE para.
c in its entirety and INSERT the following para. c in lieu thereof.
c. Quality Control Manager/Quality Assurance Manager –
1) Education: Graduation from an accredited undergraduate program with a Bachelor of Architecture, Bachelor of Science Degree in Engineering, Construction Management, or a similar field of expertise. *Note: Appropriate experience may be substituted for education and credentials.
2) Credentials: Registered Professional Architect (R.A.) and/or Professional Engineer (P.E.) and C.Q.M. for Contractors Course Certification; Note: Appropriate experience may be substituted for education and credentials.
3) Project Experience: At least 10 years CQC experience on at least two (2) projects at least $20,000,000 each of either tenant fit-out, repair and alteration, renovation, reconfiguration, or reorganization of space. (15 years with no degree)
4) Training: Certification of completion, OSHA 30 HR Construction Safety & Health Course, or equivalent training.
5) Additional Qualifications: The Offeror may provide any additional qualifications regarding this individual.
*An example of appropriate experience as a substitution would be an individual not possessing a specific degree but instead possesses extensive experience in running QC programs for similar facilities for 20 years.
ITEM 4: DELETE the General Decision Number DC20230002 as issued under the solicitation and INSERT the attached updated General Decision Number DC20230002 MOD 10 2023 10 13, in lieu thereof.
ITEM 5: REGARDING RFI LOG 4 items:
A. Specification section 01 84 00 subsection 3.4.C requires testing for in accordance with ASHRAE Standard 129.
As there are already requirements for Air Contaminant Testing and Building Flush Out.
Remove this requirement for ASHRAE 129 testing. LEED requirements for flush out or air contaminant testing will remain.
B. Part 2, Paragraph B in Specification Section 313600 requires the contractor to determine the quantity of salvaged materials from the demolition of existing buildings and supplement with new stone if the demolished quantities are not sufficient.
There are approximately 1200 pallets of bricks on site.
C. Reference spec section 142100 part 1.07.C calls to provide quote for five-year preventative Maintenance Agreement commencing upon completion of warranty maintenance.
Is this quote for five-year preventative maintenance agreement to be included in base bid? 12-month Warranty maintenance is included in the base bid.
The separate quote for a five-year maintenance agreement is not to be included as part of the base bid. Thus, please provide separately. (See revised Pricing Sheet)
D. Drawing SE-001 “Foundation Section”, Item FN-1 states “Foundation design based on the Geotech report by Haley & Aldrich, PC, dated 29 September 2020. Bid documents provided include H & A reports dated Dec. 2021 & March 2022. Please clarify if the report dated 29 Sept.
2020 will be available or required? Is GSA to provide reports?
See attached for Geotechnical Reports
E. Since survey and testing has not been performed, provide an allowance to include in the bid for the abatement of all hazardous materials as that scope cannot be quantified until the report is completed.
The Government will address any hazmat issues pertaining to the smokestack and Building 56 and 57 after award via change order.
ITEM 6: SPECIFICATIONS, DRAWINGS, SKETCHES, REPORTS
The following DOCUMENTS are hereby incorporated under this solicitation.
2.1 CISA Geologic Hazard Report-F
2.1 CISA Geotech Engineering Design Report - RFP
2.1 CISA Geotechnical Data Report-RFP
2.1-2.2 CISA Report Geotechnical RFP
ITEM 7: Offeror must acknowledge receipt of this amendment by signature in block 15 and by inclusion of page 1 of the SF30 as an attachment to the proposal submission.
