FINAL AMENDMENT 0004 2023 06 23.pdf

PDF 483 KB Posted

Attached to
Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC
Solicitation number
RFP-EQWPC-23-0001CISAHQ
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

WPH1A

Bonnie Echoles, Contracting Officer

RFP- EQWPC-23-0001CISAHQ, Construction Services for CISA Headquarters Bldg, St Elizabeths W Campus, SE WASH DC Amendment 0004

THE FOLLOWING CHANGES, CORRECTIONS, AND ADDITIONS AS NOTED HEREIN ARE HEREBY INCORPORATED

INTO THE SOLICITATION.

WPIAA

GSA, OFC OF ACQUISITIONS

1800 F STREET, NW

WASHINGTON, DC 20405

TO ALL PROSPECTIVE OFFERORS

GSA, OFFICE OF DESIGN AND CONSTRUCTION

1800 F STREET, NW

WASHINGTON, DC 20405

RFP- EQWPC-23-0001CISAHQ

06/23/2023

04/05/2023

6/23/2023

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

AMENDMENT 0004

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

ITEM 1: Proposal receipt date and time is hereby REMAINS as follows.

JULY 31, 2023, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov

ITEM 2: DELETE the SF 1442, Pricing Sheet, and Divisional Price Breakdown Summary Sheet, as issued under the RFP, and INSERT the attached Revised SF 1442, Pricing Sheet, Divisional Price Breakdown Summary Sheet, in lieu thereof.

ITEM 3: The attached ROUND 1 CISA Headquarters RFI Responses LOG is hereby incorporated under this RFP.

ITEM 4: The attached Temp Parking Lot Drawings labeled 6977_Stamped_01-23- 2023_17095_Revised Sheets Compiled, are hereby incorporated under the RFP., as referenced in the RFI Log.

ITEM 5: Offeror must acknowledge receipt of this amendment by signature in block 15 and by inclusion of page 1 of the SF30 as an attachment to the proposal submission.

END OF AMENDMENT 0004

ATTACHMENTS:

Revised SF 1442, Pricing Sheet, Divisional Price Breakdown Summary Sheet 06/23/2023 ROUND 1 CISA Headquarters RFI Responses LOG 6977_Stamped_01-23-2023_17095_Revised Sheets Compiled

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

GSA, NCR, OFC OF ACQ (WPH1A)

4TH FLOOR

WASHINGTON, DC 20405

ISSUED UNDER AMEND 0004

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA HQ BLDG, St Elizabeths West Campus, SE WASH DC

Provide labor, materials, supervision and equipment for the demolition of existing buildings, adaptive reuse of existing buildings, and construction of a new facility.

NAICS Code: 236220, Commercial and Institutional Building Construction.

Product Services Codes (PSC): Y1AA - Construction of Office Buildings.

Period of Performance: 807 calendar days from receipt of NTP.

The estimated price range for the Project is between $300,000,000 and $400,000,000

Subcontracting Plan (FAR 19.7) Optional submission of Project Labor Agreement (PLA).

IN-depth Feedback through Open Reporting Methods (INFORM) Process (communication, transparency) Mega Construction Project: compliance with equal employment opportunity and affirmative action the requirements enforced by

DOL/OFCCP

The Solicitation, The Agreement, SOW (Narratives, Specifications, Drawings), General Decision Number DC20230002

GSA, NCR, OFC OF ACQ (WPH1A)

4TH FLOOR

WASHINGTON, DC 20405

EQWPC-23-0001CISAHQ

WPHIA

Bonnie Echoles bonnie.echoles@gsa.gov (202)441-2912

1 404/05/2023

7/31/2023

3:00pm EST

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

WPIAA

GSA, NCR, OFC OF DESIGN & CONSTRUCTION (WPIA)

WASHINGTON, DC 20405

BCFA

PBS Payments Branch P.O. Box 17181 Ft. Worth, TX 76102-0181

SEE ATTACHED PRICING SHEET

DIVISION PRICE

Division 01

Division 02

Division 03

Division 04

Division 05

Division 06

Division 07

Division 08

Division 09

Division 10

Division 11

Division 12

Division 13

Division 14

Division 20

Division 21

Division 22

Division 23

Division 25

Division 26

Division 27

Division 28

Division 31

Division 32

Division 33

Division 48

TOTAL

DIVISIONAL PRICE BREAKDOWN SUMMARY

All divisions may not apply. Total amount shall match amount on OFFER FORM. Failure to list prices in appropriate category does not relieve contractor of requirement to perform all work as described in the solicitation and any amendments.

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

ISSUED UNDER AMENDMENT 0004

ISSUED UNDER AMENDMENT 0004

RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

PRICING SHEET

Attachment to SF 1442, Solicitation, Offer and Award (This form must be submitted as an attachment to the SF1442

CLIN ITEM PRICE

1 Base Contract: CONSTRUCTION SERVICES $

2 Alternate 01: CISA Temporary Parking Lot $

3 OPTION 1 - MASONRY REPOINTING at Bldgs. 56/57 and Smokestacks

4 OPTION 2 – PROTECTION BOARD INSTALLATION AT

EXISTING EXTERIOR OPENINGS AT BLDGS 56/57

5 OPTION 3 - MASONRY SURFACE FINSIHES at smokestacks (only) at Bldgs. 56/57

6 OPTION 4 - SLAB ON GRADE (SOG) WORK AT

INTERIORS OF BLDGS 56/57

OPTIONAL BID RATES

7 Contractor’s Overhead Rate for Adjustments %

8 Contractor’s Profit Rate for Adjustments %

9 Contractor’s Daily Rate for Compensable Project Delay (Work Day)

Name/Signature:

Company: Date:

2023-06-23T19:12:34-0400
BONNIE ECHOLES

File details come from the government source that posted it. Updated .