Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

WPH1A

RFP- EQWPC-23-0001CISAHQ, Construction Services for CISA Headquarters Bldg, St Elizabeths W Campus, SE WASH DC Amendment 0008

THE FOLLOWING CHANGES, CORRECTIONS, AND ADDITIONS AS NOTED HEREIN ARE HEREBY INCORPORATED

INTO THE SOLICITATION.

WP1AA

GSA, OFC OF ACQUISITIONS

1800 F STREET, NW

WASHINGTON, DC 20405

TO ALL PROSPECTIVE OFFERORS

GSA, OFC OF DESIGN AND CONSTRUCTION

1800 F STREET, NW

WASHINGTON, DC 20405

RFP- EQWPC-23-0001CISAHQ

04/05/2023

10/04/2023

10/04/2023

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

AMENDMENT 0008

IRA RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

Note: The Inflation Reduction Act of 2022 (IRA), Pub. L. No. 117-169, enacted in August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements.

Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the Specifications, and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.

ITEM 1: Proposal receipt date and time is hereby EXTENDED as follows.

OCOTBER 31, 2023, by 3:00PM EST BY EMAIL to the attention of the Contracting Officer, bonnie.echoles@gsa.gov

ITEM 2: The period for submission of Requests for Information (RFIs) is hereby closed as of the effective date of this amendment.

ITEM 3: AMENDMENT 0008 IRA RFI LOG

The attached IRA RFI LOG is hereby incorporated under the solicitation.

ITEM 4: Reference GSA’s Interim IRA Low Embodied Carbon Material Requirements provided in Amendment 0006. For construction product assemblies for glass (page 10 of the referenced document), the following calculation clarification is provided:

“For purposes of the calculation; the glazing assembly on curtain wall, storefront, or punch window conditions includes only the assembly components of the glazing unit (e.g., an IGU or laminated glazing unit). Glazing assembly components include flat glass lites, any laminate interlayers (e.g., PVB), any fritting or internal IGU shading components, spacer and created airspace, desiccant, and perimeter edge seals. Assembly components exclude adjacent materials from the glazing unit assembly calculation, such as window sashes & framing, gaskets, sealants, seals, air vapor barrier, and structural connections.”

ITEM 5: The remaining RFIs submitted to date, will be addressed in the next amendment issued.

ITEM 6: Notice reguarding sequence work as it relates to the protection of the smokestacks and other historic structures.

Elizabeths West Campus, SE WASH DC

The contractor shall be responsible for protecting the adjacent historic structures (Building 64, 57 and smokestacks) on the project site.

Preservation and Stabilization Plan The contractor shall develop a preservation and Stabilization plan outlining specific engineering methods and protocols to safeguard the historic buildings and structures. This plan shall be signed by a licensed Professional Engineer ensuring reasonable engineering efforts have been exercised. The plan shall be submitted to the Government and relevant historic preservation authorities for approval before implementation or any construction can begin. Preservation and Stabilization efforts shall comply with local, state, and national historic preservation guidelines and regulations.

Non-Destructive Techniques:

Whenever possible, the contractor shall use non-destructive engineering techniques to assess the condition of historic buildings and structures. These methods include but are not limited to ground-penetrating radar, infrared thermography, and laser scanning to minimize impact on the original materials and structure.

Minimizing Vibrations and Environmental Impact:

The contractor shall take measures to minimize vibrations and environmental impact during construction activities, especially those that may affect the stability of nearby historic buildings and structures. Heavy machinery and construction processes shall be carefully managed to prevent any harm or stress to these structures.

Emergency Response Plan:

The contractor shall develop and maintain an emergency response plan specifically tailored to address any unforeseen events that may threaten the safety or integrity of historic buildings and structures. This plan shall include protocols for immediate action and notification to relevant parties in the event of an emergency situation.

Regular Monitoring and Reporting:

The contractor shall establish a regular monitoring schedule to assess the condition of historic buildings and structures throughout the construction period. Progress reports detailing preservation efforts, challenges faced, and resolutions implemented shall be submitted to the client and historic preservation authorities at specified intervals.

Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in the Agreement, no later than _807_ calendar days from issuance of Notice to Proceed (NTP).

ITEM 7: SF 1442 Pricing Sheet DELETE the Pricing Sheet, as previously issued, and INSERT the attached revised Pricing Sheet in lieu thereof. This Pricing Sheet is to be used in the submission of the price proposal.