END OF AMENDMENT 0010
ATTACHMENTS:
REVISED PRICING SHEET
General Decision Number DC20230002 MOD 10 2023 10 13
2.1 CISA Geologic Hazard Report-F
2.1 CISA Geotech Engineering Design Report - RFP
2.1 CISA Geotechnical Data Report-RFP
2.1-2.2 CISA Report Geotechnical RFP
ISSUED UNDER AMENDMENT 0010
ATTACHMENT TO SF 1442: PRICING SHEET
(To be submitted as an ATTACHMENT TO SF 1442)
CLIN & SubCLIN Price
CLIN 0001 Non IRA Project Expenditures $
CLIN 0002 IRA Acquisition and installation of low embodied carbon materials
SubCLIN 0002AA Acquisition and installation of low embodied carbon steel and associated expenses
SubCLIN 0002AB Acquisition and installation of low embodied carbon asphalt and associated expenses
SubCLIN 0002AC Acquisition and installation of low embodied carbon glass and associated expenses
SubCLIN 0002AD Acquisition and installation of low embodied carbon concrete and associated expenses
CLIN 0003 IRA emerging and sustainable Technologies
CLIN 0004 IRA high-performance green building measures
OPTIONS
OPTION 1: MASONRY REPOINTING at Bldgs 56/57 and Smokestacks
OPTION 2: PROTECTION BOARD INSTALLATION
AT EXISTING EXTERIOR OPENINGS AT BLDGS
56/57
OPTION 3: MASONRY SURFACE FINSIHES at smokestacks (only) at Bldgs 56/57
OPTION 4: SLAB ON GRADE (SOG) WORK AT
INTERIORS OF BLDGS 56/57
ISSUED UNDER AMENDMENT 0010
ALTERNATE
Alternate 01: CISA Temporary Parking Lot
OPTION - WARRANTY
FIVE-YEAR Maintenance Agreement (Spec Section 142100 Part 1.07.C)
OPTIONAL BID RATES
Contractor’s Overhead Rate for Adjustments
Contractor’s Profit Rate for Adjustments
Contractor’s Daily Rate for Compensable Project Delay (Work Day)
OFFEROR:
IRA RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC
"General Decision Number: DC20230002 10/13/2023
Superseded General Decision Number: DC20220002
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2023. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.15 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
1 01/13/2023
2 04/07/2023
3 05/05/2023
4 06/02/2023
5 06/30/2023
6 07/21/2023
7 07/28/2023
8 08/04/2023
9 09/01/2023
10 10/13/2023
ASBE0024-007 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 39.27 18.67+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving and Christmas
Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-008 04/01/2021
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER.................$ 24.46 8.69+a
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
Thanksgiving Day, the day after Thanksgiving and Christmas
ASBE0024-014 04/01/2021
FIRESTOPPER......................$ 29.41 8.73+a
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the passage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
Thanksgiving Day, the day after Thanksgiving and Christmas
BRDC0001-002 04/30/2023
BRICKLAYER.......................$ 36.50 13.47
CARP0197-011 05/01/2023
CARPENTER, Includes Drywall
Hanging, Form Work, and Soft
Floor Laying-Carpet..............$ 32.21 13.87
CARP0219-001 05/01/2023
MILLWRIGHT.......................$ 37.65 14.54
CARP0441-001 05/01/2022
PILEDRIVERMAN....................$ 34.62 13.45
ELEC0026-016 12/06/2021
ELECTRICIAN, Includes
Installation of
HVAC/Temperature Controls........$ 50.00 20.49
ELEC0026-017 09/07/2022
ELECTRICAL INSTALLER (Sound
& Communication Systems).........$ 33.95 11.39
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside
Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2023
ELEVATOR MECHANIC................$ 52.49 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
IRON0005-005 06/01/2023
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 36.10 25.19
IRON0005-012 05/01/2023
IRONWORKER, REINFORCING..........$ 30.70 23.33
LABO0011-009 06/01/2022
LABORER: Skilled................$ 27.48 8.98
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer
(excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper, demolition.
MARB0002-004 04/30/2023
MARBLE/STONE MASON...............$ 43.16 20.28
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement
(restoration work)
MARB0003-006 04/30/2023
TERRAZZO WORKER/SETTER...........$ 33.41 12.67
MARB0003-007 04/30/2023
TERRAZZO FINISHER................$ 27.68 11.63
MARB0003-008 04/30/2023
TILE SETTER......................$ 33.41 12.67
MARB0003-009 04/30/2023
TILE FINISHER....................$ 27.68 11.63
PAIN0051-014 06/01/2023
GLAZIER
Glazing Contracts $2 million and under...........$ 30.52 13.85
Glazing Contracts over $2 million.....................$ 34.76 13.85
* PAIN0051-015 06/01/2023
PAINTER
Brush, Roller, Spray and
Drywall Finisher............$ 27.46 11.56
PLAS0891-005 07/01/2021
PLASTERER (Including
Fireproofing)....................$ 30.53 7.93
PLAS0891-006 02/01/2020
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
PLUM0005-010 08/01/2023
PLUMBER..........................$ 49.00 23.46+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-008 08/01/2023
PIPEFITTER, Includes HVAC
Pipe Installation................$ 50.27 23.32+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-016 07/01/2022
ROOFER...........................$ 32.26 14.71
SFDC0669-002 04/01/2023
SPRINKLER FITTER (Fire
Sprinklers)......................$ 40.46 25.22
SHEE0100-015 11/01/2021
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 44.37 21.33+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
* SUDC2009-003 05/19/2009
LABORER: Common or General......$ 13.04 ** 2.80
LABORER: Mason Tender -
Cement/Concrete..................$ 15.40 ** 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures
(restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67 **
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION