RFP_S-40400-00011842_FCMS~1.pdf

PDF 344 KB Posted

Attached to
Financial Case Management System (COTS) (SaaS)
Solicitation number
S-40400-00011842
Issued by
Marion County, Oregon

About this file

This document is a Request for Proposals (RFP) issued by the Oregon Public Defense Commission (OPDC) for a Commercial off the Shelf (COTS) Public Defense Financial and Case Management Software as a Service (SaaS) System. The intent is to procure a single contractor to implement a cloud-hosted COTS Financial and Case Management System (FCMS) that will replace OPDC's aging in-house database structure. The FCMS must provide comprehensive financial management, case management, timekeeping, and reporting capabilities to enhance internal efficiencies, eliminate redundant processes, improve contract management, and enable data-driven decision making. Proposals are due on December 20, 2024 by 3:00 PM Pacific Time. The Agency anticipates awarding one contract with an initial term of 5-10 years and the option to negotiate an unlimited number of renewals.

The RFP outlines minimum qualifications, including the requirement for the proposed COTS SaaS solution to substantially meet the defined system requirements. Proposers must demonstrate experience implementing similar public defense systems for State, Federal, or private agencies of comparable size to OPDC, which has approximately 300 staff members and 1,400 external stakeholders. Pricing proposals must be submitted using the provided worksheet, and the Agency will apply preferences for Oregon goods and services. The final contract will be negotiated with the apparent successful proposer, with certain terms and conditions not subject to negotiation.

View the file

Other files

File Type Posted
RFP S-40400-00011842 ATTACHMENT D - DB Outreach Plan.pdf PDF
RFP S-40400-00011842 ATTACHMENT E - Responsibility Inquiry.pdf PDF
RFP S-40400-00011842 ATTACHMENT G1 - FCMS SEC STDS. INTRODUCTION.pdf PDF
RFP S-40400-00011842 ATTACHMENT H - FCMS DRAFT MODEL CONTRACT.pdf PDF
RFP S-40400-00011842 Addendum 1-Att 1.pdf PDF
RFP S-40400-00011842 FCMS Add 2-Attachment A v2.0.xlsx XLSX spreadsheet
RFP S-40400-00011842 FCMS Add 2-Pre-Prpsl QstnsRqst4Clrf 2024 1126~2.pdf PDF
RFP S-40400-00011842 ATTACHMENT F - Definitions.pdf PDF
RFP S-40400-00011842 ATTACHMENT I - Change Order Agreement - Template.pdf PDF
RFP S-40400-00011842 Addendum 1.pdf PDF
RFP S-40400-00011842 FCMS Addendum 4.pdf PDF
Addendum 1~20.pdf PDF
RFP S-40400-00011842 ATTACHMENT A - FCMS PRICE PROPOSAL WORKBOOK.xlsx XLSX spreadsheet
RFP S-40400-00011842 ATTACHMENT B - Disclosure Exemption Certificate.pdf PDF
RFP S-40400-00011842 ATTACHMENT C - Proposer Info and Certification .pdf PDF
RFP S-40400-00011842 ATTACHMENT G2- STATEWIDE SECURITY STANDARDS.xlsx XLSX spreadsheet
RFP S-40400-00011842 ATTACHMENT J - FCMS - Functional and Technical Requirements V5 2024-09-27 VENDOR COPY.xlsx XLSX spreadsheet
RFP S-40400-00011842 Add 2 FCMS 2024 1127 Clarification.pdf PDF
RFP S-40400-00011842 FCMS Addendum 3.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPDC Financial/Case Management System RFP Page 1 of 28

STATE OF OREGON

COVER PAGE

OREGON PUBLIC DEFENSE COMMISSION

IsissuingthisRequestForProposals(RFP)underOregonBuysBid
NumberS-40400-00011842

for a Commercial, off the Shelf

FINANCIAL AND CASE MANAGEMENT

SOFTWARE AS A SERVICE (SAAS) SYSTEM

Date of Issue: OCTOBER 15, 2024

Proposals Due Date and Time: DECEMBER 20, 2024, 3:00 PM

Single Point of Contact (SPC): Jana Hart, CPPB, OBPC, OCAC

Jana.l.hart@opdc.state.or.us

TheStateofOregonpromotesequalopportunityforallindividualswithoutregardtoage,color,
disability,maritalstatus,nationalorigin,race,religionorcreed,sexorgender,sexualorientation,
orveteranstatus.

OPDC Financial/Case Management System RFP Page 2 of 28

TABLE OF CONTENTS

SECTION1: GENERALINFORMATION........................................................................................................4
1.1 INTRODUCTION..................................................................................................................................................................................................4
1.2 SCHEDULE..............................................................................................................................................................................................................4
1.3 SINGLEPOINTOFCONTACT(SPC).........................................................................................................................................................5
SECTION2: AUTHORITY,OVERVIEW,ANDSCOPE...............................................................................5
2.1 AUTHORITYANDMETHOD.........................................................................................................................................................................5
2.2 DEFINITIONOFTERMS..................................................................................................................................................................................5
2.3 OVERVIEWANDPURPOSE..........................................................................................................................................................................5
2.4 SCOPEOFWORK................................................................................................................................................................................................7
SECTION3: PROCUREMENTREQUIREMENTS.......................................................................................8
3.1 MINIMUMQUALIFICATIONS......................................................................................................................................................................8
3.2 MINIMUMSUBMISSIONREQUIREMENTS..........................................................................................................................................8
3.3 ROUND1-PROPOSALREQUIREMENTS.............................................................................................................................................9
SECTION4: SOLICITATIONPROCESS.........................................................................................................16
4.1 PUBLICNOTICE................................................................................................................................................................................................16
4.2 PRE-PROPOSALCONFERENCE...............................................................................................................................................................16
4.3 QUESTIONS/REQUESTSFORCLARIFICATIONS........................................................................................................................16
4.4 SOLICITATIONPROTESTS.........................................................................................................................................................................17
4.5 PROPOSALDELIVERYOPTIONS............................................................................................................................................................17
4.6 PROPOSALMODIFICATIONORWITHDRAWAL..........................................................................................................................18
4.7 PROPOSALDUE................................................................................................................................................................................................18
4.8 PUBLICOPENING............................................................................................................................................................................................18
4.9 PROPOSALREJECTION................................................................................................................................................................................18
4.10 EVALUATIONPROCESS...............................................................................................................................................................................19
4.11 RANKINGOFPROPOSERS.........................................................................................................................................................................22
4.12 ADDITIONALROUNDS.................................................................................................................................................................................23
SECTION5: AWARDANDNEGOTIATION.................................................................................................24
5.1 AWARDNOTIFICATIONPROCESS........................................................................................................................................................24
5.2 INTENTTOAWARDPROTEST................................................................................................................................................................24
5.3 APPARENTSUCCESSFULPROPOSERSUBMISSIONREQUIREMENTS............................................................................25
5.4 CONTRACTNEGOTIATION.......................................................................................................................................................................26
SECTION6: ADDITIONALINFORMATION................................................................................................27
6.1 COMMITMENTTODIVERSITY,EQUITY,ANDINCLUSION....................................................................................................27
6.2 CERTIFIEDFIRMPARTICIPATION.......................................................................................................................................................27
6.3 GOVERNINGLAWSANDREGULATIONS..........................................................................................................................................27
6.4 OWNERSHIP/PERMISSIONTOUSEMATERIALS........................................................................................................................27
6.5 CANCELLATIONOFRFP;REJECTIONOFPROPOSAL;NODAMAGES.............................................................................28
6.6 COSTOFSUBMITTINGAPROPOSAL...................................................................................................................................................28
6.7 STATEWIDEE-WASTE/RECOVERYPROCEDURE......................................................................................................................28
6.8 RECYCLABLEPRODUCTS...........................................................................................................................................................................28
6.9 CHECKLISTDISCLAIMER...........................................................................................................................................................................28

OPDC Financial/Case Management System RFP Page 3 of 28

LIST OF ATTACHMENTS

ATTACHMENT A -FCMS PRICE PROPOSAL WORKSHEET

ATTACHMENT B -DISCLOSURE EXEMPTION AFFIDAVIT

ATTACHMENT C -PROPOSER INFORMATION AND CERTIFICATION SHEET

ATTACHMENT D -CERTIFIED DISADVANTAGED BUSINESS CERTIFICATION AND OUTREACH

PLAN

ATTACHMENT E - RESPONSIBILITY INQUIRY FORM

ATTACHMENT F -DEFINED SOLITITATION TERMS

ATTACHMENT G -STATEWIDE SECURITY STANDARDS TERMS

ATTACHMENT H -DRAFT MODEL CONTRACT

ATTACHMENT I – CHANGE ORDER TEMPLATE

ATTACHMENT J - REQUIREMENTS TRACEABILITY MATRIX

OPDC Financial/Case Management System RFP Page 4 of 28

SECTION 1: GENERAL INFORMATION

1.1 INTRODUCTION

TheStateofOregon,actingbyandthroughtheOregonPublicDefenseCommission(“Agency”),
isissuingthisRequestforProposalundertheprovisionsofORS279B.060foranintegrated,
CommercialofftheShelf(COTS)PublicDefenseFinancialandCaseManagementSoftwareasa
Service(SaaS)System(“FCMS”,or“theSystem”).
TheintentofthissolicitationistoprocureasingleContractortoimplementaCloud-hosted
Commercial-off-the-shelf(COTS)FCMSincompliancewiththeSystemRequirements(RFP
AttachmentJ,SystemRequirementsTraceabilityMatrix(“RTM”)).TheAgencyintendsto
evaluateResponsiveProposalsthroughtwo(2)evaluationrounds(“Round”)butreservesthe
optiontoissueaNoticeofIntenttoAwardafteranyRounddependinguponscoringresults
fromsuchRound.Round1Proposalsubmissionsmustincludethefollowingthree

components:

1. AdministrativeProposal
2. TechnicalProposal
3. PriceProposal
TheAgencyanticipatestheawardofonecontractfromthisRFP.Thedurationoftheinitial
termoftheContractisnegotiable,butlikelytofallwithinarangeoffivetotenyears.The
AgencyhastheoptiontonegotiateanunlimitednumberofContractrenewalsofvaried

duration.

1.2 SCHEDULE

Thetablebelowrepresentsatentativescheduleofevents.AlltimesarelistedinPacificTime.
Alldateslistedaresubjecttochange.N/AdenotesthateventisnotapplicabletothisRFP.

[REMAINDER OF THIS PAGE BLANK]

OPDC Financial/Case Management System RFP Page 5 of 28

Event Date Time

Pre-Proposal Conference NA

Questions / Requests for Clarification Due NOVEMBER 15,2024 4:00 PM

AnswerstoQuestions/Requestsfor
ClarificationIssued(approx.)NOVEMBER26,2024

RFP Protest Period Ends DECEMBER 3, 2024

Proposals Due Deadline DECEMBER 20, 2024, 3:00 PM

Opening of Proposal N/A

Presentations, Demonstrations, or Interviews FEBRUARY 4 – 6, 2025

Issuance of Notice of Intent to Award (approx.) MARCH 5, 2025

Award Protest Period Ends MARCH 12, 2025

1.3 SINGLE POINT OF CONTACT (SPC)

TheSPCforthisRFPisidentifiedontheCoverPage,alongwiththeSPC’scontactinformation.
ProposershalldirectallcommunicationsrelatedtoanyprovisionoftheRFPinwritingonly
totheSPC,whetheraboutthetechnicalrequirementsoftheRFP,contractualrequirements,
theRFPprocess,oranyotherprovision.
SECTION2: AUTHORITY,OVERVIEW,ANDSCOPE
2.1 AUTHORITYANDMETHOD

The Agency is issuing this RFP pursuant to its authority under OAR 151.219.

TheAgencyisusingtheCompetitiveSealedProposalsmethod,pursuanttoORS279B.060
andOAR125-247-0260.AgencymayuseacombinationofthemethodsforCompetitive
SealedProposals,includingoptionalprocedures:a)CompetitiveRange;b)Discussionsand
RevisedProposals;c)RevisedRoundsofNegotiations;d)Negotiations;e)BestandFinal
Offers;andf)MultistepSealedProposals.

2.2 DEFINITION OF TERMS

ForthepurposesofthisRFP,capitalizedwordsaredefinedinOAR125-246-0110oras
definedinRFPAttachmentF,DefinedSolicitationTerms.