ITEM 8: The following, revised Specification Sections are hereby incorporated:

Spec Section 011000- Summary

Elizabeths West Campus, SE WASH DC

Spec Section 018113.13- Embodied Carbon Design Requirements

ITEM 9: Specification Section 275119 - Electronic Sound Masking See Para. 1.7. Substitutions. A. General:

“It is not the intent of this specification to limit or restrict Bid Responses to those containing products by a specific manufacturer, system topology, or masking technology, but rather to set a baseline of operational performance and functionality that all Bid Responses must meet.” (p.7)

FAR 52.211-6 Brand Name or Equal (A�� 1999)

(a) If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.

(b) To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must-

(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;

(2) Clearly identify the item by-

(i) Brand name, if any; and

(ii) Make or model number;

(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and

(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.

(c) The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

(d) Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.

(End of provision)

ITEM 10: Solicitation Evaluation Factor 6. Small Business Participation

Question: Amendment 6 added a Small Business Participation Plan which contains similar information and calculations that would be included in a Small Business Subcontracting Plan.

We request the Subcontracting Plan be submitted post bid date (a minimum of 48 hours) after the proposal submission. Completing both of these by the bid date is an excessive administrative burden. Evaluation of pricing and scope of work will be occurring up to the point of proposal submission. In order to complete both Participation and Subcontract plans, bidders

ADD paragraph 1.1.D – High Performance Green Building Measures) a.

Revised all the tables to include Top 20% Limit, Top 40% Limit and Better Than Average Limit options for each material.

a.

Added Concrete Masonry Units to the selection of materials.b.

Elizabeths West Campus, SE WASH DC would need to complete these forms prior to any price submissions by Subcontractors. There is not adequate time to evaluate for price competitiveness.

Response: A Small Business Participation Plan is required to be submitted at proposal submission to satisfy EVALUATION FACTOR 6. Small Business Participation. A Subcontracting Plan is submitted as a matter to be eligible to receive a contract award (basis for award). As such, an Offeror must submit its individual Subcontracting Plan within 48 hours (2 business days) after proposal submission.

ITEM 11: Attachment X, Small Business Participation Commitment Document (SBPCD).

Question: Amendment 6 added Attachment X, Small Business Participation Commitment Document (SBPCD). The Footnote on the form indicates it cannot be edited or modified. Is it possible to recreate the form for ease of editing so long as the same information is presented?

Response: Attachment X was issued in .doc format to allow population of 4. Small Business Participants. The form itself is NOT to altered; additional lines, as necessary, for 4. Small Business Participants is acceptable.

ITEM 12: The following Addendum 1 sketches are hereby incorporated to address a few of the Round 4 questions.

SE-106A - STRUCTURAL FRAMING PLAN - LEVEL 1 A

SE-306 - TYPICAL RATED BOLLARD DETAILS

ITEM 13: Offeror must acknowledge receipt of this amendment by signature in block 15 and by inclusion of page 1 of the SF30 as an attachment to the proposal submission.

END OF AMENDMENT 0008

ATTACHMENTS:

AMENDMENT 0008 IRA RFI LOG

Revised SF 1442 Pricing Sheet Spec Section 011000- Summary Spec Section 018113.13- Embodied Carbon Design Requirements Sketch SE-106A - STRUCTURAL FRAMING PLAN - LEVEL 1 A Sketch SE-306 - TYPICAL RATED BOLLARD DETAILS

IRA RFP-EQWPC-23-0001CISAHQ, Construction Services for the CISA Headquarters Building, St Elizabeths West Campus, SE WASH DC

AMENDMENT 0008 - IRA RFI LOG

A: The proposal table under the Sustainability evaluation factor is revised to reflect only materials that are included in the project. All materials that are not relevance are omitted from the table.

A: Scopes of Work relating to Emerging and Sustainable Technologies and High Performance Green Building Measures are included in revised the Spec Sect 011000 – Summary, as attached under this amendment. A revised SF1442 Pricing Sheet is issued under this amendment and is to be used in submitting the price proposal.

A: Correct.

The IRA-Eligible Material table (included in Addendum #6) does not allow for analysis of materials supplied by different vendors.

1.

For example different cement manufacturers will be utilized for the Structural Cast in Place Concrete and the Site Concrete Paving.

a.

There is also potential for different steel manufacturers and miscellaneous metals, and glazing manufacturers for entrances, curtainwall, fire-rated glass wall systems, bullet resistant windows and sound control windows.

b.

How would GSA like this information presented on the Contract Price for (Section II.B) and the IRA -Eligible material table included and Evaluation Factor 5.

c.

Amendment 6 issued a revised bid form 'ATTACHMENT TO SF 1442: PRICING SHEET' (AMEND 0006 SF 1442 PRICING SHEET.pdf). The 'PRICING SHEET' includes CLIN 0003 (IRA emerging and sustainable Technologies) and 0004 (IRA high-performance green building measures). (1.)

2.

Can the GSA provide a scope of work for Clin 3 "IRA Emerging and Sustainable Technologies" and Clin 4 "IRA High-performance green building measures". (2.)

a.

Can the GSA please confirm the Total Evaluated price? Multiple pricing sheets have been issued.

b.

Per the IRA-Eligible Material Table found in Evaluation Factor 5 (Solicitation pg. 16 of 40), "*The weighted score for each material must be rounded to the nearest hundredth decimal". Please confirm the "LEC Materials Evaluation Weight" listed are intended to be percentages with a possible total weighted score of 100 pts.

3.

Per the IRA-Eligible Material Table found in Evaluation Factor 5 (Solicitation pg. 16 of 40), it is stated that "In addition, for each of the IRA-Eligible Material identified in the table above, offerors shall submit compliant EPDs listing that material's GWP." Per the Agreement (pg. 16 of 42), it is stated "Within 10 business days following contract award, the Contractor shall provide the Contracting Officer with a current Market Report on IRA-Eligible Materials referenced in the Solicitation's Sustainability Factor self-scoring table." Please confirm this information shall be

4.

West Campus, SE WASH DC

A: EPDs are required to be submitted with the proposal as stated in the Evaluation Factor.

A: The CLINS are for total price and associated expenses for each low embodied carbon material.

A: Examples of associated expenses are provided in Section II.C(4) Additional Proposal Requirements of the Solicitation Document (Page 13 of the Amendment 0006 PDF).

A: The period of performance will commence one day after the Awardee’s receipt of the Notice to Proceed.

available for submission by the awarded Contractor within 10 business days following contract award, and not required at time of proposal submission.

Amendment 6 issued a revised bid form 'ATTACHMENT TO SF 1442: PRICING SHEET' (AMEND 0006 SF 1442 PRICING SHEET.pdf). The 'PRICING SHEET' includes CLINs 0002AA through 0002AD for cost associated with "Acquisition and Installation of low embodied carbon (materials) and associated expenses". Please confirm if this cost is to be the 'Material PREMIUM Cost' or 'Material TOTAL Cost' associated with CLINs.

5.

Amendment 6 issued a revised bid form 'ATTACHMENT TO SF 1442: PRICING SHEET' (AMEND 0006 SF 1442 PRICING SHEET.pdf). The 'PRICING SHEET' includes CLINs 0002AA through 0002AD for cost associated with "Acquisition and Installation of low embodied carbon (materials) and associated expenses". Please confirm what costs are to be included as defined by "associated expenses"? (i.e. for CLIN 0002AD) (1.) Product acquisition, (2.) Product fabrication, (3.) Product delivery, (4.) Forming, (.5) Placing/Installation, (6.) Finishing, (7.) Supervision, (8.)

OH/Insurances/Profit, (9.) etc.?

6.

Per The Agreement, page 15-16 of 42, section III.M. Additional Terms and Conditions, Limited Notice to Proceed with Post-award Low Embodied Carbon Materials Research Report, please confirm that the project duration (period of performance) will commence following receipt of the "unrestricted notice to proceed" from the contracting officer.

7.

Per Specification Section 018113.13 - Embodied Carbon Design Requirements issued in Amendment 6, section 1.2 states "Provide all requirements to achieve Embodied Carbon thresholds established in this specification and related material specification sections."

8.

Further on in the same specification, paragraphs 2.1.A.1, Table 1, 2.2.A.1, Table 2, 2.3.A.1, Table 3, Table 4, Table 5 Table 6 all state to provide products that result in achieving the top 20% limit in Global Warming Potential (GWP) for the low embodied carbon steel.

a.

Please confirm if the top 20% limit is a requirement per specification section 018113.13, or is it the contractors discretion to include IRA limits per category on the Interim IRA b.

West Campus, SE WASH DC

A: Specification Section 018113.13 Embodied Carbon Design Requirements to be revised.

A: GSA goes by which EPD is used for the material or product at issue. The raw material (e.g. from Nucor, Steel Dynamics, Cascade etc.) is typically formed into different shapes by smaller, more regionally-distributed fabricators. GSA has EC3-generated lists of products in both categories, and which qualify for GSA’s three GWP limits.

A: These assumptions about what constitutes fabrication are correct. Please see additional insight in the following answer.

A: EPDs identify whether a product is fabricated or unfabricated, and are categorized in EPD databases such as EC3 accordingly. The EPD’s indication of whether a steel product is fabricated governs which GWP limit applies. GSA recognizes that unfabricated steel EPDs may be more prevalent, and has received input from the steel industry on fabrication being a geographically-distributed process at smaller firms -- and one which contributes less to GWP than the steel’s original (unfabricated) manufacturing.

Low Embodied Carbon Material Requirements Form and within IRA Limit Commitment Table found within the Solicitation (pg. . 15, 16 of 40)?

Per the Interim IRA Low Embodied Carbon Material Requirements Form and within IRA Limit Commitment Table found within the Solicitation (pg. . 15, 16 of 40) there are products listed under Steel as 'fabricated' and 'unfabricated'. Please provide definition as to what is classified as 'fabricated' and 'unfabricated' for these specified products.

9.

Per the Interim IRA Low Embodied Carbon Material Requirements Form and within IRA Limit Commitment Table found within the Solicitation (pg. . 15, 16 of 40) there are products listed under Steel as 'fabricated' and 'unfabricated'. i.e., Hollow Structural Sections. It is our assumption that 'unfabricated' will be (Step 1): steel mill casting steel plate, or does it also include (Step 2): Shaping the steel plate into a tube? We would also assume that (Step 3): a 'fabricator' who would receive tube stock and add plates, caps, connects, etc. would be classified in the 'fabricated' category.

Please confirm these assumptions are correct, or provide definition of each.

10.

Per the Interim IRA Low Embodied Carbon Material Requirements Form and within IRA Limit Commitment Table found within the Solicitation (pg. . 15, 16 of 40) there are products listed under Steel as 'fabricated' and 'unfabricated'. i.e., Hot-Rolled Sections.

11.

It is our assumption that 'unfabricated' would be inclusive of the hot-rolled sections directly from a steel mill. If this assumption is correct, please provide information on how the 'fabricated' IRA [GWP limit] is to be calculated.

a.

As this project is primarily miscellaneous metals and not structural steel, we request definition on how the GWP Value for IRA limits are to be calculated for the 'fabrication' process as miscellaneous steel fabrication shops are generally smaller with less ability to track and calculate the true GWP Value.

b.

West Campus, SE WASH DC

A: There are no FAR clauses associated with the IRA Low Embodied Carbon requirements.

If a contractor fails to provide the proposed materials that are subsequently incorporated into the contract, the Government may take appropriate action for noncompliance and failure to meet the terms and conditions of the contract.

To further clarify RFI 411, we were wondering how GSA handles it if the Contractor fails to meet the requirements. Is there a penalty or Liquidated Damages associated with this item? Is funding still provided under the IRA, and how is that handled? Is the submittal rejected until it meets the requirements? If the trade specifications do not have a submittal requirement, does it not apply?

Also are there any FAR clauses associated with Embodied Carbon?

12.

Our biggest concern is associated with having so many suppliers that will provide material on this project that we are not sure all of them will meet the requirements (hence RFI 411). An example would be steel – most trades have some elements of steel associated with them and are all manufactured at different mills. If the trades specifications reference one of the related work specifications noted in 018113.13 1.3 for their products, does that mean they are to meet the carbon thresholds required?

13.

Subcontractors’ materials in these four categories must meet GSA’s IRA GWP limits if the materials are used in a way that does not consume or generate energy.

A.

ISSUED UNDER AMENDMENT 0008

Elizabeths West Campus, SE WASH DC

ATTACHMENT TO SF 1442: PRICING SHEET

(To be submitted as an ATTACHMENT TO SF 1442)

CLIN & SubCLIN Price CLIN 0001 Non IRA Project Expenditures $

CLIN 0002 IRA Acquisition and installation of low embodied carbon materials

SubCLIN 0002AA Acquisition and installation of low embodied carbon steel and associated expenses

SubCLIN 0002AB Acquisition and installation of low embodied carbon asphalt and associated expenses

SubCLIN 0002AC Acquisition and installation of low embodied carbon glass and associated expenses

SubCLIN 0002AD Acquisition and installation of low embodied carbon concrete and associated expenses

CLIN 0003 IRA emerging and sustainable Technologies

CLIN 0004 IRA high-performance green building measures

ALTERNATE 01 CISA Temporary Parking Lot

OPTIONAL BID RATES

1 Contractor’s Overhead Rate for Adjustments %

2 Contractor’s Profit Rate for Adjustments %

3 Contractor’s Daily Rate for Compensable Project Delay (Work Day)

OFFEROR:

NOT FOR CONSTRUCTION

GSA CISA HQ & Site Development RFP Package: 03/18/2022 Bid Addendum 2: 08/28/2023

Project No. GS11P08MKC0080 011000 - 1 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

Do not remove this notice. Properly destroy documents when no longer needed.

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT IDENTIFICATION

A. Project Name and Location:

St. Elizabeths West Campus

Department of Homeland Security

Cybersecurity and Infrastructure Security (CISA) Headquarters

2701 Martin Luther King Jr., Avenue. SW

Washington, DC 20032

B. Project Summary Description: The project includes but is not limited to the following Work:

1. Construction of a new, Federal Office Building located on the St. Elizabeths Campus which will provide office space and limited parking to house the Cybersecurity and Infrastructure

Security Agency, a component of the Department of Homeland Security in a new LEED

Gold facility. The constructed building area of the project will include approximately

629,595 gross square feet above and below grade.

a. Under the Base Bid, the project shall consist of shell, core , tenant fit out, historic structures stabilization and utility connections as shown on the Drawings. The work includes site work, site preparation, stabilization and monitoring of historic struc-tures and construction of all elements of the building core, shell and tenant interiors required to provide DHS with finished interior tenant space

b. Under the Base Bid, project responsibilities for the Contractor include construction of the landscape and civil engineering elements surrounding the building, imple-mentation of security measures as required by DHS and FPS for the site and non-

Tenant Improvement portions of the project, and consultation with the multiple con-sultation parties and federal regulators required to gain final approval to construct the project.

c. The Project may include Options. Refer to Division 01 Section “01 2400 OPTIONS” associated with the historic structures, Building 56, 57 and the Smokestacks.

C. Emerging and Sustainable Technologies:

1. Definitions:

a. Emerging: technologies that are newly formed or newly prominent.

b. Sustainable: technologies that help achieve Net Zero Operations (operational green-house gas emissions, energy, water, etc.) or that help comply with the Guiding Prin-ciples for Sustainable Federal Buildings. An initial “list of technologies” can be made available by the Government as requested.

2. The purpose of this work is to install and construct IRA-funded emerging and sustainable technology (E&ST) scope items:

a. Occupancy Sensors

b. Indoor Air Quality Sensors

c. Building Automation System (DDC)

Project No. GS11P08MKC0080 011000 - 2 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

d. Advanced Meters/Submeters

e. Small Circulator Pumps

f. Duct Sealing

g. New LED fixtures

h. Battery Energy Storage System/Microgrid

i. Photovoltaics

j. Smart Irrigation Meters

k. Water/Sewer Meters

3. IRA-funded E&ST scope items shall be constructed, installed, and certified as complete and operable.

4. IRA-funded E&ST scope item(s) shall be integrated into the project and conform with the overall project schedule.

5. Limit area of disturbance or work area for E&ST scope item(s) to the minimum practical area. Work area or area of disturbance shall be restored to pre-project or new condition.

D. High Performance Green Building Measures:

1. Install E&ST that advance the facility’s conversion to a High Performance Green Building

(HPGB) as defined and established in the Energy Independence and Security Act (EISA) of 2007 (42 U.S.C. § 17061(13)).

2. As-built drawings shall be provided for installed and constructed systems, products, and/or services funded by IRA

3. IRA funded, installed and/or constructed-HPGB systems, products, and/or services shall meet one or more of the following:

a. Reduce energy, water, and material resource use.

b. Improve indoor environmental quality, including reducing indoor pollution, improv-ing thermal comfort, and improving lighting and acoustic environments that affect occupant health and productivity.

c. Reduce negative impacts on the environment throughout the life-cycle of the build-ing, including air and water pollution and waste generation;

d. Increase the use of environmentally preferable products, including biobased, recy-cled content, and nontoxic products with lower life-cycle impacts;

e. Increase reuse and recycling opportunities.

f. Integrate systems in the building.

g. Reduce the environmental and energy impacts of transportation through building location and site design that support a full range of transportation choices for users of the building.

h. consider indoor and outdoor effects of the building on human health and the envi-ronment, including—

1) Improvements in worker productivity.

2) The life-cycle impacts of building materials and operations; and

3) Other factors that the GSA Director of the Office of Federal High Perfor-mance Green Buildings or the DOE Director of Commercial High-Perfor-mance Green Buildings consider to be appropriate; and/or advance compli-ance with Guiding Principles for Sustainable Federal Buildings or LEED cer-tification at the Silver or higher level, based on the stated goals of each pro-ject.

Project No. GS11P08MKC0080 011000 - 3 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

4. IRA funded HPGB scope item(s) shall be integrated into the project and conform with the overall project schedule.

5. Limit area of disturbance or work area for HPGB scope item(s) to the minimum practical area. Work area or area of disturbance shall be restored to pre-project or new condition.

E. Project Delivery Method: Design / Bid / Build. The project includes, but is not limited to construction and commissioning, hereinafter referred to as the Work:

F. The Contracting Officer for the project is:

Bonnie E. Echoles

GSA, Office of Acquisition (WPHBA)

St Elizabeths West Campus Project Office

2701 Martin Luther King Avenue, SE

Building 37A

Washington, DC 20032

1.2 WORK SEQUENCE, DURATIONS, TARGET DATES AND DELIVERABLES

A. Work Sequence: The Contractor shall schedule the work, taking into account the following constraints on work sequencing:

1. Fast tracking is allowed, but all design must be completed and approved by the Contracting

Officer (CO) prior to the initiation of construction on any individual element of the work.

2. Work of other contractors performing related work.

3. Unplanned suspension of the Work by the CO.

B. Construction and Commissioning Durations: See Request For Proposal issued by the

Government.

C. All work in telecommunication spaces, including but not limited to, painting, floor finishes, air conditioning, lighting, fire protection, fire alarm, emergency power, installation of cable trays and final cleaning activities, in addition to all telecom and security systems must be completed sixty

(60) calendar days prior to substantial completion so that the Government can take beneficial occupancy of the telecommunication spaces to perform functional and security testing for all secured areas located in the facility.

1.3 WORK UNDER OTHER CONTRACTS

A. Coordinate Work With Other Contractors: The Contractor shall cooperate with other contractors performing related work, including but not limited to the Governments Security Integrator, DHS

Security Division, and Deployment, Furnishing and Moving Contractors. The Contractor shall provide labor, materials and other costs necessary to satisfactorily coordinate the Contract Work

(Work) with work performed under other contracts. Coordinated with IT,AV and security vendors as well as the DHS furniture vendor.

B. Other work in the immediate vicinity of the site and on the St. Elizabeths Campus: The Contractor shall cooperate with other contractors performing work on other nearby projects. The Contractor shall plan for and take into account the impact of these nearby projects on site access and construction operations.

Project No. GS11P08MKC0080 011000 - 4 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

1. Protect work previously installed, as indicated on the drawings, prior to Construction No-tice to Proceed unless noted to be modified by these Drawings.

1.4 GOVERNMENT ACTIONS

A. Government Installed Equipment: The Government reserves the right to place and install equipment in completed or partially completed areas of the building prior to Substantial

Completion, provided such installation does not interfere with Contractor’s ongoing operations or the completion of the Work. The Government's installation of equipment shall not constitute acceptance of the total Work provided by the Contractor.

B. The Government reserves the right to accept select completed portions of the Work.

1. Prior to Government’s acceptance of any select completed portions of the work, the me-chanical, plumbing and electrical, telecommunications and security infrastructure systems for the space shall be fully operational, required inspections complete, all documentation submitted and commissioning test and startup operations successfully completed and ac-cepted by the Government. All architectural treatments including, but not limited to, carpet, painting, ceiling finishes, doors, finish hardware, window treatments, and MEP/FP equip-ment shall be installed. A punch list of outstanding uncompleted items will be furnished for each space accepted. Upon an acceptance date agreed to by the Government, the Gov-ernment assumes operational control and maintenance of mechanical and electrical systems serving the accepted areas of the building.

2. Upon an acceptance date agreed to by the Government, the Government will assume re-sponsibility for maintenance and custodial service for the accepted portions of the building together with the building systems serving them.

3. The warranty period for a portion of the building accepted as substantially complete to-gether with any supporting building systems will commence on the date of Substantial

Completion issued by the Government.

C. Substantial Completion and Acceptance by the Government:

1. Prior to the Government’s acceptance of Substantial Completion of the contract scope of work, all spaces, mechanical, plumbing and electrical, telecommunications and security infrastructure systems for the space shall be fully operational, required inspections com-plete, all documentation submitted and commissioning, testing and startup operations suc-cessfully completed and accepted by the Government. All architectural treatments includ-ing, but not limited to, carpet, painting, ceiling finishes, doors, finish hardware, window treatments, and MEP/FP equipment shall be installed. A punch list of outstanding uncom-pleted items will be furnished for each space accepted. Upon a date agreed to by the Gov-ernment, the Government assumes operational control and maintenance of mechanical and electrical systems serving the accepted areas of the building.

2. All fire and life safety systems shall be accepted as complete and operable by the Govern-ment prior to Substantial Completion.

3. Upon an acceptance date agreed to by the Government, the Government will assume re-sponsibility for maintenance and custodial service for the scope along with the building systems serving them if not prior accepted.

Project No. GS11P08MKC0080 011000 - 5 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

4. The warranty period for a portion of the building accepted as partially complete together with any supporting building systems deemed substantially complete will commence on the date of Substantial Completion as issued by the Government.

1.5 INSPECTION BY OTHER AUTHORITIES

A. Inspection by other Authorities: This project is subject to inspection by the following: OSHA, EPA, GSA, DDOT, Department of Energy & Environment (DOEE), United States Secret Service

(USSS), Historic Preservation Office (HPO), DHS Physical Security, DHS Project Management

Team, DHS OCSO, DHS TEMPEST Personnel, DHS Federal Protective Service and the

Government’s Construction Manager (CM).

B. Commissioning Agent: The Commissioning Agent (CxA) selected for this project by the

Government.

C. Notification of Inspections: Notify CO a minimum of two (2) working days prior to requested inspections in order to plan and coordinate inspections unless a longer duration is specified in the a specific specification or narrative.

D. Contract Modifications: Decision as to any contract modifications required as a result of inspec-tions by other authorities will be made by the CO.

1.6 SIGNIFICANT WORK PROVISIONS

A. Partnering Sessions: The Contractor shall attend a series of no fewer than three (3) partnering sessions as a part of this project. Each meeting shall be conducted by an approved Facilitator contracted by the Construction Manager. Partnering is a program whose value depends on the commitment made to it by the Contractor, the Government, and other involved parties. The conduct of the partnering meetings shall meet the following requirements:

1. Purpose: The purpose of the workshops is to develop a businesslike, cooperative relation-ship between the Contractor and the Government, including tenant agencies. The meetings will be based on the development of common goals for the Government and the Contractor, an approach to the job and a method of operations that will foster joint solutions and main-tain good working relationships and facilitate problem-solving between the parties. It is the intent of the Government that an alternate dispute resolution process be established as a part of the partnering meeting and agreement in order to encourage both parties to resolve potential disputes in a constructive manner and to avoid litigation whenever possible.

2. Frequency: The first workshop session shall be conducted within forty-five (45) calendar days after the date of the issuance of the NTP and it shall be a one (1) day workshop of approximately eight (8) hours. Follow-up partnering sessions (minimum two) of equal du-ration will be coordinated with the Government and will be attended primarily by the on-site project personnel of both the Government and the Contractor.

3. Attendance: The following persons will attend the partnering sessions:

a. The Contractor's principal, project manager, superintendent, project-related person-nel, and major subcontractors;

b. The GSA Contracting Officer, Contracting Specialist, Contracting Officer’s Repre-sentative, and Project Managers;

Project No. GS11P08MKC0080 011000 - 6 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

c. The CMa's Project Manager, Quality and others who are closely related to the pro-ject; and

d. The DHS Project Manager and other personnel closely related to the project;

e. Representatives from other affected government parties, as appropriate.

4. Location: The first workshop will be conducted away from the project site and GSA Re-gional Office, at a location to be arranged by the Contractor. Meetings during construction will be conducted in space near the project site. The cost for the facilities and working lunches for these workshops will be included in the base bid proposal.

B. Work in Existing Conditions: Work included in the contract documents shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish whichever is of higher quality.

C. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work as per the contract documents.

1. Replacement of existing conditions that are removed shall match similar existing condi-tions.

2. Unless indicated on the construction documents and prior approval has been received by the CO, existing structural members shall not be cut or altered without authorization.

3. Conditions that are to remain in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of Constructor’s access to the Work for destructive and other investigation as determined and accepted by the Government.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are in-dicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

5. Contractor shall submit a plan for approval to GSA and DHS to make any required modi-fications to the existing Campus Level V Security Fence required to access and complete

Work, as the fence currently incorporates a portion of the Center Building Structure. All required fence modifications shall be part of the Contractor’s Base Bid and must be coor-dinated with the DHS OCSO Security Division and the Contracting Officer a minimum of seven (7) days prior to starting modifications. See Division 01 Section “Security Regula-tions.”

D. Existing Conditions or As-Built Conditions: The Contractor must understand and acknowledge that the Drawings provided by the A/E may not exactly depict the existing “as constructed conditions” to which the Contractor must work with, interface, and connect to. The Contractor should anticipate adjustments to the Work and will perform these adjustments at no additional cost to the Government.

E. Existing Utilities: The Contractor shall identify, locate, document and assure utility services

(including telecommunications and data services) to the other buildings and facilities that constitute the St. Elizabeths West Campus (both inside and outside the work area) are not interrupted in the course of the work. All scheduled outages and or interruptions shall be fully coordinated in advance and approved in writing by the CO a minimum of five (5) working days in advance. Due to the nature of governmental functions performed, the importance of maintaining these services cannot be over emphasized. Failure to comply with this requirement

Project No. GS11P08MKC0080 011000 - 7 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

may result in the removal of key personnel from the site and the exercise of other appropriate contractual actions by the Government, including full or partial termination of the contract.

Existing utilities outside the building footprint shall be located by the Contractor and shall not be disturbed by the Contractor’s hoisting, bracing, mobile equipment or other equipment and stored materials on Government property. Contractor shall immediately remove any equipment or stored material that interferes with ongoing operations in the St. Elizabeths West Campus.

F. LEED Green Building Program for New Construction: The GSA requires the the project to obtain a minimum of LEED (2009) Gold level certification with the USGBC but using the ASHRAE

2013 baseline for energy performance. The A/E, as part of the Drawings, included measures and identified the system prerequisites the Contractor must implement during the construction process in order to earn the award level defined by the Drawings. See Division 01 Section “Sustainable

Design and Construction” for further details.

G. Hazardous Materials: Hazardous material abatement and containment shall be performed where necessary by the Contractor to complete the Work. The Contractor shall conduct its own survey to support its construction requirements. The amount of and the extent of information contained in the Government’s survey is provided for information only.

H. Historic Preservation: The GSA is committed to maintain and enhance the historic landmark nature of the existing NHL buildings and landscape of the St Elizabeths West Campus surrounding the project site, including but not limited to the Center Building, Creamery, and

Building 49, Historic Smokestacks, Ice House (Building 52), Power Station (Buildings 56./57) and Building 64.. Refer to the Drawings and Division 02 Section “Demolition, Historic Removal

And Dismantling”” for additional requirements. The Contractor is required to comply fully with those requirements.

I. Materials on the Site: Materials and equipment (except where otherwise noted) that are removed/demolished during this phase of the Work and not re-used under this contract shall be removed from the jobsite and properly disposed by the Contractor.

J. Government Ownership of Items Removed from the Site: Removed items indicated to remain the property of the Government shall be stored in a location as directed by the CO.

K. Landscaping: The Contractor is responsible for maintaining all existing landscaping on site from the time the date of Notice to Proceed for Construction until Substantial Completion and

Acceptance of the Work by the Government as indicated in the contract documents.

1. All landscaping that is disturbed by construction activities shall be replaced in kind prior to Substantial Completion and Acceptance of the Work. Shrubs and bushes that are dam-aged or removed shall be replaced with specimens of the same species and size. Damaged lawn areas shall be restored with sod of a grass of the same species or of a similar cultivar acceptable to the CO.

2. Trees shall not be removed or damaged during construction unless specifically identified in the Drawings. Special care shall be taken to assure proper watering, pruning, and care of trees on site. The Contractor shall not disturb the root structure of any trees in any area underneath the canopy out to the drip line. Refer to Division 01 Section “Temporary Tree and Plant

Protection”.

Project No. GS11P08MKC0080 011000 - 8 Summary

SENSITIVE BUT UNCLASSIFIED (SBU)

L. Permits: The Contractor shall be responsible for…