Reference Only - Basis of Design BOD Part 7 of 7.pdf

PDF 13 MB Posted

Attached to
Y1DZ--437-21-205 EHRM Infrastructure Upgrades Construction Fargo, ND
Solicitation number
36C77622B0030
Issued by

About this file

This federal contract opportunity solicitation seeks construction services for infrastructure upgrades at a Veterans Affairs medical center campus in Fargo, North Dakota. The solicitation is for project 437-21-205, which will upgrade the entire campus information technology infrastructure to the latest standards of the VA and industry. Construction work under this solicitation includes demolition, new construction, plumbing, mechanical HVAC, fire protection sprinklers, electrical work for lighting, power and systems, asbestos abatement, masonry, structural work, and any other work required by the contract documents to complete the infrastructure upgrades. Phasing and coordination of the work must ensure system downtimes are kept to a minimum. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files

File Type Posted
Wage Rates - Cass County - 6.17.22.pdf PDF
36C77622B0030 0005.docx DOCX document
Addendum Fiber Duct Bank.pdf PDF
36C77622B0030 0004.docx DOCX document
Technical Question Tracking Sheet - Infra Upgrades - Fargo.docx DOCX document
PCRA 437-21-205 Zone 2.pdf PDF
ICRA Zones.pdf PDF
PCRA 437-21-205 Zone 4.pdf PDF
36C77622B0030 0003.pdf PDF
PCRA 437-21-205 Zone 5.pdf PDF
PCRA 437-21-205 Zone 3.pdf PDF
36C77622B0030 0002.pdf PDF
Site Visit Sign-in Sheet - Fargo.pdf PDF
36C77622B0030 0001.pdf PDF
Wage Rates - Cass County - 4.15.22.pdf PDF
36C77622B0030 0001.pdf PDF
Wage Rates - Cass County - 4.25.22.pdf PDF
Reference Only - Basis of Design BOD Part 3 of 7.pdf PDF
Reference Only - Basis of Design BOD Part 2 of 7.pdf PDF
Reference Only - Basis of Design BOD Part 6 of 7.pdf PDF
BOD Appendix A ACM Survey Report.pdf PDF
Specifications Vol 01 Rev.pdf PDF
36C77622B0030_1.pdf PDF
Drawings Part 7 of 9.pdf PDF
Reference Only - EHRM Design Alerts 1-8.pdf PDF
COVID-19 Safety Protocols 12-14-21.pdf PDF
Contractor Safety - Environmental Form.docx DOCX document
Reference Only - Basis of Design BOD Part 5 of 7.pdf PDF
Specifications Vol 02 Rev.pdf PDF
Reference Only - Basis of Design BOD Part 1 of 7.pdf PDF
Drawings Part 2 of 9.pdf PDF
Drawings Part 6 of 9.pdf PDF
Drawings Part 8 of 9.pdf PDF
Reference Only - Basis of Design BOD Part 4 of 7.pdf PDF
Drawings Part 9 of 9.pdf PDF
Drawings Part 4 of 9.pdf PDF
Drawings Part 1 of 9.pdf PDF
Drawings Part 5 of 9.pdf PDF
Reference Only - Infra Stdrd for Telecomm Spaces 3.1 - ISTS.pdf PDF
Drawings Part 3 of 9.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No Longer part of BOD—For Security Reasons

Please see Separate Document

8-13

APPENDIX B

BLAST NARRATIVE

& CALCULATIONS

Fargo VA Health Care System | EHRM Infrastructure Upgrades | March 18, 2022

APPENDIX C STRUCTURAL CALCULATIONS

8-14

Please See Separate Document

8-15

APPENDIX D

MECHANICAL CUT SHEETS & ROOM

EQUIPMET HEAT GAIN VERIFICATION

Please See Separate Document

8-16

APPENDIX E MEETING MINUTES

8-17

8-18

8-19

8-20

8-21

8-22

8-23

MEETING MINUTES

Project Name: EHRM Infrastruc-ture Upgrades

Fargo ND VA

HCS

Project No: 437-21-205

Bancroft No: 18-121

Meeting Milestone/Purpose:

EHRM: Racks vs. Cooling Re-quirements RFI 014

Date: December 09, 2021

1:30 p.m. (CDT)

Meeting Location: Teams

Attendees: Indicates not in attendance: ** Company Phone E-mail

Bruce Yoch BrightTree Studios 412.225.67 byoch@brighttreestudio s.com

David Gamble Bancroft AE / Sr Mechani-cal Engineer

224.875-dgamble@bancroft-ae.com

Darlene Flook Bancroft AE / Project Man-ager

224-875-dflook@ bancroft-ae.com

Walter Groszko Bancroft AE / Sr Electrical Engineer

630-939-wgroszko@bancroft-ae.com

Dana Auman Bancroft AE / Project Archi-tect

847-877-

Dauman@bancroft-ae.com

Room # # of Racks Notes

Below is a list of Room numbers with their quantity of racks @ 2.3KW per/rack

BD-02 (2)

BB-92 (3)

BD-84 (2)

BA-30 (3)

BC-02 (3)

MCR/Data Center (1) No power required

1B-121 (1)

1A-54 (5)

1C-99 (3)

1D-64A (3)

1D-158 (2) 12.16.21 Bruce can only fit (1)

2A-24 (5) Serving OR’s

2C-33 (3)

2C-90A (4)

2D-18 (4)

3B-23 (4)

3D-10 (4)

4B-23 (3) Roof Repair

4E-15A (3)

502 Penthouse TR (4)

Building 3 (1)

Building 10 Mezza-nine

Emcor (1)

Building 11 TE Floor or Wall

Building 12 (1) Wall unit or move wall to make unit fit

Building 13 TE Floor or Wall

Building 30 TE Floor or Wall

Building 40 LL 102B

(4)

Building 40 UL 202A

(3)

Building 51Addition

(2)

Building 52 111 (2)

Building 52 211 (2)

Chiller Plant TE Floor or Wall

8-24

APPENDIX E

MEETING MINUTES

8-25

APPENDIX E MEETING MINUTES (CONT’D)

8-26

8-27

8-28

8-29

8-30

8-31

February 17, 2022

APPENDIX F

OPINION OF PROBABLE

8-32

Please see OPCC Details

Booklet for full report.