2.3 OVERVIEW AND PURPOSE

2.3.1 Agency Overview and Background

TheOPDCisastateagencycurrentlyundertheOregonJudicialBranch,responsiblefor
ensuringtheconstitutionalrighttocounselforindigentindividualsinvolvedinthecriminal

OPDC Financial/Case Management System RFP Page 6 of 28

justicesystem.TheAgencyworkstoprovideeffective,ethical,andhigh-qualitylegal
representationtopromotefairnessandjustice.ThemissionofOPDCistoadvocateforand
protecttherightsofindigentindividualsbyprovidingcompetent,zealous,andethicallegal
representation.TheAgencyiscommittedtoupholdingtheprinciplesofjustice,fairness,and
equalaccesstojusticeforall.
TheAgencyisintheprocessofpreparingtotransitiontotheExecutiveBranchofOregon
government,effectiveJanuary1,2025.Inanticipationofthistransition,thisRFPwillfollow
therulesunderORS279BandOAR125-247.

2.3.2 Project Overview and Background

OPDChasbeenentrustedwiththecriticalresponsibilityofensuringthatalleligible
Oregonianshaveproperaccesstoeffectivecounsel.Overthelastdecade,theeffectivenessof
publicdefensecounselforunderservedpopulationsinOregonhasfacednumerous
challengesandvariables.ThesechallengeshavepromptedtheAgencytoembarkonan
initiativetoestablisharobustFinancialandCaseManagementSystem(FCMS)asastrategic
solutiontoenhancethequality,accountability,andefficiencyofpublicdefenseservicesin

Oregon.

Acentralizeddatasystemisimperativetocaptureessentialpublicdefenseinformationand
enabledata-drivendecision-making.TheintegratedFCMSmustenableefficientmonitoring
ofattorneycaseloads,compliancewithnationalbestpracticestandards,anddetailed
reportingoftheimpactofpublicdefenseservices.Thissystemmustalsoenhancefinancial
accountability,streamlinepaymentprocesses,andmanageattorneycasesupportservices

effectively.

TheenvisionedFCMSwillenableefficientmonitoringofattorneycaseloads,compliancewith
nationalbestpracticestandards,anddetailedreportingoftheimpactofpublicdefense
services.Thissystemshouldalsoenhancefinancialaccountability,streamlinepayment
processes,andmanageattorneycasesupportservicesinordertoeffectivelyfacilitatedata
collection,analysis,andevaluation,empoweringtheAgencytoprovidecriticalinformation
anddataonpublicdefensebestpractices,contractprojections,andkeyperformance
measurestostakeholders,includingtheOregonLegislature,Governor'soffice,andthepublic.
Additionally,theFCMSprojectmustincludecomprehensivetrainingsupportservicesto
ensurethatAgencystaffcanharnessthesystem'sfullpotential.
Historically,OPDCreliedonin-housebuiltMicrosoftAccessdatabasesandExcel
spreadsheetsformanagingdataandbusinessprocesses.TheendobjectiveoftheFCMSisto
improveinternalefficiencies,eliminateredundantprocesses,enhancecontractmanagement,
andenabledata-drivendecision-making,ultimatelyenhancingthequalityandaccountability
ofpublicdefenseservicesinOregon.
Theprimaryobjectiveoftheworkeffortistofacilitatetheseamlesstransitionand
implementationofaCloud-hosted,Commercial-off-the-shelf(COTS)SaaSFCMStoreplacethe
Agency’saging,in-housedatabasestructure.

OPDC Financial/Case Management System RFP Page 7 of 28

2.4 SCOPE OF WORK

2.4.1 System Replacement

TheforemostobjectiveistosuccessfullyreplaceOPDC'send-of-life,in-housedatabase
structurewiththeFCMS,ensuringasmoothtransitionfromthelegacysystemtothenew
cloud-hostedsolution.

2.4.2 Financial Management Function

ImplementcomprehensivefinancialmanagementfeatureswithintheFCMS,including
attorney/providerreimbursementclaimsprocessing,paymentscheduling,auditfunctions,
paymenttracking,andtheestablishmentofapaperlesssystemtostreamlinefinancial

operations.

2.4.3 Case Management Function

Enhancecasemanagementcapabilitiesbyenablingcomprehensivedatacollection,
trackingcasemilestones(i.e.,foracriminalprosecution,pretrialinformation,conditionsof
release,investigationpractices,expertconsultation,motionsfiled,andpleaoffers),
recordingbasiceventdata,andmaintainingdetailedcaseinformation,includingasfora
criminalprosecution,clientdemographics,initialcharges,pretrialrelease/detention
decisions,motionsfiled,expertconsults,pleasoffered,disposition,andsentencing.
Additionally,theSystemshouldallowcontractedattorneystheabilitytotracklegalwork
performedonbehalfofclientsassignedbyagency,andmanageattorneyqualifications,
caseloads,andcontractoversightefficiently.

2.4.4 Efficient Timekeeping

ImplementarobusttimekeepingsystemwithintheFCMStoaccuratelytrackandmanage
attorneyandprovidertime,ensuringfaircompensationandaccountability.

2.4.5 Comprehensive Reporting

Developareportingframeworkthatencompassessystempre-builtstandardreports,adhoc
reportgeneration,anddirectdatabaseaccessviaplatformslikePowerBItosupportcustom
reportingdevelopedbytrainedbusinessstaff.ThiswillempowerOPDCtoproducedetailed
andstructuredreportsasrequiredbythelegislatureandrecipientsofpublicdefense

services.

2.4.6 Modernization and Transparency

Theoverarchingobjectiveistomodernizeoperationaltechnologies,providingOPDCwith
thetoolsandcapabilitiesneededtoestablishatransparentandeffectivepublicdefense

model.

OPDC Financial/Case Management System RFP Page 8 of 28

2.4.7 Security

ThesuccessfulProposer‘sSolutionmustmeetallhostingandsecurityrequirementsintheDraft
ModelContract(ExhibitH),whichinclude:
ComplywithOregon’sStatewideInformationSecurityPlanandOregon’sStatewideInformation
TechnologyControlStandards,foundonlineat:EnterpriseInformationServices:Guidancefor
StateAgencies:CyberSecurityServices:StateofOregon.
AdheretotheNationalInstituteofStandardsandTechnology(NIST)SpecialPublication800-53
(revision5ormorerecentversion)controls.ThisisequivalenttoStateRAMPImpactLevel
(Moderate/High).
SECTION3: PROCUREMENTREQUIREMENTS
3.1 MINIMUMQUALIFICATIONS
3.1.1 TheContractorshallprovideCOTSSaaSsoftwarethatsubstantiallymeets
therequirementsoutlinedintheRequirementsTraceabilityMatrix
(AttachmentI).

3.1.2 Experience Requirements

ProposermusthaveatleastthreesystemsincurrentusebyState,Federal,orPrivatepublic
defenseofficesofcomparablesizetoOPDC;thisincludesapproximately300staffmembers
and1400externalstakeholders,allofwhommayneedsomelevelofsystemaccess.The
systemsmustincludethefunctionalitiesdesiredbyOPDCasdescribedinthisRFP.Atleast
oneidentifiedsystemmustbeinuseinaStateorFederalAgency.

3.2 MINIMUM SUBMISSION REQUIREMENTS

3.2.1 Proposal Submissions

Tobeconsideredforevaluation,Proposalsmustcontaineachofthefollowingelementsin
theorderprovided(furtherdetailedinProposalRequirementssectionbelow):
• ExecutiveSummary
• Organization’sProfile
• Organization’sExperience
• PriceProposalForm(AttachmentA)
• DisclosureExemptionAffidavit(AttachmentB)
• ProposerInformationandCertificationSheet(AttachmentC)
• COBIDCertification/OutreachPlan(AttachmentD)
• ResponsibilityInquiry(AttachmentE)
• SystemsRequirementsTraceabilityMatrix(AttachmentJ)

https://www.oregon.gov/eis/cyber-security-services/Pages/guidance-for-state-agencies.aspx https://www.oregon.gov/eis/cyber-security-services/Pages/guidance-for-state-agencies.aspx

OPDC Financial/Case Management System RFP Page 9 of 28

3.2.2 Proposal Page Limits

ThereisnopagelimitonProposalsubmissions,butpoorlywrittenProposalswillnot
scorewell.PoorlywrittenProposalsarecharacterizedbymisspellingsandgrammatical
errors,extraneousmarketingmaterialsandsalespuffery,superfluouscontent,andother
disconnectedandirrelevantspacefiller.AProposermustcomprehensivelyaddressthe
Requirementswithwrittensubmissionsthataregrammaticallycorrect,concise,precise,
andrelevant.

3.2.3 Proposal Format and Quantity

TheProposalshouldfollowtheformatandreferencethesectionslistedinRFPSection3.3,
ProposalRequirements.Responsestoeachsectionandsubsectionshouldbewell
organized,presentedinaneasy-to-readformat,andlabeledtoindicatetheitembeing
addressed.Proposersmustsubmitallvolumesrequestedincompliancewitheach
volume’scontentrequirements;failuretodosomayresultinthedisqualificationofthe
Proposalasnon-responsive.
PriceProposalWorksheet(RFPAttachmentA)informationmustbesubmittedasa
separatestand-aloneelectronicresponsefile.
ProposermustsubmitonecopyofitsProposalelectronicallythroughOregonBuys.
ProposermustfollowthesubmissionproceduresoutlinedinRFPSection4.5,Proposal
DeliveryOptions.
Acceptableelectronicformatsincludethefollowing:AdobeAcrobat(.pdf),MicrosoftWord
(.docor.docx),orMicrosoftExcel(.xlsor.xlsx).Proposer’sAuthorizedRepresentative
mustsigndocumentationasdirected,e.g.,RFPAttachmentC,ProposerInformationand
CertificationSheet.
IfProposerbelievesanyofitsProposalsubmissionsareexemptfromdisclosureunder
OregonPublicRecordsLaw(ORS192.311through192.478),Proposershallcompleteand
submitRFPAttachmentC,DisclosureExemptionCertificate,andsubmitasecondcopyof
itsProposalinwhichitredactstheinformationitwishestoexemptfrompublicdisclosure.
Proposershallalsomarkas“Confidential”inOregonBuysallattachmentstoitsProposal
thatProposerbelievesareexemptfromdisclosure.Notethatthefinalpriceamountisnot
exemptfrompublicdisclosure.
3.2.4AuthorizedRepresentative
FailureofProposer’sauthorizedrepresentativetosigntheProposalmaysubjectthe
ProposaltorejectionbyAgency.

3.3 ROUND 1 - PROPOSAL REQUIREMENTS

ProposalmustaddresseachoftheitemslistedinthissectionandallotherRequirements
setforthinthisRFP,includingsatisfactionoftheProjectgoalsandobjectivesassetforth

OPDC Financial/Case Management System RFP Page 10 of 28

inRFPSection2.4,ScopeofWork,above.ProposershalldescribetheGoodstobeprovided
ortheServicestobeperformedorboth.AProposalthatmerelyofferstoprovidetheGoods
orServicesasstatedinthisRFPmaybeconsiderednon-ResponsivetothisRFPandwill
notbeconsideredfurther.

3.3.1 Volume 1: Administrative Proposal

3.3.1.1 Section 1: Executive Summary

InSection1:ExecutiveSummary,theProposershalldemonstrate:
1. Thesignificantfactorsofitsmanagementandtechnicalapproach.
2. Summaryofwheresimilarsoftwareprojectsandimplementationserviceshave
beenprovidedbytheProposer.
3. Ahigh-leveldescriptionoftheprojectmanagementmethodologyProposerwill
usetoreduceriskandmaximizethepotentialsuccessoftheFCMSimplementation,
deployment,andoperation.

4. Uniquely compelling features/functionalities offered in the proposed System.

5. IfProposerisplanningtoproposeateaming,mentor/protégée,ora
subcontractingrelationship,includinganythird-partyapplicationsorservicesrequired
tocompletetheSystem;describetheuniquevalueofeachrelationshiptotheProject’s

success.

3.3.1.2 Section 2: Organization’s Profile

InSection2:Organization’sProfile,theProposermustprovideaprofileofitsorganization.
ThisistheProposer’sopportunitytogiveanoverviewofitsorganizationanditshistory;
describeitsmannerofownership,size,geographicpresence(headquartersandbranch
officelocations)andthestructureofitsbusiness;depictitscurrentfiscalstabilityand
strategicplanforsustainedoperationsintothefuture.Suchsubmissionswillrevealthe
Proposer’smaturityandoperationallongevityanddiscusshowtheorganizationcan
effectivelydelivertheServicesdescribedinthisRFP.

3.3.1.3 Section 3: Organization’s Experience

InSection3:Organization’sExperience,Proposershallprovideadetaileddescription
concerningthenumberofyearsofexperienceinsuccessfullyimplementingprojects
reasonablycomparableinnature,capacity,complexity,scope,andsizetotheProject
describedwithinthisRFP.TheProposershallalsoprovidenamesoftheclients,client
contactinformation,andadescriptionofthesuccessfullyimplementedmodulesforeach
projectimplementedwithinthepreviousfiveyears.

3.3.1.4 Section 4: Mandatory Submission of Non-scored RFP Attachments

In Section 4, Mandatory Submission of Non-scored RFP Attachments, Proposer shall

OPDC Financial/Case Management System RFP Page 11 of 28 complete and submit the following RFP Attachments:

1. Proposer Information and Certification Sheet

ProposersshallcompleteandsubmittheAttachmentC(ProposerInformation
andCertificationSheet).
FailuretodemonstratecompliancewithOregonTaxLawsandsigntheProposer
InformationandCertificationSheet(AttachmentC)mayresultinafindingof

non-responsibility.

2. Disclosure Exemption Certificate

ProposersshallcompleteandsubmittheDisclosureExemptionCertificate
(AttachmentB)aspartoftheProposal.SUBMISSIONISREQUIREDEVENIF
PROPOSERISNOTIDENTIFYINGCONFIDENTIALORPROPRIETARY
INFORMATIONANDDATAFORNONDISCLOSURE.IfProposerisidentifying
itemsfornondisclosure,Proposermustidentifytheitemorportionofthe
Proposalthatisexemptfromdisclosureandthebasisfortheexemption.
Proposermustseparatelyprovideanappropriatelyredactedsingleelectronic
copyofthecomplete,originalProposalsubmission,markedasREDACTED

PROPOSAL.

3. Certified Disadvantaged Business Certification and Outreach Plan

ProposersshallcompleteandsubmitCertifiedDisadvantagedBusinessOutreach
Plan(RFPAttachmentD).

4. Responsibility Inquiry

Proposers shall complete and submit RFP Attachment E, Responsibility Inquiry.

5. Statewide Security Standards Spreadsheet (Submitted in Round 2)

DonotcompleteandsubmittheStatewideSecurityStandardsSpreadsheet(RFP
AttachmentG)aspartofProposer’sRound1submissions.TheAgencywill
requirecompletionandsubmissionofsuchattachmentforasubsequentRound.
SeeRFPAttachmentGforexplanation.

3.3.2 Volume 2: Technical Proposal

3.3.2.1 Section 1: System Capabilities

InSection1:SystemCapabilities,theProposershalldemonstratehowtheirCommercial
OfftheShelfSaaSproductwillcompletetheTasksandproducetherelatedDeliverables
asspecifiedinRFPAttachmentJ,RequirementsTraceabilityMatrix.

OPDC Financial/Case Management System RFP Page 12 of 28

3.3.2.2 Section 2: Statement of Work Response

InSection2:StatementofWorkResponse,theProposershalldemonstratethewayitwill
completetheTasksandproducetherelatedDeliverablesasspecifiedinRFPSection2.4

above.

1. Project Management

• Project Management Plan

TheProposershalldemonstratetheirapproachforProjectManagementwith
acomprehensiveplanforsuccessfulimplementationandmanagementofthe
projectthroughoutthecontractperiodofperformance.Theplanmustinclude
aWorkBreakdownStructure(WBS),Scheduleandresourcemanagement
plan.TheProposershallclearlydelineatebetweenProposerandOPDC
responsibilities.TheWBSwillincludeatop-levelbreakdownofmajor
deliverables,whichwillthenbefurtherdecomposedintosmallerwork
packages.Theproposedschedulewillhavestartandenddatesforeachtask.
Theongoingprojectschedulemustincludefourdatecolumns:baselinestart,
baselineend,planned/actualstart,planned/actualend.Thiswillserveasa
foundationforprojectplanning,scheduling,usertraining,andresource

management.

b. Project Schedule

Theprojectschedulewillprovideadetailedroadmapfortheexecutionoftasks,
milestones,anddeliverablesthroughouttheprojectlifecycle.Itwillserveasa
comprehensiveguide,ensuringthatallactivitiesarecompletedwithindefined
timelinesandthatdependenciesareidentifiedandmanagedeffectively.Itmust
provideaclearframeworkforprojectexecutionandenableeffective

communication.

Throughouttheproject,theContractorshallmakeregularupdatestotheproject
scheduletoreflectanychangesoradjustmentsnecessarytoaccommodate
evolvingprojectneeds.

c. Resource Management Plan

TheContractorshallprovideaResourceManagementPlantoensurethatthe
projectteamhasthenecessaryresourcestoeffectivelyimplementthesystem
withinthedefinedtimelinesandbudget.Thisplanmustencompassthe
identification,allocation,andoptimizationofresources,includingpersonnel,
equipment,usertraining,andbudgetaryconsiderations.

OPDC Financial/Case Management System RFP Page 13 of 28

2. Key Personnel

The Proposer shall demonstrate:

1. Staffproposedtofillkeypersonnelpositions(includingsubcontractorstaff,if
applicable),andtheirresumes.Therequiredresumemustdemonstrateeach
individual’squalificationsinthecontextoftheacademicandprofessional
certificationsandcredentials,aswellassubjectmatterexperienceand
expertise,neededtoconducttheworkdescribedwithinthisRFP.Atminimum,
personnelinthefollowingrolesmustbeproposedkeypersonnel:

i. Project Manager.

• TheProjectManagershallhaveaminimumof10yearsasaProject
ManagerintheITindustryandmusthaveProjectManagement
Institute–ProjectManagementProfessional(PMP)orsimilar

certification.

• Project Planning: The Project Manager is responsible for developing

andmaintainingacomprehensiveprojectplanthatoutlinesthescope,
objectives,deliverables,timelines,andresourcerequirements.

• Leadership and Team Management: The Project Manager provides

effectiveleadership,direction,andcoordinationtotheprojectteam.
Theyassigntasks,setpriorities,andmanageresourcestoensurethe
team'sproductivityandadherencetoprojecttimelines.TheProject
Managerfostersapositiveworkenvironment,promotescollaboration,
andresolvesanyconflictsorissuesthatmayarisewithintheteam.

• Risk Management: The Project Manager identifies and analyzes

potentialrisks,anddevelopsandexecutesstrategiestomitigatethem.
Theyproactivelymonitorprojectrisks,assesstheirimpactonproject
objectives,andimplementappropriateriskresponseactions.The
ProjectManagermustensurethatriskmanagementprocessesarein
placetominimizedisruptionsandensureprojectsuccess.

• Communication and Stakeholder Management: The Project Manager

servesastheprimarypointofcontactforcommunicationwith
stakeholders.Theyfacilitateregularcommunicationchannels,provide
projectupdates,andaddressanyconcernsorissuesraisedby
stakeholders.TheProjectManagerensuresthatstakeholdersare
engaged,informed,andinvolvedthroughouttheprojectlifecycle.

• Monitoring and Control: The Project Manager monitors project

progress,trackingkeymilestones,deliverables,andperformance
metrics.Theyimplementprojectcontrolmechanismstoensurethat
theprojectstaysontrackandmeetsdefinedqualitystandards.The

OPDC Financial/Case Management System RFP Page 14 of 28

ProjectManagerwillconductregularprojectstatusmeetings,performs
projectperformanceassessments,andimplementscorrectiveactions
asnecessary.

ii. Transition and Migration Lead

TheTransitionandMigrationLeadoverseestheentiretransitionprocess
fromtheexistingsystemtothenewFCMS.Theydevelopacomprehensive
transitionplan,assesspotentialchallenges,andensureasmoothtransferof
data,processes,andusers.TheTransitionandMigrationLeadshall
coordinatewiththeITteam,Contractors,andFCMSdepartmentsto
minimizedisruptionsandmanagechangerequestseffectively.

• The T/M Lead shall have a minimum of 5 years of experience in

softwaresystemsmigrationandtransitionwithexperienceinIT
systemtransitionmanagementandusertransitiontraining.

• Develop a detailed transition plan, considering data migration and verification processes.

• Coordinatewithstakeholderstoensureaseamlesstransferofdata,
processes,andusers.

• Engage stakeholders through regular updates, communication, and risk mitigation.

• Managechangeeffectivelybyprovidingtraining,support,and
addressingconcerns.

• Implement risk management strategies and conduct quality assurance checks.

3. Transition Planning

TheawardedProposer(Contractor)shallprovideTransitionPlanningwhich
involvesmeticulouspreparationforthesmoothadoptionoftheOPDCFCMS.It
encompassesdefiningprocesses,resources,andtimelinesnecessaryfora
successfultransitionfromtheexistingsystemtothenewFCMS,ensuringa
seamlesstransferofdata,processes,anduserswhileminimizingdisruptionsand
maximizingthebenefits.
TheContractorwillengageinactivitiessuchasdatamigration,usertraining,
processdocumentation,andchangemanagementtofacilitateeffective
communicationandcoordinationthroughoutthetransitionprocess,establishing
asolidfoundationforenhancedproductivityandefficiencywithinOPDC.
TheProposershallprovideaStaffingandManagementPlanand
OrganizationChart:

OPDC Financial/Case Management System RFP Page 15 of 28

1. Proposed team organization structure.

2. Totalfulltimeequivalent(FTE)employeesrequiredtodelivertheStatement
ofWorkandasummaryofstaffskillsandqualifications.
3. AffirmationthatProposer’spersonnelaresolelybasedinthecontinental
UnitedStatesandthatworkwillnotbeperformed,ordatashared,outsideof
thecontinentalUnitedStates.
4. Plantoproposeandobtainapprovalforqualifiedalternativecandidates
shouldanamedkeypersonnelpositionrequirereplacement.

5. Plan to coordinate, direct, and manage the delivery team’s Task execution.

6. Methodstoreviewandcorrectanyqualityissuesarisingfromstaffengagedon
theeffort.

7. System to notify Agency of any changes to the Proposer team’s structure.

4. Quality Management

TheProposershalldemonstratetheirapproachtoestablishandmaintaina
qualityassuranceprogram.

5. Risk Assessment/Management

TheProposershalldemonstratetheirapproachtoestablishandmaintainaRisk
ManagementProgram.

6. Contract Management

TheProposershalldemonstratetheirapproachtoconductcontractmanagement,
includingsubcontractsmanagementifapplicable.

7. Status Reports

TheProposershalldemonstratetheirapproachtodevelopanddeliverprogram
reportsformilestonereporting,projectperformancereporting,operational
reporting,andprogramstatusreporting.

8. Migration

TheProposershalldemonstratetheirapproachformigrationbyaddressingata
minimumthefollowing:
• IntegrationwithExistingSoftware
• FitGapAnalysis

OPDC Financial/Case Management System RFP Page 16 of 28

• FutureProductSupportandDevelopment
• FutureMigrationandSystemCapabilityPlanning

9. Technical and Configuration Training/Support Services

TheProposershalldemonstratetheirapproachformigrationbyaddressing
ataminimumthefollowing:
• UserTrainingPlanandSupportServices
• Long-TermTechnicalAssistanceServices
• HelpDeskPlan
• HelpGuide
• TechnicalSupport
• WorkHours
SECTION4: SOLICITATIONPROCESS
4.1PUBLICNOTICE
TheRFPandattachmentsarepublishedintheStateofOregon’selectronicprocurement
systemOregonBuysathttps://oregonbuys.gov/.Documentswillnotbemailedto
prospectiveProposers.
Modifications,ifany,tothisRFPwillbemadebywrittenAmendment(s)publishedin
OregonBuys.ProspectiveProposerissolelyresponsibleforcheckingOregonBuysto
determinewhetherornotanyAmendment(s)havebeenissued.Amendment(s)are
incorporatedintotheRFPbythisreference.

4.2 PRE-PROPOSAL CONFERENCE

A Pre-Proposal conference will not be held for this RFP.

4.3 QUESTIONS / REQUESTS FOR CLARIFICATIONS

Allinquiries,whetherrelatingtotheRFPprocess,administration,deadlineormethodof
award,ortotheintentortechnicalaspectsoftheRFPmust:
• BedeliveredtotheSPCviaemail
• ReferencetheOregonBuysbidnumber
• IdentifyProposer’snameandcontactinformation
• RefertothespecificareaoftheRFPbeingquestioned(i.e.page,sectionandparagraph
number),and
• BereceivedbytheduedateandtimeforQuestions/RequestsforClarificationidentified

in the Schedule in Section 1.2.

https://oregonbuys.gov/

OPDC Financial/Case Management System RFP Page 17 of 28

4.4 SOLICITATION PROTESTS

4.4.1 Protests to RFP

ProspectiveProposersmaysubmitaWrittenprotestofanythingcontainedinthisRFP,
includingbutnotlimitedto,theRFPprocess,Specifications,ScopeofWork,andthe
proposedSampleContract/PriceAgreement.ThisisprospectiveProposer’sonly
opportunitytoprotesttheprovisionsoftheRFP,exceptthatProposermayprotest
Amendment(s)asprovidedbelowandProposermaytakeexceptiontothetermsand
conditionsoftheSampleContractmarkedasnegotiableassetforthintheNegotiations

Section.

4.4.2 Protests to Amendment(s)

ProspectiveProposermaysubmitaWrittenprotestofanythingcontainedinan
Amendment.ProteststoanAmendment,ifissued,mustbesubmittedby5:00p.m.Pacific
TimeonthesecondBusinessDayfollowingtheissuanceoftheAmendmentorthe
date/timespecifiedintheAmendment,ortheywillnotbeconsidered.Protestsofmatters
notaddedormodifiedbytheAmendmentwillnotbeconsidered.

4.4.3 Requirements for Protests

All protests must:

• BedeliveredtotheSPCviaemail
• ReferencetheOregonBuysbidnumber
• IdentifyprospectiveProposer’snameandcontactinformation
• Besentbyanauthorizedrepresentative
• Statethereasonfortheprotest,including:
o thegroundsthatdemonstratehowtheProcurementProcessiscontraryto
law,UnnecessarilyRestrictive,legallyflawed,orimproperlyspecifiesabrand
name;and
o evidenceordocumentationthatsupportsthegroundsonwhichtheprotestis
based,and

• State the proposed changes to the RFP provisions or other relief sought.

ProteststotheRFPmustbereceivedbytheduedateandtimeidentifiedintheSchedule.
ProteststoanAmendmentmustbereceivedbytheduedateidentifiedinthe

Amendment.

4.5 PROPOSAL DELIVERY OPTIONS

ProposerissolelyresponsibleforensuringitsProposalisreceivedbytheSPCinaccordance
withtheRFPrequirementsbeforeOpening.Agencyisnotresponsiblefortransmissionerrors
ordelays,orforanymis-delivery,foranyreason.AProposalsubmittedbyanymeansnot

OPDC Financial/Case Management System RFP Page 18 of 28

authorizedbelowwillberejected.Thefollowingdeliveryoptionistheonlymethodpermitted
forthisRFP:

Delivery through OregonBuys

Proposal submission must be electronically submitted through OregonBuys at: OregonBuys.gov

Detailed instructions on how to submit a Proposal can be found at:

OregonBuys Vendor Formal Solicitation Response.pdf

4.6 PROPOSAL MODIFICATION OR WITHDRAWAL

IfaProposerwishestomakemodificationstoasubmittedProposal,theProposermust
submititsmodificationinoneoftheauthorizedmethodslistedinSection4.5(Proposal
DeliveryOptions).TobeeffectivethemodificationmustincludetheOregonBuysbidnumber
andbesubmittedtotheSPCpriortoOpening.
IfaProposerwishestowithdrawasubmittedProposal,itmustsubmitaWrittennotice
signedbyanauthorizedrepresentativeofitsintenttowithdrawtotheSPCviaemail,priorto
theProposalsDueDeadlineinaccordancewithOAR137-047-0440.Tobeeffectivethe
noticemustincludetheOregonBuysbidnumber.

4.7 PROPOSAL DUE

AProposal(includingallrequiredsubmittalitems)mustbereceivedbytheSPConorbefore
Opening.AllProposalmodificationsorwithdrawalsmustalsobereceivedpriortoOpening.
TheOregonBuysSystemwillnotallowaproposalormodificationtobeuploadedtothe
SystemaftertheProposaldeadline.

4.8 PUBLIC OPENING

Therewillbenopublicopeningofproposals.Proposalsreceivedwillnotbeavailablefor
inspectionuntilaftertheevaluationprocesshasbeencompletedandthenoticeofintentto
awardisissuedpursuanttoOAR125-247-0630.

4.9 PROPOSAL REJECTION

Agency may reject a Proposal for any of the following reasons:

• ProposerfailstosubstantiallycomplywithallprescribedRFPproceduresand
requirements,includingbutnotlimitedtotherequirementthatProposer’sauthorized
representativesigntheProposal.
• ProposerhasliquidatedanddelinquentdebtowedtotheStateoranydepartmentor
agencyoftheState.
• ProposerfailstomeettheresponsibilityrequirementsofORS279B.110.
• ProposermakesanycontactregardingthisRFPwithStaterepresentativessuchasState

https://oregonbuys.gov/bso

OPDC Financial/Case Management System RFP Page 19 of 28

employeesorofficialsotherthantheSPCorpersonsauthorizedbytheSPC,or
inappropriatecontactwiththeSPC.
• ProposerattemptstoinfluenceamemberoftheEvaluationCommittee.
• ProposalisconditionedonAgency’sacceptanceofanyothertermsandconditionsor
rightstonegotiateanyalternativetermsandconditionsthatarenotreasonablyrelatedto
thoseexpresslyauthorizedfornegotiationintheRFPorAmendment(s).

4.10 EVALUATION PROCESS

4.10.1 Source Selection Process/Basis of Award

TheAgencyintendstoawardoneContractresultingfromthissolicitationtotheProposer
whoseproposalisthemostadvantageoustotheAgency.TheAgencyintendstoawardthe
ContractresultingfromthisSolicitationtotheProposerwiththehighestoverallscored
proposal,takingintoaccountallevaluationcriteria.
TheEvaluationCommitteewilllookbeyondtheadjectivalratingsandperformanoverall
qualitativeassessmentoftheproposalsdeterminedtobewithinthecompetitiverangein
determiningtheofferthatisconsideredtobeinthebestinterestof(mostadvantageousto)
theAgency.

The Agency may reject any or all proposals if such action is in the Agency’s interest.

The Agency may, at its discretion, waive informalities and minor irregularities in proposals received.

ExchangeswithProposersafterreceiptofaproposaldonotconstitutearejectionor
counterofferbytheAgency.

4.10.2 Responsiveness and Responsibility Determination

4.10.2.1.1 Responsiveness determination

AProposalreceivedpriortoOpeningwillbereviewedtodetermineifitisResponsive
toallRFPrequirementsincludingcompliancewithSection3.1(Minimum
Qualifications)andSection3.2(MinimumSubmissionRequirements).IftheProposal
isunclear,theSPCmayrequestclarificationfromProposer.However,clarifications
maynotbeusedtorehabilitateanon-Responsiveproposal.IftheSPCfindsthe
Proposalnon-Responsive,theProposalmayberejected;however,Agencymaywaive
mistakesinaccordancewithOAR137-047-0470.

4.10.2.1.2 Responsibility Determination

AgencywilldetermineifanapparentsuccessfulProposerisResponsiblepriorto
awardandexecutionoftheContract.ProposersshallsubmitasignedResponsibility
Inquiryform(AttachmentE)withProposal.

OPDC Financial/Case Management System RFP Page 20 of 28

At any time prior to award, Agency may reject a Proposer found to be not Responsible.

4.10.3 Evaluation Criteria and Scoring

EachproposalmeetingallResponsivenessrequirementswillbeindependently
evaluatedbymembersoftheEvaluationCommittee.Evaluatorswillassigna
scorefrom0-10fortheBackgroundandExperience(4.10.3.1)andProject
ImplementationPlan(4.10.3.3)Criterialistedbelow.ScoringforCriteria4.10.3.2
ProposedSystemCapabilities,and4.10.3.4PriceProposal,willbeauto-scoredas
explainedfurtherbelow.

The following weighting provides an indication of each criterion’s relative importance.

Background and Experience – 15% Executive Summary Organization’s Profile Organization’s Experience

Weight 15%

Proposed System Capabilities – 30% Weight 30% System Features and Functions aligned with Requirements Traceability Matrix

Project Implementation Plan – 30% Weight 30%

Plan and Schedule Proposed Team

Project Management Technical and Support Requirements

System Cost – 25% Weight 25%

TOTAL 100 %

SCORE EXPLANATION

OUTSTANDING-Responsemeetsalltherequirementsandhasdemonstratedina
clearandconcisemannerathoroughknowledgeandunderstandingofthesubject
matterandproject.TheProposerprovidesinsightintoitsexpertise,knowledge,and
understandingofthesubjectmatter.
6–9
VERYGOOD–Responseprovidesusefulinformation,whileshowingexperienceand
knowledgewithinthecategory.Responsedemonstratesaboveaverageknowledge
andabilitywithnoapparentdeficienciesnoted.
ADEQUATE–Responsemeetsallrequirementsinanadequatemanner.Response
demonstratesanabilitytocomplywithguidelines,parameters,andrequirements
withnoadditionalinformationputforthbytheProposer.

1 – 4 FAIR – Proposer meets minimum requirements but does not demonstrate sufficient knowledge of the subject matter.

RESPONSEOFNOVALUE–Anunacceptableresponsethatdoesnotmeetthe
requirementssetforthintheRFP.Proposerhasnotdemonstratedknowledgeofthe
subjectmatter.

OPDC Financial/Case Management System RFP Page 21 of 28

4.10.3.1 Background and Experience

• How well does the Proposer demonstrate their understanding of the Agency’s needs and requirements?

• HowwelldoestheProposer’sPersonnelalignwiththeprojectrequirements?
• HowwelldoestheProposerpresentcomparativesuccessfulimplementationsoftheir

Software product?

4.10.3.2 Proposed System Capabilities

• Howwelldoestheproposedsystemalignwiththerequirementsanddeliverableslisted
intheRequirementsTraceabilityMatrix?TheRequirementsTraceabilityMatrixwill
automaticallyscoreeachProposer’sresponseinaccordancewitheachelement’spriority
intheMatrix.RefertotheRequirementsTraceabilityMatrixInstructionpageforfurther

clarification.

4.10.3.3 Project Implementation Plan

• Howwelldoestheproposerprovideclear,concise,andcomplete
explanationsforeachoftherequiredScopeofworkelements1-8as
describedinSection3.3.2.2,StatementofWorkResponse?
• Howwelldoestheproposerprovideclear,concise,andcomplete
explanationsfortheirTechnical,ConfigurationandUserTrainingand
SupportServices(Item9,Section3.3.2.2)?

4.10.3.4 Price Evaluation

TheSPCwillconductthepriceevaluation.TheSPCwillawardapricescoretoeachPrice
Proposalbaseduponthepercentageoftheproposedpriceascomparedtothelowest
Proposer’spriceusingthefollowingformula:
lowestpriceofall
ProposersXpriceweighting=price

score price being scored

4.10.4 Preferences

4.10.4.1 Oregon Supplies and Services

AgencyprefersOregongoodsandservices,andforevaluationpurposes,perORS
279A.128,Agencyshallsubtract5%fromthepriceforanyProposerproposingall
GoodsfabricatedorprocessedorallServicesperformedentirelyinOregonbefore
calculatingthepricescore.

OPDC Financial/Case Management System RFP Page 22 of 28

4.10.4.2 Reciprocal Preference

ForevaluationpurposesperOAR125-246-0310,Agencyshalladdapercentage
increasetoeachout-of-stateProposer'sProposalpricethatisequaltothepercentage
preference,ifany,giventoaResidentProposerintheProposer'sstate.

4.11 RANKING OF PROPOSERS

Afteranyapplicablepreferencehasbeenapplied,theSPCwilldeterminetherankofeach
Proposal,withthehighestscorereceivingthehighestrank,andsuccessiverankorder
determinedbythenexthighestscore.

4.11.1 Next Step Determination

TheAgencymay,inAgency’ssolediscretion,determineanapparentsuccessfulProposerwith
noadditionalroundsofcompetition.Ifadditionalroundsareconducted,Agencywillrank
advancingProposersattheconclusionofeachsubsequentroundandmaydeterminean
apparentsuccessfulProposeratanytimeduringthesolicitationprocess.

Additional rounds of competition may consist of, but will not be limited to:

• Presentations/Demonstrations/AdditionalSubmittalItems
• DiscussionsandsubmittalofrevisedProposals
• Serialorsimultaneousnegotiations
• BestandFinalOffers

4.11.2 Competitive Range Determination

IfAgency,initssolediscretion,determinesthatoneormoreadditionalroundsof
competitionisnecessary,itwillselectaCompetitiveRangetoindicatetheProposersthat
willbeinvitedtoparticipateinasubsequentround.TheCompetitiveRangemayinclude
all,oratAgency’ssolediscretion,some(basedprimarilyonanaturalbreakinthe
distributionofscores),oftheProposersfromapreviousround.Agencywillpostanotice
inOregonBuysofitsCompetitiveRangeDeterminationandprovidedetailsaboutthe
processandscheduleforthesubsequentround.

4.11.3 Competitive Range Protest

ProposersexcludedfromaroundmaysubmitaWrittenprotestofCompetitiveRange.
Protestsmust:
• BeemailedtotheSPC;
• ReferencetheOregonBuysbidnumber;
• IdentifyProposer’snameandcontactinformation;