Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

WPH1A

Bonnie Echoles, Contracting Officer

RFP- EQWPC-23-0001CISAHQ, Construction Services for CISA Headquarters Bldg, St Elizabeths W Campus, SE WASH DC Amendment 0002

THE FOLLOWING CHANGES, CORRECTIONS, AND ADDITIONS AS NOTED HEREIN ARE HEREBY INCORPORATED

INTO THE SOLICITATION.

WPIAA

GSA, OFC OF ACQUISITIONS

1800 F STREET, NW

WASHINGTON, DC 20405

TO ALL PROSPECTIVE OFFERORS

GSA, OFFICE OF DESIGN AND CONSTRUCTION

1800 F STREET, NW

WASHINGTON, DC 20405

RFP- EQWPC-23-0001CISAHQ

05/02/2023

04/05/2023

BONNIE ECHOLES Digitally signed by BONNIE ECHOLES

Date: 2023.05.02 18:02:02 -04'00'

5/2/2023

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

AMENDMENT 0002

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

ITEM 1: Proposal receipt date and time is hereby EXTENDED as follows.

JUNE 21, 2023, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov

ITEM 2: SITE VISIT

A Site Visit will be held at the following date and time.

Date: MONDAY, MAY 22, 2023

Time: 11:00am EST

Location: GATE 2: St Elizabeths West Campus, 2701 Martin Luther King Jr Ave, SE, Wash., DC 20032

Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than two (2) representatives from each Offeror (and (2) representatives from each Prime Subcontractor). Offerors shall submit a CHQ SAFE Visitor Processing Information Form identifying all attendees from their respective team. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Submit the CHQ SAFE Visitor Processing Information Form to the point of contact listed below by May 17, 2023, by 12:00PM EDT. Please ensure registered attendees arrive early to allow adequate time to go through security screening:

For further information about the site visit or access requirements, please contact:

Name: Steven P. Wright Esq., Project Executive

Address: GSA, Office of Design & Construction Project Office St Elizabeths West Campus 2701 Martin Luther King Jr Ave SE Washington, DC 20032

Telephone: 202-713-7652 (cell)

Email: steven.p.wright@gsa.gov

To avoid any delays upon check-in, please ensure you have completed the visit registration process before arrival, using the visitor portal sent via email (no-reply-chqvisit@hq.dhs.gov).

Once completed, registration will come with an e-mail confirmation, barcode, and visit start date.

Arrival Instructions: St Elizabeths West Campus 2701 Martin Luther King Jr., Ave., S.E.

Washington, D.C. 20032 (stoned wall side of Martin Luther King Jr. Ave. SE)

ENTER Gate 2 – Visitors’ parking is available in the temporary gravel parking lot immediately adjacent to the Gate 2 entrance.

ITEM 3: Requests for Information (RFIs) Submission

All Requests for Information (RFIs) must be received by 5:00 PM EDT, on May 26, 2023;

submitted to the attention of the Contracting Officer at bonnie.echoles@gsa.gov.

mailto:bonnie.echoles@gsa.gov

AMENDMENT 0002

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers but does not warrant that all such requests will be answered within 15 calendar days.

ITEM 4: Offeror must acknowledge receipt of this amendment by signature in block 15 and by submission of page 1 of the SF30 as an attachment to the proposal submission.

END OF AMENDMENT 0002